CN106638696B - The construction method of installation of anti-settling manhole cover - Google Patents

The construction method of installation of anti-settling manhole cover Download PDF

Info

Publication number
CN106638696B
CN106638696B CN201610935059.9A CN201610935059A CN106638696B CN 106638696 B CN106638696 B CN 106638696B CN 201610935059 A CN201610935059 A CN 201610935059A CN 106638696 B CN106638696 B CN 106638696B
Authority
CN
China
Prior art keywords
well
concrete
manhole cover
well lid
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610935059.9A
Other languages
Chinese (zh)
Other versions
CN106638696A (en
Inventor
冯化新
袁鹏
王新民
袁文龙
王德庆
宋海涛
屈凡锋
杨勇
林星艳
陈永慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huitong Construction Group Co Ltd
Original Assignee
Shandong Huitong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Huitong Construction Group Co Ltd filed Critical Shandong Huitong Construction Group Co Ltd
Priority to CN201610935059.9A priority Critical patent/CN106638696B/en
Publication of CN106638696A publication Critical patent/CN106638696A/en
Application granted granted Critical
Publication of CN106638696B publication Critical patent/CN106638696B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/125Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the lining of the shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Road Repair (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention belongs to town road construction field, more particularly to a kind of construction method of installation of anti-settling manhole cover, it is characterised in that include the following steps:Excavation of foundation pit;Pit shaft is built by laying bricks or stones;Well seat ring is installed;Perimeter reinforcement;Emulsified asphalt sprays;Bituminous concrete decking and rolling;Well lid is installed;It synchronizes and rolls;Maintenance.The beneficial effects of the invention are as follows, be effectively ensured manhole cover contacted with bituminous paving near pavement structure be fully compacted, prevent the depression of well periphery and the caducous construction quality common fault problem of bituminous concrete, well lid is smoothed out with road drop-over, path formation, beauty, it ensure that road surface ride comfort and road-ability, promote urban road traffic safety and service level;Meanwhile construction efficiency is substantially increased, construction efficiency is high, shortens long construction period;Later stage mass defect maintenance rate caused by well lid quality problems is reduced, late maintaining maintenance cost is saved, reduces influence of the construction closing phase to social environment around, mitigates the influence that repair waste material generates surrounding enviroment, obtains preferable economic and social benefit.

Description

The construction method of installation of anti-settling manhole cover
Technical field
The invention belongs to town road construction field, more particularly to a kind of construction method of installation of anti-settling manhole cover.
Background technology
The disease on road surface is especially collapsed around inspection shaft, is rotten there are extremely widespread around urban road inspection shaft and well The mass defects such as side, crack, well lid destruction, reduce later stage mass defect maintenance rate, are the bottles for restricting urban road engineering quality Neck is the chronic disease for being difficult to overcome in road construction, seriously affects urban road traffic safety and service level, influences the flat of road It is whole, beautiful.
However, installing anti-settling manhole cover using traditional construction method, often the slow, inefficiency because of speed of application, leads Cause the asphalt around well lid, it is difficult to carry out Effective Compaction at the specified temperature, go out around well lid after a period of time that is open to traffic Now different degrees of track causes the generation for jumping vehicle phenomenon, influences the use function of road;Moreover, traditional construction technology side Method, takes a substantial amount of time and manpower, so that building course exists, time-consuming, takes manpower, the shortcomings of construction environment is poor.
Invention content
The present invention is mentioned above in order to solve the problems, such as, makes up the deficiency of traditional technology, provides a kind of solution inspection shaft week Side compactness is insufficient, depression, the caducous construction quality problem of bituminous concrete;Meanwhile solution traditional construction technique is cumbersome, applies Work efficiency rate is low, long construction period etc. native defects, be a kind of manhole cover construction method of installation of innovation.
The present invention is achieved through the following technical solutions:
A kind of construction method of installation of anti-settling manhole cover, it is characterised in that include the following steps:Excavation of foundation pit;Pit shaft It builds by laying bricks or stones;Well seat ring is installed;Pit shaft perimeter reinforcement;Emulsified asphalt sprays;Bituminous concrete decking and rolling;Well lid is installed;It is synchronous to grind Pressure;Maintenance.
Further, the excavation of foundation pit finds well lid center position accurately according to the coordinate that well lid early period measures before hidden;People Work is drawn circle and is cut to range within pit shaft week roadbase Φ 1500mm, steady to bituminous concrete, the water in cut coverage Base is crushed with electric pick, is abolished range and is not less than design of foundation pit size;The reserved marginal portion of foundation pit, which uses, manually to be cut;Clearly Bottom of foundation ditch is managed, is rinsed with water, moistens before concreting.
Further, the pit shaft is built by laying bricks or stones, and substrate well circumferential portion is filled out using cement stabilized macadam or low grade C15 concrete It is real, levelling;Well head height is 16cm under asphalt uplayer.
Further, the well seat ring installation, well seat ring outer diameter is 1020mm, and it is straight that anti-settling inspection shaft structure sheaf abolishes region Diameter is controlled in 1350mm, is fixed concrete well seat ring with cement mortar, and well seat ring and pit shaft are concentric, and well seat ring height is pitch 16cm under upper layer, surely upper substrate top surface flushes with water substantially, consolidates leveling;Often side width is well seat ring with roadbase 165mm is filled using cement stabilized macadam or cast-in-place concrete, forms the washer not less than road structure intensity.
Further, the emulsified asphalt spraying, sprays bitumen layer exposed parts in concrete upper surface and excision extension Emulsified asphalt.
Further, dropproof slot is placed in well by the bituminous concrete decking and rolling by sealing ring and installation jackscrew It holds out against and fixes in seat ring;By barrel cover type well head limit shaper be installed on well seat ring, pave bituminous concrete when, foundation pit Interior layering paves, and pitch virtual resurfacing thickness is controlled by empty paving coefficient, and feature is seldom expected for peaceful material of owing;Asphalt compacting is using punching It hits rammer and alternately, after the completion of cloth uses plate compactor progress first pressing first with plate compactor, adopted after asphalt surfacing Carry out multiple pressure with battering ram, be surface-treated again using plate compactor after the completion of multiple pressure, in compacting process according to field condition and Shi Jinhang supplements mixture and by the cleaning work of extra mixture;After after road surface, internal temperature is fully lowered into outdoor temperature, It is taken out after limit shaper is firmly rotated.
Further, the well lid is installed, and when particulate formula bitumen concrete paves, well lid is put into well head, machine to be paved spread out well Well lid tilting is promoted to particulate formula bitumen concrete void and spreads 2cm and vacantly temporarily fixed, using thin under anti-settling manhole cover frame by Gai Hou Grain formula bitumen concrete filling is closely knit, and the elevation that paves of the particulate formula bitumen concrete under well lid paves elevation by periphery road surface particulate formula bitumen concrete Same control, is hugged flat with small-sized rake carefulness, after leveling, well lid is put down, then with particulate formula bitumen concrete large roller Synchronize whole compacting.
Further, the maintenance, the open to traffic after pavement asphalt inside configuration temperature is fully lowered into outdoor temperature.
The invention has the advantages that the abundant compacting of manhole cover and bituminous paving is effectively ensured, depression and drip are prevented The green caducous construction quality problem of concrete, well lid are connected smooth-going with road, and elevation is consistent, and path formation, beauty ensure that Road surface ride comfort and road-ability promote urban road traffic safety and service level;Meanwhile substantially increasing construction effect It is long to shorten the well lid installation period for rate;Later stage mass defect maintenance rate caused by well lid quality problems is reduced, the later stage is saved Maintenance cost reduces blocked for road construction influence of the phase to social environment around, reduces repair waste material and is produced to surrounding enviroment Raw influence obtains preferable economic and social benefit.
Description of the drawings
It is further described below in conjunction with the accompanying drawings.
Fig. 1 is the flow chart that the present invention constructs.
Fig. 2 to Fig. 6 is the work progress schematic diagram of construction method of the present invention.
In figure, 1 periphery road surface, 2 lay bricks, 3 well seat rings, 4 sealing rings, and 5 fall slot, and 6 well heads limit shaper, 7 coarse grain Formula pitch, grain formula pitch in 8,9 particulate formula bitumen concretes, 10 well lids.
Specific implementation mode
Below by specific embodiment, the invention will be further described.
The construction method of installation of anti-settling manhole cover, it is characterised in that include the following steps:Excavation of foundation pit;Pit shaft is built It builds;Well seat ring is installed;Perimeter reinforcement;Emulsified asphalt sprays;Bituminous concrete decking and rolling;Well lid is installed;It synchronizes and rolls;It supports Shield.
The excavation of foundation pit finds well lid center position accurately according to the coordinate that well lid early period measures before hidden, artificial to draw circle pair Range is cut within pit shaft week roadbase Φ 1500mm, to the bituminous concrete in cut coverage, cement treated material electricity consumption Pick is crushed, and is abolished range and be should be less than foundation pit size, and must not disturb pavement structure, forbids to generate protuberance or crackle;Foundation pit Reserved marginal portion ensures that crater wall is neat, smoother, solid using manually cutting.Substrate should be cleaned out, and be answered before concreting It is rinsed with water, moistens.
The pit shaft is built by laying bricks or stones, well head height it is insufficient should upward spreading pit shaft as required, well head, which is laid bricks, to be built by inspection shaft Standard control is built, answers that mortar is full, build specification by laying bricks or stones, size is accurate;Substrate well circumferential portion uses cement stabilized macadam or low grade C15 concrete tamps, is levelling.Well head height is 16cm under coarse grain formula bitumen concrete, ensures to be mounted directly prefabricated regulation ring on well head.
The well seat ring installation, well seat ring(Prefabricated regulation ring)Outer diameter is 1020mm, and anti-settling inspection shaft structure sheaf is abolished Regional diameter is controlled in 1350mm, is fixed concrete prefabricated regulation ring with cement mortar, well seat ring and pit shaft are concentric, steady with water Upper substrate top surface flushes, and consolidates leveling;Well seat ring is 165mm per side width with roadbase, using cement stabilized macadam or now Pouring concrete is filled the washer to be formed not less than road structure intensity.
The emulsified asphalt spraying, to bitumen layer exposed parts spraying emulsification drip in concrete upper surface and excision extension Blueness will spray in place, and dosage is uniform.
The bituminous concrete decking and rolling leads to dropproof slot to prevent dregs and bituminous concrete from falling into inspection shaft It crosses sealing ring and installation jackscrew is placed in well seat ring and holds out against and fix.Gap around fall arrest construction equipment and manhole shaft Tight seal is carried out using rubber ring, when ensureing the construction of asphalt concrete structure layer, bituminous concrete and other sundries can not be fallen Enter in inspection shaft.Before asphalt concrete structure layer cloth, it is important to note that hygienic cleaning around pit shaft, ensures cleaned in situ.By well Lid is installed special limit positioning mold and is installed on well seat ring, and pave bituminous concrete, is layered and paves in foundation pit, bituminous concrete Virtual resurfacing thickness is controlled by empty paving coefficient, and cloth principle is seldom expected for peaceful material of owing, and is dripped around pit shaft after preventing bituminous concrete to be compacted Green concrete is higher than the bituminous concrete surface for completion of having constructed, and is had an impact to bituminous concrete flatness;Bituminous concrete Compacting uses battering ram alternately, to use plate compactor to carry out first pressing, bituminous concrete table first after the completion of cloth with plate compactor Multiple pressure is carried out using battering ram after face is smooth, is surface-treated again using plate compactor after the completion of multiple pressure.Basis in compacting process Field condition carries out feed supplement and the cleaning work of extra bituminous concrete in time, ensure the compactness after bituminous concrete compacting and Flatness.New black top concrete is controlled in bituminous concrete compacting process emphatically to handle with original face bed joint, seam crossing It needs manually to smear bituminous concrete combination oil, new old asphalt concrete must be made to connect batch position without clear gap, in conjunction with closely knit. After after road surface, internal temperature is fully lowered into outdoor temperature, taken out after gently rotating mold.
The well lid is installed, and when particulate formula bitumen concrete paves, spheroidal graphite cast-iron well seat is put into well head, machine to be paved spread out well Well lid elevation is promoted to particulate formula bitumen concrete void and spreads 2cm and fixed by Gai Hou, and particulate formula pitch is used under anti-settling manhole cover frame Concrete filling is closely knit, and the particulate formula bitumen concrete elevation that paves equally is controlled by the road surface particulate formula bitumen concrete elevation that paves under well lid, manually Quickly well lid is fallen after leveling, then pave with particulate formula bitumen concrete synchronizes whole compacting with large roller.
The maintenance, can open to traffic after after road surface, internal temperature is fully lowered into outdoor temperature.Such as without special traffic Pressure, preferably after asphalt stabilization, about 3--7 days, then open to traffic.
According to the disclosure and teachings of the above specification, those skilled in the art in the invention can also be to above-mentioned embodiment party Formula carries out change and modification appropriate.Therefore, the invention is not limited in specific implementation modes disclosed and described above, to this Some modifications and changes of invention should also be as falling into the scope of the claims of the present invention.

Claims (7)

1. a kind of construction method of installation of anti-settling manhole cover, it is characterised in that include the following steps:Excavation of foundation pit;Pit shaft is built It builds;Well seat ring is installed;Pit shaft perimeter reinforcement;Emulsified asphalt sprays;Bituminous concrete decking and rolling;Well lid is installed;It synchronizes and rolls; Maintenance;
Wherein, dropproof slot is placed in by sealing ring and installation jackscrew in well seat ring by the bituminous concrete decking and rolling Hold out against fixation;Barrel cover type well head well head limit shaper is installed on well seat ring, pave bituminous concrete, layering in foundation pit It paves, bituminous concrete virtual resurfacing thickness is peaceful to owe material few material by empty paving coefficient control;Bituminous concrete compacting using battering ram with Plate compactor alternately, uses plate compactor to carry out first pressing first after the completion of cloth, using impact after bituminous concrete surfacing Rammer carries out multiple pressure, is surface-treated using plate compactor after the completion of multiple pressure, is carried out in time according to field condition in compacting process again Supplement bituminous concrete and by the cleaning work of extra bituminous concrete;Wait for that road surface internal temperature is fully lowered into outdoor temperature Afterwards, it is taken out after well head limit shaper firmly being rotated.
2. the construction method of installation of anti-settling manhole cover according to claim 1, it is characterised in that:The foundation pit is opened It digs, according to the coordinate that well lid early period measures before hidden, finds well lid center position accurately;Artificial circle of drawing is to pit shaft week roadbase Φ Range is cut within 1500mm, is crushed with electric pick to bituminous concrete, the cement treated material in cut coverage, is abolished model It encloses and is not less than design of foundation pit size;The reserved marginal portion of foundation pit, which uses, manually to be cut;Bottom of foundation ditch is cleared up, is used before concreting Water is rinsed, is moistened.
3. the construction method of installation of anti-settling manhole cover according to claim 1, it is characterised in that:The pit shaft is built It builds, substrate well circumferential portion tamps using cement stabilized macadam or low grade C15 concrete, is levelling;Well head height is above pitch The lower 16cm of layer.
4. the construction method of installation of anti-settling manhole cover according to claim 1, it is characterised in that:The well seat ring peace Dress, well seat ring outer diameter are 1020mm, and anti-settling inspection shaft structure sheaf is abolished regional diameter and controlled in 1350mm, will with cement mortar Concrete well seat ring is fixed, and well seat ring and pit shaft are concentric, and well seat ring height is 16cm under asphalt uplayer, surely goes up base with water substantially Layer top surface flushes, and consolidates leveling;Well seat ring and roadbase are 165mm per side width, using cement stabilized macadam or cast-in-place mixed Solidifying soil is filled, and forms the washer not less than road structure intensity.
5. the construction method of installation of anti-settling manhole cover according to claim 1, it is characterised in that:The emulsified asphalt Spraying sprays emulsified asphalt to bitumen layer exposed parts in concrete upper surface and excision extension.
6. the construction method of installation of anti-settling manhole cover according to claim 1, it is characterised in that:The well lid peace If particulate formula bitumen concrete paves, well lid is put into well head, after machine to be paved spread out well lid, well lid tilting is promoted to particulate Formula bitumen concrete void is spread 2cm and is vacantly temporarily fixed, closely knit using the filling of particulate formula bitumen concrete under anti-settling manhole cover frame, under well lid The particulate formula bitumen concrete elevation that paves equally is controlled by the periphery road surface particulate formula bitumen concrete elevation that paves, hugged with small-sized rake it is flat, it is whole After flat, well lid is put down, then synchronizes whole compacting with large roller with particulate formula bitumen concrete.
7. the construction method of installation of anti-settling manhole cover according to claim 1, it is characterised in that:The maintenance, is waited for Pavement asphalt inside configuration temperature is fully lowered into open to traffic after outdoor temperature.
CN201610935059.9A 2016-11-01 2016-11-01 The construction method of installation of anti-settling manhole cover Active CN106638696B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610935059.9A CN106638696B (en) 2016-11-01 2016-11-01 The construction method of installation of anti-settling manhole cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610935059.9A CN106638696B (en) 2016-11-01 2016-11-01 The construction method of installation of anti-settling manhole cover

Publications (2)

Publication Number Publication Date
CN106638696A CN106638696A (en) 2017-05-10
CN106638696B true CN106638696B (en) 2018-09-11

Family

ID=58820365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610935059.9A Active CN106638696B (en) 2016-11-01 2016-11-01 The construction method of installation of anti-settling manhole cover

Country Status (1)

Country Link
CN (1) CN106638696B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847237A (en) * 2019-11-22 2020-02-28 河北瑞池工程项目管理有限公司 Anti-settling structure of inspection well and construction method thereof

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620322A (en) * 2017-07-13 2018-01-23 上海二十冶建设有限公司 The anti-settling method on municipal comprehensive pipeline inspection shaft periphery
CN108103880A (en) * 2017-12-21 2018-06-01 广东水利电力职业技术学院(广东省水利电力技工学校) A kind of hard processing method of road surface with soft subgrade well cover, road surface with soft subgrade, well cover
GB2574070B (en) * 2018-05-26 2020-05-20 Caswick Ltd Manhole device
US11008728B2 (en) 2018-05-26 2021-05-18 Caswick Limited Manhole device
CN109339058B (en) * 2018-11-30 2021-06-29 中国一冶集团有限公司 Template and method for reserved foundation pit of inspection well
CN110284525A (en) * 2019-04-02 2019-09-27 贵州磷镁材料有限公司 A kind of anti-settling manhole cover construction and the maintenance of impaired well lid or replacing options
CN110042870B (en) * 2019-04-24 2020-07-07 昆山加林工程项目管理有限公司 Deformation-resistant and sedimentation-resistant road wide-edge well ring structure and implementation method thereof
CN110295628A (en) * 2019-07-02 2019-10-01 广东源基建设工程有限公司 A kind of pavement construction method with inspection shaft
CN110499784B (en) * 2019-08-15 2021-03-12 济南城建集团有限公司 Synchronous lifting construction process for manhole cover
CN111005436A (en) * 2019-12-23 2020-04-14 中冶天工集团有限公司 Structure for preventing surrounding pavement of urban road drainage inspection well from sinking and construction method
CN111041947A (en) * 2019-12-30 2020-04-21 云南省建设投资控股集团有限公司 Mold for anti-settling well lid construction limiting well ring and construction method thereof
CN111005299B (en) * 2019-12-31 2021-05-04 江苏阿道夫公路特种养护工程有限公司 Anti-cracking maintenance process for asphalt pavement around well cover
CN113463691A (en) * 2020-03-31 2021-10-01 无锡市市政设施建设工程有限公司 Method for installing anti-settling well cover of newly-built road
CN111827362A (en) * 2020-07-27 2020-10-27 中交一公局集团有限公司 Mounting process of inspection well cover
CN112095668B (en) * 2020-09-22 2022-04-08 齐力建设集团有限公司 Municipal road anti-settlement manhole cover and rapid construction method thereof
CN112647543B (en) * 2021-01-12 2022-04-12 湖北路远建设集团有限公司 Rigid mounting construction method for manhole cover
CN112922037A (en) * 2021-01-25 2021-06-08 武汉市汉阳市政建设集团有限公司 Synchronous construction method for anti-settling well lid installation and pavement asphalt laying
CN113898056A (en) * 2021-10-28 2022-01-07 中国化学工程第七建设有限公司 Construction method of traffic lane inspection well
CN115030224A (en) * 2022-06-21 2022-09-09 青岛中润公用事业设计有限责任公司 Municipal road inspection well and construction method thereof
CN115075301B (en) * 2022-07-20 2024-06-14 中国二十二冶集团有限公司 Road pipeline well lid base and construction and installation method for well periphery

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04131407A (en) * 1990-09-22 1992-05-06 Nichireki Chem Ind Co Ltd Method for repairing area around manhole or the like area
CN104775451A (en) * 2014-01-15 2015-07-15 青岛市城乡建设委员会 Rapid disposal method for diseases near road manhole
CN105421571A (en) * 2015-12-15 2016-03-23 重庆金灿钢结构有限公司 Sewer well and rainwater well construction process
CN105569087A (en) * 2016-01-13 2016-05-11 中国十九冶集团有限公司 Inspection well construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04131407A (en) * 1990-09-22 1992-05-06 Nichireki Chem Ind Co Ltd Method for repairing area around manhole or the like area
CN104775451A (en) * 2014-01-15 2015-07-15 青岛市城乡建设委员会 Rapid disposal method for diseases near road manhole
CN105421571A (en) * 2015-12-15 2016-03-23 重庆金灿钢结构有限公司 Sewer well and rainwater well construction process
CN105569087A (en) * 2016-01-13 2016-05-11 中国十九冶集团有限公司 Inspection well construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847237A (en) * 2019-11-22 2020-02-28 河北瑞池工程项目管理有限公司 Anti-settling structure of inspection well and construction method thereof

Also Published As

Publication number Publication date
CN106638696A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106638696B (en) The construction method of installation of anti-settling manhole cover
CN102644295A (en) Construction method for preventing peripheral and local sedimentation of road surface inspection well
CN108914753A (en) A kind of airport asphalt concrete pavement preventive maintenance method
CN106592368A (en) Asphalt pavement paving no-cutting construction method
CN108487323B (en) Construction process of manhole cover device of inspection well on road
CN106120524B (en) A kind of road construction method on pavement and non-motorized lane intersection
CN106835877B (en) The construction method of roadbed widening structure
CN206553851U (en) roadbed widening structure
CN201296895Y (en) Vertical cracking pavement repair structure
CN109235179A (en) A kind of guarantor's drainage pavement structure and its construction method reducing urban heat land effect
CN209338946U (en) A kind of large longitudinal slope Deteriorated concrete pavement regenerated road surface structure
CN110499692A (en) One kind pouring into formula composite pavement construction method
CN110295628A (en) A kind of pavement construction method with inspection shaft
CN108252176A (en) A kind of pavement engineering construction method equipped with inspection shaft
CN107905082B (en) Crushing and utilizing method suitable for old cement concrete panel under poor support
CN207079446U (en) A kind of sponge municipal drainage road construction apparatus
CN107642109A (en) A kind of town road heavy well cover walling crib ruggedized construction and its construction method
CN107151961A (en) A kind of construction method of town road
CN110205895A (en) A kind of green low-carbon environment-friendly type road structure using regrown material
CN111005285A (en) White-to-black pavement structure and white-to-black pavement construction method
CN212000419U (en) Road structure in hilly areas
CN207228166U (en) A kind of town road heavy well cover walling crib ruggedized construction
CN213115347U (en) Dampproof ground
CN108951383A (en) A kind of construction technology that the regeneration of cement stabilized macadam base presplitting formula is reinforced
CN110499784B (en) Synchronous lifting construction process for manhole cover

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 250022 01-05 30 unit, Ji'nan Zhonghai Plaza, 6636 South Ring Road, Ji'nan City, Shandong.

Applicant after: Shandong Huitong Construction Group Co., Ltd.

Address before: 250000 51, Ji Luo Road, Tianqiao District, Ji'nan, Shandong

Applicant before: JINAN HUITONG JOINT MUNICIPAL ENGINEERING CO., LTD.

CB02 Change of applicant information
CB03 Change of inventor or designer information

Inventor after: Feng Huaxin

Inventor after: Chen Yonghui

Inventor after: Yuan Peng

Inventor after: Wang Xinmin

Inventor after: Yuan Wenlong

Inventor after: Wang Deqing

Inventor after: Song Haitao

Inventor after: Qu Fanfeng

Inventor after: Yang Yong

Inventor after: Lin Xingyan

Inventor before: Feng Huaxin

Inventor before: Chen Yonghui

Inventor before: Yuan Peng

Inventor before: Wang Xinmin

Inventor before: Yuan Wenlong

Inventor before: Wang Deqing

Inventor before: Song Haitao

Inventor before: Qu Fanfeng

Inventor before: Yang Yong

Inventor before: Lin Xingyan

CB03 Change of inventor or designer information