CN106592430B - A kind of cast-in-place winter construction method of Hanging Basket cantilever - Google Patents

A kind of cast-in-place winter construction method of Hanging Basket cantilever Download PDF

Info

Publication number
CN106592430B
CN106592430B CN201611000135.3A CN201611000135A CN106592430B CN 106592430 B CN106592430 B CN 106592430B CN 201611000135 A CN201611000135 A CN 201611000135A CN 106592430 B CN106592430 B CN 106592430B
Authority
CN
China
Prior art keywords
temperature
concrete
hanging basket
canvas
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611000135.3A
Other languages
Chinese (zh)
Other versions
CN106592430A (en
Inventor
戴小松
冯浩
何家刚
陈琳
王军舰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Infrastructure Construction Investment Co Ltd
Original Assignee
China Construction Third Bureau Infrastructure Construction Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Infrastructure Construction Investment Co Ltd filed Critical China Construction Third Bureau Infrastructure Construction Investment Co Ltd
Priority to CN201611000135.3A priority Critical patent/CN106592430B/en
Publication of CN106592430A publication Critical patent/CN106592430A/en
Application granted granted Critical
Publication of CN106592430B publication Critical patent/CN106592430B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention discloses a kind of cast-in-place winter construction method of Hanging Basket cantilever, it is comprised the following steps that:(1)Paste fire-retardant extruded sheet in the outer surface of hanging basket formwork;(2)Hot water circuit pipeline is laid on the outside of fire-retardant extruded sheet;(3)Extruded sheet and hot water circuit pipeline are fixed on rib in length and breadth by the way that reinforcing bar point is welded in template;(4)Integrally wrapped up using canvas cantilever segment;(5)Electric heating impact gun heats beam body template and reinforcing bar;(6)Arrange temperature measuring point;(7)Pour segment concrete;(8)Film and cotton-wadded quilt covering newly pour beam section concrete;(9)Two cantilever end of box beam T structures is using fire prevention rock cotton board closure;(10)Heated up in chamber using coal stove, while steam is conveyed into chamber using electric steam generator;(11)Tensioning mud jacking.The method of the present invention step is simple, easy construction, construction quality are easy to ensure;Using effect is good and practical value is high.

Description

A kind of cast-in-place winter construction method of Hanging Basket cantilever
Technical field
The present invention relates to bridge cast-in-situ box-beam technical field of construction, is specifically a kind of cast-in-place winter construction side of Hanging Basket cantilever Method.
Background technology
According to specification, when stabilization is less than 5 DEG C to outdoor daily mean temperature round the clock within continuous 5 days, i.e., into winter construction.Because The box beam of teletostage cradle cantilever construction be one positioned at the constantly mobile space structure in high-altitude, concrete transportation and pour more tired Difficulty, construction risk bigger, puts into higher.Therefore, need to design a kind of step simple, easy construction, good economy performance, it is safe, The method that construction quality is easy to ensure ensures the cast-in-place construction of teletostage box beam Hanging Basket cantilever
The content of the invention
It is an object of the invention to provide one kind to combine three kinds of regenerative process, steam heating and construction " heating house method " maintenance sides The cast-in-place winter construction method of Hanging Basket cantilever of formula.
To achieve the above object, the present invention provides following technical solution:
A kind of cast-in-place winter construction method of Hanging Basket cantilever, it is comprised the following steps that:
(1) fire-retardant extruded sheet is pasted in the outer surface of hanging basket formwork flange plate, side form and bed die:Fire-retardant extruded sheet embedded template In length and breadth between rib;
(2) hot water circuit pipeline is laid on the outside of fire-retardant extruded sheet:Hot water is laid with 25cm spacing on the outside of fire-retardant extruded sheet Circulating line, conveys hot water by hot-water boiler and carries out circulating-heating, keep the temperature of template outer space;
(3) extruded sheet and hot water circuit pipeline are fixed on rib in length and breadth by the way that reinforcing bar point is welded in template:Using 8 reinforcing bars of Φ with Template in length and breadth fix by rib spot welding;
(4) cantilever segment is integrally wrapped up using canvas:Cantilever segment template appearance fixes extruded sheet and hot-water circulation pipe It is overall to be wrapped up using canvas behind road, ensure the overall wind shielding effect of box girder segment, reduce the convection current with outside air, it is ensured that is new Pour the heat-accumulating and-keeping effect of beam section;
(5) electric heating impact gun heats beam body template and reinforcing bar:Ensure concrete enter mould front template, reinforcing bar temperature is not less than 5 DEG C, in addition, casting concrete surface pour leaching with hot water to upper segment cantilever end section, ensure engaging portion between segment Temperature is more than 5 DEG C;
(6) temperature measuring point is arranged:Set temperature sensor is arranged as temperature measuring point, temperature measuring point in box beam before concreting Worst position is being kept the temperature, in case carrying out temperature monitoring during maintenance to beam body concrete, i.e., flange plate left and right sides respectively sets 1, top 1 is set in plate, 1 is set in bottom plate, each at the web of left and right to set 2, one group amounts to 8 temperature measuring points, using thermometric line, Web and bottom plate thermometric line are uniformly guided in chamber, and top plate thermometric line is drawn by top plate;
(7) segment concrete is poured:Concreting selection is carried out in the day temperature higher period, is conducive to concrete and is entered The control of mould temperature;
(8) film and cotton-wadded quilt covering newly pour beam section concrete:The relatively thin easily heat dissipation of structure is endured cold at box beam flange plate, On the edge of a wing, plate top surface first covers layer of plastic film, then installs electric blanket additional on it, then covers cotton-wadded quilt, to strengthen flange plate portion Position insulation;
(9) two cantilever end of box beam T structures is using fire prevention rock cotton board closure;
(10) heated up in chamber using coal stove, while steam is conveyed into chamber using electric steam generator:Altogether 4 Platform coal stove, daily coal fire furnace roof place a stainless steel bucket, play humidification and thermogenic action;Pour in rear cabinet room and persistently add It is hot and steam-cured, ensure to provide humidity with steam while temperature, it is ensured that the temperature inside the box is not less than 5 DEG C, and keeps case indoor temperature Substantially constant;Gas poisoning and the excessive carbonization for accelerating concrete of gas concentration lwevel in order to prevent, must be the exhaust of stove Outside pipe outlet box room;
(11) tensioning mud jacking:Hanging Basket segment concrete strength carries out tensioning mud jacking after reaching design requirement, and mud jacking mix is used Water uses mixing plant hot-water supply, and temperature ensures slurry temperature more than 15 DEG C, while prevent that temperature is excessive right at 30 DEG C or so Slurry impacts, and with 48h after mud jacking during mud jacking, the temperature of structural concrete must not be less than 5 DEG C, and insulation should extend to After grouting and intensity reach 25MPa after could stop, duct grouting should carry out under positive temperature, before its intensity reaches 25MPa, no It must endure cold, the quality accident being damaged by frost in order to prevent after box beam concrete grouting occurs, and spy is pressed using low temperature resistant grouting material Test block test is starched, to ensure squeezing quality.
As the further scheme of the present invention:Extruded sheet described in step (1) is B1 grades of fire-retardant extruded sheets.
As the further scheme of the present invention:Hot water circuit pipeline described in step (2) uses diameter 20mm floor heating pipes.
As the further scheme of the present invention:When fixing extruded sheet using 8 reinforcing bar spot welding of Φ described in step (3), it should keep away Exempt from electric spark and touch extruded sheet.
As the further scheme of the present invention:Canvas described in step (4) is each containing duck, canvas periphery spacing 50cm If binding strap 1, binding strap should not leaked out away from canvas edge 30cm with ensuring that adjacent canvas is overlapping after binding;Cantilever end end Portion's canvas to hanging from flange plate both sides along bridge with forming the keeping warmth space of closing after canvas is bound;To prevent strong wind from scraping canvas Walk or scratch, binding strap should be bound firm with hanging basket formwork on the inside of canvas.
As the further scheme of the present invention:Electric heating impact gun described in step (5) is 30kW industrial air heaters.
As the further scheme of the present invention:There is the temperature of temperature sensor monitors described in step (6):Outside air temperature, Each observation station temperature in case indoor air temperature, concrete opening temperature, concrete molding temperature and box beam entity.
As the further scheme of the present invention:Concrete molding temperature described in step (7) is 5~30 DEG C;Pour the time It is arranged in the morning on daytime 9:00 to afternoon 16:00;Before pouring, the residue on reinforcing bar and template is cleaned, for the place of ice and snow Reason, is sure not directly by ice dissolution, because the water directly melted can freeze again at low temperature.
As the further scheme of the present invention:The power of electric steam generator described in step (10) is 24kW.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, method and step is simple, easy construction, construction quality are easy to ensure;
2nd, using effect is good and practical value is high.
Brief description of the drawings
Fig. 1 is the present invention to cast-in-situ box girder Winter Construction Methods FB(flow block) of being constructed.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment, belongs to the scope of protection of the invention.
Referring to Fig. 1, in the embodiment of the present invention, a kind of cast-in-place winter construction method of Hanging Basket cantilever, it is comprised the following steps that:
(1) B1 grades of fire-retardant extruded sheets are pasted in the outer surface of hanging basket formwork flange plate, side form and bed die:Fire-retardant extruded sheet insertion Template is in length and breadth between rib;
(2) hot water circuit pipeline is laid on the outside of fire-retardant extruded sheet:Hot water is laid with 25cm spacing on the outside of fire-retardant extruded sheet Circulating line, conveys hot water by hot-water boiler and carries out circulating-heating, keep the temperature of template outer space;The hot water follows Endless tube road uses diameter 20mm floor heating pipes;
(3) extruded sheet and hot water circuit pipeline are fixed on rib in length and breadth by the way that reinforcing bar point is welded in template:Using 8 reinforcing bars of Φ with Template in length and breadth fix by rib spot welding;During the fixation extruded sheet using 8 reinforcing bar spot welding of Φ, electric spark should be avoided to touch extruded sheet;
(4) cantilever segment is integrally wrapped up using canvas:Cantilever segment template appearance fixes extruded sheet and hot-water circulation pipe It is overall to be wrapped up using canvas behind road, ensure the overall wind shielding effect of box girder segment, reduce the convection current with outside air, it is ensured that is new Pour the heat-accumulating and-keeping effect of beam section;The canvas is respectively to set binding strap 1, binding strap containing duck, canvas periphery spacing 50cm It should not leaked out away from canvas edge 30cm with ensuring that adjacent canvas is overlapping after binding;Cantilever end end canvas with along bridge to from the wing Listrium both sides, which hang, forms the keeping warmth space of closing after canvas is bound;To prevent strong wind from canvas is blown off or being scratched, on the inside of canvas Binding strap should bind firm with hanging basket formwork;
(5) electric heating impact gun heats beam body template and reinforcing bar:Ensure concrete enter mould front template, reinforcing bar temperature is not less than 5 DEG C, in addition, casting concrete surface pour leaching with hot water to upper segment cantilever end section, ensure engaging portion between segment Temperature is more than 5 DEG C;The electric heating impact gun is 30kW industrial air heaters;
(6) temperature measuring point is arranged:Set temperature sensor is arranged as temperature measuring point, temperature measuring point in box beam before concreting Worst position is being kept the temperature, in case carrying out temperature monitoring during maintenance to beam body concrete, i.e., flange plate left and right sides respectively sets 1, top 1 is set in plate, 1 is set in bottom plate, each at the web of left and right to set 2, one group amounts to 8 temperature measuring points, using thermometric line, Web and bottom plate thermometric line are uniformly guided in chamber, and top plate thermometric line is drawn by top plate;The temperature of the temperature sensor monitors Have:Each observation station temperature in outside air temperature, case indoor air temperature, concrete opening temperature, concrete molding temperature and box beam entity Degree;
(7) segment concrete is poured:Concreting selection is carried out in the day temperature higher period, is conducive to concrete and is entered The control of mould temperature, the concrete molding temperature are 5~30 DEG C;Arrangement of time is poured in morning 9 on daytime:00 to afternoon 16: 00;Before pouring, the residue on reinforcing bar and template is cleaned, the processing for ice and snow, is sure not directly by ice dissolution, because directly Connecing the water of thawing can freeze again at low temperature;
(8) film and cotton-wadded quilt covering newly pour beam section concrete:The relatively thin easily heat dissipation of structure is endured cold at box beam flange plate, On the edge of a wing, plate top surface first covers layer of plastic film, then installs electric blanket additional on it, then covers cotton-wadded quilt, to strengthen flange plate portion Position insulation;
(9) two cantilever end of box beam T structures is using fire prevention rock cotton board closure;
(10) heated up in chamber using coal stove, while steam is conveyed into chamber using electric steam generator:Altogether 4 Platform coal stove, daily coal fire furnace roof place a stainless steel bucket, play humidification and thermogenic action;Pour in rear cabinet room and persistently add It is hot and steam-cured, ensure to provide humidity with steam while temperature, it is ensured that the temperature inside the box is not less than 5 DEG C, and keeps case indoor temperature Substantially constant;Gas poisoning and the excessive carbonization for accelerating concrete of gas concentration lwevel in order to prevent, must be the exhaust of stove Outside pipe outlet box room;The power of the electric steam generator is 24kW;
(11) tensioning mud jacking:Hanging Basket segment concrete strength carries out tensioning mud jacking after reaching design requirement, and mud jacking mix is used Water uses mixing plant hot-water supply, and temperature ensures slurry temperature more than 15 DEG C, while prevent that temperature is excessive right at 30 DEG C or so Slurry impacts, and with 48h after mud jacking during mud jacking, the temperature of structural concrete must not be less than 5 DEG C, and insulation should extend to After grouting and intensity reach 25MPa after could stop, duct grouting should carry out under positive temperature, before its intensity reaches 25MPa, no It must endure cold, the quality accident being damaged by frost in order to prevent after box beam concrete grouting occurs, and spy is pressed using low temperature resistant grouting material Test block test is starched, to ensure squeezing quality.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference numeral in claim should not be considered as to the involved claim of limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical solution, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (9)

  1. A kind of 1. cast-in-place winter construction method of Hanging Basket cantilever, it is characterised in that it is comprised the following steps that:
    (1) fire-retardant extruded sheet is pasted in the outer surface of hanging basket formwork flange plate, side form and bed die:Fire-retardant extruded sheet embedded template is in length and breadth Between rib;
    (2) hot water circuit pipeline is laid on the outside of fire-retardant extruded sheet:Hot water circuit is laid with 25cm spacing on the outside of fire-retardant extruded sheet Pipeline, conveys hot water by hot-water boiler and carries out circulating-heating, keep the temperature of template outer space;
    (3) extruded sheet and hot water circuit pipeline are fixed on rib in length and breadth by the way that reinforcing bar point is welded in template:Using 8 reinforcing bars of Φ and template Rib spot welding in length and breadth is fixed;
    (4) cantilever segment is integrally wrapped up using canvas:After cantilever segment template appearance fixes extruded sheet and hot water circuit pipeline, It is overall to be wrapped up using canvas, ensure the overall wind shielding effect of box girder segment, reduce the convection current with outside air, it is ensured that newly pour beam section Heat-accumulating and-keeping effect;
    (5) electric heating impact gun heats beam body template and reinforcing bar:Ensure that concrete is entering mould front template, reinforcing bar temperature not less than 5 DEG C, In addition, to upper segment cantilever end section, casting concrete surface pour leaching with hot water, ensures engaging portion temperature between segment More than 5 DEG C;
    (6) temperature measuring point is arranged:For set temperature sensor as temperature measuring point, temperature measuring point is arranged in guarantor in box beam before concreting The worst position of temperature, in case carrying out temperature monitoring during maintenance to beam body concrete, i.e. flange plate left and right sides respectively sets 1, in top plate 1 is set, 1 is set in bottom plate, respectively sets 2 at the web of left and right, one group amounts to 8 temperature measuring points, using thermometric line, web And bottom plate thermometric line is uniformly guided in chamber, top plate thermometric line is drawn by top plate;
    (7) segment concrete is poured:Concreting selection is carried out in the day temperature higher period, is conducive to concrete and is entered mould temperature The control of degree;
    (8) film and cotton-wadded quilt covering newly pour beam section concrete:The relatively thin easily heat dissipation of structure is endured cold at box beam flange plate, in the wing Listrium top surface first covers layer of plastic film, then installs electric blanket additional on it, then covers cotton-wadded quilt, to strengthen flange plate position guarantor Temperature;
    (9) two cantilever end of box beam T structures is using fire prevention rock cotton board closure;
    (10) heated up in chamber using coal stove, while steam is conveyed into chamber using electric steam generator:4 coals altogether Stove, daily coal fire furnace roof place a stainless steel bucket, play humidification and thermogenic action;Pour in rear cabinet room continuous heating and It is steam-cured, ensure to provide humidity with steam while temperature, it is ensured that the temperature inside the box is not less than 5 DEG C, and keeps case indoor temperature basic It is constant;Gas poisoning and the excessive carbonization for accelerating concrete of gas concentration lwevel in order to prevent, must draw the exhaust pipe of stove Outside outlet room;
    (11) tensioning mud jacking:Hanging Basket segment concrete strength carries out tensioning mud jacking after reaching design requirement, and mud jacking mixing water is adopted With mixing plant hot-water supply, temperature ensures slurry temperature more than 15 DEG C, while prevent temperature excessive to slurry at 30 DEG C or so Impact, with 48h after mud jacking during mud jacking, the temperature of structural concrete must not be less than 5 DEG C, and insulation should extend to grouting Afterwards and intensity reach 25MPa after could stop, duct grouting should carry out under positive temperature, must not be by before its intensity reaches 25MPa Freeze, the quality accident being damaged by frost in order to prevent after box beam concrete grouting occurs, and spy carries out mud jacking examination using low temperature resistant grouting material Block is tested, to ensure squeezing quality.
  2. 2. a kind of cast-in-place winter construction method of Hanging Basket cantilever according to claim 1, it is characterised in that institute in step (1) It is B1 grades of fire-retardant extruded sheets to state extruded sheet.
  3. 3. a kind of cast-in-place winter construction method of Hanging Basket cantilever according to claim 1, it is characterised in that institute in step (2) The hot water circuit pipeline stated uses diameter 20mm floor heating pipes.
  4. 4. a kind of cast-in-place winter construction method of Hanging Basket cantilever according to claim 1, it is characterised in that institute in step (3) When stating using 8 reinforcing bar spot welding of Φ fixation extruded sheet, electric spark should be avoided to touch extruded sheet.
  5. 5. a kind of cast-in-place winter construction method of Hanging Basket cantilever according to claim 1, it is characterised in that institute in step (4) It is containing duck to state canvas, and canvas periphery spacing 50cm respectively sets binding strap 1, and binding strap should be away from canvas edge 30cm, with true Protect and overlapping after the binding of adjacent canvas do not leak out;Cantilever end end canvas with along bridge to from flange plate both sides hang canvas binding after shape Into the keeping warmth space of closing;To prevent strong wind from canvas is blown off or being scratched, binding strap should bind jail with hanging basket formwork on the inside of canvas Gu.
  6. 6. a kind of cast-in-place winter construction method of Hanging Basket cantilever according to claim 1, it is characterised in that institute in step (5) It is 30kW industrial air heaters to state electric heating impact gun.
  7. 7. a kind of cast-in-place winter construction method of Hanging Basket cantilever according to claim 1, it is characterised in that institute in step (6) The temperature for stating temperature sensor monitors has:Outside air temperature, case indoor air temperature, concrete opening temperature, concrete molding temperature with And each observation station temperature in box beam entity.
  8. 8. a kind of cast-in-place winter construction method of Hanging Basket cantilever according to claim 1, it is characterised in that institute in step (7) Concrete molding temperature is stated as 5~30 DEG C;Arrangement of time is poured in morning 9 on daytime:00 to afternoon 16:00;Before pouring, to clean Residue on reinforcing bar and template, the processing for ice and snow, is sure not directly by ice dissolution, because the water directly melted is in low temperature Under can freeze again.
  9. 9. a kind of cast-in-place winter construction method of Hanging Basket cantilever according to claim 1, it is characterised in that institute in step (10) The power for stating electric steam generator is 24kW.
CN201611000135.3A 2016-11-14 2016-11-14 A kind of cast-in-place winter construction method of Hanging Basket cantilever Active CN106592430B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611000135.3A CN106592430B (en) 2016-11-14 2016-11-14 A kind of cast-in-place winter construction method of Hanging Basket cantilever

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611000135.3A CN106592430B (en) 2016-11-14 2016-11-14 A kind of cast-in-place winter construction method of Hanging Basket cantilever

Publications (2)

Publication Number Publication Date
CN106592430A CN106592430A (en) 2017-04-26
CN106592430B true CN106592430B (en) 2018-04-13

Family

ID=58590011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611000135.3A Active CN106592430B (en) 2016-11-14 2016-11-14 A kind of cast-in-place winter construction method of Hanging Basket cantilever

Country Status (1)

Country Link
CN (1) CN106592430B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503297A (en) * 2017-09-12 2017-12-22 中建八局第三建设有限公司 Basket protection maintenance canopy integrated with beam body steam curing and its construction method
CN107721331B (en) * 2017-10-19 2021-05-18 清华大学 Method for guaranteeing hydration process of concrete expansion joint construction in severe cold area
CN108018779A (en) * 2017-11-30 2018-05-11 苏交科集团股份有限公司 Concrete construction method under a kind of low temperature difference environment
CN111519540A (en) * 2020-04-29 2020-08-11 中国水利水电第八工程局有限公司 Continuous beam cantilever heat preservation construction equipment
CN111927125A (en) * 2020-06-19 2020-11-13 中铁隧道集团二处有限公司 Concrete winter maintenance construction method
CN113027156A (en) * 2021-03-10 2021-06-25 中铁二十局集团第六工程有限公司 Maintenance system is used in case roof beam winter construction
CN112854748A (en) * 2021-03-10 2021-05-28 中铁二十局集团第六工程有限公司 Maintenance method for construction of suspension casting box girder in winter
CN114525741A (en) * 2022-02-19 2022-05-24 中铁二十局集团第六工程有限公司 Beam body heat insulation construction method adjacent to existing line cantilever beam
CN114657897A (en) * 2022-02-19 2022-06-24 中铁二十局集团第六工程有限公司 Heat-insulating construction method for suspension cast beam in alpine region
CN114657898A (en) * 2022-02-19 2022-06-24 中铁二十局集团第六工程有限公司 Construction method for cantilever beam in alpine region
CN114673159A (en) * 2022-05-07 2022-06-28 华能鹤岗发电有限公司 Concrete heat preservation construction method for winter construction

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100373402B1 (en) * 2000-11-08 2003-03-03 (주)서영기술단 Dry apparatus of bridge slab in the winter season
JP2003247211A (en) * 2002-02-25 2003-09-05 Shintouyou Gosei Kk Flaking preventive concrete structure and flaking preventing method for concrete structure
CN101586330B (en) * 2008-05-22 2011-01-26 中铁十一局集团第一工程有限公司 Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN101545246B (en) * 2009-05-05 2010-11-10 中国铁道科学研究院铁道建筑研究所 Method for constructing support grouting material in winter
CN201835519U (en) * 2010-06-10 2011-05-18 中国建筑土木建设有限公司 Support grouting insulated cabinet for railway passenger dedicated line
CN102108678B (en) * 2011-01-18 2014-09-17 龙建路桥股份有限公司 High-altitude construction complete set device and method in winter
CN102162301A (en) * 2011-03-04 2011-08-24 葛洲坝集团第五工程有限公司 Method and device for preserving temperature and humidity and protecting during concrete construction in winter
CN103171041A (en) * 2013-04-09 2013-06-26 中建三局第二建设工程有限责任公司 Auxiliary curing method for cold weather concrete by electric heating tapes
CN204023410U (en) * 2014-06-23 2014-12-17 中铁十二局集团有限公司 Winter deck paving heat preservation construction device
CN104675118B (en) * 2015-02-11 2017-09-05 刘明瑞 A kind of concreting in cold weather electrical heating process
CN205259609U (en) * 2015-11-16 2016-05-25 中铁十四局集团有限公司 Concrete construction intelligence control by temperature change in winter template heating heat preservation system
CN205385618U (en) * 2016-01-05 2016-07-13 山东科技大学 Special electric blanket of civil engineering construction

Also Published As

Publication number Publication date
CN106592430A (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN106592430B (en) A kind of cast-in-place winter construction method of Hanging Basket cantilever
CN204511468U (en) A kind of High-geotemperature tunnel heat insulation and dissipation liner structure
CN204721993U (en) Cultivation piggery feces cleaning structure
CN113216482B (en) Steel truss floor support plate electric heating and heat preservation system
CN206111210U (en) Freeze proof device of long tunnel concrete in winter of cold area heat preservation
CN109610894A (en) A kind of blending station thermal insulation construction technique
CN205088573U (en) Concrete construction heat preservation system
CN115464757A (en) Construction heat preservation and health maintenance method for cantilever cast-in-place bridge in cold low-temperature area
CN205100066U (en) Horizontal energy -concerving and environment -protective type asphalt concrete regenerating device
CN207244473U (en) Basket protection maintenance canopy integrated with beam body steam curing
CN210282694U (en) Heat preservation canopy is used in section of jurisdiction production
CN207686125U (en) A kind of prefabricated non-combined sandwich electric heating heat-insulation wall plate
CN205372644U (en) Heating waste heat collection device
CN207036738U (en) A kind of tunnel roof fire resistance test device
CN207635861U (en) A kind of high-temperature shuttle kiln
CN207144522U (en) Large volume ultra-long concrete teletostage jointless construction conserves structure
CN207549071U (en) A kind of construction beam strorage area precast beam winter and summer dual-purpose type curing means
CN207017108U (en) A kind of pitch thawing equipment
CN206398180U (en) A kind of heavy grade thermal pipeline support pipe portion structure
CN105157097B (en) A kind of detachable phase transition heat accumulation unit applied to wall with flues
CN201424731Y (en) Insulating, temperature-adjusting and ventilating roof structure
CN205156646U (en) Kiln waste heat of baking bricks stores recycle device
CN206323348U (en) A kind of air-supply snow-removing device of solar panel located at prefabricated cabin roof
CN110370452A (en) A kind of concrete mixing station heating heat preserving method
CN207635366U (en) Heat preservation mechanism for chimney construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: A new era of Business Center No. 456 430000 Hubei province Wuhan city Wuchang District Wu Luo Road, 40 floor

Applicant after: China Construction three Bureau infrastructure construction investment Co., Ltd.

Address before: A new era of Business Center No. 456 430000 Hubei province Wuhan city Wuchang District Wu Luo Road, 40 floor

Applicant before: CCTEB INFRASTRUCTURE CONSTRUCTION CO., LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant