CN106956796A - High speed bubble-cap rests the head on packing box all-in-one - Google Patents
High speed bubble-cap rests the head on packing box all-in-one Download PDFInfo
- Publication number
- CN106956796A CN106956796A CN201710304554.4A CN201710304554A CN106956796A CN 106956796 A CN106956796 A CN 106956796A CN 201710304554 A CN201710304554 A CN 201710304554A CN 106956796 A CN106956796 A CN 106956796A
- Authority
- CN
- China
- Prior art keywords
- conveying
- bubble
- chartered plane
- pillow
- conveying device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B11/00—Wrapping, e.g. partially or wholly enclosing, articles or quantities of material, in strips, sheets or blanks, of flexible material
- B65B11/50—Enclosing articles, or quantities of material, by disposing contents between two sheets, e.g. pocketed sheets, and securing their opposed free margins
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B35/00—Supplying, feeding, arranging or orientating articles to be packaged
- B65B35/30—Arranging and feeding articles in groups
- B65B35/54—Feeding articles along multiple paths to a single packaging position
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B57/00—Automatic control, checking, warning, or safety devices
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Containers And Plastic Fillers For Packaging (AREA)
Abstract
Packing box all-in-one is rested the head on the present invention relates to the high speed bubble-cap of a kind of multiple functional, ultrahigh in efficiency, flexible operation.High speed bubble-cap pillow packing box all-in-one includes bubble-cap machine and box packing machine, and conveying connection is realized by interior bag conveying device between bubble-cap machine and box packing machine, it is characterised in that:The all-in-one is also including resting the head on chartered plane, and the feed end for resting the head on chartered plane realizes that conveying is connected by outsourcing feed conveying device and interior bag conveying device, and the discharge end of pillow chartered plane goes out material conveying device by outsourcing and is connected with box packing machine realization conveying.This high speed bubble-cap pillow packing box all-in-one can require that bag bubble-cap mounted box production line or outsourcing bubble-cap pillow packing box production line, not only reduce recruitment cost, decrease cost of floor space, improve the productivity effect of terminal user in selection according to user.
Description
Technical field
Packing box all-in-one is rested the head on the present invention relates to a kind of high speed bubble-cap.
Background technology
High speed bubble-cap mounted box all-in-one is also known as blister packaging machine, is typically made up of bubble-cap machine and box packing machine, and bubble-cap machine is completed
The formation and encapsulation of medicine version bubble-cap, box packing machine complete the mounted box of medicine version bubble-cap, and the all-in-one can be only done loads medicine box by medicine version
Work(Referred to as interior bag bubble-cap mounted box), but some medicines version needs to be initially charged with a pillow bag, is then reloaded into medicine box
(Referred to as outsourcing bubble-cap rests the head on packing box), this all-in-one just can not realize such function, to realize medicine version-pillow bag-mounted box this
The function of sample, a pillow packing box all-in-one can only be bought again, but produce again for that should produce interior bag bubble-cap mounted box
For the manufacturer of outsourcing bubble-cap pillow packing box, it so can undoubtedly increase the input cost of equipment.
The content of the invention
In view of the deficiency that prior art is present, present invention innovation provides a kind of multiple functional, ultrahigh in efficiency, flexible operation
High speed bubble-cap pillow packing box all-in-one.High speed bubble-cap pillow packing box all-in-one includes bubble-cap machine and box packing machine, the bubble
Conveying connection is realized by interior bag conveying device between cover machine and box packing machine, it is characterised in that:The all-in-one also includes pillow chartered plane,
The feed end of the pillow chartered plane realizes that conveying is connected by outsourcing feed conveying device and interior bag conveying device, the pillow chartered plane
Discharge end goes out material conveying device by outsourcing and is connected with box packing machine realization conveying, and the interior bag conveying device feeds with outsourcing and conveyed
The conveying junction of device is provided with the switching device for being used for switching conveying flow direction.
The interior bag conveying device is provided with two;The pillow chartered plane has two groups of pillow chartered plane groups, and one group of pillow chartered plane group passes through
One outsourcing feed conveying device realizes that conveying is connected with an interior bag conveying device, and another group of pillow chartered plane group is outer by another
Bag feed conveying device realizes that conveying is connected with another interior bag conveying device.
The discharge end of the pillow chartered plane and outsourcing, which go out between material conveying device to be provided with, to be used for two groups of pillow chartered plane groups output
Material collaborates and sent into the double track interflow conveying device that outsourcing goes out material conveying device.
Double track interflow conveying device includes interflow conveying mechanism, and the interflow conveying mechanism includes interflow conveying
Band and vertical conveying belt, the interflow conveyer belt and conveying power source drive connection, the vertical conveying belt are angularly disposed in conjunction
Flow above conveyer belt, and be connected with interflow power source, the conveying direction of the vertical conveying belt is with collaborating the defeated of conveyer belt
Sending direction to have has confluence passage on the angle less than 90 °, the interflow conveyer belt, the confluence passage discharges defeated with outsourcing
Send device conveying linking.
The input linking of the interflow conveying mechanism has school position conveying mechanism, and school position conveying mechanism has two schools
Position conveying assembly, two schools position conveying assembly correspondence is connected with the discharge end conveying of two pillow chartered plane groups, and one of school position is defeated
The conveying direction of sending component is against vertical conveying belt, and the conveying direction of another school position conveying assembly is against confluence passage;It is described
School position conveying assembly includes the school position supply unit set before and after two or more, and each school position supply unit includes
There is the school position power source that school position conveyer belt and driving school position conveyer belt are rotated, the school position conveyer belt of supply unit in each school position
Top is electrically connected provided with detection photoelectricity, the detection photoelectricity and school position power source with motion controller or PLC.
Two groups of pillow chartered plane groups of the pillow chartered plane are mounted side by side on support, and every group of pillow chartered plane group is all conveyed by material and filled
Put, constituted for film device, film forming device, middle seal apparatus and end seal device, the confession film device of two groups of pillow chartered plane groups, film
Former, middle seal apparatus and end seal device all mutually stagger.
The outsourcing goes out between material conveying device and box packing machine to be additionally provided with calibration linkage conveying device, and the calibration linkage is defeated
Device is sent to include manipulator and calibration conveying mechanism, the calibration conveying mechanism is made up of multiple calibration supply units, each
Calibration supply unit includes calibration conveyer belt, two conveying rollers and calibration drive mechanism, and the calibration conveyer belt is around being located at
On two conveying rollers, the calibration drive mechanism realizes the power source of conveying for calibration conveyer belt, each calibration supply unit
Top is designed with photocell eye, and the photocell eye, calibration drive mechanism and manipulator are all electrically connected with PLC.
The manipulator is directional-rotation manipulator, and the directional-rotation manipulator is located at the top of calibration conveying mechanism,
The directional-rotation manipulator circumferentially equal portions be provided with multiple controllable oscilaltions component suction nozzle, the suction of the component suction nozzle
Mouth is connected with source of the gas, and the directional-rotation manipulator realizes orientation uniform rotation by the driving of power source.
The bubble-cap machine send edition device to realize that conveying is connected with interior bag conveying device by directional-rotation.
The switching device includes block and the switching power source of driving block oscilaltion, and it is in arc that the block, which has,
The blocking surface in face, the blocking surface is in the conveying on the transfer passage of interior bag conveying device with outsourcing feed conveying device simultaneously
On passage.
According to a kind of high speed bubble-cap for providing of the present invention rest the head on packing box all-in-one, organic combination bubble-cap machine, pillow chartered plane and
These three equipment of box packing machine, in the case of ensureing that yield is constant, user can be as requested, bag bubble-cap mounted box production line in selection
Or outsourcing bubble-cap rests the head on packing box production line, integral double-purpose not only reduces recruitment cost, decreases cost of floor space, improves end
The productivity effect of end subscriber.
Brief description of the drawings
Fig. 1 is the front view of whole machine of the invention;
Fig. 2 is the top view of whole machine of the invention;
Fig. 3 is the stereogram of pillow chartered plane(Double pillow chartered plane groups);
Fig. 4 is the side view of pillow chartered plane(Double pillow chartered plane groups);
Fig. 5 is the top view of pillow chartered plane(Double pillow chartered plane groups);
Fig. 6 is the single side view for resting the head on chartered plane group(Double pillow chartered plane groups);
Fig. 7 is the top view of school position conveying mechanism;
Fig. 8 is the side view of school position conveying mechanism;
Fig. 9 is the partial enlarged drawing at C in Fig. 1.
Embodiment
As shown in Figures 1 and 2, high speed bubble-cap pillow packing box all-in-one, includes bubble-cap machine 1 and box packing machine 11, bubble-cap
Conveying connection is realized by interior bag conveying device 3 between machine 1 and box packing machine 11, the bubble-cap version that bubble-cap machine 1 is produced is just interior by this
Bag conveying device 3 is sent to box packing machine 11 and carries out mounted box, and the bubble-cap version that bubble-cap machine 1 is produced in addition is to send version to fill by directional-rotation
Put 2 to be transferred in interior bag conveying device 3, these are all prior art, are repeated no more here.
The said equipment is bubble-cap mounted box production line, can be only done the direct mounted box of bubble-cap version, in order that the equipment can be same
When possess pillow packet function, all-in-one of the invention also includes pillow chartered plane 6, and the feed end of the pillow chartered plane 6 passes through outsourcing charging conveying
Device 4 realizes that conveying is connected with interior bag conveying device 3, and the discharge end for resting the head on chartered plane 6 goes out material conveying device 8 and mounted box by outsourcing
The realization conveying connection of machine 11, bag conveying device 3 and the conveying junction of outsourcing feed conveying device 4 are provided with for cutting inside in addition
The switching device 5 of conveying flow direction is changed, as shown in Figure 9.It should be noted that whether interior bag conveying device 3, or outsourcing discharging
Conveying device 4 and outsourcing feed conveying device 8, are all general conveyer belt type conveying device.
By such structure, when manufacturer will produce bubble-cap mounted box, only need to by the switching of switching device 5, make in
Bag conveying device 3 is unimpeded, and the bubble-cap version that such bubble-cap machine 1 is produced enters box packing machine 11 by interior bag conveying device 3;And work as
When manufacturer will produce bubble-cap pillow packing box, by the switching of switching device 5, interior bag conveying device 3 is fed with outsourcing and convey
Device 4 keeps unimpeded, and the bubble-cap version that such bubble-cap machine 1 is produced is first into interior bag conveying device 3, then and is transferred to outsourcing
Feed conveying device 4, enters finally into pillow chartered plane 6 and carries out pillow bag, pillow goes out material conveying device 8 by outsourcing after the completion of wrapping and wraps pillow
Bag feeding box packing machine 11.
As shown in figure 9, switching device 5 includes block 50 and the switching power source of the driving oscilaltion of block 50, block
50 have the blocking surface in cambered surface, and blocking surface is on the transfer passage of interior bag conveying device 3 and outsourcing charging conveying dress simultaneously
Put on 4 transfer passage.When producing bubble-cap mounted box, switching power source drive block 50 is past to be raised, and such bubble-cap version is just straight
Connect from the lower section of block 50 and pass through, so in bag conveying device 3 be just able to always unimpeded, bubble-cap edition is sent directly into box packing machine 11 and filled
Box;When producing bubble-cap pillow packing box, switching power source drive block 50 down lands, and such bubble-cap version is with regard to bag conveying dress inside
Put and be intercepted on 3, and then turn on outsourcing feed conveying device 4, bubble-cap version feeding is rested the head on chartered plane by outsourcing feed conveying device 4
6 carry out pillow bag, are then re-fed into the mounted box of box packing machine 11.The switching device 5 is simple in construction, having stable behavior, and in the resistance of cambered surface
Block face can guarantee that bubble-cap version can turn glibly.
Described above is the combination that a bubble-cap mounted box production line and a bubble-cap rest the head on packing box production line, but for
For some manufacturers, only one production line can not meet production requirement completely.Therefore, the interior bag conveying device 3 of the present invention
Provided with two;Certainly, pillow chartered plane 6 also has two groups of pillow chartered plane groups 61(Two groups of pillow chartered plane groups 61 can independently complete pillow bag
Work, as in Figure 3-5), one group of pillow chartered plane group 61 passes through an outsourcing feed conveying device 4 and an interior bag conveying device 3
Conveying connection is realized, another group of pillow chartered plane group 61 passes through another outsourcing feed conveying device 4 and another interior bag conveying device 3
Realize conveying connection.In this way, realize production capacity to double, bubble-cap function is realized that 500 editions/MIN, pillow chartered plane are realized
400 bags/MIN, mounted box function realize 400 boxes/MIN, and production production capacity maximizes matching.
However, also encountering some problems using twin wire mode of movement:First be two groups of pillow chartered plane groups 61 structure
Problem, second is the problem of how two groups of pillow bags that two groups of pillow chartered plane groups 61 are exported collaborate.
For first problem, the structure problem of two groups of pillow chartered plane groups.As shown in fig. 6, a pillow chartered plane group 61 is by material
Conveying device 610, constitute for film device 611, film forming device 613, middle seal apparatus 614 and end seal device 615, two groups of pillows
Chartered plane group just includes two device for transporting objects 610, two in film device 611, two film forming devices 613, two for encapsulating
614 and two end seal devices 615 are put, if simply two groups of pillow chartered plane groups put together side by side, then entirely rest the head on chartered plane
Floor space can be very big, and is not easy to operate two groups of pillow chartered plane groups, of the invention by two in order to solve this problem
Group pillow chartered plane group 61 is abreast arranged on support 62, the confession film devices 611 of two groups of pillow chartered plane groups 61, film forming device 613, in
Seal apparatus 614 and end seal device 615 all mutually stagger, i.e., two of two groups pillow chartered plane groups 61 are mutually wrong for film device 611
Open, two film forming devices 613 of two groups of pillow chartered plane groups 61 mutually stagger, two middle seal apparatus 614 of two groups of pillow chartered plane groups 61
Mutually stagger, two end seal devices 615 of two groups of pillow chartered plane groups 61 mutually stagger.Set by this position, two groups of pillow chartered planes
Group 61 is taken up space on support 62 with minimum, and such displaced manner more facilitates the operation of workman, only needs one
People is with regard to that can manage two groups of pillow chartered plane groups 61;Importantly, the pillow chartered plane group 61 of two groups of independences can work simultaneously, can also be single
Solely work, during a group maintenance, another group can work on, and thereby guarantee that the maximization of production capacity.
For Second Problem, the problem of how two groups of pillow bags that two groups of pillow chartered plane groups 61 are exported collaborate.Two groups of pillow bags
Two groups of pillow bags that unit 61 is exported need one pillow bag streamline of synthesis to enter outsourcing and go out material conveying device 8, to understand
Certainly this problem, the present invention is provided between the discharge end of pillow chartered plane 6 and outsourcing go out material conveying device 8 to be used for two groups of pillow chartered planes
The material of group output collaborates and sent into the double track interflow conveying device 7 that outsourcing goes out material conveying device 8.
As shown in fig. 7, double track interflow conveying device 7 includes interflow conveying mechanism B, interflow conveying mechanism B includes conjunction
Flow conveyer belt 76 and vertical conveying belt 78.As illustrated in figs. 7 and 8, interflow conveyer belt 76 and conveying power source 72(Motor)Transmission
Connection, by conveying the driving of power source 72, conveyer belt 76 pairs of pillow bags in interflow are conveyed;Vertical conveying belt 78 is angularly disposed
In the top of interflow conveyer belt 76, the conveying direction of the vertical conveying belt 78 has with the conveying direction of interflow conveyer belt 76 to be less than
90 ° of angle, also has confluence passage 711 on the conveyer belt 76 of interflow certainly.Vertical conveying belt 78 and interflow power source 77(Electricity
Machine)Drive connection, by collaborating the driving of power source 77, it is oblique that vertical conveying belt 78 coordinates interflow conveyer belt 76 to carry out pillow bag
A streamline is merged into confluence passage 711 to conveying, and by the pillow bag that two streamline conveyings come.
As shown in fig. 7, vertical conveying belt 78 is as hypotenuse, the length of hypotenuse is more than straight flange stroke, former using trigonometric function
Reason calculates the trigonometric function relation of hypotenuse and straight flange, in conjunction with pillow bag and the actual friction factor of vertical conveying belt 78, meter
The required linear velocity and the required linear velocity of interflow conveyer belt 76 of vertical conveying belt 78 are calculated, finally by fine setting, finally makes to stand
The interflow that the linear velocity of formula conveyer belt 78 can just meet pillow bag with the linear velocity of interflow conveyer belt 76 is required.
Certainly, the premise calls that pillow bag collaborates are that the pillow bag on two streamlines can be while enter interflow conveyer belt
On 76, in order to realize this premise, the present invention also has school position conveying mechanism A in interflow conveying mechanism B input linking.The school
Position conveying mechanism A has two schools position conveying assembly A1, and one of school position conveying assembly A1 conveying direction is against vertical defeated
Band 78 is sent, another school position conveying assembly A1 conveying direction is against confluence passage 711;Two schools position conveying assembly A1 includes
Have a school position supply unit set before and after two or more, each school position supply unit include school position conveyer belt 73 with
And the school position power source 71 that driving school position conveyer belt 73 is rotated(Servomotor), the school position conveyer belt of supply unit in each school position
73 tops are electrically connected provided with detection photoelectricity 74, detection photoelectricity 74 and school position power source 71 with motion controller or PLC.
The school position conveying assembly A1 that the discharging streamline correspondence of two sets of pillow chartered plane groups 61 is parallel with two conveys linking, below
By taking motion controller control as an example(PLC control can also, only PLC reaction comparatively can be slower), describe its work in detail
Make principle:When resting the head on bag on the school position conveyer belt 73 of first school position supply unit(One school position supply unit is only adjusted
Whole pillow bag, and two or more pillow bag can not be adjusted simultaneously, therefore the adjacent spacing of pillow bag is prior
Adjust), the detection photoelectricity 74 above it measures pillow bag, and detection photoelectricity 74, which is surveyed, transfers data to motion controller, now
Motion controller starts to compare the pillow bag position on the two schools position conveyer belts 73 of two schools position conveying assembly A1 side by side,
If the pillow bag on the conveyer belt 73 of school position side by side does not align, then motion controller just controls the conveying of one of school position
The school position power source 71 of unit carries out adjustment of rotational speed, and by the speed governing of school position 71 pairs of schools of power source position conveyer belt 73, pillow bag exists
Transporting velocity on the conveyer belt 73 of school position is just got up or slowed down soon, by the speed governing of two schools position conveyer belt 73, finally makes two
Pillow bag on individual school position conveying assembly A1 out can be entered synchronously on the conveyer belt 76 of interflow.Certainly, conveyed in each school position
In the case that the fed distance of unit is certain, it is desirable to which the speed of conveying is faster, the school position supply unit of school position conveying mechanism is constituted
Quantity is more, and the detection photoelectricity 74 above the supply unit of these schools position all tracks pillow bag, the corresponding school of dynamic adjustment in real time
The transporting velocity of position supply unit, finally makes the pillow bag on the position conveying assembly A1 of two schools synchronously enter interflow conveyer belt 76
On.
After two groups of pillow bags collaborate on the conveyer belt 76 of interflow, there is certain spacing between two neighboring pillow bag,
But it is irregular, and the irregular pillow bag of these spacing is sent into well-regulated box packing machine 11 when sending into box packing machine 11 and conveyed
In grid, therefore the present invention also discharges in outsourcing and be additionally provided with calibration linkage conveying device between conveying device 8 and box packing machine 11, should
Calibration linkage conveying device includes manipulator 10 and calibration conveying mechanism 9.The manipulator 10 is existing with calibration conveying mechanism 9
Technology, is repeated no more here.Pillow bag, which enters, begins to mounted box work after box packing machine 11, finally complete whole work.
Claims (9)
1. high speed bubble-cap rests the head on packing box all-in-one, include bubble-cap machine(1)With box packing machine(11), the bubble-cap machine(1)With mounted box
Machine(11)Between pass through interior bag conveying device(3)Realize conveying connection, it is characterised in that:The all-in-one also includes pillow chartered plane(6),
The pillow chartered plane(6)Feed end pass through outsourcing feed conveying device(4)With interior bag conveying device(3)Realize conveying connection, institute
State pillow chartered plane(6)Discharge end material conveying device is gone out by outsourcing(8)With box packing machine(11)Conveying connection is realized, the interior bag is defeated
Send device(3)With outsourcing feed conveying device(4)Conveying junction be provided be used for switch conveying flow direction switching device(5).
2. high speed bubble-cap according to claim 1 rests the head on packing box all-in-one, it is characterised in that:The interior bag conveying device
(3)Provided with two;The pillow chartered plane(6)With two groups of pillow chartered plane groups(61), one group of pillow chartered plane group(61)Entered by an outsourcing
Material conveying device(4)With an interior bag conveying device(3)Conveying connection is realized, another group of pillow chartered plane group is entered by another outsourcing
Material conveying device realizes that conveying is connected with another interior bag conveying device.
3. high speed bubble-cap according to claim 2 rests the head on packing box all-in-one, it is characterised in that:The pillow chartered plane(6)Go out
Material end goes out material conveying device with outsourcing(8)Between be provided with and be used for two groups of pillow chartered plane groups(61)The material of output collaborates and sent into outer
Wrap out material conveying device(8)Double track interflow conveying device(7).
4. high speed bubble-cap according to claim 3 rests the head on packing box all-in-one, it is characterised in that:The double track interflow conveying dress
Put(7)Include interflow conveying mechanism(B), the interflow conveying mechanism(B)Include interflow conveyer belt(76)With vertical conveying
Band(78), the interflow conveyer belt(76)With conveying power source(72)Drive connection, the vertical conveying belt(78)It is angularly disposed
In interflow conveyer belt(76)Top, and with collaborating power source(77)Drive connection, the vertical conveying belt(78)Conveying direction
With interflow conveyer belt(76)Conveying direction have less than 90 ° of angle, the interflow conveyer belt(76)It is upper that there is confluence passage
(711), the confluence passage(711)Go out material conveying device with outsourcing(8)Conveying linking.
5. high speed bubble-cap according to claim 4 rests the head on packing box all-in-one, it is characterised in that:The interflow conveying mechanism
(B)Input linking have school position conveying mechanism(A), school position conveying mechanism(A)With two schools position conveying assembly(A1),
Two schools position conveying assembly correspondence and two pillow chartered plane groups(61)Discharge end conveying linking, one of school position conveying assembly
Conveying direction is against vertical conveying belt(8), the conveying direction of another school position conveying assembly is against confluence passage(711);It is described
School position conveying assembly(A1)Include the school position supply unit set before and after two or more, each school position supply unit
Include school position conveyer belt(73)And driving school position conveyer belt(73)The school position power source of rotation(71), conveyed in each school position
The school position conveyer belt of unit(73)Top is provided with detection photoelectricity(74), the detection photoelectricity(74)And school position power source(71)With fortune
Movement controller or PLC electrical connections.
6. high speed bubble-cap according to claim 2 rests the head on packing box all-in-one, it is characterised in that:The pillow chartered plane(6)Two
Group pillow chartered plane group(61)It is mounted side by side on support(62)On, every group of pillow chartered plane group(61)All by device for transporting objects(610), for film
Device(611), film forming device(613), middle seal apparatus(614)And end seal device(615)Constitute, two groups of pillow chartered plane groups
For film device(611), film forming device(613), middle seal apparatus(614)And end seal device(615)All mutually stagger.
7. high speed bubble-cap according to claim 6 rests the head on packing box all-in-one, it is characterised in that:The outsourcing discharging conveying dress
Put(8)With box packing machine(11)Between be additionally provided with calibration linkage conveying device, the calibration linkage conveying device includes manipulator
(10)With calibration conveying mechanism(9).
8. high speed bubble-cap according to claim 1 or 2 rests the head on packing box all-in-one, it is characterised in that:The bubble-cap machine(1)It is logical
Cross directional-rotation and send an edition device(2)With interior bag conveying device(3)Realize conveying connection.
9. high speed bubble-cap according to claim 1 or 2 rests the head on packing box all-in-one, it is characterised in that:The switching device(5)
Include block(50)With driving block(50)The switching power source of oscilaltion, the block(50)With the stop in cambered surface
Face, the blocking surface is in interior bag conveying device simultaneously(3)Transfer passage on outsourcing feed conveying device(4)Conveying lead to
On road.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710304554.4A CN106956796B (en) | 2017-05-03 | 2017-05-03 | High-speed bubble cap pillow packing box all-in-one |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710304554.4A CN106956796B (en) | 2017-05-03 | 2017-05-03 | High-speed bubble cap pillow packing box all-in-one |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106956796A true CN106956796A (en) | 2017-07-18 |
CN106956796B CN106956796B (en) | 2022-12-30 |
Family
ID=59482085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710304554.4A Active CN106956796B (en) | 2017-05-03 | 2017-05-03 | High-speed bubble cap pillow packing box all-in-one |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106956796B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109229531A (en) * | 2018-08-25 | 2019-01-18 | 浙江希望机械有限公司 | Full servo ultrahigh speed bubble-cap mounted box all-in-one machine |
CN111372856A (en) * | 2017-11-29 | 2020-07-03 | Ckd株式会社 | PTP sheet holding device |
CN114313363A (en) * | 2021-12-31 | 2022-04-12 | 浙江希望机械有限公司 | High-speed double-line bubble cap pillow packaging box all-in-one machine |
RU2802525C1 (en) * | 2021-12-31 | 2023-08-30 | Чжэцзян Хопинг Машинери Ко., Лтд. | High speed double line integrated blister and pillow bag box packing machine |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040237473A1 (en) * | 2003-05-28 | 2004-12-02 | Glopak Inc. | High speed bagging system and method |
CN202320827U (en) * | 2011-12-08 | 2012-07-11 | 吴德兴 | Rail changing single or double connected firecracker packaging machine |
CN104340670A (en) * | 2014-10-08 | 2015-02-11 | 重庆豪能兴富同步器有限公司 | Confluence device for cylindrical tins |
CN104787399A (en) * | 2015-04-27 | 2015-07-22 | 珠海天博打印耗材有限公司 | Pillow type packaging machine and control method for pillow type packaging machine |
CN104816848A (en) * | 2015-04-21 | 2015-08-05 | 新疆全安药业有限公司 | Production technology of gastrohelcosis treating capsules |
CN105645115A (en) * | 2014-11-14 | 2016-06-08 | 杭州康和包装有限公司余杭分公司 | Common cover stacking machine and packaging technique thereof |
CN106218964A (en) * | 2016-09-23 | 2016-12-14 | 浙江希望机械有限公司 | A kind of linkage conveying device and apply the packer of this linkage conveying device |
CN206871414U (en) * | 2017-05-03 | 2018-01-12 | 浙江希望机械有限公司 | High speed bubble-cap rests the head on packing box all-in-one |
-
2017
- 2017-05-03 CN CN201710304554.4A patent/CN106956796B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040237473A1 (en) * | 2003-05-28 | 2004-12-02 | Glopak Inc. | High speed bagging system and method |
CN202320827U (en) * | 2011-12-08 | 2012-07-11 | 吴德兴 | Rail changing single or double connected firecracker packaging machine |
CN104340670A (en) * | 2014-10-08 | 2015-02-11 | 重庆豪能兴富同步器有限公司 | Confluence device for cylindrical tins |
CN105645115A (en) * | 2014-11-14 | 2016-06-08 | 杭州康和包装有限公司余杭分公司 | Common cover stacking machine and packaging technique thereof |
CN104816848A (en) * | 2015-04-21 | 2015-08-05 | 新疆全安药业有限公司 | Production technology of gastrohelcosis treating capsules |
CN104787399A (en) * | 2015-04-27 | 2015-07-22 | 珠海天博打印耗材有限公司 | Pillow type packaging machine and control method for pillow type packaging machine |
CN106218964A (en) * | 2016-09-23 | 2016-12-14 | 浙江希望机械有限公司 | A kind of linkage conveying device and apply the packer of this linkage conveying device |
CN206871414U (en) * | 2017-05-03 | 2018-01-12 | 浙江希望机械有限公司 | High speed bubble-cap rests the head on packing box all-in-one |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111372856A (en) * | 2017-11-29 | 2020-07-03 | Ckd株式会社 | PTP sheet holding device |
CN111372856B (en) * | 2017-11-29 | 2022-03-15 | Ckd株式会社 | PTP sheet holding device |
CN109229531A (en) * | 2018-08-25 | 2019-01-18 | 浙江希望机械有限公司 | Full servo ultrahigh speed bubble-cap mounted box all-in-one machine |
CN114313363A (en) * | 2021-12-31 | 2022-04-12 | 浙江希望机械有限公司 | High-speed double-line bubble cap pillow packaging box all-in-one machine |
WO2023124067A1 (en) * | 2021-12-31 | 2023-07-06 | 浙江希望机械有限公司 | High-speed double-track blister pillow packing and cartoning packing integrated machine |
RU2802525C1 (en) * | 2021-12-31 | 2023-08-30 | Чжэцзян Хопинг Машинери Ко., Лтд. | High speed double line integrated blister and pillow bag box packing machine |
Also Published As
Publication number | Publication date |
---|---|
CN106956796B (en) | 2022-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206871414U (en) | High speed bubble-cap rests the head on packing box all-in-one | |
CN106956796A (en) | High speed bubble-cap rests the head on packing box all-in-one | |
US9731854B2 (en) | Product packaging system | |
CN106965994A (en) | A kind of rotary type multi-station vacuum shaping packing machine and packing method | |
CN103204266B (en) | Vertical boxing machine and rotary box-sucking mechanism thereof | |
CN104925283A (en) | Packaging equipment and packaging technology of sanitary napkins | |
CN204713441U (en) | Fertilizer packing device | |
CN203512161U (en) | Shaping device for vacuum shaping packaging machine | |
CN209506144U (en) | Drug sack filling machine | |
CN202464152U (en) | Connecting line for pillow type packaging machine and cartoning machine | |
CN102424153B (en) | Film combining machine | |
CN206885458U (en) | A kind of medicine plate stack device and filling mechanism | |
CN206797876U (en) | Full-automatic paper product packing machine | |
CN107416270A (en) | Full-automatic paper product packing machine | |
CN206456940U (en) | A kind of charger for being used to connect labelling machine | |
CN204150271U (en) | Aluminium-plastic bubble plate packing machine | |
CN206704638U (en) | Double track collaborates conveying device | |
CN103708056B (en) | A kind of arranging machine | |
CN206050203U (en) | A kind of linkage conveying device and the packer using the linkage conveying device | |
CN109733918A (en) | A kind of double correction conveying devices | |
CN209023220U (en) | Steering conveying device and packaging equipment | |
CN106218964B (en) | A kind of linkage conveying device and the packing machine using the linkage conveying device | |
CN210191944U (en) | Medicine board position adjustment mechanism | |
CN208802195U (en) | Stack medicine plate conveying mechanism | |
CN106240901B (en) | A kind of food materials auto-feeder for bag |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: High speed blister pillow packaging box all-in-one machine Effective date of registration: 20230811 Granted publication date: 20221230 Pledgee: Industrial Bank Co.,Ltd. Wenzhou Ruian sub branch Pledgor: ZHEJIANG HOPING MACHINERY Co.,Ltd. Registration number: Y2023330001721 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |