CN206584222U - A kind of supercentral station's centralized monitoring system - Google Patents
A kind of supercentral station's centralized monitoring system Download PDFInfo
- Publication number
- CN206584222U CN206584222U CN201621089814.8U CN201621089814U CN206584222U CN 206584222 U CN206584222 U CN 206584222U CN 201621089814 U CN201621089814 U CN 201621089814U CN 206584222 U CN206584222 U CN 206584222U
- Authority
- CN
- China
- Prior art keywords
- safety
- area
- interchanger
- station
- work station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Alarm Systems (AREA)
Abstract
A kind of supercentral station's centralized monitoring system, including centralized control center's monitoring system, protection information is managed and trouble analysis system, operation management system, electric energy metering system, large screen display system, accessory system, centralized control center's monitoring system, protection information is managed and trouble analysis system, operation management system, electric energy metering system, large screen display system and accessory system link together, the utility model is by renting power communication private network or operator's designated lane by each power plant's access area centralized control center, and according to water power, photovoltaic, the different service types such as wind-powered electricity generation strictly carry out security partitioning according to electricity secondary safety protection principle, each system is separate not to be interfere with each other.
Description
Technical field
The utility model belongs to monitoring system, specially a kind of supercentral station's centralized monitoring system.
Background technology
At present, it is required to realize modern management and Unit Economic to subordinate power station in each electricity power enterprise of China's electricity market
The requirement of operation.And developing rapidly with Computer Control Technology, equipment automatization level and water power administrative skill, it is traditional
The drawbacks of single power station management mode, becomes increasingly conspicuous, and build according to integration, centralization generating produce business processing and
Management platform has become the inevitable choice of electric power enterprise development.
It is more that supercentral station is typically distributed relative distribution, quantity, distant, have inconvenient traffic and be difficult quick to reach existing
, therefore, region centralized control center of company is set up, region company is realized centralized Control, scheduling to each scattered power station and is managed,
Maximizing generation profit is realized, changes electricity power enterprise's production management mode of operation, reaches and increase efficiency by downsizing payrolls, finally realize power plant's " nothing
People is on duty, few man on duty ".
Utility model content
The purpose of this utility model is to provide asking in a kind of supercentral station's centralized monitoring system, solution background technology
Topic.
The utility model is realized using following technical scheme:
A kind of supercentral station's centralized monitoring system, including the management of centralized control center's monitoring system, protection information and accident analysis
System, operation management system, electric energy metering system, large screen display system, accessory system, centralized control center's monitoring
System, protection information management and trouble analysis system, operation management system, electric energy metering system, large screen display system
System and accessory system link together, centralized control center's monitoring system include gps system, data server, five anti-work stations,
Operator workstation, protection system work station, metering system work station, regimen system work station, intelligent video monitoring work station,
Power scheduling work station, operation management system, safety I area's interchanger, safety II area's interchanger, safety III area's interchanger,
Fire wall, isolating device, the gps system, data server, five anti-work stations, operator workstation are connected to Ith area of safety and handed over
Change planes;Protection system work station, metering system work station, regimen system work station are connected to II area's interchanger of safety;Intelligence is regarded
Frequency monitor workstation, power scheduling work station, production run work station, which are connected to, is both connected to III area's interchanger of safety;Safety I
Area's interchanger, II area's interchanger of safety, III area's interchanger of safety link together with large screen display system, the safety I
Fire wall is connected between area's interchanger, II area's interchanger of safety;Connected between II area's interchanger of safety, III area's interchanger of safety
Have and be connected with power station, wind park, photovoltaic plant, station group in isolating device, centralized control center's monitoring system.
In the utility model, the data server, operator workstation, five anti-work stations, gps system belong to safety I
Area, protection system work station, metering system work station, regimen system work station belong to IIth area of safety, intelligent video monitoring work
Stand, power scheduling work station, operation management system belong to IIIth area of safety, between Ith area of safety, IIIth area of IIth area of safety and safety
Information exchange pass through network connection.
In the utility model, the data server, operator workstation, five anti-work stations, gps system pass through safety I
Area's interchanger links together.
In the utility model, the protection system work station, metering system work station, regimen system work station pass through safety
II area's interchanger links together.
In the utility model, the intelligent video monitoring work station, power scheduling work station, operation management system lead to
III area's interchanger of safety is crossed to link together.
In the utility model, the large screen display system and I area's interchanger of safety, II area's interchanger of safety, safety III
Area's interchanger links together.
The utility model is specifically designed for the power station type that traditional area power plant faces differs, resource distribution is unreasonable, geography
The problems such as remote location, difficult management and design.By setting up center of the centralized monitor, unified management and control has each power plant under its command, passes through letter
Breathization and standardization promote production management system improve with improve, promote production process transparence, it is ensured that safety in production can
Control, can control, in control.The combination of the real-time systems such as management information system and DCS system, computer supervisory control system is realized, is carried
The real time implementation of high information gathering and processing, automatization level, realize the overall salary strategy of the production and operation, reach that reduction work is difficult
Degree, saving personnel cost, raising power benefit.
In the utility model, supercentral station's centralized monitoring system is set up between electric power dispatching system and power plant, is carry
Concentrate a distant place to monitor in real time, safety, the task such as economical operation and joint optimal operation, management, and to administrative each power plant's progress more
High-level Comprehensive Control and management, cover computer monitoring, industrial television, electrical energy metering, micro_computer five_proof, protection information pipe
The systems such as reason, normal operation, office automation information management.The system is pacified according to different service types according to Power Secondary
Full protection principle strictly carries out security partitioning, and each system is separate not to be interfere with each other.
Beneficial effect:Each supercentral station of security protection of network is taken into full account in the utility model centralized monitoring system scheme
Network-specific passage is used to information transfer between centralized monitoring system, and configures longitudinal direction encryption authentication device, and will be concentrated
Carry out increasing fire wall and isolating device between security partitioning, each area between each function system of monitoring system.Therefore number can be realized
According to transmission and monitoring, and ensure the privacy and security of data.
Brief description of the drawings
Fig. 1 is systematic schematic diagram of the present utility model;
Fig. 2 is monitoring schematic diagram of the present utility model.
Embodiment
In order that technological means, creation characteristic, reached purpose and effect that the utility model is realized are easy to understand, under
Face combines and is specifically illustrating, and the utility model is expanded on further.
Referring to Fig. 1, a kind of systematic schematic diagram of supercentral station's centralized monitoring system, a kind of supercentral station's Centralized Monitoring system
System, including the management of centralized control center's monitoring system 1, protection information and trouble analysis system 2, operation management system 3, electric flux
Metering system 4, large screen display system 7, accessory system 6, centralized control center's monitoring system 1, protection information management and failure
Analysis system 2, operation management system 3, electric energy metering system 4, large screen display system 7 and accessory system 6 are connected to
Together, centralized control center's monitoring system 1 mainly includes real time data server, historic data server, operator's work
Stand, engineer and training station, five anti-work stations, ON-CALL work stations and printer, GPS, UPS and the network switch etc..
The main task of realization is:Networked with each point of power station computer monitoring system, it is carried out remote security monitoring, in real time control and
Management.Possesses following major function:1st, to the remote measurement and data processing of point power station analog quantity parameter;2nd, to point power station switching value
Collection and sequence of events recording;3rd, to the emergency review of important parameter;4th, to the remote control of each point of Major Electromechanical Equipment;5th, it is right
The remote regulating in each point of power station, possesses AGC/AVC regulatory functions;6th, the data gathered are handled and are calculated etc. with Premium Features;
7th, to the operational management and guidance in each point of power station;8th, self diagnosis, self- recoverage and passage monitoring and alarm automatically.The protection information
Management includes data server, operator workstation and network switch etc. with trouble analysis system 2.By the guarantor of each power plant in region
Protect information and failure alarm signal carries out centralized watch, comprehensive analysis, while safety manager is also required in centralized control center pair
Each power station relay protection device constant value is set, inquired about and changed, and carrying out throwing to related soft pressing plate moves back, in such case
Under, the relay protection information management network concentrated is set up, is crash analysis and processing according to delineation of activities tissue and application data
Foundation is provided, the automatization level of relay protection running management is improved.Each power station is efficiently solved to protect various microcomputer relays
Bulk information produced by the equipment such as shield and automatic safety device, traveling wave ranging device, fault oscillograph lacks the present situation of management.
The operation management system 3 includes web server, real-time server, relation storehouse server, application server, operator
Work station, physical isolation apparatus, network switch etc..This function be power plant carry out asset of equipments, production run, enterprise operation and
The business such as administrative affair provide integrated, intelligent, integrated information service and business support.Operation management system is transported
With advanced practical management thought and design concept, with reference to the actual management requirement of power plant, to the Business Stream of power plant's production management
With information flow analyse in depth and comprehensive information planning, realize the becoming more meticulous, standardize of power plant production management work, specification
Change, information-based, intelligentized management objectives.The electric energy metering system 4 includes data server, application server and operation
Member's work station, the network switch, the main automatic acquisition and processing for completing the related electric flux of each power plant in region realizes electric flux number
According to statistics, analytic function, form all kinds of forms, and possess and third party's interface function.The large screen display system 7 includes
Many liquid crystal-spliced units, splicing controller, network switch etc..Each supercentral station's video, computer graphic can easily be shown
As signal, and with single screen, across shielding, combine, freely scale, the image display function, the advanced side of operating method such as mobile roaming
Just.The system situation that the accessory system 6 has actually been built according to each supercentral station is configured, and mainly has phone scheduling, wind
Power prediction, OMS, SG-OSS intelligent grid supporting system technologies etc., each system are simultaneous comprising application server respectively
Operator workstation, network switch etc..To realize the tasks such as joint optimal operation, management.
Referring to Fig. 2, a kind of monitoring schematic diagram of supercentral station's centralized monitoring system, centralized control center's monitoring system 1 is wrapped
Include gps system 8, data server 9, five anti-work stations 10, operator workstation 11, protection system work station 12, metering system
Work station 13, regimen system work station 14, intelligent video monitoring work station 15, power scheduling work station 16, normal operation
System 17, I area's interchanger 18 of safety, II area's interchanger 19 of safety, III area's interchanger 20 of safety, fire wall 21, isolating device 22,
The gps system 8, data server 9, five anti-work stations 10, operator workstation 11 are connected to I area's interchanger 18 of safety;Protect
Protecting system work station 12, metering system work station 13, regimen system work station 14 are connected to II area's interchanger 19 of safety;Intelligence is regarded
Frequency monitor workstation 15, power scheduling work station 16, production run work station 17, which are connected to, is both connected to III area's interchanger of safety
20;I area's interchanger 18 of safety, II area's interchanger 19 of safety, III area's interchanger 20 of safety are connected to large screen display system 7
Together, it is connected with fire wall 21 between the area's interchanger 18 of safety I, II area's interchanger 19 of safety;II area's interchanger 19 of safety,
It is connected between III area's interchanger 20 of safety in isolating device 22, centralized control center's monitoring system 1 and is connected with power station 23, wind
Power plant 24, photovoltaic plant 25, station group 26.The data server 9, operator workstation 11, five anti-work stations 10, GPS systems
System 8 belongs to Ith area of safety, and protection system work station 12, metering system work station 13, regimen system work station 14 belong to safety II
Area, intelligent video monitoring work station 15, power scheduling work station 16, operation management system 17 belong to IIIth area of safety, safety I
Information exchange between area, IIIth area of IIth area of safety and safety passes through network connection.The data server 9, operator workstation
11st, five anti-work stations 10, gps system 8 are linked together by the area's interchanger 18 of safety I.The protection system work station 12, meter
Amount system work station 13, regimen system work station 14 are linked together by the area's interchanger 19 of safety II.The intelligent video prison
Control work station 15, power scheduling work station 16, operation management system 17 are linked together by the area's interchanger 20 of safety III.
The large screen display system 7 is connected to I area's interchanger 18 of safety, II area's interchanger 19 of safety, III area's interchanger 20 of safety
Together.Each supercentral station of security protection to the Centralized Monitoring system of network is taken into full account in the utility model centralized monitoring system scheme
Information transfer uses network-specific passage between system, and configures longitudinal direction encryption authentication device, and by each work(of centralized monitoring system
It can carry out increasing fire wall and isolating device between security partitioning, each area between system.Therefore data transfer and monitoring can be realized,
And ensure the privacy and security of data.
General principle of the present utility model and principal character and advantage of the present utility model, one's own profession has been shown and described above
The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification
Simply illustrate principle of the present utility model, on the premise of the utility model spirit and scope are not departed from, the utility model is also
Various changes and modifications are had, these changes and improvements are both fallen within the range of claimed the utility model, the utility model
Claimed scope is by appended claims and its equivalent thereof.
Claims (6)
1. a kind of supercentral station's centralized monitoring system, including the management of centralized control center's monitoring system, protection information and accident analysis system
System, operation management system, electric energy metering system, large screen display system, accessory system, it is characterised in that the collection
Control central monitor system, it is protection information management and trouble analysis system, operation management system, electric energy metering system, big
On-screen display system and accessory system link together, centralized control center's monitoring system include gps system, data server,
Five anti-work stations, operator workstation, protection system work station, metering system work station, regimen system work station, intelligent video
Monitor workstation, power scheduling work station, operation management system, I area's interchanger of safety, II area's interchanger of safety, safety
III area's interchanger, fire wall, isolating device, the gps system, data server, five anti-work stations, operator workstation connection
In the area's interchanger of safety I;Protection system work station, metering system work station, regimen system work station are connected to IIth area of safety and handed over
Change planes;Intelligent video monitoring work station, power scheduling work station, production run work station, which are connected to, is both connected to the friendship of IIIth area of safety
Change planes;I area's interchanger of safety, II area's interchanger of safety, III area's interchanger of safety link together with large screen display system,
Fire wall is connected between the area's interchanger of safety I, II area's interchanger of safety;II area's interchanger of safety, IIIth area of safety are exchanged
It is connected between machine in isolating device, centralized control center's monitoring system and is connected with power station, wind park, photovoltaic plant, power station
Group.
2. a kind of supercentral station's centralized monitoring system according to claim 1, it is characterised in that the data server,
Operator workstation, five anti-work stations, gps system belong to Ith area of safety, protection system work station, metering system work station, regimen
System work station belongs to IIth area of safety, and intelligent video monitoring work station, power scheduling work station, operation management system belong to
IIIth area of safety, the information exchange between Ith area of safety, IIIth area of IIth area of safety and safety passes through network connection.
3. a kind of supercentral station's centralized monitoring system according to claim 1, it is characterised in that the data server,
Operator workstation, five anti-work stations, gps system are linked together by the area's interchanger of safety I.
4. a kind of supercentral station's centralized monitoring system according to claim 1, it is characterised in that the protection system work
Stand, metering system work station, regimen system work station are linked together by the area's interchanger of safety II.
5. a kind of supercentral station's centralized monitoring system according to claim 1, it is characterised in that the intelligent video monitoring
Work station, power scheduling work station, operation management system are linked together by the area's interchanger of safety III.
6. a kind of supercentral station's centralized monitoring system according to claim 1, it is characterised in that the large screen display system
System links together with I area's interchanger of safety, II area's interchanger of safety, III area's interchanger of safety.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621089814.8U CN206584222U (en) | 2016-09-29 | 2016-09-29 | A kind of supercentral station's centralized monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621089814.8U CN206584222U (en) | 2016-09-29 | 2016-09-29 | A kind of supercentral station's centralized monitoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206584222U true CN206584222U (en) | 2017-10-24 |
Family
ID=60108315
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621089814.8U Active CN206584222U (en) | 2016-09-29 | 2016-09-29 | A kind of supercentral station's centralized monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206584222U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108445862A (en) * | 2018-02-06 | 2018-08-24 | 国网江西省电力有限公司电力科学研究院 | A kind of test system and method for new energy power station control performance |
CN108600173A (en) * | 2018-03-22 | 2018-09-28 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | A kind of distributed travelling wave ranging System and method for having cryptographic security |
CN109888842A (en) * | 2019-04-12 | 2019-06-14 | 北京理工大学 | A kind of geomantic omen light complemental power-generation centralized control center cloud control method |
CN111049264A (en) * | 2019-12-02 | 2020-04-21 | 苏州协鑫新能源运营科技有限公司 | Energy management system based on cloud platform |
CN113890483A (en) * | 2021-09-29 | 2022-01-04 | 中国华能集团清洁能源技术研究院有限公司 | Hardware topological structure of photovoltaic power station monitoring system |
-
2016
- 2016-09-29 CN CN201621089814.8U patent/CN206584222U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108445862A (en) * | 2018-02-06 | 2018-08-24 | 国网江西省电力有限公司电力科学研究院 | A kind of test system and method for new energy power station control performance |
CN108600173A (en) * | 2018-03-22 | 2018-09-28 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | A kind of distributed travelling wave ranging System and method for having cryptographic security |
CN108600173B (en) * | 2018-03-22 | 2020-09-25 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Distributed traveling wave ranging system and method with encryption security |
CN109888842A (en) * | 2019-04-12 | 2019-06-14 | 北京理工大学 | A kind of geomantic omen light complemental power-generation centralized control center cloud control method |
CN111049264A (en) * | 2019-12-02 | 2020-04-21 | 苏州协鑫新能源运营科技有限公司 | Energy management system based on cloud platform |
CN113890483A (en) * | 2021-09-29 | 2022-01-04 | 中国华能集团清洁能源技术研究院有限公司 | Hardware topological structure of photovoltaic power station monitoring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206584222U (en) | A kind of supercentral station's centralized monitoring system | |
CN102570601B (en) | Transformer substation cockpit system | |
CN104950855A (en) | Town sewage plant and pump station operation monitoring management system and town sewage plant and pump station operation monitoring management method | |
CN105564465A (en) | System and method for controlling maintenance operation of railway electrical service signal equipment | |
CN106203830A (en) | Promote Distribution Network Failure response and the electric service system of repairing ability | |
CN106532935B (en) | For carrying out the method and its system of secondary system of intelligent substation fault diagnosis | |
CN106682826A (en) | Emergency repair command platform for distribution network | |
CN106026405A (en) | Relay protection on-line monitoring and analyzing system based on EMS system | |
CN102968689A (en) | Intelligent monitoring method for remote control of power transformation overhaul work | |
CN109494877A (en) | Marine wind electric field integrated monitoring method, apparatus, computer equipment and medium | |
CN107272532A (en) | A kind of electric self-service terminal method for visually monitoring and platform | |
CN115641070A (en) | Multi-level multi-department linkage handling method and deduction device for power grid emergency | |
CN206515892U (en) | Distribution repairing scheduling of resource platform based on power grid GIS | |
CN113556377B (en) | Ship external field coating environment monitoring system | |
CN209104902U (en) | A kind of monitoring device for distribute-electricity transformer district | |
CN102495615A (en) | Remote monitoring management system of large tonnage box girder transport and erection equipment group safety construction | |
CN204906004U (en) | Distributed intelligent regional power grid of network layering | |
CN114139742A (en) | Power distribution network management and control system and management and control method | |
CN104333131A (en) | Method for establishing prefecture and county power grid regulation data integration | |
CN204515470U (en) | The long-range gate control system of sun power | |
Zheng et al. | Research and practice of intelligent operation and maintenance system for essential load guarantee based on 5G and IOT technology | |
CN110866061A (en) | Information visualization system based on GIS | |
CN204496268U (en) | A kind of digital integration remote training fault diagnosis system of production system | |
CN108303956B (en) | Automatic on-duty centralized monitoring system for power grid dispatching | |
CN107301606A (en) | A kind of energy management monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|