CN206708563U - A kind of water proof structure of Pipeline Crossing Program floor - Google Patents

A kind of water proof structure of Pipeline Crossing Program floor Download PDF

Info

Publication number
CN206708563U
CN206708563U CN201720387160.5U CN201720387160U CN206708563U CN 206708563 U CN206708563 U CN 206708563U CN 201720387160 U CN201720387160 U CN 201720387160U CN 206708563 U CN206708563 U CN 206708563U
Authority
CN
China
Prior art keywords
pipe sleeve
pipeline
floor
proof structure
water proof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720387160.5U
Other languages
Chinese (zh)
Inventor
马树军
丁光亮
董栋
宫珊娜
尹纪涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao No 1 Construction Group Co Ltd
Original Assignee
Qingdao No 1 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao No 1 Construction Group Co Ltd filed Critical Qingdao No 1 Construction Group Co Ltd
Priority to CN201720387160.5U priority Critical patent/CN206708563U/en
Application granted granted Critical
Publication of CN206708563U publication Critical patent/CN206708563U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model discloses a kind of water proof structure of Pipeline Crossing Program floor, include pipe sleeve, pipe sleeve is located in concrete floor, pipeline is located in pipe sleeve, architectural surface is provided with the top of concrete floor, pipe sleeve runs through architectural surface and concrete floor, the first anti-hydrofoil ring, the second anti-hydrofoil ring and ring seal steel plate are provided with the outside of pipe sleeve, antirust coat is provided with pipe sleeve inside and outside wall, packed layer is provided with the antirust coat of pipe sleeve inwall;Flexible water stop is wound with the pipeline outer wall, multiple reinforced steels are provided with architectural surface and concrete floor, the connection reinforcing bar of reinforcement by connection reinforcing bar is provided between multiple reinforced steels.The water proof structure of Pipeline Crossing Program floor of the present utility model, multiple waterproof is formed, not only largely improve the watertightness of the water proof structure of Pipeline Crossing Program floor, and profile is more attractive in appearance after the completion of construction.

Description

A kind of water proof structure of Pipeline Crossing Program floor
Technical field
Technical field of building construction is the utility model is related to, more particularly to a kind of water proof structure of Pipeline Crossing Program floor.
Background technology
With the development of modern economy, building construction speed improves constantly, and in multilayer and high-rise building, there is many The pipelines for passing through building floor, including warmer pipeline, fire extinguisher canvas hose, drainage pipeline etc., in process of construction, it will usually building more Pre-buried diameter is slightly larger than the diameter of pipe laying in build floor, and length is slightly longer than the pipe sleeve of building floor thickness, integrally built If after the completion of, various pipes are installed in pipe sleeve, then by the filling material of the gap between around pipeline and pipe sleeve Material closure, but often occur that the phenomenon of leak or infiltration occurs in the bottom surface at Pipeline Crossing Program floor, leak or infiltration it is main because Space between pipe sleeve and pipeline is smaller, and the water resistance of existing filler cannot be guaranteed, secondly, in process of construction There is also small space between the pipe sleeve mouth and pipe sleeve reserved on building floor, it is also easy to after long-time use The phenomenon to seep water, again, shunk caused by the concrete solidification between building floor and pipe sleeve, cause the generation in gap; Leak not only influences whether the harmonious inhabitation of resident, in some instances it may even be possible to therefore a series of neighbourhood's contradiction can occur, and also the later stage leaks Water is inconvenient to repair, life band many troubles and loss to resident.
Utility model content
For defect present in prior art or deficiency, the utility model innovatively proposes a kind of Pipeline Crossing Program building The water proof structure of plate, multiple waterproof is formed, not only largely improve the watertight of the water proof structure of Pipeline Crossing Program floor Property, and profile is more attractive in appearance after the completion of construction.
What the technical solution of the utility model was realized in:
A kind of water proof structure of Pipeline Crossing Program floor, includes pipe sleeve, and the pipe sleeve is located in concrete building In plate, pipeline is located in pipe sleeve, architectural surface is provided with the top of the concrete floor, the pipe sleeve is through dress Finish coat and concrete floor, the pipe sleeve outside are provided with the first anti-hydrofoil ring, the second anti-hydrofoil ring and ring seal Steel plate, and the first anti-hydrofoil ring is arranged in architectural surface, second anti-the hydrofoil ring and ring seal steel plate are arranged at In concrete floor;Antirust coat is provided with the pipe sleeve inside and outside wall, is set on the antirust coat of the pipe sleeve inwall There is a packed layer, the packed layer is that one layer of asbestos cord is wound in along the axial direction of pipe sleeve inwall antirust coat;The pipeline Flexible water stop is wound with outer wall, asbestos cord and the flexible water stop compacting is filled in the space of pipe sleeve and pipeline It is interior;It is provided with multiple reinforced steels in the architectural surface and concrete floor, the company of being provided between the multiple reinforced steel Connect the connection reinforcing bar of reinforced steel;Fluid sealant, the filling are filled between pipe sleeve and pipeline above the packed layer Case ring is installed between the pipe sleeve and pipeline of layer lower section.
Preferably, the antirust coat is the antirust paint of brushing before pipe sleeve installation.
Preferably, the space between the pipe sleeve and pipeline is 10-20mm.
Preferably, the pipe sleeve top is higher than architectural surface, between the top of the pipe sleeve and architectural surface Distance be 20-40mm.
Preferably, the ring seal steel plate is arranged among the outer wall of the pipe sleeve in concrete floor, institute State the lower section that the second anti-hydrofoil is located on ring seal steel plate.
Compared with prior art, the beneficial effects of the utility model are:
The utility model discloses a kind of water proof structure of Pipeline Crossing Program floor, wherein, the antirust coat of pipe sleeve inwall On be provided with packed layer, packed layer is that one layer of asbestos cord is wound in along the axial direction of pipe sleeve inwall antirust coat, outside pipeline Flexible water stop is wound with wall, asbestos cord and flexible water stop compacting are filled in the space of pipe sleeve and pipeline, passed through The asbestos cord of filling and the flexible water stop of pipeline outer wall winding, fundamentally solve the leak at Pipeline Crossing Program floor and ooze The problem of water, meanwhile, avoid pipeline from being rocked in pipe sleeve, add the steadiness of pipeline;Set on the outside of pipe sleeve First anti-hydrofoil ring, the second anti-hydrofoil ring and ring seal steel plate, multiple waterproof is formed, further increases water resistance;It is more The connection reinforcing bar of reinforcement by connection reinforcing bar is provided between individual reinforced steel, both are connected as an entirety, enhance overall structure Rigidity;The antirust coat set on pipe sleeve inside and outside wall, it is corroded after pipe sleeve long-time use can be prevented, enhances pipe The service life of road sleeve pipe;It is filled with fluid sealant between pipe sleeve and pipeline above packed layer, the pipeline below packed layer Case ring is installed between sleeve pipe and pipeline, will be fully sealed between pipe sleeve and pipeline, improve sealing, prevent from oozing Water, make structure at the top and bottom of pipe sleeve smooth, it is more attractive in appearance.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Reference:1st, pipe sleeve;2nd, concrete floor;3rd, pipeline;4th, architectural surface;5th, the first anti-hydrofoil ring;6、 Ring seal steel plate;7th, the second anti-hydrofoil ring;8th, antirust coat;9th, packed layer;10th, flexible water stop;11st, reinforcing bar is connected;12nd, add Gu reinforcing bar;13rd, fluid sealant;14th, case ring.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As shown in Figure 1, the utility model provides a kind of water proof structure of Pipeline Crossing Program floor, includes pipe sleeve 1, the pipe sleeve 1 is located in concrete floor 2, and pipeline 3 is located in pipe sleeve 1, the pipe sleeve 1 and pipeline Space between 3 is 10-20mm;The top of concrete floor 2 is provided with architectural surface 4, and the pipe sleeve 1 is through decoration Surface layer 4 and concrete floor 2, the top of pipe sleeve 1 are higher than architectural surface 4, the top of the pipe sleeve 1 and decorative cover Layer the distance between 4 is 20-40mm;The outside of pipe sleeve 1 is provided with the first anti-hydrofoil ring 5, the second anti-hydrofoil ring 7 and ring Shape steel plate for sealing water 6, and the first anti-hydrofoil ring 5 is arranged in architectural surface 4, second anti-the hydrofoil ring 7 and ring seal Steel plate 6 is arranged in concrete floor 2, and the plate of ring seal steel 7 is arranged in the pipe sleeve 1 in concrete floor 2 Outer wall among, the second anti-hydrofoil ring 7 be located at ring seal steel plate 6 lower section;Set on the inside and outside wall of pipe sleeve 1 There is antirust coat 8, the antirust coat 8 is that pipe sleeve 1 installs the preceding antirust paint brushed, the antirust coat 8 of the inwall of pipe sleeve 1 On be provided with packed layer 9, the packed layer 9 is that one layer of asbestos are wound in along the axial direction of the inwall antirust coat 8 of pipe sleeve 1 Rope;Flexible water stop 10 is wound with the outer wall of pipeline 3, the compacting of asbestos cord and flexible water stop 10 is filled in pipeline set In the space of pipe 1 and pipeline 3;Multiple reinforced steels 12 are provided with the architectural surface 4 and concrete floor 2, it is the multiple The connection reinforcing bar 11 of reinforcement by connection reinforcing bar 12 is provided between reinforced steel 12;The pipe sleeve 1 and pipe of the top of packed layer 9 Fluid sealant 13 is filled between road 3, case ring 14 is installed between the pipe sleeve 1 and pipeline 3 of the lower section of packed layer 9.
Pipe sleeve 1 first is cut by the thickness of the specification of pipeline 3 and worn concrete floor 2, pipe sleeve 1 is inside and outside before installing Wall brushing antirust paint respectively, the pipeline 3 that outside is wound with flexible water stop 10 is inserted in by requirement, then with timber wedge pipeline set Pipe 1 is temporarily fixed on hole, and the concentricity of adjustment pipe sleeve 1 and pipeline 3, the space between pipe sleeve 1 and pipeline 3 will be Even, pipe sleeve 1 is concordant with plate bottom, the space between pipe sleeve 1 and pipeline 3 blocked with asbestos cord it is tight, make asbestos cord and The compacting of flexible water stop 10 is filled in the space of pipe sleeve 1 and pipeline 3, and the external application concrete of pipe sleeve 1 pours in two times to be smash Closely knit, asbestos cord is clogged in remaining gap after the completion of filling-up hole concrete placings, and sealant sealing 13, fluid sealant 13 are broken in the top of pipe sleeve 1 It is required that concordant with the top of pipe sleeve 1, glue-line requirement is uniform, the bottom of pipe sleeve 1 installation decorative circle 14, improves sealing, prevents Infiltration.
The preferred embodiment of the upper only utility model, it is all in this practicality not to limit the utility model Within new spirit and principle, any modification, equivalent substitution and improvements made etc., guarantor of the present utility model should be included in Within the scope of shield.

Claims (5)

1. a kind of water proof structure of Pipeline Crossing Program floor, includes pipe sleeve, the pipe sleeve is located in concrete floor Interior, pipeline is located in pipe sleeve, it is characterised in that:Architectural surface, the pipeline are provided with the top of the concrete floor Sleeve pipe runs through architectural surface and concrete floor, and the first anti-hydrofoil ring, the second anti-hydrofoil ring are provided with the outside of the pipe sleeve With ring seal steel plate, and the first anti-hydrofoil ring is arranged in architectural surface, second anti-the hydrofoil ring and ring seal Steel plate is arranged in concrete floor;Antirust coat is provided with the pipe sleeve inside and outside wall, the pipe sleeve inwall is prevented It is provided with packed layer on rusty scale, the packed layer is that one layer of asbestos are wound in along the axial direction of pipe sleeve inwall antirust coat Rope;Be wound with flexible water stop on the pipeline outer wall, asbestos cord and the flexible water stop compacting be filled in pipe sleeve and In the space of pipeline;Be provided with multiple reinforced steels in the architectural surface and concrete floor, the multiple reinforced steel it Between be provided with the connection reinforcing bar of reinforcement by connection reinforcing bar;Filled with sealing between pipe sleeve and pipeline above the packed layer Glue, case ring is installed between the pipe sleeve and pipeline below the packed layer.
2. the water proof structure of Pipeline Crossing Program floor according to claim 1, it is characterised in that:The antirust coat is pipeline set The antirust paint brushed before pipe installation.
3. the water proof structure of Pipeline Crossing Program floor according to claim 1, it is characterised in that:The pipe sleeve and pipeline Between space be 10-20mm.
4. the water proof structure of Pipeline Crossing Program floor according to claim 3, it is characterised in that:The pipe sleeve top is high In architectural surface, the distance between the top of the pipe sleeve and architectural surface are 20-40mm.
5. the water proof structure of Pipeline Crossing Program floor according to claim 1, it is characterised in that:The ring seal steel plate is set Put among the outer wall of the pipe sleeve in concrete floor, the second anti-hydrofoil is located under ring seal steel plate Side.
CN201720387160.5U 2017-04-13 2017-04-13 A kind of water proof structure of Pipeline Crossing Program floor Expired - Fee Related CN206708563U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720387160.5U CN206708563U (en) 2017-04-13 2017-04-13 A kind of water proof structure of Pipeline Crossing Program floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720387160.5U CN206708563U (en) 2017-04-13 2017-04-13 A kind of water proof structure of Pipeline Crossing Program floor

Publications (1)

Publication Number Publication Date
CN206708563U true CN206708563U (en) 2017-12-05

Family

ID=60455836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720387160.5U Expired - Fee Related CN206708563U (en) 2017-04-13 2017-04-13 A kind of water proof structure of Pipeline Crossing Program floor

Country Status (1)

Country Link
CN (1) CN206708563U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512708A (en) * 2019-09-30 2019-11-29 谢伦杰 A kind of assembled architecture embedded pipeline part
CN114319678A (en) * 2021-12-06 2022-04-12 中国建筑第八工程局有限公司 Water stopping structure and water stopping construction method for water-containing room

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512708A (en) * 2019-09-30 2019-11-29 谢伦杰 A kind of assembled architecture embedded pipeline part
CN114319678A (en) * 2021-12-06 2022-04-12 中国建筑第八工程局有限公司 Water stopping structure and water stopping construction method for water-containing room
CN114319678B (en) * 2021-12-06 2023-12-15 中国建筑第八工程局有限公司 Water stopping structure of water room and water stopping construction method

Similar Documents

Publication Publication Date Title
CN106677440A (en) Roofing parapet water-floating structure and construction method thereof
CN202884378U (en) Steel composite anti-corrosion pipe
CN204530780U (en) The water proof structure of underground-structure deformation joint
CN206034677U (en) Side fascia installation node
CN208981531U (en) A kind of prefabricated assembled parapet connection structure
CN206708563U (en) A kind of water proof structure of Pipeline Crossing Program floor
CN205976143U (en) Side fascia installation node
CN108301466A (en) Integral prefabricated caisson of toilet and caisson of toilet construction and its construction method
CN106592788A (en) Blocking device for high pressure hole, construction method and application thereof
CN206449309U (en) Composite water-stop sleeve pipe
CN212506725U (en) Basement waterproof structure
CN107504277A (en) A kind of underground structure embedded wall penetration pipe water-tight device
CN101781935A (en) Method for substituting pre-embedded waterproof casing pipe in concrete structure
CN111473165A (en) Waterproof structure of superimposed sheet and PVC water piping connection department
CN217579825U (en) Prefabricated pin-connected panel rainwater box culvert suitable for integrative machine of strutting
CN103628506B (en) Construction method for waterproof positions of foundation platform and pile head
CN107675811B (en) Bathroom waterproof system and construction method
CN213871460U (en) Water leakage prevention structure of service pipe
CN205976057U (en) Side fascia installation node
CN214534875U (en) Basement poling waterproof construction
CN208871172U (en) The Prestressed concrete cylinder pipe of included antiseptic property
CN211624441U (en) Basement wall pipe waterproof construction
CN208804332U (en) A kind of hydrous fluids basement wall pipe waterproof construction
CN208918030U (en) A kind of outer wall of basement Screw arbor with nut at both-ends hole plugging structure
CN202769079U (en) Sleeve pipe of floor pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205

Termination date: 20180413