CN207079446U - A kind of sponge municipal drainage road construction apparatus - Google Patents

A kind of sponge municipal drainage road construction apparatus Download PDF

Info

Publication number
CN207079446U
CN207079446U CN201721046939.7U CN201721046939U CN207079446U CN 207079446 U CN207079446 U CN 207079446U CN 201721046939 U CN201721046939 U CN 201721046939U CN 207079446 U CN207079446 U CN 207079446U
Authority
CN
China
Prior art keywords
balancing pole
guide
wheel group
municipal drainage
termination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721046939.7U
Other languages
Chinese (zh)
Inventor
刘永伟
张楠楠
彭仕军
刘华
王长进
袁强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
One Hop Renewable Resources Technology Co Ltd
Original Assignee
One Hop Renewable Resources Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by One Hop Renewable Resources Technology Co Ltd filed Critical One Hop Renewable Resources Technology Co Ltd
Priority to CN201721046939.7U priority Critical patent/CN207079446U/en
Application granted granted Critical
Publication of CN207079446U publication Critical patent/CN207079446U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

It the utility model is related to asphalt pavement construction instrument field, specifically disclose a kind of sponge municipal drainage road construction apparatus, including guide-localization mechanism, center balancing pole, turn to supporting leg, the reinforcement mechanism for tamping bituminous paving corner, the guide-localization mechanism is connected by center balancing pole with turning to supporting leg, and the reinforcement mechanism is slidably connected on the balancing pole of center;The guide-localization mechanism includes being used for the housing for protecting road dental calculus, the guide wheel group, the road wheel group for walking that are oriented to for turning; the housing is connected by rod member with center balancing pole; the guide wheel group is distributed on case inside wall, and the road wheel group is arranged on housing bottom.The present apparatus precisely can be run along bend radian, and the asphalt aggregate at bend roadside angle is compacted, improves the construction quality of bend bituminous paving, extends the service life of asphalt roads.

Description

A kind of sponge municipal drainage road construction apparatus
Technical field
It the utility model is related to sponge urban road construction instrument field, and in particular to a kind of sponge municipal drainage road is applied Work apparatus.
Background technology
Traditional road ground does not have pervious function, and city can only rely on surface charge for remittance system and drainage pipeline networks to exclude earth's surface drop Rain, and because the urban development speed in China is extremely swift and violent, cause the serious hysteresis of urban infrastructure development, the row in many cities Drainage facility can not effectively meet the requirement of draining, and especially in the heavy rain time, therefore, city usually occurs in very heavy rains Rainwater accumulates and cross flow phenomenon.Substantial amounts of rainwater makes surface runoff drastically increase, and occurs peak value quickly, and city area expands Greatly, runoff coefficient can also increase therewith, and this is also the important origin cause of formation that China produces city waterlogging many city summers.And ecology is thoroughly Water route face can effectively reduce city overland runoff, mitigate pumping equipment burden, Yi Jihuan due to itself good water permeability Solve the prevention waterlogging pressure in city.Meanwhile the construction scale of sewerage system can also be reduced using ecological permeable road surface, reduce city Construction cost.
Existing sponge urban road construction mode uses pervious asphalt concrete construction process more.1. stirring:Permeable terrace is mixed The denseness of cement mortar is larger in compound, and negligible amounts, is equably wrapped on orthopaedics in order to which just cement mortar can guarantee that, preferably uses Forced mixer, mixing time are more than 5 minutes.2. pour:Before pouring, roadbed must be moistened first with water.Otherwise it is saturating The quick dehydration part of water terrace can weaken the adhesion strength between aggregate.Because permeable terrace mixture is more stiff, by what is mixed and stirred The permeable terrace material that permeable terrace is become reconciled, which is layered on roadbed, to be paved.3. vibrate:It should not be vibrated strongly in casting process Or compacting.The permeable concrete compound typically gently to be shaken with plate vibrator after paving, but must be noted that high frequency can not be used Vibrator, otherwise he can make the excessively closely knit face of concrete reduce porosity, and influence permeable effect.High speed vibrator also can simultaneously Cement slurry is come out from coarse aggregate surface segregation, flow into bottom and form an impermeable stratum, material is lost water penetration.4. roller Pressure:After vibrating, pervious concrete mix further should be flattened using solid steel tube or the compacting of light-duty road roller, it is contemplated that mix Close the conditions such as denseness and the environment temperature of material, it may be necessary to multiple roll-in, it should be noted that roller must be cleared up before roll-in, with Anti-stick aggregate.5. maintenance:Permeable terrace easy dehydration, is dried quickly, so maintenance is very heavy due to substantial amounts of hole be present Want especially early curings, it should be noted that avoid moisture in terrace from largely evaporating.Usual pervious concrete striking time is more mixed than common Solidifying soil is short, and such its side and edge will be exposed in air, and road surface and side are covered in time using plastic sheeting or colour bar cloth Face, to ensure humidity and the abundant aquation of cement.Permeable terrace should start watering maintenance for 1 day after being cast, and pressure should not be used during water drenching Power water column flings concrete surface, can so take away some cement mortars, causes some weaker positions, but can be in the feelings of normality Directly watered from top to bottom under condition.The water seasoning time of permeable terrace should be no less than 7 days.At present, compaction type form of construction work is more Asphalt aggregate is compressed using large-scale pressing machinery, big machinery compacting efficiency high, pressing result is good, but works as and be related to road When tooth is with roadside delivery position, especially turning, big machinery change are difficult reply, in actual use, bituminous paving Edge it is not close due to suppressing, easily there is road surface Water Damage, have a strong impact on service life of road surface, increase maintenance cost, Influence traffic safety.
The content of the invention
The purpose of this utility model is:For prior art sponge urban road construction apparatus for roadside especially When being turning roadside, because arc measurement is forbidden, easily road dental calculus is damaged by pressure, and the problem of roadside asphalt aggregate can not compress; A kind of sponge municipal drainage road construction apparatus is provided, precisely can be run along bend radian, to the asphalt aggregate at bend roadside angle It is compacted, improves the construction quality of bend bituminous paving, extends the service life of asphalt roads.
The technical solution adopted in the utility model is as follows:
A kind of sponge municipal drainage road construction apparatus, including guide-localization mechanism, center balancing pole, turn to supporting leg, For tamping the reinforcement mechanism of bituminous paving corner, the guide-localization mechanism is connected by center balancing pole with turning to supporting leg Connect, the reinforcement mechanism is slidably connected on the balancing pole of center;
The guide-localization mechanism is included for protecting the housing of road dental calculus, the guide wheel group being oriented to for turning, being used for The road wheel group of walking, the housing are connected by rod member with center balancing pole, and the guide wheel group is distributed on case inside wall On, the road wheel group is arranged on housing bottom.
Preferably, the reinforcement mechanism includes motor, drive shaft, compacting termination, the motor is horizontal sliding Dynamic to be arranged on the balancing pole of center, the compacting termination is connected by drive shaft with motor.
Preferably, the steering supporting leg is uniformly distributed on peripheries with multiple folding rollers.
Preferably, the utility model also includes the level meter for horizontal location, the level meter is installed in parallel in drive On dynamic motor.
Preferably, the steering supporting leg is formed using telescoping rod processing and fabricating.
Preferably, the present apparatus also includes being used to prevent from being compacted the anti-adhesion mechanism that termination sticks together with aggregate, it is described anti- Viscous mechanism is arranged on compacting termination.
Preferably, the anti-adhesion mechanism includes electric hot plate and temperature controller, the electric hot plate is distributed on compacting termination Lower surface, the temperature controller is arranged on the upper surface of compacting termination, and the temperature controller passes through circuit and electric hot plate Connection.
In summary, by adopting the above-described technical solution, the beneficial effects of the utility model are:
1st, in traditional sponge urban road construction apparatus compacting mechanism, because large-scale apparatus is difficult to road pavement Corner is tamped, long-term use of easily to cause road surface corner to be damaged, sponge municipal drainage road construction device of the present utility model Tool, by guide-localization mechanism and road dental calculus of the supporting leg by the present apparatus installed in the turning pitch roadside for needing to tamp can be turned to On, steering radian of the guide-localization mechanism along road dental calculus moves, so as to drive the radius of turn of the present apparatus and road to keep one Directly, reinforcement mechanism is more accurately tamped to asphalt aggregate near the bend arm of angle, avoid during compacting, bend road Section needs not stop the angle for converting reinforcement mechanism, delays construction speed, improves the construction quality and efficiency of construction of bituminous paving.
2nd, when having tamped one section of corner, for more convenient mobile device, sponge municipal drainage of the present utility model Road construction apparatus is in guide-localization mechanism and turns to the uniform multiple folding rollers of surrounding of supporting leg, tamps bituminous paving When, folding roller is opened, and allows the stressed member of leg to contact ground, and when needing to move, folding roller downward movement, support Its whole device, then moved by roller, make present apparatus operation more efficient.
3rd, in order to further improve the precision of the present apparatus, sponge municipal drainage road construction apparatus of the present utility model is driving Level meter is mounted with dynamic motor, motor keep level can be ensured to greatest extent, so that compacting termination can ensure precision Higher horizontal reciprocating movement, improve the construction precision of device.
4th, because during compacting, compacting termination will contact with aggregate, can stick together unavoidably, in order to avoid material is big Amount is deposited on the surface of compacting termination, and the present apparatus is additionally arranged the mechanism that prevents adhesion, and compacting termination table will be sticked in by electric hot plate The aggregate heating in face, makes it thinning again, to reach the purpose departed from from compacting termination, improves equipment operation stability.
Brief description of the drawings
Fig. 1 is the structure chart of the utility model sponge municipal drainage road construction apparatus;
Fig. 2 is the guide-localization mechanism enlarged drawing of the utility model sponge municipal drainage road construction apparatus;
Fig. 3 is the horizontal operation face schematic diagram of the utility model sponge municipal drainage road construction apparatus;
Marked in figure:1- guide-localizations mechanism;1.1- housing;1.2- guide wheel group;1.3- road wheel groups;2- centers balance Bar;3- turns to supporting leg;4- reinforcement mechanisms;4.1- motor;4.2- drive shaft;4.3- is compacted termination;6- folding rollers;7- Level meter.
Embodiment
All features disclosed in this specification, can be with any in addition to mutually exclusive feature and/or step Mode combines.
The present invention is elaborated with reference to Fig. 1, Fig. 2, Fig. 3.
Embodiment 1, a kind of sponge municipal drainage road construction apparatus, including guide-localization mechanism 1, center balancing pole 2, turn Reinforcement mechanism 4 to supporting leg 3, for tamping bituminous paving corner, the guide-localization mechanism 1 by center balancing pole 2 with Turn to supporting leg 3 to connect, the reinforcement mechanism 4 is slidably connected on center balancing pole 2;
The guide-localization mechanism 1 includes being used for the housing 1.1 for protecting road dental calculus, the guide wheel group being oriented to for turning 1.2nd, the road wheel group 1.3 for walking, the housing 1.1 are connected by rod member with center balancing pole 2, the guide wheel group 1.2 are distributed on case inside wall, and the road wheel group 1.3 is arranged on the bottom of housing 1.1.The housing 1.1 is in inverted u-shaped, It can be buckled on the dental calculus of road, road wheel group 1.3 is two groups, and one group is arranged on the bottom of U-shaped housing, and is connect with road dental calculus surface Touch, another group is arranged on the bottom surface of U-shaped housing sidewall, and guide wheel group 1.2 contacts with the vertical plane of road dental calculus, realizes whole The steering of device, guide wheel group 1.2 are located at road dental calculus in pavement side.
Further, the reinforcement mechanism 4 of this implementation includes motor 4.1, drive shaft 4.2, compacting termination 4.3, described The level of motor 4.1 is slidably mounted on center balancing pole 2, and the compacting termination 4.3 passes through drive shaft 4.2 and motor 4.1 connection.The driving compacting of motor 4.1 termination 4.3 moves up and down, so as to realize tamping operation.The steering supporting leg 3 is adopted Formed with telescoping rod processing and fabricating.Further, the steering supporting leg 3 of this implementation is uniformly distributed on peripheries with multiple folding rollers 6. Folding roller 6, in expansion posture, allows bottom plate to be contacted with road surface, it is necessary to when walking in compacting, and folding roller 6 is rotated down, branch Whole device is propped up, is walked.
The present embodiment at work, is directed to detent mechanism 1 and reinforcement mechanism 4 is respectively arranged in the both sides of road dental calculus, lead It is located to detent mechanism 1 on pavement, and reinforcement mechanism 4 is located on road to be tamped, regulation reinforcement mechanism 4 balances at center Position on bar 2, it is fixed on the arm of angle of asphalt roads and go out, positioned at road dental calculus side;Start motor 4.1, driving electricity The driving compacting of machine 4.1 termination 4.3 moves up and down, so as to automatically be compacted the asphalt aggregate of road edge.Due to whole device It is for corner, during compacting, guide-localization mechanism 1 changes the operation of whole device with the radian of road dental calculus Direction, so as to be accurately compacted the asphalt aggregate of road corner actuated position, preferably improve the construction quality of road With precision.
Embodiment 2, the present embodiment have made following optimization on the basis of embodiment 1:The present embodiment also includes being used for level The level meter 7 of positioning, the level meter 7 are installed in parallel on motor 4.1.Level meter 7 can ensure driving electricity to greatest extent Machine 4.1 is horizontal, so that compaction head can ensure the higher horizontal reciprocating movement of precision, improves the construction essence of device Degree.
Following optimization has been made in embodiment 3, this implementation on the basis of embodiment 1:The present embodiment also includes being used to prevent from pressing The anti-adhesion mechanism that real termination 4.3 sticks together with aggregate, the anti-adhesion mechanism are arranged on compacting termination 4.3.
Further, the anti-adhesion mechanism of the present embodiment includes electric hot plate and temperature controller, and the electric hot plate is distributed on pressure The lower surface of real termination 4.3, the temperature controller are arranged on the upper surface of compacting termination, and the temperature controller passes through circuit Connected with electric hot plate.
It is embodiment of the present utility model as described above.The utility model is not limited to above-mentioned embodiment, anyone The structure change made under enlightenment of the present utility model should be learnt, it is every that there is same or like skill with the utility model Art scheme, each falls within the scope of protection of the utility model.

Claims (7)

  1. A kind of 1. sponge municipal drainage road construction apparatus, it is characterised in that:Including guide-localization mechanism (1), center balancing pole (2) supporting leg (3), the reinforcement mechanism (4) for tamping bituminous paving corner, are turned to, the guide-localization mechanism (1) is in Heart balancing pole (2) is connected with turning to supporting leg (3), and the reinforcement mechanism (4) is slidably connected on center balancing pole (2);
    The guide-localization mechanism (1) includes being used for the housing (1.1) for protecting road dental calculus, the guide wheel group being oriented to for turning (1.2), the road wheel group (1.3) for walking, the housing (1.1) is connected by rod member with center balancing pole (2), described to lead It is distributed on to wheel group (1.2) on case inside wall, the road wheel group (1.3) is arranged on housing (1.1) bottom.
  2. 2. sponge municipal drainage road construction apparatus as claimed in claim 1, it is characterised in that:Reinforcement mechanism (4) bag Motor (4.1), drive shaft (4.2), compacting termination (4.3) are included, motor (4.1) level is slidably mounted on center On balancing pole (2), compacting termination (4.3) is connected by drive shaft (4.2) with motor (4.1).
  3. 3. sponge municipal drainage road construction apparatus as claimed in claim 1, it is characterised in that:Turn to the four of supporting leg (3) It is evenly equipped with multiple folding rollers (6) week.
  4. 4. sponge municipal drainage road construction apparatus as claimed in claim 2, it is characterised in that:Also include being used for horizontal location Level meter (7), the level meter (7) is installed in parallel on motor (4.1).
  5. 5. the sponge municipal drainage road construction apparatus as described in claim 1-4 is any, it is characterised in that:It is described to turn to support Leg (3) is formed using telescoping rod processing and fabricating.
  6. 6. sponge municipal drainage road construction apparatus as claimed in claim 2, it is characterised in that:Also include being used to prevent from being compacted The anti-adhesion mechanism that termination (4.3) sticks together with aggregate, the anti-adhesion mechanism are arranged in compacting termination (4.3).
  7. 7. sponge municipal drainage road construction apparatus as claimed in claim 6, it is characterised in that:The anti-adhesion mechanism includes electricity Hot plate and temperature controller, the electric hot plate are distributed on the lower surface of compacting termination (4.3), and the temperature controller is arranged on pressure The upper surface of real termination, the temperature controller are connected by circuit with electric hot plate.
CN201721046939.7U 2017-08-21 2017-08-21 A kind of sponge municipal drainage road construction apparatus Active CN207079446U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721046939.7U CN207079446U (en) 2017-08-21 2017-08-21 A kind of sponge municipal drainage road construction apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721046939.7U CN207079446U (en) 2017-08-21 2017-08-21 A kind of sponge municipal drainage road construction apparatus

Publications (1)

Publication Number Publication Date
CN207079446U true CN207079446U (en) 2018-03-09

Family

ID=61420810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721046939.7U Active CN207079446U (en) 2017-08-21 2017-08-21 A kind of sponge municipal drainage road construction apparatus

Country Status (1)

Country Link
CN (1) CN207079446U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924272A (en) * 2019-12-11 2020-03-27 刘士英 Bridge pavement vibration compaction device
CN110952424A (en) * 2019-12-18 2020-04-03 长沙理工大学 Highway road surface leveling device
CN110952422A (en) * 2019-12-18 2020-04-03 长沙理工大学 Highway pavement leveling method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924272A (en) * 2019-12-11 2020-03-27 刘士英 Bridge pavement vibration compaction device
CN110952424A (en) * 2019-12-18 2020-04-03 长沙理工大学 Highway road surface leveling device
CN110952422A (en) * 2019-12-18 2020-04-03 长沙理工大学 Highway pavement leveling method
CN110952424B (en) * 2019-12-18 2021-10-01 长沙理工大学 Highway road surface leveling device
CN110952422B (en) * 2019-12-18 2021-10-01 长沙理工大学 Highway pavement leveling method

Similar Documents

Publication Publication Date Title
CN106638696B (en) The construction method of installation of anti-settling manhole cover
CN207079446U (en) A kind of sponge municipal drainage road construction apparatus
CN106758642A (en) A kind of colorful water-permeable concrete entirety pavement structure and its construction method
CN205420946U (en) Novel ecology that prevents surface gathered water road structure of permeating water
CN105256692A (en) Color and pervious concrete pavement structure and construction technology therefor
CN106759126B (en) Construction method of side slope support drainage channel
CN103352407A (en) Construction process of roadbed structure with sand-based water-permeable bricks
CN203295913U (en) Novel ecological permeable road structure
CN109914178A (en) A kind of biological enzyme curing materials integration paved roads construction method
CN103882788B (en) Based on the method for constructing roadway of the modification roller compacted concrete surface layer of enzyme soil cured substrate layer
CN103114509B (en) Slipform construction method for concrete side film of roadbase
CN109338842A (en) Colorful water-permeable road surface and construction method
CN111021174A (en) Construction method of urban road
CN207079447U (en) A kind of bituminous paving corner compaction apparatus
CN106930327B (en) Well lid construction installation method
CN103304250A (en) High water-storage concrete
CN103835205A (en) Construction method for road edge stone sliding mode
CN111549603A (en) Pavement considering water load coupling and construction method thereof
CN105332328A (en) Collapsible loess road structure capable of preventing water seepage and construction method of road with structure
CN115787576A (en) Movable slope protection sand cushion paving compaction device and construction process
CN213115347U (en) Dampproof ground
CN202787016U (en) Novel water seepage concrete member
CN203319874U (en) Concrete pavement with high water storage capacity
CN105735095A (en) Method for preventing wheels of sand filling construction machinery from being trapped
CN206245160U (en) A kind of asphalt surface course structure of slag fine aggregate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant