CN108914753A - A kind of airport asphalt concrete pavement preventive maintenance method - Google Patents

A kind of airport asphalt concrete pavement preventive maintenance method Download PDF

Info

Publication number
CN108914753A
CN108914753A CN201810835108.0A CN201810835108A CN108914753A CN 108914753 A CN108914753 A CN 108914753A CN 201810835108 A CN201810835108 A CN 201810835108A CN 108914753 A CN108914753 A CN 108914753A
Authority
CN
China
Prior art keywords
asphalt
face
road
seam
pit slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810835108.0A
Other languages
Chinese (zh)
Inventor
周庆月
赵振华
王克平
陆宁
施逸锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZENGGUANG COMPOSITE TECHNOLOGY Co Ltd
Original Assignee
JIANGSU ZENGGUANG COMPOSITE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZENGGUANG COMPOSITE TECHNOLOGY Co Ltd filed Critical JIANGSU ZENGGUANG COMPOSITE TECHNOLOGY Co Ltd
Priority to CN201810835108.0A priority Critical patent/CN108914753A/en
Publication of CN108914753A publication Critical patent/CN108914753A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/03Arrangements for curing paving; Devices for applying curing means; Devices for laying prefabricated underlay, e.g. sheets, membranes; Protecting paving under construction or while curing, e.g. use of tents
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0966Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving
    • E01C23/0973Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving with liquid or semi-liquid materials, e.g. crack sealants
    • E01C23/098Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving with liquid or semi-liquid materials, e.g. crack sealants and working the surface of the filling or applying particulate material thereto, e.g. smoothing, gritting

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

The present invention relates to pavement of road conservation technology fields, and in particular to a kind of airport asphalt concrete pavement preventive maintenance method, using following steps:Step 1:Crack treatment, using following steps;1) preparation stage before constructing;2) it slots the stage;3) cleaning in crack and drying stage;4) cementation of fissures sessions;5) cementation of fissures quality testing stage;Step 2;Pit slot processing, using following steps;1) preparation of construction 2) delimit digging range;3) pit slot is excavated;4) pit slot is cleared up;5) spread sticking layer oil;6) rolled asphalt mixture is backfilled:7) joint seal waterproof;Step 3;Asphalt pavement regeneration sealing;It improves with that can improve road conditions and exercises quality, extends pavement life, reduces life cycle cost.

Description

A kind of airport asphalt concrete pavement preventive maintenance method
Technical field
The present invention relates to pavement of road conservation technology fields, and in particular to a kind of airport asphalt concrete pavement is preventative to support Maintaining method.
Background technique
With social development, great change is also had occurred in the trip tool of people, and aircraft is efficiently quickly handed over as a kind of Logical tool is widely used.In order to promote national economy lasting, fast-developing, foundation construction field is still long-term in country Development plan gives special assistance to direction, air transportation with it efficiently, efficiently operation way and important strategic value increasingly by To attention, therefore, in recent years, newly-built, reconstructed or expanded airport quantity also grows continuously and fast.
And frequently takeoff and landing is also increasing to the load of Airport Asphalt.Therefore it is directed to airport pitch road The maintenance problem in face is increasingly paid attention to.Compared with conventional cement concrete track, bituminous concrete runway is seamless, driving is relaxed Suitable, maintenance is convenient, therefore, has become the main body of airfield pavement.However, since asphalt durability can poor, asphalt pavement Service life is far below cement concrete constructions, moreover, just will appear early disease using very short time, in unfavourable season, these Disease can be developed with geometry speed.Therefore, asphalt pavement service life and quality are improved, it is most important to prevent early damage.
Domestic airport runway early disease has:Crack, infiltration, purt slurry, pit slot, loose, they are to cause airfield runway road The principal element of face early damage, final embodiment are that the deterioration of flatness makes runway begin to delay or stopping caused destruction It is in good state eventually, and maintenance cost can be saved, it is more necessary to use simple, economical and effective preventive maintenance. It is planned that assessment and preventive maintenance periodically are carried out to airfield runway safety, stability, comfort etc., it is runway pavement Some technical parameters are improved, and can stop the diseases such as crack in a long time to destruction caused by road face.
Traditional curing method is just handled after often there is disease, easily leads to the drawbacks of take stopgap measures, Overlapping investment is also larger.Preventive maintenance is carried out, then can largely mitigate such drawback, while also reducing cost, Improve maintenance efficiency.Road face preventive maintenance passes through regular highway condition investigation, finds road surface little damage and disease mark in time As its producing cause of analyzing and researching takes protectiveness maintenance measure to the ill, small disease further expansion is prevented, to slow down Face or Pavement Condition speed of worsening, make face or road surface be in good service state always.
Summary of the invention
In view of the defects and deficiencies of the prior art, the present invention intends to provide a kind of airport asphalt concrete pavement is pre- Anti- property maintenance process, it improves with that can improve road conditions and exercises quality, extends pavement life, reduces life cycle cost.
A kind of airport asphalt concrete pavement preventive maintenance method of the present invention, using following steps:
Step 1:Crack treatment, using following steps:
1) preparation stage before constructing:
I) according to the conversion area and depth in crack, prepare emulsified asphalt satisfactory enough or pitch and filler material; II performance checking then) is carried out to pouring machine, it is ensured that its bitumen pipeline, pitch spray gun are unimpeded, and high-pressure hot air blows roasting device pressure Power is enough, temperature is suitable;
2) it slots the stage:
I) the tiny irregular cracks for slit width within 5mm can generally be incited somebody to action due to being difficult to directly pour into pointing Seam spreads to deep 40mm, wide 12mm;II) with sweep seam machine to extension it is new seam and original wider old seam clean, scan out The sundries come will be removed in time, in order to which gap-grouting material and the face Yuan Dao bond;
3) cleaning in crack and drying stage:
I roasting spray gun is blown with high-pressure hot air after) slotting, the compressed air after heating is blowed to crack, clear out the rubble in seam With the sundries such as powder;II) the road plane materiel material heating of fracture two sides simultaneously, thus the temperature for reducing gap-grouting material and being poured Difference;
4) cementation of fissures sessions:
I) start pouring machine, gap-grouting material is heated, when gap-grouting material temperature reaches operating temperature, carry out cementation of fissures work Industry;It II, should be immediately using inhaling the problems such as in order to protect not solidified gap-grouting material, prevent wheelprint) after cementation of fissures operation Material is received, so that they adhere to pointing surface, as temporary covering;
5) cementation of fissures quality testing stage:
I) whether the inspection cementation of fissures is linearly smooth, appearance neat and tidy, and sealing material is substantially concordant with road face;II it) checks and fills Whether abundant full, the surfacing of seam, grainless micelle or the knot that becomes silted up, drag mark is without extra gap-grouting material;III) after rolling not Deformation is fallen off, is kept sufficiently resilient;
Step 2:Pit slot processing, using following steps:
1) preparation of construction:I) probe pit slot type and degree of disease determine Disease Processing range and depth;II) root Prepare sticking layer oil material and asphalt according to former road noodles type;III traffic closing) is carried out to disease section, allocates and transports construction machine Tool guarantees each equipment normal operation of constructing;
2) digging range delimited:According to " circular hole side is mended, and oblique hole is just mended " principle, pit slot maintenance surface delimited;Maintenance surface is at square Shape, surrounding people having a common goal face graticule is parallel or vertical, and range will be in actual pit trough rim;
3) pit slot is excavated:I the bituminous concrete of damage) is cut;II) using Hydraulic pick or grooving machine along the maintenance model delimited Enclose joint-cutting, it is desirable that joint-cutting is vertical, and the bituminous concrete in maintenance range is dug pine with equipment such as Hydraulic picks, and waste material is walked clearly; It is excavated when excavation from centre to four sides, in order to avoid damage trimming, it is desirable that it excavates and arrives intact, stable bottom surface;III) when processing depth Too deep when needing layered rolling, each layer cuts face and to form step, and step width is not less than 10cm;
4) pit slot is cleared up:I) to after excavation pit slot bottom and surrounding handle, ravelled spot occur will cut completely, out Existing crack will do the processing of cementation of fissures joint seal, and be removed the loose pellet of pit slot bottom, four walls completely with wire brush;II) with blowing Machine dries up the sundries such as the floating ash in ponding, watermark and repairing range in pit slot;
5) spread sticking layer oil:Spread sticking layer oil is wanted on pit slot bottom surface and four walls, improves the bonding of new-old concrete;Sticking layer oil Spread is answered uniformly, without leakage to spill, without trickling;
6) rolled asphalt mixture is backfilled:
I hot-mix asphalt mixture) is inserted into pit slot and is rolled, when layering is repaired, placement in layers, layered rolling;II it) returns When filling out asphalt, even, leveling is pushed away with plate is bulldozed, number is controlled, prevent number from excessively causing fines product in bottom surface, coarse fodder It stays in surface, leads to mixture segregation;It when III) rolling, is compacted with small-size vibratory roller or plate compactor, first rolls hole Four side of slot again successively to centre promote, guarantee road face entirety flatness and new and old road face seam it is smooth, simultaneously for seam Place can suitably increase rolling layer, improve compactness, prevent in the future that seam is loose, infiltration;
7) joint seal waterproof:It is uniformly applied in the new old asphalt concrete seam of repairing face surrounding with pitch class binder;
Step 3:Asphalt pavement regeneration sealing, using following steps:
1) equipment prepares:Strength brusher, full-automatic pitch sprinkling car;
2) preparation of maintaining runway agent:It is made of high performance modified bitumen, water, modifying agent, film forming agent and additive;By matter The proportion for measuring percentage is as follows:High performance modified bitumen 60-80%, water 20-45%, modifying agent 10-35%, film forming agent 10- 35% and additive 2-15%;
Wherein:
I) high performance modified bitumen:For split fastly type cation type emulsified asphalt;
II) water:Insoluble impurities, pH value must not be contained in water without harmful solubility salt for clean and drinkable water It need to control in 6-8, temperature is between 10-26.7 DEG C;
III) modifying agent:SBR latex;
IV) film forming agent:For alcohols;
V) additive:For regenerative agent, slow setting or coagulant, storage stabilizing agent or tackifier.
3) process flow:
I) face Xian Dao is detected, and is then cleaned using strength brusher to the face Yuan Dao surface, is determined the width in face and to be applied The length of work;II) according to I) area that calculates of the width in the face Zhong Dao and the length gauge to be constructed, to determine spread width and spread Amount;III) construction protective emblem line on the road spread Hou face;IV) pitch regeneration sealing construction:The maintaining runway agent that will be prepared for It is placed in full-automatic pitch sprinkling car, spread construction is carried out to road face;Rubbing for the road Zai Dui face is controlled coefficient and is examined after construction It surveys, then carries out closing health again, it is finally open to use;V) detection is checked and accepted:The detection of asphalt pavement regeneration sealing delivery receiving acceptance Content mainly includes:The detection of road sweat coefficient, road surface construction depth detection and the detection of road face coefficient of friction.
Further, pitch class binder is bitumen regenerant, rapid-setting emulsified asphalt.
Further, spread sticking layer oil is asphalt adhesive, emulsified asphalt or the foamed asphalt of heat.
After adopting the above structure, the present invention has the beneficial effect that:A kind of airport asphalt concrete pavement of the present invention is pre- Anti- property maintenance process, it forms the processing of the maintenance to road face using crack treatment, pit slot processing and asphalt pavement regeneration sealing, it It with road conditions can be improved, improves and exercises quality, extend pavement life, reduce life cycle cost.
Detailed description of the invention
Described herein the drawings are intended to provide a further understanding of the invention, constitutes part of this application, but It does not constitute improper limitations of the present invention, in the accompanying drawings:
Fig. 1 be not conserving in the present invention before the face Yuan Dao schematic diagram;
Fig. 2 is the road face schematic diagram after maintenance of the invention.
Specific embodiment
With specific embodiment, the present invention will be described in detail below, and illustrative examples therein and explanation are only used to explain The present invention, but it is not as a limitation of the invention.
A kind of airport asphalt concrete pavement preventive maintenance method described in present embodiment, using following step Suddenly:
Step 1:Crack treatment, using following steps:
Classification of rifts:Asphalt pavement damage can be divided into function decaying and structural failure modes on the whole, the former shows For the decline of road face service ability, flatness and antiskid reduced performance;The latter cause face structural-load-carrying capacity reduction, with crack, The forms such as pit slot show;Crack be in all kinds of damages of asphalt pavement it is most common, most easily occur and earliest caused disease it One, it and is aggravated along with the entire validity period of asphalt pavement with the growth in road age;
Equipment prepares:Groover, pouring machine, hair dryer;Above equipment is:The model of Shandong Xiang Gong Machinery Co., Ltd. The road surface slotting machine of XKC-300, model XCF-450 road pavement air blower and the road surface model XGF-200 bitumen crack-pouring machine;
1) preparation stage before constructing:
I) according to the conversion area and depth in crack, prepare emulsified asphalt satisfactory enough or pitch and filler material; II performance checking then) is carried out to pouring machine, it is ensured that its bitumen pipeline, pitch spray gun are unimpeded, and high-pressure hot air blows roasting device pressure Power is enough, temperature is suitable;
2) it slots the stage:
I) the tiny irregular cracks for slit width within 5mm can generally be incited somebody to action due to being difficult to directly pour into pointing Seam spreads to deep 40mm, wide 12mm;II) with sweep seam machine to extension it is new seam and original wider old seam clean, scan out The sundries come will be removed in time, in order to which gap-grouting material and the face Yuan Dao bond;
3) cleaning in crack and drying stage:
I roasting spray gun is blown with high-pressure hot air after) slotting, the compressed air after heating is blowed to crack, clear out the rubble in seam With the sundries such as powder;
II) the road plane materiel material heating of fracture two sides simultaneously, so that the temperature difference for reducing gap-grouting material and being poured, makes two Person combines under " hot-hot " environment, the phenomenon that " twice seam " occurs after avoiding repairing;
4) cementation of fissures sessions:
I) start pouring machine, gap-grouting material is heated, when gap-grouting material temperature reaches operating temperature, carry out cementation of fissures work Industry;Cementation of fissures operation carries out immediately after crack cleaning and drying, to reduce crack secondary pollution;
It II, should be immediately the problems such as in order to protect not solidified gap-grouting material, prevent wheelprint) after cementation of fissures operation Using absorbing material, so that they adhere to pointing surface, as temporary covering;
5) cementation of fissures quality testing stage:
I) whether the inspection cementation of fissures is linearly smooth, appearance neat and tidy, and sealing material is substantially concordant with road face;II it) checks and fills Whether abundant full, the surfacing of seam, grainless micelle or the knot that becomes silted up, drag mark is without extra gap-grouting material;III) after rolling not Deformation is fallen off, is kept sufficiently resilient;
Step 2:Pit slot processing, using following steps:
Pit slot is the Common Diseases of asphalt pavement, and pit slot not only influences the overall beautiful of road, but also influences the row of aircraft Safety and comfortable is sailed, is also easy to make aircraft that there was a mechanical failure and damage, or even causes safety accident.Therefore, on road face The pit slot of appearance should be repaired in time;Asphalt pavement pit slot generallys use digging type pit repairing method and is handled, it is The cutting of irregular asphalt concrete pavement pit slot is rectangular, i.e., according to the principle of " circular hole side is mended, and oblique hole is just mended ", excavate disease Evil road face, will under pit slot bottom surface dig to intact part or by bottom surface Disease Processing it is thorough after, addition new pitch mixture pressed Real molding.Since the technique is thorough to Disease Processing, long service life after maintenance be can reach 2~5 years, can be maintained to road mask Face or in repair, therefore also referred to as permanent repair;
Material prepares:Patching material for routine servicing is mainly the hot-mix asphalt mixture of various specifications, repairs material Material should have enough intensity, good height temperature stability, stronger water stability and fatigue resistance.
Equipment prepares:Small-sized mixing apparatus, excavation equipment (grooving machine, Hydraulic pick), cleaning equipment (hair dryer), compacting are set Standby (plate compactor, baby roller);
1) preparation of construction:
I) probe pit slot type and degree of disease determine Disease Processing range and depth;
II sticking layer oil material and asphalt) are prepared according to former road noodles type;
III traffic closing) is carried out to disease section, allocates and transports construction equipment, guarantees each equipment normal operation of constructing;
2) digging range delimited:According to " circular hole side is mended, and oblique hole is just mended " principle, pit slot maintenance surface delimited;Maintenance surface is at square Shape, surrounding people having a common goal face graticule is parallel or vertical, and range will be in actual pit trough rim;
3) pit slot is excavated:
I the bituminous concrete of damage) is cut;
II) using Hydraulic pick or grooving machine along the maintenance range joint-cutting delimited, it is desirable that joint-cutting is vertical, and is set with Hydraulic pick etc. The standby bituminous concrete by maintenance range digs pine, and waste material is walked clearly;It is excavated when excavation from centre to four sides, in case damage is cut Side, it is desirable that excavate and arrive intact, stable bottom surface;
III) when processing depth is too deep need layered rolling when, each layer cuts face and to form step, and step width is not less than 10cm;On the one hand it prevents from forming vertical straight joint, rainwater is avoided directly quickly to penetrate into maintenance bottom surface;On the other hand in layered rolling When, can guarantee can grinding compacting at every layer of girth seam;
4) pit slot is cleared up:
I) to after excavation pit slot bottom and surrounding handle, ravelled spot occur will cut completely, and crack occur will do The processing of cementation of fissures joint seal, and removed the loose pellet of pit slot bottom, four walls completely with wire brush;
II the sundries such as the floating ash in ponding, watermark and the repairing range in pit slot) are dried up with hair dryer;
5) spread sticking layer oil:Spread sticking layer oil is wanted on pit slot bottom surface and four walls, improves the bonding of new-old concrete;Sticking layer oil Spread is answered uniformly, without leakage to spill, without trickling;Spread sticking layer oil is asphalt adhesive, emulsified asphalt or the foamed asphalt of heat;
6) rolled asphalt mixture is backfilled:
I hot-mix asphalt mixture) is inserted into pit slot and is rolled, when layering is repaired, placement in layers, layered rolling;
When II) backfilling asphalt, even, leveling is pushed away with plate is bulldozed, number is controlled, prevent number from excessively causing fines Product is stayed in bottom surface, coarse fodder in surface, and mixture segregation is caused;
It when III) rolling, is compacted with small-size vibratory roller or plate compactor, first rolls four side of pit slot again successively in Between promote, guarantee road face entirety flatness and new and old road face seam it is smooth, can suitably increase stone roller simultaneously for seam crossing Number is pressed, compactness is improved, prevents in the future that seam is loose, infiltration;
7) joint seal waterproof:
I it) is uniformly applied in the new old asphalt concrete seam of repairing face surrounding, is on the one hand played anti-with pitch class binder Water effect, on the other hand prevents that seam crossing asphalt is loose, gnaws side;Pitch class binder is bitumen regenerant, fast curdled milk Change pitch;
Step 3:Asphalt pavement regeneration sealing, using following steps:
Using special equipment by the uniform spread to asphalt pavement of bituminous pavement sealing material with excellent permeability, The deficiency for compensating for traditional mist sealing material such as emulsified asphalt and modified emulsifying asphalt can be very good to prevent and solve asphalt road The early disease problem that face occurs.Cost of New Type Asphalt Pavement regeneration sealing material penetrates into old road surfaces, activates the pitch of aging, It updates and goes back the already oxidised pitch lotion of original surface, to extend the service life on road surface.
Asphalt pavement regeneration sealing can postpone the generation of the other diseases in road surface, maintain the use function on road surface, extend road Service life;Its construction technology is simple, and open to traffic is rapidly (2 to 3 hour can open to traffic).Its main function Be waterproof, closing microcrack, supplement pitch bonding material, stablize it is loose gather materials, closing road surface prevents bitumen blowing and generates The color of bituminous pavement is deepened in aging;Increase bituminous pavement and the contrast of graticule etc..Asphalt pavement regeneration sealing can be effective Improve surface feature, hence it is evident that improve needle penetration, softening point and the ductility of aged asphalt, but asphalt pavement regeneration sealing covers are not The structural-load-carrying capacity on road surface can be changed, therefore, it is complete that asphalt pavement regeneration sealing covers are mainly used for bearing capacity of pavement structure On the road surface of good appearance early damage.
Sealing material can fill out envelope minute crack and surface void, play waterproof and inhibit loose effect, prevent face The further aging of material;It improves road face antiskid performance, avoid Moisture Damage, reach protection road face structure, extend road face service life Purpose, be a kind of cost-effective preventive maintenance measure;
Asphalt pavement regeneration sealing covers are suitable for the diseases such as surface generation infiltration, oil-poor, microscopic checks and aging is serious Runway Surface and Expressway Asphalt maintaining runway, according to on-site actual situations need to decide whether need add gold Hard rock aggregate, if coefficient of sliding resistance is completely qualified after maintaining runway agent construction, the technique of diamond dust addition can be completely left out, because Later period diamond dust is inoperative;
Asphalt pavement regeneration sealing covers be primarily adapted for use in there is early stage microcrack, road surface gather materials loose, pitted skin and The serious equal earlier period damages of pavement seepage, and road face composite quality index at this time is more than good and good.It is specific as follows:
A, asphalt pavement regeneration sealing covers produce minute crack suitable for the face Yuan Dao road table, and fracture width is 1~3 Crack should be pre-processed for there is the road surface in the cracks such as serious check crack, cracking, after stablizing, then take drip by ㎜ or so Green pavement recycling sealing covers.
B, former road surface road table is loose, or even pitted skin occurs, road surfaces asphalt stripping or aging and when intact structural strength, can Asphalt pavement regeneration sealing covers are taken, discrete aggregate is effectively bonded, repair aged asphalt;Improve road surface appearance.
C, when former road surfaces infiltration coefficient increases, road surface appearance infiltration is serious or more serious, and pavement structural strength and knot When structure is intact, pavement seepage can be effectively prevented using asphalt pavement regeneration sealing covers, prevent water infiltration soften base and Roadbed protects base and roadbed, reduces or prevents Water Damage
4) equipment prepares:Strength brusher, full-automatic pitch sprinkling car;Qinhuangdao Lulong County Lu Tong Engineering Machinery Plant SL-1500II type strength cleaning machine for road surface;The full-automatic pitch sprinkling car of Cheng Li special purpose vehicle limited liability company production;
5) preparation of maintaining runway agent:
Maintaining runway agent is made of high performance modified bitumen, water, modifying agent, film forming agent and additive;By mass percentage Proportion it is as follows:High performance modified bitumen 60-80%, water 20-45%, modifying agent 10-35%, film forming agent 10-35% and additional Agent 2-15%;
Wherein:
I) high performance modified bitumen:For split fastly type cation type emulsified asphalt;It is that asphalt pavement curing agent is most main The material wanted, emulsified asphalt used in asphalt pavement conserving sealing are necessary for cation type, do not have to the de-emulsification speed of lotion The problems such as being strict with, but considering the construction time, it is proposed that using splitting type fastly, and relative to common road emulsified asphalt, The granularity of its lotion is thinner, and asphalt emulsion must uniformly, not have the independence that cannot be easily re-dispersed after appropriate agitation Or condensation composition.Its technical requirements is as follows:
Lotion physical characteristics:
II) water:Insoluble impurities, pH value must not be contained in water without harmful solubility salt for clean and drinkable water It need to control in 6-8, temperature is between 10-26.7 DEG C;
III) modifying agent:SBR latex;
It is modified using SBR latex, effect is the high temperature performance for improving sealing material;The performance indicator of SBR is such as Under:
Pilot project Performance indicator
Mode of appearance (25 DEG C) Milky white liquid
Particle charging Cationic (+)
Active matter content/% ≥62
Viscosity/(Mpa.s) 10~60
Specific gravity (25 DEG C)/(g/cm3) 1.03±0.05
pH 3~5
Chemical stability (CaCl2)/% ≥10
Mechanical stability (5min)/% ≥10
IV) film forming agent:For alcohols
The effect of film forming agent is mainly conducive to the molding of sealing and improves stability of emulsion and uniformity;Maintaining runway The film forming agent that agent uses is generally alcohols.Its performance indicator see the table below:
Pilot project It is required that
Average degree of polymerization ≥1500
Alcoholysis degree/(mol/mol) 85~100
Viscosity/(Mpa.s) 18~35
Volatile matter/% ≤10
Ash content/% ≤3
pH 5~7
Purity/% ≥90
V) additive:For regenerative agent, slow setting or coagulant, storage stabilizing agent or tackifier.According to road surface actual conditions with And the particular/special requirement of engineering, a small amount of additive can be added in maintaining runway agent sealing material;Maintaining runway agent commonly adds Agent is added to have regenerative agent, slow setting or coagulant, storage stabilizing agent, tackifier etc..
VI) asphalt pavement regeneration maintaining runway agent technical requirement
Detection project Technical requirements
Temperature/DEG C ﹤ 50
Specific gravity (25 DEG C)/(g/m3) ≥1.04
En Gela viscosity (50 DEG C)/s ≤50
Substance content/% ≥50
Rotary viscosity (25 DEG C)/(Mpas) ﹥ 5000
Flash-point/DEG C ﹥ 100
6) process flow:
I) face Xian Dao is detected, and is then carried out the face Yuan Dao surface and is cleaned, determines the width in face and the length to be constructed;
II) according to I) area that calculates of the width in the face Zhong Dao and the length gauge to be constructed, to determine spread width and spread Amount;
III) construction protective emblem line on the road spread Hou face;
IV) pitch regeneration sealing construction:The maintaining runway agent being prepared for is placed in full-automatic pitch sprinkling car, to road face Carry out spread construction;Rubbing for the road Zai Dui face is controlled coefficient and is detected after construction, then carries out closing health again, finally opens It uses;
V) detection is checked and accepted:Asphalt pavement regeneration sealing delivery receiving acceptance detection content mainly include:The inspection of road sweat coefficient It surveys, road surface construction depth detection and road face coefficient of friction detect.
Novel road face sealing sealing and traditional mist sealing Contrast on effect of the invention:
(1) as shown in Figure 1, Figure 2 as can be seen that the road surface contrast effect between not conserving and after maintenance compares.
(2) comparison such as following table between the detection data of road face:
(3) the road surface effect after conserving is better than the face Yuan Dao effect, is able to extend the service life in face.
The above description is only a preferred embodiment of the present invention, thus it is all according to the configuration described in the scope of the patent application of the present invention, The equivalent change or modification that feature and principle are done, is included in the scope of the patent application of the present invention.

Claims (3)

1. a kind of airport asphalt concrete pavement preventive maintenance method, it is characterised in that:Using following steps:
Step 1:Crack treatment, using following steps:
1) preparation stage before constructing:
I) according to the conversion area and depth in crack, prepare emulsified asphalt satisfactory enough or pitch and filler material;II) so Performance checking is carried out to pouring machine afterwards, it is ensured that its bitumen pipeline, pitch spray gun are unimpeded, and high-pressure hot air blows roasting device pressure foot Enough, temperature is suitable;
2) it slots the stage:
I) the tiny irregular cracks for slit width within 5mm can generally expand seam due to being difficult to directly pour into pointing Width is to deep 40mm, wide 12mm;II) with sweep seam machine to extension it is new seam and original wider old seam clean, scan out come Sundries will be removed in time, in order to which gap-grouting material and the face Yuan Dao bond;
3) cleaning in crack and drying stage:
I roasting spray gun is blown with high-pressure hot air after) slotting, the compressed air after heating is blowed to crack, clear out the rubble and powder in seam The sundries such as end;II) the road plane materiel material heating of fracture two sides simultaneously, thus the temperature difference for reducing gap-grouting material and being poured;
4) cementation of fissures sessions:
I) start pouring machine, gap-grouting material is heated, when gap-grouting material temperature reaches operating temperature, carry out cementation of fissures operation;II) It, should be immediately using absorbing material the problems such as in order to protect not solidified gap-grouting material, prevent wheelprint after cementation of fissures operation Material, so that they adhere to pointing surface, as temporary covering;
5) cementation of fissures quality testing stage:
I) whether the inspection cementation of fissures is linearly smooth, appearance neat and tidy, and sealing material is substantially concordant with road face;II) check that the cementation of fissures is No sufficiently full, surfacing, grainless micelle or the knot that becomes silted up, drag mark is without extra gap-grouting material;III) do not occur after rolling Fall off deformation, keeps sufficiently resilient;
Step 2:Pit slot processing, using following steps:
1) preparation of construction:I) probe pit slot type and degree of disease determine Disease Processing range and depth;II) according to original Road noodles type prepares sticking layer oil material and asphalt;III traffic closing) is carried out to disease section, allocates and transports construction equipment, is protected Each equipment of card construction runs well;
2) digging range delimited:According to " circular hole side is mended, and oblique hole is just mended " principle, pit slot maintenance surface delimited;Maintenance surface is rectangular, and four The face Zhou Tongdao graticule is parallel or vertical, and range will be in actual pit trough rim;
3) pit slot is excavated:I the bituminous concrete of damage) is cut;II it) is cut using Hydraulic pick or grooving machine along the maintenance range delimited Seam, it is desirable that joint-cutting is vertical, and the bituminous concrete in maintenance range is dug pine with equipment such as Hydraulic picks, and waste material is walked clearly;It excavates When excavated from centre to four sides, in order to avoid damage trimming, it is desirable that excavate arrive intact, stable bottom surface;III) when processing depth is too deep When needing layered rolling, each layer cuts face and to form step, and step width is not less than 10cm;
4) pit slot is cleared up:I) to after excavation pit slot bottom and surrounding handle, ravelled spot occur will cut completely, split Seam will do the processing of cementation of fissures joint seal, and be removed the loose pellet of pit slot bottom, four walls completely with wire brush;II it) is blown with hair dryer The sundries such as the floating ash in ponding, watermark and repairing range in dry pit slot;
5) spread sticking layer oil:Spread sticking layer oil is wanted on pit slot bottom surface and four walls, improves the bonding of new-old concrete;Sticking layer oil should be spilt Cloth uniformly, without leakage is spilt, without trickling;
6) rolled asphalt mixture is backfilled:
I hot-mix asphalt mixture) is inserted into pit slot and is rolled, when layering is repaired, placement in layers, layered rolling;II) backfill drip When green mixture, be bulldozed plate push away it is even, leveling, to control number, prevent number excessively cause fines product in bottom surface, coarse fodder stay in Surface leads to mixture segregation;It when III) rolling, is compacted with small-size vibratory roller or plate compactor, first rolls pit slot four Side again successively to centre promote, guarantee road face entirety flatness and new and old road face seam it is smooth, can simultaneously for seam crossing Suitably to increase rolling layer, compactness is improved, prevents in the future that seam is loose, infiltration;
7) joint seal waterproof:It is uniformly applied in the new old asphalt concrete seam of repairing face surrounding with pitch class binder;
Step 3:Asphalt pavement regeneration sealing, using following steps:
1) equipment prepares:Strength brusher, full-automatic pitch sprinkling car;
2) preparation of maintaining runway agent:It is made of high performance modified bitumen, water, modifying agent, film forming agent and additive;By quality hundred Divide the proportion of ratio as follows:High performance modified bitumen 60-80%, water 20-45%, modifying agent 10-35%, film forming agent 10-35% and Additive 2-15%;
Wherein:
I) high performance modified bitumen:For split fastly type cation type emulsified asphalt;
II) water:Insoluble impurities must not be contained in water without harmful solubility salt for clean and drinkable water, pH value needs to control System is in 6-8, and temperature is between 10-26.7 DEG C;
III) modifying agent:SBR latex;
IV) film forming agent:For alcohols;
V) additive:For regenerative agent, slow setting or coagulant, storage stabilizing agent or tackifier.
3) process flow:
I) face Xian Dao is detected, and is then cleaned using strength brusher to the face Yuan Dao surface, is determined the width in face and to be constructed Length;II) according to I) area that calculates of the width in the face Zhong Dao and the length gauge to be constructed, to determine spread width and spread quantity; III) construction protective emblem line on the road spread Hou face;IV) pitch regeneration sealing construction:The maintaining runway agent being prepared for is placed in In full-automatic pitch sprinkling car, spread construction is carried out to road face;Rubbing for the road Zai Dui face is controlled coefficient and is detected after construction, so Carry out closing health again afterwards, it is finally open to use;V) detection is checked and accepted:The content master of asphalt pavement regeneration sealing delivery receiving acceptance detection Including:The detection of road sweat coefficient, road surface construction depth detection and the detection of road face coefficient of friction.
2. a kind of airport asphalt concrete pavement preventive maintenance method according to claim 1, it is characterised in that:Pitch Class binder is bitumen regenerant, rapid-setting emulsified asphalt.
3. a kind of airport asphalt concrete pavement preventive maintenance method according to claim 1, it is characterised in that:Spread Sticking layer oil is asphalt adhesive, emulsified asphalt or the foamed asphalt of heat.
CN201810835108.0A 2018-07-26 2018-07-26 A kind of airport asphalt concrete pavement preventive maintenance method Pending CN108914753A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810835108.0A CN108914753A (en) 2018-07-26 2018-07-26 A kind of airport asphalt concrete pavement preventive maintenance method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810835108.0A CN108914753A (en) 2018-07-26 2018-07-26 A kind of airport asphalt concrete pavement preventive maintenance method

Publications (1)

Publication Number Publication Date
CN108914753A true CN108914753A (en) 2018-11-30

Family

ID=64416776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810835108.0A Pending CN108914753A (en) 2018-07-26 2018-07-26 A kind of airport asphalt concrete pavement preventive maintenance method

Country Status (1)

Country Link
CN (1) CN108914753A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868699A (en) * 2019-03-29 2019-06-11 重庆建工住宅建设有限公司 Road noise reduction antiskid process of surface treatment
CN110183146A (en) * 2019-04-25 2019-08-30 沈阳三鑫集团盘锦路用材料有限公司 A kind of bituminous pavement cold patch material and its application method
CN110241700A (en) * 2019-05-27 2019-09-17 内蒙古路桥工程技术检测有限责任公司 Repair technology after pit slot detection
CN110965423A (en) * 2019-12-17 2020-04-07 中交路桥华北工程有限公司 Anti-crack construction method for asphalt pavement splicing
CN111519491A (en) * 2020-04-26 2020-08-11 山东省高速路桥养护有限公司 Construction method of sand-containing fog seal in highway maintenance
CN111877112A (en) * 2020-07-25 2020-11-03 杭州大江东城市设施管养有限公司 Road crack repairing method and road crack repairing machine
CN112523028A (en) * 2019-09-17 2021-03-19 浙江长兴市政建设有限公司 Waterproof edge sealing construction method for joint of pit and groove of asphalt pavement
CN112625512A (en) * 2020-12-07 2021-04-09 杭州联体消修化工有限公司 Asphalt pavement sealing compact reduction curing agent and construction process thereof
CN113005925A (en) * 2021-03-30 2021-06-22 何怡 Method for repairing crack of concrete bridge deck of bridge
CN113389124A (en) * 2021-08-03 2021-09-14 上海市城市建设设计研究总院(集团)有限公司 Disease treatment method for crack and damage of embedded integral track bed rail-side asphalt pavement
CN114508028A (en) * 2022-03-01 2022-05-17 安徽重标建筑工程有限公司 Construction method for modifying cement pavement with asphalt concrete

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350421A (en) * 2015-09-28 2016-02-24 北京城建道桥建设集团有限公司 Thin layer overlaying surface construction method suitable for pavement overhaul and intermediate maintenance and preventive conservation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350421A (en) * 2015-09-28 2016-02-24 北京城建道桥建设集团有限公司 Thin layer overlaying surface construction method suitable for pavement overhaul and intermediate maintenance and preventive conservation

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
于晓坤等: "《公路养护管理》", 31 May 2006 *
宁波市质量技术监督局: "《城市道路养护技术规程》", 1 April 2016 *
张争奇: "《高速公路沥青路面维修养护技术》", 30 September 2010 *
柴亚: "改良型雾封层技术在沥青路面预防性养护中的应用", 《交通世界(建养.机械)》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868699A (en) * 2019-03-29 2019-06-11 重庆建工住宅建设有限公司 Road noise reduction antiskid process of surface treatment
CN110183146A (en) * 2019-04-25 2019-08-30 沈阳三鑫集团盘锦路用材料有限公司 A kind of bituminous pavement cold patch material and its application method
CN110241700A (en) * 2019-05-27 2019-09-17 内蒙古路桥工程技术检测有限责任公司 Repair technology after pit slot detection
CN112523028A (en) * 2019-09-17 2021-03-19 浙江长兴市政建设有限公司 Waterproof edge sealing construction method for joint of pit and groove of asphalt pavement
CN110965423A (en) * 2019-12-17 2020-04-07 中交路桥华北工程有限公司 Anti-crack construction method for asphalt pavement splicing
CN111519491A (en) * 2020-04-26 2020-08-11 山东省高速路桥养护有限公司 Construction method of sand-containing fog seal in highway maintenance
CN111877112A (en) * 2020-07-25 2020-11-03 杭州大江东城市设施管养有限公司 Road crack repairing method and road crack repairing machine
CN111877112B (en) * 2020-07-25 2022-04-05 杭州大江东城市设施管养有限公司 Road crack repairing method and road crack repairing machine
CN112625512A (en) * 2020-12-07 2021-04-09 杭州联体消修化工有限公司 Asphalt pavement sealing compact reduction curing agent and construction process thereof
CN113005925A (en) * 2021-03-30 2021-06-22 何怡 Method for repairing crack of concrete bridge deck of bridge
CN113389124A (en) * 2021-08-03 2021-09-14 上海市城市建设设计研究总院(集团)有限公司 Disease treatment method for crack and damage of embedded integral track bed rail-side asphalt pavement
CN114508028A (en) * 2022-03-01 2022-05-17 安徽重标建筑工程有限公司 Construction method for modifying cement pavement with asphalt concrete
CN114508028B (en) * 2022-03-01 2023-10-03 安徽重标建筑工程有限公司 Construction method for modifying cement pavement by asphalt concrete

Similar Documents

Publication Publication Date Title
CN108914753A (en) A kind of airport asphalt concrete pavement preventive maintenance method
CN106638696B (en) The construction method of installation of anti-settling manhole cover
CN105860554B (en) It is a kind of to coagulate antiskid type mist sealing material and preparation method fastly
CN106894308A (en) A kind of crack resistance construction of cement stable macadam base method
CN104831598A (en) Construction method for reconstruction of old cement pavement into asphalt concrete pavement
CN100999894A (en) Cement concrete bridge surface synchronous breakstone water-proof binding composite layer and construction method thereof
CN105386382B (en) A kind of construction of semi-rigid asphalt pavement fiber reinforcement Sub-sealing Course
CN109914178A (en) A kind of biological enzyme curing materials integration paved roads construction method
CN108867231A (en) A kind of antiskid type asphalt pavement construction technique
CN106192698A (en) Highway pavement rubblization treatment recycling paving construction structure and technology
CN208136691U (en) A kind of Cost of New Type Asphalt Pavement cementation of fissures reparation structure
CN109082969A (en) A kind of construction technology of the anticoagulant ice thin overlay of snow melt
CN109736161A (en) A kind of composite construction Sub-sealing Course for the road face between the cement road face on airport and semi-rigid type base
CN213625024U (en) Cold regeneration road surface structure of emulsified asphalt
CN106966639A (en) A kind of poor asphalt macadam transition zone compound and semi-rigid asphalt pavement
CN207846123U (en) Reinforced structure complex
CN113389107A (en) Milling, mixing, paving and compacting method for synchronous paving and in-situ cold recycling
CN208917613U (en) A kind of white based on polymer modified asphalt changes black pavement structure
CN108468280A (en) Old bridge floor repair materials height glues mute micro-surface area superthin layer and its application method
CN105735079A (en) Treatment method for bituminous pavement transverse reflection cracks
CN107151961A (en) A kind of construction method of town road
CN207727375U (en) A kind of Highway Asphalt Pavement Cracks repairing structure
CN115652870A (en) Method for processing joint and bedding surface of asphalt concrete core wall in high-altitude area
CN106277940B (en) It is a kind of can all-weather construction the quick repairing material in high-performance road surface and preparation method thereof
CN204780555U (en) Structure that repaired in bituminous paving hole groove

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 226600 No.20, Nanhai Avenue East, Haian Development Zone, Nantong City, Jiangsu Province

Applicant after: Jiangsu Zengguang New Material Technology Co., Ltd

Address before: 226600 No.20, Nanhai Avenue East, Haian Development Zone, Nantong City, Jiangsu Province

Applicant before: JIANGSU ZENGGUANG COMPOSITE TECHNOLOGY Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181130