CN107060115A - A kind of combustion gas hole plugging system and its plugging construction method - Google Patents

A kind of combustion gas hole plugging system and its plugging construction method Download PDF

Info

Publication number
CN107060115A
CN107060115A CN201710272856.8A CN201710272856A CN107060115A CN 107060115 A CN107060115 A CN 107060115A CN 201710272856 A CN201710272856 A CN 201710272856A CN 107060115 A CN107060115 A CN 107060115A
Authority
CN
China
Prior art keywords
combustion gas
gas hole
floor
plugging
sand bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710272856.8A
Other languages
Chinese (zh)
Inventor
隋海涛
刘仍浩
孙春娥
孟丽娟
刘安鲁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
Second Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd East China Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd East China Branch filed Critical Second Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd East China Branch
Priority to CN201710272856.8A priority Critical patent/CN107060115A/en
Publication of CN107060115A publication Critical patent/CN107060115A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6807Expansion elements for parts cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention provides a kind of combustion gas hole plugging system, comprising:The coal tar layer of paste between combustion gas hole and steel sleeve on floor, cement sand bed, waterproof coating layer, wherein, coal tar layer of paste is extended in hole outside the hole in combustion gas hole, and include upper and lower two parts, upper part protrudes from the upper surface of floor, lower part is located at below the upper surface of floor and between the inwall and steel sleeve in combustion gas hole, and cement sand bed surrounds the upper part of coal tar layer of paste, and waterproof coating layer surrounds cement sand bed.Present invention also offers a kind of plugging construction method of combustion gas hole plugging system.The combustion gas hole plugging system and its construction method of the present invention efficiently solves leakage problems present in prior art, and gathers materials on the spot, and construction method is simple, easy to operate.

Description

A kind of combustion gas hole plugging system and its plugging construction method
Technical field
The present invention relates to building engineering field, more particularly to a kind of combustion gas hole plugging system and its plugging construction method.
Background technology
At present, in residential project work progress, gas pipeline is laid independently is responsible for construction by gas company.Generally, Possessed at the construction field (site) after working face, the staff of gas company marches into the arena construction again, carry out kitchen room location floor with opening, Sleeve pipe is installed and gas pipeline is laid.Due to there is waterproof requirement between kitchen, therefore, to sleeve pipe border gap at floor with opening mouthful Closure be just particularly important.
As shown in figure 1, being enclosed on the gap between the coal gas hole 30 ' opened up on the outer steel sleeve 2 ' of gas pipe 1 ' and floor 3 ' Smaller, generally only 2mm very easily ignores.It is only using border note to the processing of this position in conventional construction work The method for beating glass cement 4 ' is blocked, and without individually closure, so handles existing defects:First, in glass cement closure During, workman directly beats gap with glue rifle note, does not do after-treatment, it is difficult to which closing is complete, there is gap;Second, glass cement Directly leak outside in environment, and directly contacted with concrete, steel sleeve, it is insecure to there is bonding, through after a period of time very The problems such as easily there is alice, come off.
Therefore, there is serious leakage hidden danger in above-mentioned existing combustion gas hole method for blocking.If moving in finishing the later stage in owner Complete, then seepage occur to be accomplished by carrying out destructive reparation, lose larger.
The content of the invention
To solve the problem of prior art is present, the present invention proposes a kind of improved combustion gas hole plugging system and its closure Construction method, the closure mode is blocked using multilayer, can be effectively prevented from seepage, be improved construction quality.
The combustion gas hole plugging system of the present invention is included:The pitch ointment between combustion gas hole and steel sleeve on floor Layer, cement sand bed, waterproof coating layer, wherein, coal tar layer of paste is extended in hole outside the hole in combustion gas hole, and comprising Upper and lower two parts, upper part protrudes from the upper surface of floor, and lower part is located at below the upper surface of floor and positioned at combustion gas hole Inwall and steel sleeve between, cement sand bed surround coal tar layer of paste upper part, waterproof coating layer surround cement sand bed.
Further, coal tar layer of paste has been partially formed the conical surface, positioned at the periphery of steel sleeve, and from steel sleeve Outer wall extends to the upper surface of floor.
Further, cement sand bed has the profile of cylinder, and on horizontal and vertical, the size of cement sand bed is equal More than the upper part of coal tar layer of paste.
Further, waterproof coating layer includes first, second, third part, and Part I surrounds cement sand bed, and tool There is the profile of cylinder, Part II is upwardly extended from the upper surface of Part I, the steel sleeve of certain length is surrounded, with steel bushing Pipe is directly contacted, and Part III is extended outwardly from the cylinder of Part I, the part covered beyond Part II circumference The upper surface of floor, is directly contacted with the upper surface of floor.
Further, on horizontal and vertical, the size of the Part I of waterproof coating layer is all higher than cement sand bed.
Further, first, second, third part of waterproof coating layer is integrated.
The plugging construction method of the combustion gas hole plugging system of the present invention includes step:
1. live thin portion cleaning, cleaning Gas Pipe periphery;
2. periphery ointment is closed, and is got to pitch ointment note in the gap between combustion gas hole and floor using glue rifle;
3. aproll is moistened;
4. fixing mould, dry patching mortar;
5. form removal is conserved after the completion of being molded, and brushing polyurethane water-proof paint.
Further, when 2. step is noted and play pitch ointment, pitch ointment is slowly squeezed out using glue rifle, makes pitch ointment Into strips, and a diameter of 6mm.
Further, after the completion of 2. step is noted and play pitch ointment, slow to be pressed into filling closely knit with slow with one's hands.
Further, mould hangs hoop from installation fitting, is fixed after set is fixed using dovetail clip.
The combustion gas hole plugging construction method and plugging system of the present invention efficiently solves seepage present in prior art Problem, and gather materials on the spot, construction method is simple, easy to operate.
Brief description of the drawings
The present invention is made below in conjunction with the accompanying drawings further to describe and illustrate.
Fig. 1 is the schematic diagram of existing combustion gas hole method for blocking.
Fig. 2 is the schematic diagram of the combustion gas hole plugging system of the preferred embodiment of the present invention.
Fig. 3 is the process chart of combustion gas hole plugging construction method.
Embodiment
As shown in Fig. 2 the combustion gas hole plugging system 100 of the preferred embodiment of the present invention includes coal tar layer of paste 10, water Silt particle pulp layer 20, waterproof coating layer 30.
Coal tar layer of paste 10 is extended in hole outside the hole for the combustion gas hole 50a being opened on floor 50, is both filled with Space between combustion gas hole 50a inwall and the steel sleeve 40 being enclosed on outside gas pipe 60, also sealed combustion gas hole 50a holes with Space between steel sleeve 40.Coal tar layer of paste 10 includes upper and lower two parts 10a, 10b, and upper part 10a is to protrude from floor 50 The part of upper surface 51, lower part 10b is to be located at the lower section of 50 upper surface of floor 51 and positioned at combustion gas hole 50a inwall and steel bushing Part between pipe 40.The upper part 10a of coal tar layer of paste 10 is formed with the conical surface, positioned at the periphery of steel sleeve 40, and from steel The outer wall of sleeve pipe 40 extends to the upper surface 51 of floor 50.
On the one hand pitch ointment has the effect of waterproof, on the other hand with cementability, can effectively be bonded in combustion gas hole On wall and steel bushing pipe outer wall, prevent water from the gap leakage between both.
Cement sand bed 20 surrounds the upper part 10a of coal tar layer of paste 10, and it has the profile of cylinder, horizontal and vertical Upwards, the size of cement sand bed 20 is all higher than the size of part 10a in coal tar layer of paste 10.
Waterproof coating layer 30 surrounds cement sand bed 20, and it includes first, second, third part 30a, 30b, 30c.Its In, Part I 30a surrounds cement sand bed 20, the profile with cylinder, on horizontal and vertical, Part I 30a's Size is all higher than the size of cement sand bed 20;Part II 30b from Part I 30a upper surface are upwardly extended, and surround one The steel sleeve 40 of measured length, is directly contacted with steel sleeve 40;Part III 30c from Part I 30a cylinder are extended outwardly, The upper surface 51 of a part of floor 50 covered beyond Part II 30b circumference, is directly contacted with the upper surface 51 of floor 50.The First, second, third part 30a, 30b, 30c is integrated, therefore, and Part II 30b has sealed cement sand bed 20, prevent water from This layer of seepage, first, Part III 30a, 30c sealed connecing between cement sand bed 20 and steel sleeve 40 and floor 50 respectively Contact portion point, prevents water from contact portion seepage.
Above-mentioned combustion gas hole plugging system 100 is blocked using multilayer, and ingenious arrangement can be prevented effectively from seepage.
As shown in figure 3, the technological process of the combustion gas hole plugging construction method of the present invention is:Working face transfer → scene thin portion Cleaning → periphery ointment closing → watering moistening → mould is positioned → fills up mortar → mould dismounting → brushing water-repellent paint.
Technological process is described in detail below.
Working face is transferred, live thin portion cleaning:
After the completion of gas pipeline installing engineering, be operated face transfer with gas company in time, and by Gas Pipe periphery and Shi Qingli, it is ensured that carry out laitance, concrete slag inclusion before construction operation around the hole of combustion gas hole etc. and be cleaned, it is ensured that note is beaten Ointment pre-structure position is stable.
Periphery ointment closing:
Pitch ointment is placed in glue rifle, is so easy to note to buy oil cream, note beats process and slowly squeezes out pitch using glue rifle Ointment, makes pitch ointment into strips, diameter 6mm.As shown in Fig. 2 pitch ointment contains the combustion on steel sleeve 40 and floor 50 Interstitial site between the 50a holes of gas hole, note is clogged closely knit after the completion of beating with slow with one's hands slow be pressed into, and generally, combustion gas hole hole is straight Footpath is 50mm, steel sleeve 40 uses 40mm sleeve pipes, external diameter 46mm, and steel sleeve is with hole gap in 2mm, therefore, pitch ointment energy The gap between steel sleeve and hole is filled up completely, meanwhile, the seam for being entered pitch ointment pointing between steel sleeve and floor with glue rifle Gap, to ensure that gap is blocked completely between steel sleeve and floor.
Watering moistening:
Aproll is moistened after the completion of noting cream of buying oil, it is ensured that mortar closed process is combined closely with concrete floor.
Mould positions, fills up mortar:
Mould hangs hoop, diameter 110mm, height 25mm from installation fitting.Fixed after set is fixed using dovetail clip, material is easy to Choose.Good forming effect, quality is unified.
Mould is removed, brushing water-repellent paint:
Form removal is conserved after the completion of shaping, and brushing polyurethane water-proof paint, is protected, accomplishes waterproof dual fail-safe.Mould It is reusable.
Above-mentioned combustion gas hole plugging construction method is simple using material, gathers materials on the spot, hoop, swallow are hung including 110mm using material Tail folder, hod, plasterer's trowel, glue rifle, cement mortar, and polyurethane water-proof paint.
The combustion gas hole plugging construction method of the present invention avoids seepage using the waterproof type of rigid flexible system, that is, ensure that and apply The life requirement of work, has the condition that Forming Quality is high, be easy to standardization to carry out again.
Only the preferred embodiment of the present invention is described for above-mentioned embodiment, and the not guarantor to the present invention Shield scope is defined.On the premise of design concept of the present invention and scope is not departed from, one of ordinary skill in the art According to various modifications, replacement and the improvement of word description provided by the present invention, accompanying drawing to made by technical scheme, The protection category of the present invention all should be belonged to.Protection scope of the present invention is determined by claim.

Claims (10)

1. a kind of combustion gas hole plugging system, it is characterised in that include the pitch between the combustion gas hole on floor and steel sleeve Ointment layer, cement sand bed, waterproof coating layer, wherein, the coal tar layer of paste is extended in hole outside the hole in combustion gas hole, And comprising upper and lower two parts, the upper part protrudes from the upper surface of floor, and the lower part is located under the upper surface of floor Just and between the inwall and steel sleeve in combustion gas hole, the cement sand bed surrounds the upper part of coal tar layer of paste, described anti- Water paint layer surrounds cement sand bed.
2. combustion gas hole as claimed in claim 5 plugging system, it is characterised in that the coal tar layer of paste has been partially formed The conical surface, positioned at the periphery of steel sleeve, and extends to from the outer wall of steel sleeve the upper surface of floor.
3. combustion gas hole as claimed in claim 5 plugging system, it is characterised in that the cement sand bed has the outer of cylinder Shape, on horizontal and vertical, the size of the cement sand bed is all higher than the upper part of coal tar layer of paste.
4. combustion gas hole as claimed in claim 5 plugging system, it is characterised in that the waterproof coating layer comprising first, second, Part III, the Part I surrounds cement sand bed, and with the profile of cylinder, and the Part II is from Part I Upper surface upwardly extend, surround the steel sleeve of certain length, directly contacted with steel sleeve, the Part III is from Part I Cylinder extend outwardly, the upper surface of a part of floor covered beyond Part II circumference, the upper surface with floor is straight Contact.
5. combustion gas hole as claimed in claim 8 plugging system, it is characterised in that on horizontal and vertical, the water-repellent paint The size of the Part I of layer is all higher than cement sand bed.
6. combustion gas hole as claimed in claim 8 plugging system, it is characterised in that first, second, the of the waterproof coating layer Three parts are integrated.
7. a kind of plugging construction method of combustion gas hole as claimed in claim 1 plugging system, it is characterised in that include step:
1. live thin portion cleaning, cleaning Gas Pipe periphery;
2. periphery ointment is closed, and is got to pitch ointment note in the gap between combustion gas hole and floor using glue rifle;
3. aproll is moistened;
4. fixing mould, dry patching mortar;
5. form removal is conserved after the completion of being molded, and brushing polyurethane water-proof paint.
8. combustion gas hole as claimed in claim 1 plugging construction method, it is characterised in that 2. noted in the step and play pitch ointment When, pitch ointment is slowly squeezed out using glue rifle, makes pitch ointment into strips, and a diameter of 6mm.
9. combustion gas hole as claimed in claim 1 plugging construction method, it is characterised in that 2. noted in the step and play pitch ointment After the completion of, slow to be pressed into filling closely knit with slow with one's hands.
10. combustion gas hole as claimed in claim 1 plugging construction method, it is characterised in that the mould is hung from installation fitting Hoop, is fixed after set is fixed using dovetail clip.
CN201710272856.8A 2017-04-24 2017-04-24 A kind of combustion gas hole plugging system and its plugging construction method Pending CN107060115A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710272856.8A CN107060115A (en) 2017-04-24 2017-04-24 A kind of combustion gas hole plugging system and its plugging construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710272856.8A CN107060115A (en) 2017-04-24 2017-04-24 A kind of combustion gas hole plugging system and its plugging construction method

Publications (1)

Publication Number Publication Date
CN107060115A true CN107060115A (en) 2017-08-18

Family

ID=59604074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710272856.8A Pending CN107060115A (en) 2017-04-24 2017-04-24 A kind of combustion gas hole plugging system and its plugging construction method

Country Status (1)

Country Link
CN (1) CN107060115A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002047711A (en) * 2000-08-01 2002-02-15 Shimizu Corp Mounting structure for trap and drain pipe of double floor
CN1851185A (en) * 2006-05-31 2006-10-25 张晶 Pipeline and floor joint position water proof construction method
CN101140042A (en) * 2007-08-28 2008-03-12 大亚湾核电运营管理有限责任公司 Corrosion proof structure of pipeline through wall or through ground
CN202532026U (en) * 2012-04-22 2012-11-14 项谱成 Floor board pipeline waterproof structure
CN202812489U (en) * 2012-06-30 2013-03-20 福州市第三建筑工程公司 Floorslab embedded part for non-plugging penetration of stand pipe
CN103062511A (en) * 2012-12-30 2013-04-24 河北建设集团天辰建筑工程有限公司 Processing method for preventing water leakage at contact position of polyvinyl chloride (PVC) tube and concrete floor slab
CN204828964U (en) * 2015-06-16 2015-12-02 北京中建建筑设计院有限公司 First structure of waterproof receipts that floor was worn to hot -water heating riser between residential sanitation
CN105239732A (en) * 2015-11-04 2016-01-13 江苏经贸职业技术学院 Extension roof pipe for preventing rainwater leakage and construction method thereof
CN205090098U (en) * 2015-09-30 2016-03-16 中国建筑第八工程局有限公司 Pipeline hangs hole block structure
CN105587938A (en) * 2016-03-29 2016-05-18 山东天齐置业集团股份有限公司 Toilet pipe root blocking structure and construction process thereof

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002047711A (en) * 2000-08-01 2002-02-15 Shimizu Corp Mounting structure for trap and drain pipe of double floor
CN1851185A (en) * 2006-05-31 2006-10-25 张晶 Pipeline and floor joint position water proof construction method
CN101140042A (en) * 2007-08-28 2008-03-12 大亚湾核电运营管理有限责任公司 Corrosion proof structure of pipeline through wall or through ground
CN202532026U (en) * 2012-04-22 2012-11-14 项谱成 Floor board pipeline waterproof structure
CN202812489U (en) * 2012-06-30 2013-03-20 福州市第三建筑工程公司 Floorslab embedded part for non-plugging penetration of stand pipe
CN103062511A (en) * 2012-12-30 2013-04-24 河北建设集团天辰建筑工程有限公司 Processing method for preventing water leakage at contact position of polyvinyl chloride (PVC) tube and concrete floor slab
CN204828964U (en) * 2015-06-16 2015-12-02 北京中建建筑设计院有限公司 First structure of waterproof receipts that floor was worn to hot -water heating riser between residential sanitation
CN205090098U (en) * 2015-09-30 2016-03-16 中国建筑第八工程局有限公司 Pipeline hangs hole block structure
CN105239732A (en) * 2015-11-04 2016-01-13 江苏经贸职业技术学院 Extension roof pipe for preventing rainwater leakage and construction method thereof
CN105587938A (en) * 2016-03-29 2016-05-18 山东天齐置业集团股份有限公司 Toilet pipe root blocking structure and construction process thereof

Similar Documents

Publication Publication Date Title
CN103967386A (en) Anti-leakage joint processing method of first filling gap of outer window of building
CN202559540U (en) Waterproof plugging structure for outer wall split bolt hole
CN103015721B (en) Leakage prevention construction method of reserved holes in kitchen and toilet
CN206861108U (en) A kind of armored concrete leakproof socket joint pipe joint
CN107816138A (en) A kind of construction technology of subsided rest room
CN102518216A (en) Cantilever type cover plate deformation joint structure of accessible roof and construction method for structure
CN105951893A (en) Uplift pile head node waterproof structure and construction method thereof
CN203947772U (en) A kind of kitchen and toilet draining main riser service sleeve
CN105442861B (en) Drainage conduit of toilet percolating water backwater surface repair method
CN104264700A (en) Seepage prevention construction method for light-weight precipitation well point post-cast strip of underground construction
CN106193485A (en) A kind of building wall exempts from cracking resistance technique of plastering
CN207959289U (en) Structure is repaired in a kind of leak for basement post-pouring zone position
CN206667502U (en) A kind of combustion gas hole plugging system
CN105587938A (en) Toilet pipe root blocking structure and construction process thereof
CN107060115A (en) A kind of combustion gas hole plugging system and its plugging construction method
CN106836683A (en) A kind of construction method of Machine-made Sand aggregate dry-mixed mortar coated building metope
CN104179258B (en) External wall shear wall bolt hole Seepage method
CN206521812U (en) A kind of anti-leakage structure of toilet
CN206708563U (en) A kind of water proof structure of Pipeline Crossing Program floor
CN204174629U (en) A kind of light-duty precipitation well point ater-casting, underground building multi-way prevention plugging structure
CN104452813B (en) A kind of underground power house gate shaft protected against the effects of immersion method
CN204531214U (en) A kind of Ventilating for roof hole structure
CN209211892U (en) One kind can be used for overhanging the molding light instrument in i-beam structure hole
CN203979669U (en) Can locate the structure antiseepage built-in joint pipe fitting in axle center
CN208518097U (en) Shower cabinet waterproof construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171229

Address after: 450003, Henan, Zhengzhou Jinshui District Garden Road West, agricultural road south 6, 1 units, 22, 2207

Applicant after: The Second Construction Company Ltd of China Construction Second Bureau

Address before: 210000 Jiangsu city of Nanjing Province along the Yangtze River Industrial Development Zone geguan Road No. 815

Applicant before: EAST CHINA BRANCH, THE SECOND CONSTRUCTION ENGINEERING Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818