CN106904821B - The production technology and its large-scale optical fiber prefabricating stick of large-scale optical fiber prefabricating stick - Google Patents

The production technology and its large-scale optical fiber prefabricating stick of large-scale optical fiber prefabricating stick Download PDF

Info

Publication number
CN106904821B
CN106904821B CN201710081160.7A CN201710081160A CN106904821B CN 106904821 B CN106904821 B CN 106904821B CN 201710081160 A CN201710081160 A CN 201710081160A CN 106904821 B CN106904821 B CN 106904821B
Authority
CN
China
Prior art keywords
connecting rod
heat
plug
generating wires
optical fiber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710081160.7A
Other languages
Chinese (zh)
Other versions
CN106904821A (en
Inventor
王醒东
杨军勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN XIN'AOKE CABLE Co.,Ltd.
Original Assignee
Tianjin Fortis Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Fortis Group Co Ltd filed Critical Tianjin Fortis Group Co Ltd
Priority to CN201910129028.8A priority Critical patent/CN109704561B/en
Priority to CN201910128912.XA priority patent/CN109721237B/en
Priority to CN201710081160.7A priority patent/CN106904821B/en
Publication of CN106904821A publication Critical patent/CN106904821A/en
Application granted granted Critical
Publication of CN106904821B publication Critical patent/CN106904821B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B37/00Manufacture or treatment of flakes, fibres, or filaments from softened glass, minerals, or slags
    • C03B37/01Manufacture of glass fibres or filaments
    • C03B37/012Manufacture of preforms for drawing fibres or filaments
    • C03B37/014Manufacture of preforms for drawing fibres or filaments made entirely or partially by chemical means, e.g. vapour phase deposition of bulk porous glass either by outside vapour deposition [OVD], or by outside vapour phase oxidation [OVPO] or by vapour axial deposition [VAD]
    • C03B37/018Manufacture of preforms for drawing fibres or filaments made entirely or partially by chemical means, e.g. vapour phase deposition of bulk porous glass either by outside vapour deposition [OVD], or by outside vapour phase oxidation [OVPO] or by vapour axial deposition [VAD] by glass deposition on a glass substrate, e.g. by inside-, modified-, plasma-, or plasma modified- chemical vapour deposition [ICVD, MCVD, PCVD, PMCVD], i.e. by thin layer coating on the inside or outside of a glass tube or on a glass rod
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B37/00Manufacture or treatment of flakes, fibres, or filaments from softened glass, minerals, or slags
    • C03B37/01Manufacture of glass fibres or filaments
    • C03B37/012Manufacture of preforms for drawing fibres or filaments
    • C03B37/014Manufacture of preforms for drawing fibres or filaments made entirely or partially by chemical means, e.g. vapour phase deposition of bulk porous glass either by outside vapour deposition [OVD], or by outside vapour phase oxidation [OVPO] or by vapour axial deposition [VAD]
    • C03B37/018Manufacture of preforms for drawing fibres or filaments made entirely or partially by chemical means, e.g. vapour phase deposition of bulk porous glass either by outside vapour deposition [OVD], or by outside vapour phase oxidation [OVPO] or by vapour axial deposition [VAD] by glass deposition on a glass substrate, e.g. by inside-, modified-, plasma-, or plasma modified- chemical vapour deposition [ICVD, MCVD, PCVD, PMCVD], i.e. by thin layer coating on the inside or outside of a glass tube or on a glass rod
    • C03B37/01807Reactant delivery systems, e.g. reactant deposition burners
    • C03B37/01815Reactant deposition burners or deposition heating means
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B37/00Manufacture or treatment of flakes, fibres, or filaments from softened glass, minerals, or slags
    • C03B37/01Manufacture of glass fibres or filaments
    • C03B37/012Manufacture of preforms for drawing fibres or filaments
    • C03B37/014Manufacture of preforms for drawing fibres or filaments made entirely or partially by chemical means, e.g. vapour phase deposition of bulk porous glass either by outside vapour deposition [OVD], or by outside vapour phase oxidation [OVPO] or by vapour axial deposition [VAD]
    • C03B37/018Manufacture of preforms for drawing fibres or filaments made entirely or partially by chemical means, e.g. vapour phase deposition of bulk porous glass either by outside vapour deposition [OVD], or by outside vapour phase oxidation [OVPO] or by vapour axial deposition [VAD] by glass deposition on a glass substrate, e.g. by inside-, modified-, plasma-, or plasma modified- chemical vapour deposition [ICVD, MCVD, PCVD, PMCVD], i.e. by thin layer coating on the inside or outside of a glass tube or on a glass rod
    • C03B37/01861Means for changing or stabilising the diameter or form of tubes or rods
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P40/00Technologies relating to the processing of minerals
    • Y02P40/50Glass production, e.g. reusing waste heat during processing or shaping
    • Y02P40/57Improving the yield, e-g- reduction of reject rates

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Manufacture, Treatment Of Glass Fibers (AREA)

Abstract

The invention discloses a kind of production technologies of large-scale optical fiber prefabricating stick, comprising the following steps: 1) plug deposition procedures;2) vitrifying process;3) the thick extension process first stage;4) thick extension process second stage;5) the thick extension process phase III;If assisted heating device includes a pair of expansion hinge frame, push rod and each heat-generating wires being arranged in juxtaposition in step 3) and step 5);The expansion hinge frame includes first connecting rod, second connecting rod, third connecting rod, fourth link, the 5th connecting rod and six-bar linkage;Heat-generating wires are arc coil, and neighbouring heat-generating wires are connected by elastic conducting strip;Push rod drives the expansion of expansion hinge frame or shrinks;Positive pole and cathode are separately connected on heat-generating wires.The present invention is solved existing large-scale optical fiber prefabricating stick in extension process and the biggish defect of the size of each part difference is occurred using a kind of completely new production technology and ancillary heating equipment.

Description

The production technology and its large-scale optical fiber prefabricating stick of large-scale optical fiber prefabricating stick
Technical field
The present invention relates to preform production fields, and in particular to a kind of production technology of large-scale optical fiber prefabricating stick.
Background technique
Preform is the core starting materials for manufacturing quartzy series fibre.The internal structure of optical fiber is exactly in prefabricated rods It is formed, thus the production of prefabricated rods is most important part in optical fiber fabrication technology.There are many methods for the production of preform, often Manufacture craft is vapour phase oxidation process.In vapour phase oxidation process, the steam and oxygen of high-purity halide react, and are formed Some oxide fine particles, these oxide fine particles can be deposited on the surface of glass or quartz body (or inner wall of tubular body), Then transparent glass bar is formed by sintering.
In order to there is a higher deposition rate, prefabricated rods preparation, which is generally all taken, first prepares large-sized plug, then by plug Draw and attenuate, then outside plug redeposited covering method.During stretching, plug rises the plug of large-scale optical fiber prefabricating stick Diameter is less than normal after beginning drawn;At the end of stretching, the melting of plug tail end is insufficient, causes the section diameter bigger than normal.Plug is straight The lesser part of diameter, usually removes in actual use process and does not have to, product is caused to waste, and cost improves.
Summary of the invention
The present invention solves existing big in view of the above-mentioned problems, proposing a kind of production technology of large-scale optical fiber prefabricating stick The production technology of size fibers prefabricated rods is easy to appear the non-uniform defect of size of prefabricated rods.
The technical solution adopted by the present invention is as follows:
A kind of production technology of large-scale optical fiber prefabricating stick, comprising the following steps:
1) plug deposition procedures: on core rod lathe, being passed through silicon tetrachloride, hydrogen and oxygen in oxygen-hydrogen torch, carries out Deposition sintering, the silicon dioxide microparticle of generation are attached to formation plug matrix on kind of stick;It is deposited in plug base end sintered Journey, the rate promoted by reducing kind of stick, so that the plug base end outer diameter of 10mm~20mm length is greater than other parts 6mm ~10mm;
2) vitrifying process: obtained plug matrix obtains glass in 1800 DEG C~2000 DEG C of at a temperature of melting dehydration The plug of change;
3) the thick extension process first stage: vitrified plug being transferred in high temperature furnace and heats extension, the high temperature furnace Temperature is controlled at 2000 DEG C~2200 DEG C, protrudes into assisted heating device to plug overstriking region, so that the temperature in plug overstriking region Degree is more than 2300 DEG C;Further heating extends, and control return air wind speed is 10~15cm/s;
4) thick extension process second stage: moving assisted heating device, and high temperature furnace controls temperature at 2000 DEG C~2200 DEG C, Further heating extends, and control return air wind speed is 20~25cm/s;
5) the thick extension process phase III: high temperature furnace controls temperature at 2100 DEG C~2300 DEG C, and further heating extends, control Return air wind speed processed is 30cm/s~35cm/s;Assisted heating device to plug far from overstriking region one end so that in local temperature It rises more than 2300 DEG C;It is cooling after extension, be made the overstriking area outer diameter of plug compared with the big 3mm of plug central region outer diameter~ 4mm;
Assisted heating device described in the step 3) and step 5) include a pair of expansion hinge frame being arranged in juxtaposition, push rod and Several heat-generating wires;
The expansion hinge frame includes first connecting rod, second connecting rod, third connecting rod, fourth link, the 5th connecting rod and the 6th company Bar;Described first connecting rod one end is fixedly connected with push rod, the hinged heat-generating wires of the other end;The second connecting rod, which is fixedly connected, to be pushed away Bar, the hinged heat-generating wires of the other end;Cross-articulation in the middle part of the first connecting rod and second connecting rod;Third connecting rod one end hinge At the tie point for connecing first connecting rod and heat-generating wires, the hinged heat-generating wires of the other end;The fourth link hinged second connects At the tie point of bar and heat-generating wires, the hinged heat-generating wires of the other end;Intersect in the middle part of the third connecting rod and fourth link Hingedly;At the tie point of the hinged third connecting rod in described 5th connecting rod one end and heat-generating wires, the hinged heat-generating wires of the other end; At the tie point of the hinged fourth link of the six-bar linkage and heat-generating wires, the hinged heat-generating wires of the other end;Described 5th Cross-articulation in the middle part of connecting rod and six-bar linkage;The heat-generating wires are arc coil, and neighbouring heat-generating wires pass through Elastic conducting strip is connected;
Push rod connects the other end of first connecting rod or second connecting rod far from third connecting rod or fourth link;The push rod driving The expansion of expansion hinge frame is shunk;Be separately connected on the heat-generating wires being connected with first connecting rod or second connecting rod power supply anode and Cathode.
A kind of production technology of large-scale optical fiber prefabricating stick of the invention is in plug deposition procedures, so that plug base end The outer diameter of 10mm~20mm length is greater than other parts 6mm~10mm, compensates for the starting point that subsequent extension process is easy to appear Diameter reduction.Thick extension process is separated into three different stages simultaneously, is regulated and controled respectively, the first stage is used Assisted heating device compensates formula heating, so that the temperature of initial end is higher, faster, heat passes more rapidly heat transfer It is handed to matrix inner core;The process stretched when so that initial is rapider, reduces the reduction of diameter and reduces possible waste.Then Assisted heating device is used by the phase III, compensates the heat of stage loss, and increases the circulation of hot gas, so that heat passes It passs more evenly, reduces the larger-size defect of prefabricated rods extending end.Assisted heating device thermal-stable in the present invention leads to Overregulate push rod can spacing between regulation heating wire, and then adjust the temperature of heating and the range of heating region, Its is easy to operate.
Optionally, in the step 3), expansion hinge frame is in contraction state, so that upper between several heat-generating wires Lower spacing is smaller.Between heat-generating wires between the upper and lower away from smaller so that heat is more concentrated, faster, heat is more for heating temperature speed Add and is transferred to matrix inner core rapidly.
Optionally, in the step 5), expansion hinge frame is in expansion state, so that upper between several heat-generating wires Lower spacing is bigger.Between heat-generating wires between the upper and lower away from larger so that heat is uniformly dispersed.
Optionally, the production technology of the large-scale optical fiber prefabricating stick further includes that pre- essence prolongs process;The pre- essence prolongs process: Plug overstriking region is carried out heating accurate extension, so that the overstriking area outer diameter of plug is small compared with plug central region outer diameter difference In or equal to 2mm;The pre- essence is prolonged process and is in after the thick extension process phase III.It is prefabricated to obtaining that process is prolonged using pre- essence The thicker part of stick part point is extended in advance, the accurate control extended convenient for subsequent fine extension process equal proportion.
Optionally, the elastic conducting strip uses high temperature resistant conductive exothermal wire same as heat-generating wires.
Optionally, the assisted heating device further includes driving motor and control unit, and described control unit is electrically connected Driving motor, for the driving motor tool there are four pull rod, four pull rods are separately connected four push rods, and the driving motor driving is drawn Bar movement, and then drive push rod horizontal movement.
The invention also discloses a kind of large-scale optical fiber prefabricating stick, the large-scale optical fiber prefabricating stick utilizes above-mentioned large scale Preform technique is made.
The beneficial effects of the present invention are: a kind of production technology of large-scale optical fiber prefabricating stick of the invention deposits work in plug Sequence compensates for subsequent extended so that the outer diameter of plug base end 10mm~20mm length is greater than other parts 6mm~10mm The reduction of the diameter for the starting point that journey is easy to appear.Thick extension process is separated into three different stages simultaneously, is carried out respectively Regulation uses assisted heating device to the first stage, compensates formula heating, so that the temperature of initial end is higher, heat transfer Faster, the process stretched when so that initial is rapider, reduces the reduction of diameter and reduces possible waste.Then pass through third Stage uses assisted heating device, compensates the heat of stage loss, and increases the circulation of hot gas, so that heat transfer is more equal It is even, reduce the larger-size defect of prefabricated rods extending end.Assisted heating device thermal-stable in the present invention, passes through adjusting Push rod can spacing between regulation heating wire, and then adjust the temperature of heating and the range of heating region, operation It is easy.
In addition, expansion hinge frame is in contraction state so that between several heat-generating wires between the upper and lower away from smaller.Fever Between wire between the upper and lower away from smaller so that heat is more concentrated, faster, heat is transferred to more rapidly base to heating temperature speed Internal core.Expansion hinge frame is in expansion state so that between several heat-generating wires between the upper and lower away from bigger.Heat-generating wires Between between the upper and lower away from larger so that heat is uniformly dispersed.Thicker part point of the process to the part for obtaining prefabricated rods is prolonged using pre- essence Extended in advance, the accurate control extended convenient for subsequent fine extension process equal proportion.
Detailed description of the invention:
Fig. 1 is the technological process of production schematic diagram of large-scale optical fiber prefabricating stick of the present invention;
Fig. 2 is the assisted heating device structural schematic diagram of the production technology of large-scale optical fiber prefabricating stick;
Fig. 3 is expansion hinge frame structural schematic diagram in the assisted heating device of the production technology of large-scale optical fiber prefabricating stick;
Fig. 4 is that the assisted heating device of the production technology of large-scale optical fiber prefabricating stick matches structural representation with prefabricated rods Figure.
Each appended drawing reference in figure are as follows:
1, expansion hinge frame;2, push rod;3, heat-generating wires;4, first connecting rod;5, second connecting rod;6, third connecting rod;7, Double leval jib;8, the 5th connecting rod;9, six-bar linkage;10, elastic conducting strip;12, pull rod;14, control unit;15, high temperature furnace.
Specific embodiment:
Below with reference to each attached drawing, the present invention will be described in detail.
It is 120mm prefabricated rods or larger-sized prefabricated rods that signified large scale, which refers generally to diameter, in the present invention.
The invention discloses a kind of large-scale optical fiber prefabricating stick, the large-scale optical fiber prefabricating stick utilizes above-mentioned large scale light Fine prefabricated rods technique is made.
Embodiment one: the invention also discloses a kind of production technology of large-scale optical fiber prefabricating stick (see attached drawings 1), including with Lower step:
1) plug deposition procedures: on core rod lathe, being passed through silicon tetrachloride, hydrogen and oxygen in oxygen-hydrogen torch, carries out Deposition sintering, the silicon dioxide microparticle of generation are attached to formation plug matrix on kind of stick;It is deposited in plug base end sintered Journey, the rate promoted by reducing kind of stick, so that the outer diameter of plug base end 10mm length is greater than other parts 6mm;
2) vitrifying process: obtained plug matrix obtains vitrified plug in 1800 DEG C of at a temperature of melting dehydration;
3) the thick extension process first stage: vitrified plug being transferred in high temperature furnace 15 and heats extension, high temperature furnace 15 Temperature is controlled at 2000 DEG C, protrudes into assisted heating device to plug overstriking region, so that the temperature in plug overstriking region is 2300 ℃;Further heating extends, and control return air wind speed is 10cm/s;
4) thick extension process second stage: moving assisted heating device, and high temperature furnace 15 controls temperature at 2000 DEG C, further Heating extends, and control return air wind speed is 20cm/s;
5) the thick extension process phase III: high temperature furnace 15 controls temperature at 2100 DEG C, and further heating extends, and controls return air Wind speed is 30cm/s;Assisted heating device to plug far from overstriking region one end so that local temperature is increased beyond 2300 DEG C;Prolong It is cooling after stretching, the overstriking area outer diameter of plug is made compared with the big 3mm of plug central region outer diameter;
6) pre- essence prolongs process: plug overstriking region is carried out heating accurate extension so that the overstriking area outer diameter of plug compared with Plug central region outer diameter difference is equal to 2mm.
Embodiment two: the invention also discloses a kind of production technologies of large-scale optical fiber prefabricating stick, comprising the following steps:
1) plug deposition procedures: on core rod lathe, being passed through silicon tetrachloride, hydrogen and oxygen in oxygen-hydrogen torch, carries out Deposition sintering, the silicon dioxide microparticle of generation are attached to formation plug matrix on kind of stick;It is deposited in plug base end sintered Journey, the rate promoted by reducing kind of stick, so that the outer diameter of plug base end 20mm length is greater than other parts 10mm;
2) vitrifying process: obtained plug matrix obtains vitrified plug in 2000 DEG C of at a temperature of melting dehydration;
3) the thick extension process first stage: vitrified plug is transferred in high temperature furnace and heats extension, high temperature furnace 15 is controlled Temperature processed protrudes into assisted heating device to plug overstriking region, so that the temperature in plug overstriking region is 2300 DEG C at 2200 DEG C; Further heating extends, and control return air wind speed is 15cm/s;
4) thick extension process second stage: moving assisted heating device, and high temperature furnace 15 controls temperature at 2200 DEG C, further Heating extends, and control return air wind speed is 25cm/s;
5) the thick extension process phase III: high temperature furnace 15 controls temperature 2300, and further heating extends, and controls return air wind Speed is 35cm/s;Assisted heating device to plug far from overstriking region one end so that local temperature is increased beyond 2300 DEG C;Extend After, it is cooling, the overstriking area outer diameter of plug is made compared with the big 4mm of plug central region outer diameter;
6) pre- essence prolongs process: plug overstriking region is carried out heating accurate extension so that the overstriking area outer diameter of plug compared with Plug central region outer diameter difference is equal to 2mm.
In the step 3), expansion hinge frame 1 is in contraction state, so that between several heat-generating wires 3 between the upper and lower Away from smaller.Between heat-generating wires 3 between the upper and lower away from smaller so that heat is more concentrated, faster, heat is more for heating temperature speed Add and is transferred to matrix inner core rapidly.
In the step 5), expansion hinge frame 1 is in expansion state, so that between several heat-generating wires 3 between the upper and lower Away from bigger.Between heat-generating wires 3 between the upper and lower away from larger so that heat is uniformly dispersed.
A kind of production technology of large-scale optical fiber prefabricating stick of the invention is in plug deposition procedures, so that plug base end The outer diameter of 10mm~20mm length is greater than other parts 6mm~10mm, compensates for the starting point that subsequent extension process is easy to appear Diameter reduction.Thick extension process is separated into three different stages simultaneously, is regulated and controled respectively, the first stage is used Assisted heating device compensates formula heating, so that the temperature of initial end is higher, faster, heat passes more rapidly heat transfer It is handed to matrix inner core;The process stretched when so that initial is rapider, reduces the reduction of diameter and reduces possible waste.Then Assisted heating device is used by the phase III, compensates the heat of stage loss, and increases the circulation of hot gas, so that heat passes It passs more evenly, reduces the larger-size defect of prefabricated rods extending end.
The invention discloses a kind of assisted heating device (see attached drawing 2,3,4), the assisted heating device include it is a pair of simultaneously Arrange expansion hinge frame 1, push rod 2 and several heat-generating wires 3 of arrangement;
The expansion hinge frame 1 includes first connecting rod 4, second connecting rod 5, third connecting rod 6, fourth link 7,8 and of the 5th connecting rod Six-bar linkage 9;Described 4 one end of first connecting rod is fixedly connected with push rod 2, the hinged heat-generating wires 3 of the other end;The second connecting rod 5 It is fixedly connected with push rod 2, the hinged heat-generating wires 3 of the other end;5 middle part cross-articulation of the first connecting rod 4 and second connecting rod;It is described At the tie point of the hinged first connecting rod 4 in 6 one end of third connecting rod and heat-generating wires 3, the hinged heat-generating wires 3 of the other end;It is described At the tie point of the hinged second connecting rod 5 of fourth link 7 and heat-generating wires 3, the hinged heat-generating wires 3 of the other end;The third 7 middle part cross-articulation of connecting rod 6 and fourth link;The company of 5th connecting rod, 8 one end hinged third connecting rod 6 and heat-generating wires 3 Junction, the hinged heat-generating wires 3 of the other end;The tie point of the six-bar linkage 9 hinged fourth link 7 and heat-generating wires 3 Place, the hinged heat-generating wires 3 of the other end;5th connecting rod 8 and 9 middle part cross-articulation of six-bar linkage;The heat-generating wires 3 For arc coil, neighbouring heat-generating wires 3 are connected by elastic conducting strip 10;
Push rod 2 connects the other end of first connecting rod 4 or second connecting rod 5 far from third connecting rod 6 or fourth link 7;It is described to push away Bar 2 drives the expansion of expansion hinge frame 1 or shrinks;It is separately connected on the heat-generating wires 3 being connected with first connecting rod 4 or second connecting rod 5 The anode and cathode of power supply.
Assisted heating device thermal-stable in the present invention, by adjust push rod 2 can regulation heating wire 3 it Between spacing, and then adjust heating temperature and heating region range, it is easy to operate.
The production technology of the large-scale optical fiber prefabricating stick further includes that pre- essence prolongs process;The pre- essence prolongs process: to plug Overstriking region carries out heating accurate extension, so that the overstriking area outer diameter of plug is equal to 2mm compared with plug central region outer diameter difference; The pre- essence is prolonged process and is in after the thick extension process phase III.Process is prolonged to obtaining the relatively thick of prefabricated rods part using pre- essence Part is extended in advance, the accurate control extended convenient for subsequent fine extension process equal proportion.
The elastic conducting strip 10 uses high temperature resistant conductive exothermal wire 3 same as heat-generating wires 3.
The assisted heating device further includes driving motor and control unit 14, and described control unit 14 is electrically connected driving Motor, for the driving motor tool there are four pull rod 12, four pull rods 12 are separately connected four push rods 2, the driving motor driving Pull rod 12 moves, and then drives 2 horizontal movement of push rod.
Control unit 14 in the present embodiment is computer system.Heat-generating wires 3 and elastic conducting strip 10 in the present invention Tungsten wire can be used.Refractory ceramics, such as boron nitride ceramics can be used in expansion hinge frame 1.
When the present invention is implemented, the production technology of large-scale optical fiber prefabricating stick is planted, using following steps:
1) on core rod lathe, silicon tetrachloride, hydrogen and oxygen are passed through in oxygen-hydrogen torch, it is raw after carrying out deposition sintering It is attached on kind of stick at silicon dioxide microparticle, forms plug matrix;Sintering process is deposited in plug base end, by reducing kind The rate that stick is promoted, so that the outer diameter of plug base end 10mm length is greater than other parts 6mm;2) the plug matrix obtained Dehydration is melted at a temperature of 1800 DEG C, vitrifying obtains vitrified plug;3) vitrified plug is transferred in high temperature furnace Heating extends, and high temperature furnace controls temperature at 2000 DEG C, protrudes into assisted heating device to plug overstriking region, so that plug widening area The temperature in domain is 2300 DEG C;Further heating extends, and control return air wind speed is 10cm/s;4) move assisted heating device, high temperature Furnace controls temperature at 2000 DEG C, and further heating extends, and control return air wind speed is 20cm/s;5) high temperature furnace controls temperature 2100 DEG C, further heating extends, and control return air wind speed is 30cm/s;Assisted heating device, far from overstriking region one end, makes to plug It obtains local temperature and is increased beyond 2300 DEG C;It is cooling after extension, the overstriking area outer diameter of plug is made compared with plug central region The big 3mm of outer diameter;6) the pre- essence prolongs process: carrying out heating accurate extension to plug overstriking region, so that the overstriking region of plug Outer diameter is equal to 2mm compared with plug central region outer diameter difference.
The above description is only a preferred embodiment of the present invention, not thereby limits scope of patent protection of the invention, all It is directly or indirectly to be used in other relevant technologies with equivalent structure transformation made by description of the invention and accompanying drawing content Field similarly includes within the scope of the present invention.

Claims (7)

1. a kind of production technology of large-scale optical fiber prefabricating stick, which comprises the following steps:
1) plug deposition procedures: on core rod lathe, it is passed through silicon tetrachloride, hydrogen and oxygen in oxygen-hydrogen torch, is deposited Sintering, the silicon dioxide microparticle of generation are attached to formation plug matrix on kind of stick;Sintering process is deposited in plug base end, is led to Crossing reduces the rate that kind of stick is promoted so that the plug base end outer diameter of 10mm~20mm length be greater than other parts 6mm~ 10mm;
2) vitrifying process: obtained plug matrix obtains vitrified in 1800 DEG C~2000 DEG C of at a temperature of melting dehydration Plug;
3) the thick extension process first stage: vitrified plug being transferred in high temperature furnace and heats extension, the high temperature furnace control Temperature protrudes into assisted heating device to plug overstriking region, so that the temperature in plug overstriking region at 2000 DEG C~2200 DEG C More than 2300 DEG C;Further heating extends, and control return air wind speed is 10cm/s~15cm/s;
4) thick extension process second stage: moving assisted heating device, and high temperature furnace controls temperature at 2000 DEG C~2200 DEG C, into one Step heating extends, and control return air wind speed is 20cm/s~25cm/s;
5) the thick extension process phase III: high temperature furnace controls temperature at 2100 DEG C~2300 DEG C, and further heating extends, and controls back Wind wind speed is 30cm/s~35cm/s;Assisted heating device, far from overstriking region one end, surpasses to plug so that local temperature rises Cross 2300 DEG C;It is cooling after extension, the overstriking area outer diameter of plug is made compared with the big 3mm~4mm of plug central region outer diameter;
Assisted heating device described in the step 3) and step 5) includes a pair of expansion hinge frame being arranged in juxtaposition, push rod and several A heat-generating wires;
The expansion hinge frame includes first connecting rod, second connecting rod, third connecting rod, fourth link, the 5th connecting rod and six-bar linkage;Institute It states first connecting rod one end and is fixedly connected with push rod, the hinged heat-generating wires of the other end;The second connecting rod is fixedly connected with push rod, another Hold hinged heat-generating wires;Cross-articulation in the middle part of the first connecting rod and second connecting rod;Described third connecting rod one end hinged first At the tie point of connecting rod and heat-generating wires, the hinged heat-generating wires of the other end;The hinged second connecting rod of fourth link and hair At the tie point of hot wire, the hinged heat-generating wires of the other end;Cross-articulation in the middle part of the third connecting rod and fourth link;Institute At the tie point for stating the hinged third connecting rod in the 5th connecting rod one end and heat-generating wires, the hinged heat-generating wires of the other end;Described At the tie point of the hinged fourth link of six-bar linkage and heat-generating wires, the hinged heat-generating wires of the other end;5th connecting rod and Cross-articulation in the middle part of six-bar linkage;The heat-generating wires are arc coil, and neighbouring heat-generating wires pass through elastic conducting Electric piece is connected;
Push rod connects the other end of first connecting rod or second connecting rod far from third connecting rod or fourth link;The push rod driving is flexible It cuts with scissors frame expansion or shrinks;The positive and negative of power supply is separately connected on the heat-generating wires being connected with first connecting rod or second connecting rod Pole.
2. the production technology of large-scale optical fiber prefabricating stick as described in claim 1, which is characterized in that in the step 3), stretch Contracting hinge frame be in contraction state so that between several heat-generating wires between the upper and lower away from smaller.
3. the production technology of large-scale optical fiber prefabricating stick as described in claim 1, which is characterized in that in the step 5), stretch Contracting hinge frame be in expansion state so that between several heat-generating wires between the upper and lower away from more greatly.
4. the production technology of large-scale optical fiber prefabricating stick as claimed in claim 2, which is characterized in that further include that pre- essence prolongs work Sequence;The pre- essence prolongs process: carrying out heating accurate extension to plug overstriking region, so that the overstriking area outer diameter of plug is compared with plug Central region outer diameter difference is less than or equal to 2mm;The pre- essence is prolonged process and is in after the thick extension process phase III.
5. the production technology of large-scale optical fiber prefabricating stick as described in claim 1, which is characterized in that the elastic conducting strip is adopted With high temperature resistant conductive exothermal wire same as heat-generating wires.
6. the production technology of large-scale optical fiber prefabricating stick as described in claim 1, which is characterized in that the assisted heating device It further include driving motor and control unit, described control unit is electrically connected driving motor, and there are four draw for the driving motor tool Bar, four pull rods are separately connected four push rods, the driving motor driving pull rod movement, and then drive push rod horizontal movement.
7. a kind of large-scale optical fiber prefabricating stick, which is characterized in that the large-scale optical fiber prefabricating stick utilizes such as claim 1 to 6 The production technology of large-scale optical fiber prefabricating stick described in any one claim is made.
CN201710081160.7A 2017-02-15 2017-02-15 The production technology and its large-scale optical fiber prefabricating stick of large-scale optical fiber prefabricating stick Active CN106904821B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201910129028.8A CN109704561B (en) 2017-02-15 2017-02-15 Production process of large-size optical fiber preform
CN201910128912.XA CN109721237B (en) 2017-02-15 2017-02-15 Optical fiber preform production process and optical fiber preform
CN201710081160.7A CN106904821B (en) 2017-02-15 2017-02-15 The production technology and its large-scale optical fiber prefabricating stick of large-scale optical fiber prefabricating stick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710081160.7A CN106904821B (en) 2017-02-15 2017-02-15 The production technology and its large-scale optical fiber prefabricating stick of large-scale optical fiber prefabricating stick

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201910129028.8A Division CN109704561B (en) 2017-02-15 2017-02-15 Production process of large-size optical fiber preform
CN201910128912.XA Division CN109721237B (en) 2017-02-15 2017-02-15 Optical fiber preform production process and optical fiber preform

Publications (2)

Publication Number Publication Date
CN106904821A CN106904821A (en) 2017-06-30
CN106904821B true CN106904821B (en) 2019-03-22

Family

ID=59207604

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201710081160.7A Active CN106904821B (en) 2017-02-15 2017-02-15 The production technology and its large-scale optical fiber prefabricating stick of large-scale optical fiber prefabricating stick
CN201910128912.XA Active CN109721237B (en) 2017-02-15 2017-02-15 Optical fiber preform production process and optical fiber preform
CN201910129028.8A Active CN109704561B (en) 2017-02-15 2017-02-15 Production process of large-size optical fiber preform

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201910128912.XA Active CN109721237B (en) 2017-02-15 2017-02-15 Optical fiber preform production process and optical fiber preform
CN201910129028.8A Active CN109704561B (en) 2017-02-15 2017-02-15 Production process of large-size optical fiber preform

Country Status (1)

Country Link
CN (3) CN106904821B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111320374B (en) * 2018-12-15 2023-09-26 中天科技精密材料有限公司 Optical fiber preform and method for manufacturing the same
CN116970881B (en) * 2023-09-22 2023-12-19 连云港天舒热处理科技有限公司 Heat treatment equipment for nonferrous metal processing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11171576A (en) * 1997-12-04 1999-06-29 Furukawa Electric Co Ltd:The Method for drawing optical fiber glass preform
CN1403397A (en) * 2002-10-23 2003-03-19 长飞光纤光缆有限公司 PCVD process of making optical fiber rod in high deposition rate
CN101328013A (en) * 2007-06-22 2008-12-24 江苏亨通光纤科技有限公司 Method for drawing optical fibre by using large size optical fibre prefabricated bar
CN101811822A (en) * 2010-04-16 2010-08-25 长飞光纤光缆有限公司 Method for manufacturing large-diameter optical fiber mandril through PCVD process

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2088238C (en) * 1992-01-30 1998-08-18 Masato Oku Method of manufacturing optical fiber preform
CN100354220C (en) * 2002-06-19 2007-12-12 住友电气工业株式会社 Method for drawing glass parent material and drawing machine for use therein
CN1197799C (en) * 2002-09-06 2005-04-20 江苏法尔胜光子有限公司 Sintering process for manufacturing prefabricated fiber rod
KR100896103B1 (en) * 2003-03-10 2009-05-07 엘에스전선 주식회사 Apparatus for making optical fiber preform capable of reducing soot
JP2004338970A (en) * 2003-05-13 2004-12-02 Sumitomo Electric Ind Ltd Manufacturing method of glass preform
ATE502907T1 (en) * 2003-06-30 2011-04-15 Prysmian Spa METHOD AND DEVICE FOR DRILLING PREFORMS FOR HOLE LIGHT GUIDE FIBERS
JP2005060148A (en) * 2003-08-08 2005-03-10 Sumitomo Electric Ind Ltd Optical fiber preform production method, optical fiber preform, optical fiber production method, and optical fiber
JP2007223824A (en) * 2006-02-21 2007-09-06 Shin Etsu Chem Co Ltd Method for sintering porous glass preform
JP2009001471A (en) * 2007-06-25 2009-01-08 Sumitomo Electric Ind Ltd Method for manufacturing drawn glass body
CN101428964B (en) * 2008-09-23 2011-01-12 富通集团有限公司 Method of manufacturing large-scale optical fiber prefabricating stick cladding
CN101792256B (en) * 2010-02-09 2011-12-28 中天科技精密材料有限公司 Test method for large size optical fiber preforms
DE102011116806A1 (en) * 2011-10-25 2013-04-25 Heraeus Quarzglas Gmbh & Co. Kg Method for producing a cylindrical glass component by elongation
CN102627399B (en) * 2012-04-18 2014-12-03 长飞光纤光缆股份有限公司 Vertical stretch method and device of optical fiber prefabricating rod
JP6459585B2 (en) * 2015-02-10 2019-01-30 住友電気工業株式会社 Optical fiber preform manufacturing method
CN106082632A (en) * 2016-06-16 2016-11-09 中天科技精密材料有限公司 A kind of interior chemical vapor deposition method of pipe that automatically eliminates prepares glass tubing bow degree method during preform

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11171576A (en) * 1997-12-04 1999-06-29 Furukawa Electric Co Ltd:The Method for drawing optical fiber glass preform
CN1403397A (en) * 2002-10-23 2003-03-19 长飞光纤光缆有限公司 PCVD process of making optical fiber rod in high deposition rate
CN101328013A (en) * 2007-06-22 2008-12-24 江苏亨通光纤科技有限公司 Method for drawing optical fibre by using large size optical fibre prefabricated bar
CN101811822A (en) * 2010-04-16 2010-08-25 长飞光纤光缆有限公司 Method for manufacturing large-diameter optical fiber mandril through PCVD process

Also Published As

Publication number Publication date
CN109721237B (en) 2021-06-25
CN106904821A (en) 2017-06-30
CN109704561A (en) 2019-05-03
CN109704561B (en) 2021-09-21
CN109721237A (en) 2019-05-07

Similar Documents

Publication Publication Date Title
CN105217951B (en) A kind of stretched vertically method and apparatus of preform
CN106904821B (en) The production technology and its large-scale optical fiber prefabricating stick of large-scale optical fiber prefabricating stick
CN104211295B (en) A kind of optic fibre drawing apparatus and drawing process thereof
CN108046582A (en) A kind of continuous device and method for preparing preform and wire drawing
CN102627399A (en) Vertical stretch method and device of optical fiber prefabricating rod
CN105271696A (en) Fiber core-cladding ratio adjustable optical fiber preform extrusion method and device
CN106396361A (en) Optical fiber perform rod casing tube sintering device, and sintering method thereof
CN207987041U (en) A kind of continuous device for preparing preform and wire drawing
CN109516686A (en) A kind of the preform female rod stretching device and drawing process of VAD sintering
KR20200089229A (en) Automated large outside diameter preform tipping process and resulting glass preforms
KR101426158B1 (en) Apparatus for fabricating optical fiber preform
CN209456303U (en) A kind of preform female rod stretching device of VAD sintering
CN106673414A (en) Dehydroxylation annealing method and device of large-size optical fiber perform
CN207435309U (en) A kind of upper end connection structure of prefabricated rods female rod to be tensioned
CN213060660U (en) Optical fiber drawing annealing device
CN106111980A (en) A kind of preparation method of nano wire
JPS60151237A (en) Method for drawing rodlike or tubular glass material
JP2014221691A (en) Dummy rod integrated optical fiber preform and preparation method thereof
CN208104228U (en) A kind of fiber drawing furnace gas leading-in device
CN101289272A (en) Production method of profiled silex glass holding bar and apparatus
JP4271125B2 (en) Optical fiber preform drawing method
JP7042229B2 (en) Method of stretching glass base material for optical fiber
CN1502575A (en) Optical fibers and methods of fabrication
CN117401899A (en) Optical fiber preform sintering equipment and method
CN102869627B (en) Method for producing glass base material

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200108

Address after: 300000 Tianjin Haitai Huayuan Industrial Zone Xiqing District Road No. 18 West 1--301

Co-patentee after: Hangzhou Futong Communication Technology Co., Ltd.

Patentee after: Tianjin Fortis Group Co., Ltd.

Co-patentee after: Tianjin Futong Xinmao Science and Technology Co., Ltd.

Address before: 300000 Tianjin Haitai Huayuan Industrial Zone Xiqing District Road No. 18 West 1--301

Patentee before: Tianjin Fortis Group Co., Ltd.

TR01 Transfer of patent right

Effective date of registration: 20200415

Address after: 300000 Tianjin Haitai Huayuan Industrial Zone Xiqing District Road No. 18 West 1--301

Co-patentee after: HANGZHOU FUTONG COMMUNICATION TECHNOLOGY Co.,Ltd.

Patentee after: TIANJIN FUTONG GROUP Co.,Ltd.

Co-patentee after: TIANJIN FUTONG XINMAO SCIENCE & TECHNOLOGY Co.,Ltd.

Co-patentee after: SHENZHEN XIN'AOKE CABLE Co.,Ltd.

Address before: 300000 Tianjin Haitai Huayuan Industrial Zone Xiqing District Road No. 18 West 1--301

Co-patentee before: HANGZHOU FUTONG COMMUNICATION TECHNOLOGY Co.,Ltd.

Patentee before: TIANJIN FUTONG GROUP Co.,Ltd.

Co-patentee before: TIANJIN FUTONG XINMAO SCIENCE & TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 300000 West 1-301, No.18 Haitai West Road, Huayuan Industrial Zone, Xiqing District, Tianjin

Patentee after: TIANJIN FUTONG GROUP Co.,Ltd.

Patentee after: HANGZHOU FUTONG COMMUNICATION TECHNOLOGY Co.,Ltd.

Patentee after: Tianjin Futong Information Technology Co.,Ltd.

Patentee after: SHENZHEN XIN'AOKE CABLE Co.,Ltd.

Address before: 300000 West 1-301, No.18 Haitai West Road, Huayuan Industrial Zone, Xiqing District, Tianjin

Patentee before: TIANJIN FUTONG GROUP Co.,Ltd.

Patentee before: HANGZHOU FUTONG COMMUNICATION TECHNOLOGY Co.,Ltd.

Patentee before: TIANJIN FUTONG XINMAO SCIENCE & TECHNOLOGY Co.,Ltd.

Patentee before: SHENZHEN XIN'AOKE CABLE Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20210923

Address after: No.2 songpingshan Road, North Science Park, Nanshan District, Shenzhen, Guangdong 518000

Patentee after: SHENZHEN XIN'AOKE CABLE Co.,Ltd.

Address before: 300000 West 1-301, No.18 Haitai West Road, Huayuan Industrial Zone, Xiqing District, Tianjin

Patentee before: TIANJIN FUTONG GROUP Co.,Ltd.

Patentee before: HANGZHOU FUTONG COMMUNICATION TECHNOLOGY Co.,Ltd.

Patentee before: Tianjin Futong Information Technology Co.,Ltd.

Patentee before: SHENZHEN XIN'AOKE CABLE Co.,Ltd.

TR01 Transfer of patent right