CN106701110A - Method for stabilizing pressure of gas collecting pipe of coke oven - Google Patents

Method for stabilizing pressure of gas collecting pipe of coke oven Download PDF

Info

Publication number
CN106701110A
CN106701110A CN201510789477.7A CN201510789477A CN106701110A CN 106701110 A CN106701110 A CN 106701110A CN 201510789477 A CN201510789477 A CN 201510789477A CN 106701110 A CN106701110 A CN 106701110A
Authority
CN
China
Prior art keywords
blower
air blower
turnover panel
rotating speed
suction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510789477.7A
Other languages
Chinese (zh)
Other versions
CN106701110B (en
Inventor
赵恒波
武斌
马银华
王凤阁
刘兆强
陈述
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN201510789477.7A priority Critical patent/CN106701110B/en
Publication of CN106701110A publication Critical patent/CN106701110A/en
Application granted granted Critical
Publication of CN106701110B publication Critical patent/CN106701110B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B27/00Arrangements for withdrawal of the distillation gases
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B27/00Arrangements for withdrawal of the distillation gases
    • C10B27/06Conduit details, e.g. valves
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B41/00Safety devices, e.g. signalling or controlling devices for use in the discharge of coke
    • C10B41/08Safety devices, e.g. signalling or controlling devices for use in the discharge of coke for the withdrawal of the distillation gases

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Coke Industry (AREA)

Abstract

The invention provides a method for stabilizing the pressure of a gas collecting pipe of a coke oven, which is characterized in that a set of automatic flap adjusting system is added in a gas pipeline in front of the inlet of a gas blower, and the automatic flap adjusting system and a suction control point in front of the blower are interlocked; the reasonable suction range before the primary cooler is calibrated to be 1500 +/-200 Pa; the reasonable adjusting working range of the front turning plate of the calibration blower is 30-70%; the rotating speed of the hydraulic coupler of the air blower and the turning plate are adjusted to be automatic, and the opening degree of the turning plate is controlled to be 30-70%; according to the change of the gas generation amount, the rotating speed of the hydraulic coupler of the blower is manually adjusted, then the number of turns of the opening of the valve of the circulating pipe is manually adjusted, and finally the opening of the inlet valve of the blower is manually adjusted. The invention can ensure the stability of the suction before the primary cooler, the qualification rate of 1500 +/-200 Pa is more than 95 percent, the qualification rate in the range of 160 +/-40 Pa reaches more than 96 percent, the damage of furnace protecting iron pieces and equipment caused by large pressure fluctuation of the gas collecting pipe is greatly reduced, and the loss of byproducts is avoided.

Description

A kind of method of stabilization coke oven collecting main pressure
Technical field
The invention belongs to coke making process technical field, it is related to a kind of method for stablizing coke oven collecting main pressure.
Background technology
In recent years, the domestic capacity coke oven for having built substantial amounts of 6 meters or even more than 7 meters successively, coal gas guiding system is two sections Discharge, gas-blowing engine uses fluid coupling automatic speed regulation, automatic using turnover panel on discharge with stabilizing blower suction Regulation stabilization collecting main pressure.After operation of going into operation, generally existing coke oven collecting main pressure fluctuates big problem these coke ovens, Hyperpressure often occur causes the smolder even raw coke oven gas that catches fire of the positions such as fire door to diffuse, or extremely low pressure coke oven negative pressure occurs, makes Into body of heater blowby, not only severe contamination environment, loses resource, and very big to coking furnace shaft harm, has a strong impact on coke oven and uses Life-span.Therefore, domestic many factories and research unit have carried out substantial amounts of research and probe, this is not all solved ideally and is asked Topic.
Analysis reason, the technique is primarily present following two problems:
1st, the automatic speed regulation of air blower fluid coupling is delayed, causes air blower suction force fluctuation range big so that pressure is adjusted on discharge Section machine cannot realize fine setting to stablize collecting main pressure.Simultaneously as air blower suction force control lag also result in its with discharge on Be present coupling in automatic regulating system, interfere.
2nd, segmented collecting main pressure regulation machine itself there is also coupling, easily be sent out in the case where air blower suction force fluctuation is big Raw " surge " phenomenon, interferes;
It is stabilizing blower suction to solve this very corn of a subject, it is ensured that coal gas exports overall situation pressure stability, is collecting main pressure Regulation creates good conditions.
The content of the invention
The present invention is intended to provide one kind can realize quick regulation air blower suction force, to maintain air blower suction force stabilization, and then it is gas collection Pipe pressure regulation machine creates the service condition of stabilization, the method for finally realizing coke oven collecting main pressure stabilization.
It is up to this purpose, this invention takes following technical solution:
(1) increase turnover panel automatic regulating system on gas piping before gas-blowing engine entrance, and turnover panel is automatically adjusted and air blast Machine suction interlocking operation, while releasing the interlock connection of coupler rotating speed and air blower suction force;
(2), in 1500 ± 200Pa, the operation of collecting main pressure regulation machine is steady within this range for reasonable suction force range before demarcating primary cooler It is fixed;
(3), 30%~70%, within this range, turnover panel regulation is the sensitiveest for the reasonable working range of turnover panel before demarcating air blower;
(4) take based on turnover panel before air blower automatically adjusts, be aided with adjustment air blower fluid coupling rotating speed, circulation pipe valve and The suction method of adjustment of blower inlet valve opening, is tuned into fixation, air blower and collection by air blower fluid coupling rotating speed first Tracheae turnover panel regulation machine is tuned into automatically, and turnover panel aperture is controlled 30%~70%;Then according to the change of coal resource, adjust manually Section air blower fluid coupling rotating speed, or circulation pipe valve, blower inlet valve opening are further adjusted manually.Concrete operations Main points press following corresponding relation:
Beneficial effects of the present invention are:
Present invention can ensure that the stabilization of air blower suction force, is improved to more than 95% in the qualification rate of 1500 ± 200Pa by original 65%, Collecting main pressure is obviously improved, and qualification rate brings up to more than 96% by original 64% in the range of 160 ± 40Pa.Come into operation Since there is no coal gas diffusion accident, smolder and catch fire and body of heater blowby situation is eliminated, environmental quality is obviously improved, often The damage of the furnace retaining ironware and equipment caused by collecting main pressure fluctuation is big can be greatly reduced year, spare part, cost of equipment and pair is reduced Product loses.
Brief description of the drawings
Fig. 1 is air blower suction force regulation process schematic representation.
Specific embodiment
Suction is constantly close to setting value before the present invention mainly adjusts air blower 1 by controlling the aperture of turnover panel 3, is reached with this To air blower suction force and the stabilization of collecting main pressure.Its specific method is:
1st, the automatic regulating system of a set of turnover panel 3 is increased on gas piping before the entrance of gas-blowing engine 1, meanwhile, by turnover panel 3 certainly Dynamic regulating system forms interlocking with air blower suction force control point 6.
2nd, the reasonable suction force range of air blower 1 is demarcated in 1500 ± 200Pa.
3rd, the reasonable working range that turnover panel 3 is adjusted before demarcation air blower 1 is 30%~70%.
4th, take based on turnover panel 3 before air blower automatically adjusts, be aided with the rotating speed of adjustment air blower fluid coupling 2, circulation pipe valve 5 and the suction method of adjustment of the aperture of blower inlet valve 4, the rotating speed of air blower fluid coupling 2 is tuned into fixation first, drum Blower fan 1 and discharge turnover panel regulation machine are tuned into automatically, and the aperture of turnover panel 3 is controlled 30%~70%;Then according to coal resource Change, the manually rotating speed of regulation air blower fluid coupling 2, or further manual regulation circulation pipe valve 5, blower inlet valve 4 apertures of door.Embodiment concrete operations main points press following corresponding relation:

Claims (1)

1. it is a kind of stabilization coke oven collecting main pressure method, it is characterised in that:
(1) increase turnover panel automatic regulating system on gas piping before gas-blowing engine entrance, and turnover panel is automatically adjusted and air blast Machine suction interlocking operation, while releasing the interlock connection of fluid coupling rotating speed and air blower suction force;
(2) reasonable suction force range is in 1500 ± 200Pa before demarcating primary cooler;
(3) the reasonable working range of turnover panel is 30%~70% before demarcating air blower;
(4) take based on turnover panel before air blower automatically adjusts, be aided with adjustment air blower fluid coupling rotating speed, circulation pipe valve and The suction method of adjustment of blower inlet valve opening, is tuned into fixation, air blower and collection by air blower fluid coupling rotating speed first Tracheae turnover panel regulation machine is tuned into automatically, and turnover panel aperture is controlled 30%~70%;Then according to the change of coal resource, adjust manually Section air blower fluid coupling rotating speed, or circulation pipe valve, blower inlet valve opening are further adjusted manually;Concrete operations Main points press following corresponding relation:
CN201510789477.7A 2015-11-17 2015-11-17 Method for stabilizing pressure of gas collecting pipe of coke oven Active CN106701110B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510789477.7A CN106701110B (en) 2015-11-17 2015-11-17 Method for stabilizing pressure of gas collecting pipe of coke oven

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510789477.7A CN106701110B (en) 2015-11-17 2015-11-17 Method for stabilizing pressure of gas collecting pipe of coke oven

Publications (2)

Publication Number Publication Date
CN106701110A true CN106701110A (en) 2017-05-24
CN106701110B CN106701110B (en) 2019-05-31

Family

ID=58932498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510789477.7A Active CN106701110B (en) 2015-11-17 2015-11-17 Method for stabilizing pressure of gas collecting pipe of coke oven

Country Status (1)

Country Link
CN (1) CN106701110B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108728133A (en) * 2018-08-01 2018-11-02 马鞍山钢铁股份有限公司 A kind of unmanned accuracy-control system and method for coke guide operation
CN109798260A (en) * 2019-01-15 2019-05-24 临涣焦化股份有限公司 A kind of gas-blowing engine device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63245487A (en) * 1987-03-31 1988-10-12 Kawasaki Steel Corp Method and apparatus for operating coke oven riser
KR100651776B1 (en) * 2005-12-26 2006-12-01 주식회사 포스코 Damper plate control device of waste gas valve in coke oven
CN101885969A (en) * 2009-05-13 2010-11-17 中国神华能源股份有限公司 Gas collector pressure control method
CN104498058A (en) * 2014-12-31 2015-04-08 太原重工股份有限公司 Pressure balance control method for coke oven gas collector
CN105295964A (en) * 2015-10-29 2016-02-03 山东钢铁股份有限公司 Coke oven crude gas discharge control system and method
CN106701115A (en) * 2015-11-17 2017-05-24 鞍钢股份有限公司 Coke oven low-pressure ammonia water valve replacement method for preventing gas diffusion

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63245487A (en) * 1987-03-31 1988-10-12 Kawasaki Steel Corp Method and apparatus for operating coke oven riser
KR100651776B1 (en) * 2005-12-26 2006-12-01 주식회사 포스코 Damper plate control device of waste gas valve in coke oven
CN101885969A (en) * 2009-05-13 2010-11-17 中国神华能源股份有限公司 Gas collector pressure control method
CN104498058A (en) * 2014-12-31 2015-04-08 太原重工股份有限公司 Pressure balance control method for coke oven gas collector
CN105295964A (en) * 2015-10-29 2016-02-03 山东钢铁股份有限公司 Coke oven crude gas discharge control system and method
CN106701115A (en) * 2015-11-17 2017-05-24 鞍钢股份有限公司 Coke oven low-pressure ammonia water valve replacement method for preventing gas diffusion

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108728133A (en) * 2018-08-01 2018-11-02 马鞍山钢铁股份有限公司 A kind of unmanned accuracy-control system and method for coke guide operation
CN109798260A (en) * 2019-01-15 2019-05-24 临涣焦化股份有限公司 A kind of gas-blowing engine device
CN109798260B (en) * 2019-01-15 2020-11-06 临涣焦化股份有限公司 Gas blower device

Also Published As

Publication number Publication date
CN106701110B (en) 2019-05-31

Similar Documents

Publication Publication Date Title
CN103836639B (en) A kind of primary air fan control method based on First air burner hearth differential pressure and device
CN106701110A (en) Method for stabilizing pressure of gas collecting pipe of coke oven
CN104611487B (en) A kind of blast oven controls the method for top temperature
CN103940213A (en) Coke drying system dry gas temperature and flow self-adjustment control device and method
CN104074789A (en) Novel energy saving method for induced draught fan
CN104073605B (en) A kind of fast air-cooler load equalizer of vertical continuous annealing furnace and balance method
KR101421896B1 (en) Sintering airflow control system using sintering waste recirculation equipment
CN105176554B (en) A kind of method of control plateau coking coke quality
CN201136849Y (en) Automatic recognition device for regulating collecting main pressure of coke ovens
CN108088250A (en) A kind of belt type roasting machine heat power engineering system and its control method
CN106701115A (en) Coke oven low-pressure ammonia water valve replacement method for preventing gas diffusion
CN104630399A (en) Method for controlling H2 content in coal gas in safety range in blowing out process
CN108977206A (en) A kind of quenching furnace prestores the control pressurer system of room
CN102433134B (en) Method and system for controlling gas-collecting tube pressure of coke oven
CN204661561U (en) A kind of cement vertical mill system
CN206828447U (en) A kind of quenching stove prestores the control pressurer system of room
CN107576193A (en) A kind of rotary hearth furnace green-ball drying system temprature control method
CN211445493U (en) Be used for glass production facility refrigerated bellows of apron
CN111534308A (en) Method for controlling temperature of ultrahigh coke oven
CN207313630U (en) A kind of Coal Grinding System of Pci humidification device
CN105785065A (en) Power station boiler wind speed on-line monitoring system and speed measuring method
CN207031468U (en) A kind of blast-furnace tuyere leading portion that handles blocks up burnt device
CN206212542U (en) Switch board cooling device
CN213012940U (en) Blast furnace hot blast main pipe refractory lining rapid cooling structure
CN204892289U (en) But oven of automatically regulated deflector roll height

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant