- CN106787187B CN106787187B CN201611177357.2A CN201611177357A CN106787187B CN 106787187 B CN106787187 B CN 106787187B CN 201611177357 A CN201611177357 A CN 201611177357A CN 106787187 B CN106787187 B CN 106787187B
- Authority
- CN
- China
- Prior art keywords
- running
- management
- oms
- maintenance
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000012423 maintenance Methods 0.000 claims abstract description 58
- 230000005540 biological transmission Effects 0.000 claims abstract description 25
- 230000005611 electricity Effects 0.000 claims abstract description 23
- 238000012544 monitoring process Methods 0.000 claims 1
- 238000007726 management method Methods 0.000 description 23
- 238000007689 inspection Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 210000004556 brain Anatomy 0.000 description 1
- 238000013501 data transformation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- H02J13/0017—
Landscapes
- Stand-By Power Supply Arrangements (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of current misdelivery proof methods, it is related to power Transmission technical field, management and running OMS system and power system monitor D5000 system are associated by the present invention, when there is transmission line of electricity to need to overhaul, corresponding work ticket is handled by management and running OMS system according to the number that route needs to overhaul point, the information of all maintenance points is transmitted in power system monitor D5000 system by management and running OMS system, and power system monitor D5000 system indicates corresponding maintenance board in corresponding route according to the information of maintenance point;When some, which overhauls point, completes maintenance, work ticket corresponding with the maintenance point is cancelled by management and running OMS system, then maintenance point completion service information is transmitted in power system monitor D5000 system by management and running OMS system, power system monitor D5000 system cancels maintenance board corresponding with work ticket automatically;When the route for needing to overhaul in power system monitor D5000 system there is no maintenance board when could be powered to the route, by the design of such method can prevent to misdeliver electricity the occurrence of.
Description
Technical field
The present invention relates to power Transmission technical fields, more particularly to a kind of current misdelivery proof method.
Background technique
When transmission line of electricity needs to overhaul, regulation person carries out stopping power transmission operation, but usual route needs are more
Place needs to overhaul, and each maintenance point is required to handle a work ticket, so that same needs the route overhauled to have multiple works
The case where making ticket, to guarantee safety, it is necessary to power transmission could be carried out to route after the completion of all working ticket.
Currently, handling work ticket is in management and running OMS system, and power system monitor is using power system monitor D5000 system.
One route handles multiple work tickets, and on power system monitor D5000 system interface, a maintenance warning sign can only be hung, it cannot
It is corresponding with the number of work ticket, and be all manually to check work ticket and work one by one in OMS system by regulation person before power transmission
Log checks whether that all working ticket has all been completed;If having removed maintenance after neglecting a work ticket completion wherein
Warning sign will miss the other work tickets being carrying out, and cause misdelivery electricity, cause very to the person, power grid and equipment safety
Big security risk.
Summary of the invention
The technical problem to be solved by the present invention is in view of the above shortcomings of the prior art, provide a kind of current misdelivery proof method,
Solve the problems, such as due to work ticket with maintenance board it is not corresponding cause misdelivery electricity, have work ticket and maintenance board one-to-one correspondence, prevent
Misdeliver after maintenance electricity feature.
In order to solve the above technical problems, the technical solution used in the present invention is: a kind of current misdelivery proof method, scheduling is managed
Reason OMS system and power system monitor D5000 system be associated, specific works the following steps are included:
(1) when transmission line of electricity needs to overhaul, overhaul as needed quantity a little by management and running OMS system handle one with
Upper work ticket;
(2) management and running OMS system is sent to multi-line power transmission information is overhauled in power system monitor D5000 system, power grid prison
Control D5000 system indicates on the corresponding route of system interface overhauls board with the above work ticket of said one correspondingly;
(3) when transmission line of electricity is completed to overhaul, the above work ticket of said one is cancelled by management and running OMS system;
(4) management and running OMS system sends line maintenance completion information in power system monitor D5000 system, power grid prison
Control D5000 system cancels on the corresponding route of system interface overhauls board with the above work ticket of said one correspondingly;
(5) when the system interface route in power system monitor D5000 system does not overhaul board, this route can be sent
Electricity.
Preferably, management and running OMS system and power system monitor D5000 system are mounted on the same computer.
Preferably, management and running OMS system data carry out real-time update according to the foundation and performance of maintenance point.
Preferably, power system monitor D5000 system data carries out in real time more according to management and running OMS system data transformation
Newly.
Preferably, it overhauls on the transmission line of electricity of system interface in power system monitor D5000 system after board has all cancelled and first sends out
Indicating alarm out, then power transmission.
Preferably, indicating alarm includes the prompt of power system monitor D5000 system interface and auditory tone cues.
The beneficial effects of adopting the technical scheme are that the present invention supervises management and running OMS system and power grid
Control D5000 system is associated, and when there is transmission line of electricity to need to overhaul, staff first powers off the route, then basis
The number that the route needs to overhaul point handles corresponding work ticket, the corresponding inspection of each work ticket by management and running OMS system
It repairs a little, the information of all maintenance points is transmitted in power system monitor D5000 system by management and running OMS system, power system monitor D5000
System indicates corresponding maintenance board, the corresponding maintenance board of each work ticket in corresponding route according to the information of maintenance point;When
When some maintenance point completes maintenance, work ticket corresponding with the maintenance point is cancelled by management and running OMS system, is then managed by scheduling
Maintenance point completion service information is transmitted in power system monitor D5000 system by reason OMS system, and power system monitor D5000 system is certainly
It is dynamic to cancel maintenance board corresponding with work ticket;When there is no maintenance boards for the route for needing to overhaul in power system monitor D5000 system
Shi Caineng is powered to the route, and by the design of such method, maintenance point and work ticket are corresponded, work ticket and maintenance
Board corresponds, clear intuitive, sets up line maintenance point while corresponding mark maintenance board, when maintenance point completes maintenance, revocation inspection
Board is repaired, illustrates that maintenance is completed in all maintenance points of the route when route does not overhaul board, then carries out normal power-up, it is such
Method can prevent to misdeliver electricity the occurrence of.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Specific embodiment
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
As shown in Figure 1, for a kind of flow chart of current misdelivery proof method of the present invention, a kind of current misdelivery proof method manages scheduling
Reason OMS system and power system monitor D5000 system be associated, specific works the following steps are included:
(1) when transmission line of electricity needs to overhaul, overhaul as needed quantity a little by management and running OMS system handle one with
Upper work ticket;
(2) management and running OMS system is sent to multi-line power transmission information is overhauled in power system monitor D5000 system, power grid prison
Control D5000 system indicates on the corresponding route of system interface overhauls board with the above work ticket of said one correspondingly;
(3) when transmission line of electricity is completed to overhaul, the above work ticket of said one is cancelled by management and running OMS system;
(4) management and running OMS system sends line maintenance completion information in power system monitor D5000 system, power grid prison
Control D5000 system cancels on the corresponding route of system interface overhauls board with the above work ticket of said one correspondingly;
(5) when the system interface route in power system monitor D5000 system does not overhaul board, this route can be sent
Electricity.
The management and running OMS system and power system monitor D5000 system are mounted on the same computer, are mounted on same electricity
It economizes on resources on brain, while observing more intuitive and convenient.
The management and running OMS system data carry out real-time update according to the foundation and performance of maintenance point.
The power system monitor D5000 system data converts according to the management and running OMS system data and carries out real-time update.
It overhauls first to issue after board has all cancelled on the transmission line of electricity of system interface in the power system monitor D5000 system and mention
It warns report, then power transmission.
The indicating alarm includes the prompt of power system monitor D5000 system interface and auditory tone cues.
The beneficial effects of adopting the technical scheme are that the present invention supervises management and running OMS system and power grid
Control D5000 system is associated, and when there is transmission line of electricity to need to overhaul, staff first powers off the route, then basis
The number that the route needs to overhaul point handles corresponding work ticket, the corresponding inspection of each work ticket by management and running OMS system
It repairs a little, the information of all maintenance points is transmitted in power system monitor D5000 system by management and running OMS system, power system monitor D5000
System indicates corresponding maintenance board, the corresponding maintenance board of each work ticket in corresponding route according to the information of maintenance point;When
When some maintenance point completes maintenance, work ticket corresponding with the maintenance point is cancelled by management and running OMS system, is then managed by scheduling
Maintenance point completion service information is transmitted in power system monitor D5000 system by reason OMS system, and power system monitor D5000 system is certainly
It is dynamic to cancel maintenance board corresponding with work ticket;When there is no maintenance boards for the route for needing to overhaul in power system monitor D5000 system
Shi Caineng is powered to the route, and by the design of such method, maintenance point and work ticket are corresponded, work ticket and maintenance
Board corresponds, clear intuitive, sets up line maintenance point while corresponding mark maintenance board, when maintenance point completes maintenance, revocation inspection
Board is repaired, illustrates that maintenance is completed in all maintenance points of the route when route does not overhaul board, then carries out normal power-up, it is such
Method can prevent to misdeliver electricity the occurrence of.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.
Claims (6)
1. a kind of current misdelivery proof method, it is characterised in that: close management and running OMS system and power system monitor D5000 system
Connection, specific works the following steps are included:
(1) when transmission line of electricity needs to overhaul, the quantity overhauled as needed a little handles more than one work by management and running OMS system
Make ticket;The corresponding maintenance point of each work ticket;
(2) management and running OMS system is sent to multi-line power transmission information is overhauled in power system monitor D5000 system, power system monitor
D5000 system indicates on the corresponding route of system interface overhauls board with the above work ticket of said one correspondingly;Each
Work ticket corresponds to a maintenance board;
(3) when transmission line of electricity is completed to overhaul, the above work ticket of said one is cancelled by management and running OMS system;
(4) management and running OMS system sends line maintenance completion information in power system monitor D5000 system, power system monitor
D5000 system cancels on the corresponding route of system interface overhauls board with the above work ticket of said one correspondingly;
(5) when the system interface route in power system monitor D5000 system does not overhaul board, this route can carry out power transmission.
2. a kind of current misdelivery proof method according to claim 1, it is characterised in that: the management and running OMS system and electricity
Net monitoring D5000 system is mounted on the same computer.
3. a kind of current misdelivery proof method according to claim 1, it is characterised in that: the management and running OMS system data
Real-time update is carried out according to the foundation of maintenance point and performance.
4. a kind of current misdelivery proof method according to claim 1, it is characterised in that: the power system monitor D5000 system number
Real-time update is carried out according to converting according to the management and running OMS system data.
5. a kind of current misdelivery proof method according to claim 1, it is characterised in that: in the power system monitor D5000 system
It is overhauled on the transmission line of electricity of system interface after board has all cancelled and first issues indicating alarm, then power transmission.
6. a kind of current misdelivery proof method according to claim 5, it is characterised in that: the indicating alarm includes power system monitor
The prompt of D5000 system interface and auditory tone cues.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611177357.2A CN106787187B (en) | 2016-12-19 | 2016-12-19 | A kind of current misdelivery proof method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611177357.2A CN106787187B (en) | 2016-12-19 | 2016-12-19 | A kind of current misdelivery proof method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106787187A CN106787187A (en) | 2017-05-31 |
CN106787187B true CN106787187B (en) | 2019-04-23 |
Family
ID=58889779
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611177357.2A Active CN106787187B (en) | 2016-12-19 | 2016-12-19 | A kind of current misdelivery proof method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106787187B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008269023A (en) * | 2007-04-16 | 2008-11-06 | Chugoku Electric Power Co Inc:The | Operation target reporting system and operation target reporting server |
CN101697400A (en) * | 2009-10-26 | 2010-04-21 | 华北电网有限公司北京十三陵蓄能电厂 | Method for preventing accident of cross operation by five-prevention shutting system |
CN102065284A (en) * | 2010-12-29 | 2011-05-18 | 广东电网公司电力科学研究院 | Method and system for realizing visualized operation of power grid |
CN201937334U (en) * | 2010-12-01 | 2011-08-17 | 许继集团有限公司 | Centralized type protecting, overhauling and mistaken-operation-preventing system |
CN104851052A (en) * | 2015-04-02 | 2015-08-19 | 国网山东省电力公司青岛供电公司 | Intelligent error preventing method and system used for outputting dispatching operation ticket |
CN205160208U (en) * | 2015-11-11 | 2016-04-13 | 云南电网有限责任公司玉溪供电局 | Power dispatching prevents maloperation ticket system |
CN106059090A (en) * | 2016-07-20 | 2016-10-26 | 国网江苏省电力公司扬州供电公司 | Prompt system based on scheduling automation system and work method thereof |
-
2016
- 2016-12-19 CN CN201611177357.2A patent/CN106787187B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008269023A (en) * | 2007-04-16 | 2008-11-06 | Chugoku Electric Power Co Inc:The | Operation target reporting system and operation target reporting server |
CN101697400A (en) * | 2009-10-26 | 2010-04-21 | 华北电网有限公司北京十三陵蓄能电厂 | Method for preventing accident of cross operation by five-prevention shutting system |
CN201937334U (en) * | 2010-12-01 | 2011-08-17 | 许继集团有限公司 | Centralized type protecting, overhauling and mistaken-operation-preventing system |
CN102065284A (en) * | 2010-12-29 | 2011-05-18 | 广东电网公司电力科学研究院 | Method and system for realizing visualized operation of power grid |
CN104851052A (en) * | 2015-04-02 | 2015-08-19 | 国网山东省电力公司青岛供电公司 | Intelligent error preventing method and system used for outputting dispatching operation ticket |
CN205160208U (en) * | 2015-11-11 | 2016-04-13 | 云南电网有限责任公司玉溪供电局 | Power dispatching prevents maloperation ticket system |
CN106059090A (en) * | 2016-07-20 | 2016-10-26 | 国网江苏省电力公司扬州供电公司 | Prompt system based on scheduling automation system and work method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106787187A (en) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105184442A (en) | Power distribution network dispatching management statistical analysis system | |
CN106655523A (en) | Smart electric service system | |
CN206584222U (en) | A kind of supercentral station's centralized monitoring system | |
CN105262227A (en) | Fool-proof lockout system | |
CN102521701A (en) | Early warning command system and Early warning command method of power system | |
CN107545519B (en) | Power grid enterprise operation and inspection management and control method | |
CN112508384B (en) | Visual automatic monitoring equipment and method for power dispatching operation ticket | |
CN103366245A (en) | OSB (operation sevice bus)-based power grid fault information distribution method and system | |
CN106787187B (en) | A kind of current misdelivery proof method | |
CN111668935B (en) | Substation operation preparation management method and system based on EIM | |
CN105119371A (en) | Power grid dispatching automation fault alarm system | |
CN107832857A (en) | A kind of low-voltage network system of smart city | |
CN110018378B (en) | Fault studying and judging method for distributing different transformers of same overhead line by multiple repair work orders | |
CN108596782A (en) | Large-area power failure data rapid intercommunication method | |
Peng et al. | Design and development of intelligent operation and maintenance training system for substation based on augmented reality | |
CN111476473A (en) | Intelligent network management and control system for coking production | |
CN103872778B (en) | The wind-powered electricity generation control centre device that a kind of redundancy is arranged | |
CN110212585A (en) | Running of wind generating set Reliability Prediction Method, device and Wind turbines based on statistical analysis | |
CN109638965A (en) | A kind of intelligent power distribution monitoring platform | |
CN107301606A (en) | A kind of energy management monitoring system | |
CN113489146A (en) | Power distribution network safety operation management and control system | |
CN104300679A (en) | Error prevention system of centralized control station | |
CN207302127U (en) | A kind of sewage network intelligent maintenance device based on cloud service | |
CN202634075U (en) | Distribution transformer district equipment abnormal running remote alarm intelligent management center | |
CN207148594U (en) | Avoid the distribution box system of maloperation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |