CN208518097U - Shower cabinet waterproof construction - Google Patents

Shower cabinet waterproof construction Download PDF

Info

Publication number
CN208518097U
CN208518097U CN201820982448.1U CN201820982448U CN208518097U CN 208518097 U CN208518097 U CN 208518097U CN 201820982448 U CN201820982448 U CN 201820982448U CN 208518097 U CN208518097 U CN 208518097U
Authority
CN
China
Prior art keywords
shower cabinet
bedroom
waterproof
layer
floor tile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820982448.1U
Other languages
Chinese (zh)
Inventor
丛利
杨敬东
高延圣
程彩云
马征
栾旭照
李泽朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201820982448.1U priority Critical patent/CN208518097U/en
Application granted granted Critical
Publication of CN208518097U publication Critical patent/CN208518097U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)
  • Finishing Walls (AREA)

Abstract

The utility model provides a kind of shower cabinet waterproof construction, the waterproof coating layer of the shower cabinet extends on the ground in the bedroom, carpet is equipped on the waterproof coating layer in the bedroom, the ground side of the shower cabinet and the joint in the bedroom form exposed floor tile adhesive layer and waterproof protective layer, the ground side is equipped with water and does not leak to block the exposed floor tile adhesive layer and waterproof protective layer, the top of the joint is equipped with partition wall to separate the bedroom and the shower cabinet, the bottom of the partition wall is equipped with stone material item, the bottom of the stone material item and the floor tile of the shower cabinet, the ground in the ground side and the bedroom is fixed.The utility model waterproof construction solves bedroom side carpet under glass partition and makes moist mouldy quality problems, has ensured the waterproof construction quality of hotel guest room shower cabinet.

Description

Shower cabinet waterproof construction
Technical field
The utility model relates to the fitting-out work technical fields of building, relate in particular to a kind of shower cabinet waterproof knot Structure.
Background technique
One or more surfaces wall of hotel guest room shower cabinet installs floor glass partiton wall, and partition wall root is decorated with elongated stone material item simultaneously Cancel concrete flashing, is design scheme relatively common in hotel's decoration renovation.Under traditional Waterproof Measure of Cement Out, the program It makes moist mouldy common quality defect there are bedroom side carpet.
Utility model content
In view of the foregoing, the utility model provides a kind of shower cabinet waterproof construction, solves existing shower cabinet waterproof and arranges It applies not in place, bedroom carpet is caused to make moist mouldy technical problem.
To achieve the above object, the technical scheme adopted by the utility model is that: a kind of shower cabinet waterproof construction is provided, it is described The ground structure of shower cabinet successively includes floor, screed-coat, waterproof coating layer, waterproof protective layer, floor tile bonding from top to bottom Layer and floor tile, the shower cabinet connect with bedroom, and the waterproof coating layer of the shower cabinet extends on the ground in the bedroom, Carpet is equipped on the waterproof coating layer in the bedroom, the ground side of the shower cabinet and the joint in the bedroom form outer The floor tile adhesive layer and waterproof protective layer of dew, the ground side are equipped with water and do not leak to block the exposed floor tile bonding Layer and waterproof protective layer, the top of the joint are equipped with partition wall to separate the bedroom and the shower cabinet, the partition wall Bottom is equipped with stone material item, and the top surface of the stone material item is higher than the height of the floor tile to form the shower cabinet and the bedroom Water-blocking bank platform, the first groove of the fixed partition wall bottom, the bottom of the stone material item are offered at the top of the stone material item Be formed with the second groove, be filled with stone material adhesive mortar in second groove, the bottom of the stone material adhesive mortar with The ground of the floor tile of the shower cabinet, the ground side and the bedroom is fixed.
In the utility model embodiment, waterproof coating layer, the water-repellent paint are painted on the solid wall of the shower cabinet The outside of layer is equipped with walltile adhesive layer, and the paste outside of the walltile adhesive layer has walltile.
In the utility model embodiment, gap, the stone material item between the partition wall and the stone material item are with described Sealant is filled in the gap between gap and the stone material item and walltile between face brick, the side of the partition wall is using sealing Glue hands over trap to close.
In the utility model embodiment, it is painted on the leak-free outer layer of water of the ground side and the ground in the bedroom Second layer waterproof coating layer.
In the utility model embodiment, the thickness of the waterproof coating layer is not less than 1.5mm, the solid wall of the shower cabinet The brushing height of waterproof coating layer be not less than 1.8m.
In the utility model embodiment, length that the waterproof coating layer of the shower cabinet extends on the ground in the bedroom Not less than 500mm, it is not less than 200mm to the expanded width of the two sides of the shower cabinet.
In the utility model embodiment, in the utility model embodiment, the gap of the adjacent floor tile, the walltile Between be filled with face brick joint trimming agent.
The utility model makes it have following the utility model has the advantages that the utility model waterproof due to using above technical scheme On the one hand structure meets design requirement of the guest room without concrete shower cabinet installation floor glass partiton wall;On the other hand glass is solved Bedroom side carpet makes moist mouldy quality problems under glass partition wall, has ensured the waterproof construction quality of hotel guest room shower cabinet.
Detailed description of the invention
Fig. 1 is the utility model shower cabinet waterproof construction elevational schematic view.
Fig. 2 is the enlarged diagram of the utility model shower cabinet Yu bedroom joint.
Fig. 3 is the utility model shower cabinet waterproof construction floor map.
The corresponding relationship of appended drawing reference and component is as follows:
Shower cabinet 1;Floor 11;Screed-coat 111;Waterproof protective layer 112;Floor tile adhesive layer 12;Floor tile 13;Solid wall 14;Walltile adhesive layer 15;Walltile 16;Bedroom 2;Carpet 21;Waterproof coating layer 3;Water does not leak 4;Partition wall 5;Stone material item 6;Stone Material adhesive mortar 7;Sealant 8;Face brick joint trimming agent 9.
Specific embodiment
For the benefit of to the understanding of the utility model, it is illustrated with reference to the accompanying drawings and embodiments.
It please refers to Fig.1 to Fig.3, the utility model provides a kind of shower cabinet waterproof construction, the ground structure of the shower cabinet 1 It from top to bottom successively include floor 11, screed-coat 111, waterproof coating layer 3, waterproof protective layer 112, floor tile adhesive layer 12 and ground Face brick 13, the shower cabinet 1 connect with bedroom 2, and the waterproof coating layer 3 of the shower cabinet 1 prolongs on the ground in the bedroom 2 It stretches, in the utility model embodiment, the length that the waterproof coating layer 3 of the shower cabinet 1 extends on the ground in the bedroom 2 is not Less than 500mm, it is not less than 200mm, 3 upper berth of waterproof coating layer in the bedroom 2 to the expanded width of the two sides of the shower cabinet 1 Equipped with carpet 21, the joint in the ground side of the shower cabinet 1 and the bedroom 2 formed exposed floor tile adhesive layer 12 and Waterproof protective layer 112, the ground side are equipped with water and do not leak 4 to block exposed the floor tile adhesive layer 12 and waterproofing protection Layer 112, more preferably, the water of the ground side, which does not leak, is painted with the painting of second layer waterproof on 4 outer layer and the ground in the bedroom 2 The bed of material 3, the top of the joint are equipped with partition wall 5 to separate the bedroom 2 and the shower cabinet 1, the partition wall 5 be glass every Wall, the bottom of the partition wall 5 are equipped with stone material item 6, and the top surface of the stone material item 6 is higher than the height of the floor tile 13 to be formed The water-blocking bank platform of shower cabinet 1 Yu the bedroom 2 is stated, the top of the stone material item 6 offers the first of fixed 5 bottom of partition wall Groove, the bottom of the stone material item 6 have the second groove, and stone material adhesive mortar 7 is filled in second groove, described The floor tile 13 of the bottom of stone material adhesive mortar 7 and the shower cabinet 1, the ground side and the ground in the bedroom 2 are solid Calmly, gap, the stone material item 6 between the partition wall 5 and the stone material item 6 and the gap between the floor tile 13 and the stone Sealant 8 is filled in gap between material item 6 and walltile 16, the side of the partition wall 5 hands over trap to close using sealant 8.
In the utility model embodiment, waterproof coating layer 3, the waterproof are painted on the solid wall 14 of the shower cabinet 1 The outside of dope layer 3 is equipped with walltile adhesive layer 15, and the paste outside of the walltile adhesive layer 15 has walltile 16.It is more excellent Ground, the thickness of the waterproof coating layer 3 are not less than 1.5mm, and the brushing height of the waterproof coating layer 3 of solid wall 14 is not less than 1.8m。
In the utility model embodiment, the screed-coat 111, the waterproof protective layer 112, the floor tile adhesive layer 13 And the walltile adhesive layer 15 is mortar;The adjacent floor tile 13, the walltile 16 gap between be filled with face Brick joint trimming agent 9.
Details described above the utility model shower cabinet waterproof construction, illustrates its construction method below.
1, after the completion of the construction of 1 floor leveling layer of shower cabinet, in the facade of solid wall 14, the ground brushing thickness of shower cabinet 1 The metope brushing height of waterproof coating layer 3 not less than 1.5mm, solid wall 14 is not less than 1.8m, the positions water such as foundation, pipe root 4 are not leaked and does fillet, and waterproof coating layer 3 described in the utility model uses JS water-repellent paint (polymer cement waterproof paint);Shower Between 1 waterproof coating layer 3 with 2 joint of bedroom to the ground development length in bedroom 2 be not less than 500mm, to the shower cabinet Two sides expanded width be not less than 200mm.It is completed to waterproof coating layer 3, waterproof protective layer 112,13 sticking construction of floor tile Afterwards, it does not leak the exposed screed of 4 closure (waterproof protective layer 112, floor tile adhesive layer 12) side with water, then will extend into sleeping The water-repellent paint on 2 ground of room is back brushed to ground side, realizes the secondary edge sealing of ground side frontier defense water.
2, as shown in figure 3,14 facade of solid wall of the partition wall 5 of shower cabinet 1 and shower cabinet 1 also uses JS water-repellent paint to seal Side.It is before metope waterproof construction, the base treatment of solid wall 14 is good, JS water-repellent paint is brushed on the metope of solid wall 14; After the completion of the walltile 16 of solid wall 14 is pasted, exposed walltile adhesive layer 15 is not leaked into compacting with water and receives light, then will handed over The JS water-repellent paint of junction is brushed toward 16 finished surface direction of walltile, the screed of 14 side of closed body wall.3, practical with this Novel stone item 6, which replaces, respectively decorates one piece of inverted "L" shape stone material item inside and outside 5 foundation of Normal practice mid-board, to stone material binding sand Penetrant crystalline is mixed in slurry 7, and when installation ensures that mortar is full embedding closely knit in the second groove, forms 13 finished surface of face brick above Ground Stealthy water-blocking bank platform, gap, stone material item 6 between partition wall 5 and stone material item 6 and the gap between floor tile 13 and stone material item 6 with 16 gaps of walltile all use sealant 8 to handle, while stone material item 6 will hand over trap to close with the side sealant 8 of partition wall 5.
4, the gap processing between the adjacent walltile 16 of shower cabinet 1, floor tile 13 uses porcelain waterproof face brick joint trimming agent 9 Replace the jointing agent in Normal practice, forms the waterproof layer of a closure, 9 physical property of face brick joint trimming agent in face brick layer Good, long service life is hard not lose flexibility.After the completion of walltile 16, floor tile 13 are pasted and conserved, U.S. seam is carried out to brickwork joint Processing, concrete technology flow process is: gap cleaning → joint trimming agent configuration → gap filling → dedicated receipts side ball tooled joint → curing → shovel falls two sides overlap → completion.
Combine accompanying drawings and embodiments that the utility model is described in detail above, those skilled in the art can Many variations example is made to the utility model according to the above description.Thus, certain details in embodiment should not be constituted to this reality With novel restriction, the utility model will be using the range that the appended claims define as the protection scope of the utility model.

Claims (7)

1. a kind of shower cabinet waterproof construction, the ground structure of the shower cabinet successively includes floor, screed-coat, waterproof from top to bottom Dope layer, waterproof protective layer, floor tile adhesive layer and floor tile, the shower cabinet connect with bedroom, which is characterized in that the leaching Waterproof coating layer between bath extends on the ground in the bedroom, and carpet is equipped on the waterproof coating layer in the bedroom, described The ground side of shower cabinet and the joint in the bedroom form exposed floor tile adhesive layer and waterproof protective layer, the ground Side is equipped with water and does not leak to block the exposed floor tile adhesive layer and waterproof protective layer, the top of the joint be equipped with every Wall is to separate the bedroom and the shower cabinet, and the bottom of the partition wall is equipped with stone material item, and the top surface of the stone material item is higher than institute The height of floor tile is stated to form the water-blocking bank platform of the shower cabinet Yu the bedroom, offers fixation at the top of the stone material item First groove of the partition wall bottom, the bottom of the stone material item have the second groove, are filled with stone in second groove Material adhesive mortar, the floor tile of the bottom of the stone material adhesive mortar and the shower cabinet, the ground side and described The ground in bedroom is fixed.
2. shower cabinet waterproof construction according to claim 1, which is characterized in that be painted on the solid wall of the shower cabinet The outside of waterproof coating layer, the waterproof coating layer is equipped with walltile adhesive layer, and the paste outside of the walltile adhesive layer has Walltile.
3. shower cabinet waterproof construction according to claim 2, which is characterized in that between the partition wall and the stone material item Filled with sealing in the gap between gap and the stone material item and walltile between gap, the stone material item and the floor tile Trap is handed over to close using sealant in the side of glue, the partition wall.
4. shower cabinet waterproof construction according to claim 1, which is characterized in that the leak-free outer layer of water of the ground side And second layer waterproof coating layer is painted on the ground in the bedroom.
5. shower cabinet waterproof construction according to claim 1, which is characterized in that the thickness of the waterproof coating layer is not less than The brushing height of 1.5mm, the waterproof coating layer of the solid wall of the shower cabinet are not less than 1.8m.
6. shower cabinet waterproof construction according to claim 1, which is characterized in that the waterproof coating layer of the shower cabinet is to institute The length extended on the ground in bedroom is stated not less than 500mm, is not less than 200mm to the expanded width of the two sides of the shower cabinet.
7. shower cabinet waterproof construction according to claim 2, which is characterized in that the adjacent floor tile, the walltile Gap between be filled with face brick joint trimming agent.
CN201820982448.1U 2018-06-25 2018-06-25 Shower cabinet waterproof construction Active CN208518097U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820982448.1U CN208518097U (en) 2018-06-25 2018-06-25 Shower cabinet waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820982448.1U CN208518097U (en) 2018-06-25 2018-06-25 Shower cabinet waterproof construction

Publications (1)

Publication Number Publication Date
CN208518097U true CN208518097U (en) 2019-02-19

Family

ID=65337080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820982448.1U Active CN208518097U (en) 2018-06-25 2018-06-25 Shower cabinet waterproof construction

Country Status (1)

Country Link
CN (1) CN208518097U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670739A (en) * 2019-08-22 2020-01-10 中国十七冶集团有限公司 Waterproof construction method for floor skirting line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670739A (en) * 2019-08-22 2020-01-10 中国十七冶集团有限公司 Waterproof construction method for floor skirting line

Similar Documents

Publication Publication Date Title
CN102140836B (en) Construction method of large-size floor tile
CN103343655B (en) Wall window construction method
CN103821296A (en) Wall plastering technique for aerated concrete block filler wall
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN205776886U (en) Concrete composite wall body structure
CN109750758A (en) The construction method that prefabricated sandwich heat preservation shear wall exterior wall is laterally stitched and vertically stitched
CN102400525B (en) Thin-layer plastering method for autoclaved aerated concrete block wall bodies
CN104088416A (en) Gypsum heat preservation painting mortar construction process
CN202990369U (en) Water stop device with bathroom threshold stones
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN102852290A (en) Roof parapet flashing place structure and construction method thereof
CN109184253A (en) A kind of method for repairing and mending of exterior wall leakage
CN103195218B (en) Wall ceramic sand mortar external plastering construction method
CN102094496A (en) Method for manufacturing imitation brick wall
CN110306819B (en) Method for repairing red brick outer wall of historic building
CN208518097U (en) Shower cabinet waterproof construction
CN104652623B (en) A kind of composite thermal insulation mortar construction method
CN204492022U (en) The waterproof construction of parapet high-low bay deformation joint
CN206220272U (en) Ground hot water lays heating toilet doorway sealing damp proof insulation construction
CN211114595U (en) Ancient building restores and uses ground brick
CN107574936A (en) A kind of heat preserving exterior wall construction technology
CN104278717A (en) Waterproof and drainage structure of sunken toilet
CN109864644B (en) Bathroom shower room chassis and construction method thereof