- CN207549071U CN207549071U CN201721661490.5U CN201721661490U CN207549071U CN 207549071 U CN207549071 U CN 207549071U CN 201721661490 U CN201721661490 U CN 201721661490U CN 207549071 U CN207549071 U CN 207549071U
- Authority
- CN
- China
- Prior art keywords
- precast beam
- winter
- construction
- purpose type
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 28
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 16
- 239000007921 spray Substances 0.000 claims abstract description 15
- 238000012423 maintenance Methods 0.000 claims abstract description 5
- 230000008093 supporting effect Effects 0.000 claims description 19
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 230000008901 benefit Effects 0.000 abstract description 3
- 238000001723 curing Methods 0.000 description 17
- 238000003860 storage Methods 0.000 description 3
- 238000000151 deposition Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000010025 steaming Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a dual-purpose type curing means of roof beam district precast beam winter and summer is deposited in construction, including the canopy frame and the maintenance cover that covers the canvas on the canopy frame and constitute, the canopy frame is including erecting in precast beam both sides grudging post, the top of both sides grudging post is equipped with the bracing piece, the shed roof that forms the canopy frame on the both sides grudging post is fixed respectively at the bracing piece both ends, the inboard of grudging post is equipped with diagonal bracing, diagonal bracing sets up along the vertical even interval of grudging post, every grudging post inboard all is equipped with spray piping, spray piping ground mark is higher than precast beam top ground elevation, the precast beam bottom is equipped with and deposits the roof beam pedestal and evaporates the pipeline of curing, the roof beam pedestal is four, two liang of combination are arranged in precast beam both ends below, it is three to evaporate the pipeline of curing. The utility model has the characteristics of safety, be suitable for etc, there are fine popularization and practical value, can produce good economic benefits after extensive popularization and application.
Description
Technical field
The utility model belongs to the realm of building construction more particularly to a kind of construction beam strorage area precast beam winter and summer is dual-purpose
Type curing means.
Background technology
When the continuous 3d of temperature on average is less than -3 DEG C to environment less than 5 DEG C or the lowest temperature round the clock, corresponding architectural engineering into
Enter winter construction, then need to carry out construction production according to the requirement of winter construction.For mass concrete engineering, coagulation
After native casting complete and within its curing period, certain ambient temperature level is needed to ensure the continuous increasing of concrete strength
By force, otherwise the quality of concrete will be had an impact, we invent such insulated curing method to ensure concreter thus
The quality of journey.Hot weather construction temperature is excessively high simultaneously, and also concrete strength can be damaged.
Utility model content
The purpose of this utility model is to provide a kind of construction beam strorage area precast beam winter and summer dual-purpose type curing means,
It solves curing cover in the prior art to be arranged on prefabricated boom support, frame is structure as a whole with prefabricated boom support, leads to curing cover
The technical issues of installing inconvenience;And the technical issues of solving prior art steam curing and incompatible watering maintenance.
To achieve the above object, the utility model adopts the following technical solution:
A kind of construction beam strorage area precast beam winter and summer dual-purpose type curing means, it is characterised in that:Including frame and cover
The curing cover of the canvas composition on frame is covered, the frame includes Zhi Li at two side stand of precast beam, the top of two side stands
Equipped with supporting rod, the supporting rod both ends are separately fixed at the ceiling that frame is formed on two side stands, are set on the inside of the stand
There is skewed horizontal load, the skewed horizontal load is set along stand longitudinal direction uniform intervals, and spray piping is equipped on the inside of each stand,
The spray piping ground elevation is higher than precast beam top ground absolute altitude, and the precast beam bottom is equipped with and deposits beam pedestal and steaming
Pipeline is supported, the beam pedestal is four, combines be arranged in below precast beam both ends two-by-two, and the steam-cured pipeline is three, horizontal
It is arranged in below precast beam to uniform intervals.
It is further preferred that the frame is equipped with several temperature sensors, the side both ends of the temperature sensor are set
Inside frame, the display end of the temperature sensor is set on the outside of frame, and the display end is placed on the outside of canvas.
Further, the stand is assembled by bowl buckle by vertical supporting, cross-brace and longitudinal bracing.
Further, the cross-brace grows 60 ~ 100cm, the longitudinal bracing be longer than precast beam longitudinal length 200cm ~
300cm, the vertical supporting is higher than 80 ~ 100cm at the top of precast beam.
In addition, the supporting rod is made of caliber of the steel pipe of 6 ~ 9cm, both ends are welded and fixed with stand.
It is further preferred that the spray piping ground elevation is higher than 50 ~ 100cm of precast beam top ground absolute altitude.
The utility model has the characteristics that and advantageous effect compared with prior art:
The utility model has the advantage of the temperature that can effectively ensure precast beam care environments, and it is right at any time to accomplish
Temperature is adjusted, it is ensured that the quality of maintenance ensure that the quality of precast beam entity, in addition, the utility model simultaneously and deposits spray
Shower pipe road and steam-cured pipeline, therefore can carry out insulated curing, summer in alternately insulated curing and wet curing, winter
It can carry out watering maintenance.Simultaneously the stent of the utility model and traditional curing cover be exactly a part for prefabricated boom support not
Together, the utility model frame can conserve the space for providing bigger independently of prefabricated boom support for precast beam.
The utility model has the characteristics that safety, is applicable in, and has popularization and practical value well, after widely promoting and applying
Good economic benefit can be generated.
Description of the drawings
Fig. 1 is a kind of structural representation of construct beam strorage area precast beam winter and summer dual-purpose type curing means of the utility model
Figure;
Fig. 2 be the utility model is related to steam-cured pipeline and deposit the position relationship structure diagram of beam pedestal.
Reference numeral:1- canvas;2- precast beams;3- stands;31- vertical supportings;32- cross-braces;33- longitudinal bracings;
4- supporting rods;5- spray pipings;6- deposits beam pedestal;The steam-cured pipelines of 7-;8- skewed horizontal loads;9- display ends.
Specific embodiment
To be easy to understand technological means of the utility model, character of innovation, reached purpose and effect, below
The utility model is further illustrated.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model
Design, is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model
System.In addition to the embodiment recorded herein, those skilled in the art also are able to public based on the application claims and specification institute
The content opened includes doing using the embodiment to recording herein using obvious other technical solutions, these technical solutions
Go out the technical solution of any obvious substitutions and modifications.
A kind of construction beam strorage area precast beam winter and summer dual-purpose type curing means, including frame and are covered on frame
The curing cover that canvas 1 forms, frame include Zhi Li in 2 liang of side stands 3 of precast beam, and the top of two side stands 3 is equipped with supporting rod 4,
4 both ends of supporting rod are separately fixed at the ceiling that frame is formed on two side stands 3, and the inside of stand 3 is equipped with skewed horizontal load 8, oblique
Support 8 is equipped with spray piping 5 along the longitudinal uniform intervals setting of stand 3, each 3 inside of stand, and 5 ground elevation of spray piping is high
In 2 top ground absolute altitude of precast beam, 2 bottom of precast beam, which is equipped with, deposits beam pedestal 6 and steam-cured pipeline 7, and beam pedestal 6 is four,
It combines and is arranged in below 2 both ends of precast beam two-by-two, steam-cured pipeline 7 is three, and laterally homogeneous arranged for interval is under precast beam 2
Side, frame are equipped with several temperature sensors, and the side both ends of temperature sensor are set on inside frame, the display of temperature sensor
End 9 is set on the outside of frame, and display end 9 is placed on 1 outside of canvas, and stand 3 is propped up by vertical supporting 31, cross-brace 32 and longitudinal direction
Support is 33 assembled by bowl buckle, and cross-brace 32 grows 60 ~ 100cm, longitudinal bracing 33 be longer than 2 longitudinal length 200cm of precast beam ~
300cm, vertical supporting 31 are made higher than 80 ~ 100cm of the top of precast beam 2, supporting rod 4 of caliber of the steel pipe of 6 ~ 9cm, both ends and
Stand 3 is welded and fixed, and 5 ground elevation of spray piping is higher than 2 50 ~ 100cm of top ground absolute altitude of precast beam.
Construction period, precast beam concrete works can be in a closed spaces, simultaneously in winter for the utility model
The space manually set up is more tight, internal persistently to lead to steam, it is ensured that the temperature of entire confined space be able to maintain that one compared with
High level(Demand of technical standard environment temperature is not less than 5 DEG C), in order to grasp the situation of change of temperature of shed, Wo Men in real time
Temperature sensor is arranged outside canopy, can be controlled the variation of temperature in real time, be ensured that temperature meets code requirement, this assures pre-
The construction quality of beam processed.
It could be aware that whether this engineering can enter winter construction by Planning of construction periods, can then be needed into winter construction pre-
It first arranges steam-cured pipeline, and ensures the unimpeded of pipeline, carry out winter construction convenient for the later stage.
Before precast beam deposits in beam pedestal, bowl fastening type stand is set up in pedestal both sides, the spacing of two side stands is more than
The width of beam body, in order to the storage and proposition of follow-up precast beam;Support height is higher than the height of precast beam storage, in order to rear
The covering of continuous canvas.
The utility model winter concrete construction method is as follows:
(1)It deposits beam pedestal lower part and arranges steam-cured pipeline in advance.When depositing the molding of beam pedestal, we can then arrange two in advance
The steam-cured pipeline in road, steam-cured pipeline tube body have pre-processed venthole, and steam can uniformly discharge when leading to steam
(2)It deposits beam pedestal both sides and sets up bowl fastening type stand.We set up bowl buckle depositing Liang Tai both sides before precast beam storage
Formula stand, support height deposit in the height of pedestal higher than precast beam, and in order to the covering of follow-up canvas, spray is set in stand
Shower pipe road.
(3)Ceiling top covers canvas around stand.Canvas covering is tight to ensure that steam does not leak outside.
(4)Arrange that temperature measuring equipment ensures that internal temperature is up to standard.Automatic temperature-adjusting Acquisition Instrument is laid on the outside of canvas, monitors canopy in real time
Interior temperature change, to adjust quantity of steam in time, hot weather construction is compared with winter construction, and steam-cured pipeline is closed in hot weather construction, is opened
Logical spray piping.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all in this practicality
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
Claims (7)
1. a kind of construction beam strorage area precast beam winter and summer dual-purpose type curing means, it is characterised in that:Including frame and covering
Canvas on frame(1)The curing cover of composition, the frame include Zhi Li in precast beam(2)Two side stands(3), two side stands
(3)Top be equipped with several supporting rods(4), the supporting rod(4)Both ends are separately fixed at two side stands(3)Upper formation frame
Ceiling, the stand(3)Inside be equipped with skewed horizontal load(8), the skewed horizontal load(8)Along stand(3)Longitudinal uniform intervals
Setting, each stand(3)Inside is equipped with spray piping(5), the spray piping(5)Ground elevation is higher than precast beam
(2)Top ground absolute altitude, the precast beam(2)Bottom is equipped with and deposits beam pedestal(6)With steam-cured pipeline(7), the beam pedestal
(6)It is four, combines be arranged in precast beam two-by-two(2)Below both ends, the steam-cured pipeline(7)It is three, laterally homogeneous
Every being arranged in precast beam(2)Lower section.
2. a kind of construction beam strorage area precast beam winter as described in claim 1 and summer dual-purpose type curing means, feature exist
In:The frame is equipped with several temperature sensors, and the side both ends of the temperature sensor are set on inside frame, the temperature
The display end of Acquisition Instrument(9)Set on the outside of frame, the display end(9)It is placed on canvas(1)Outside.
3. a kind of construction beam strorage area precast beam winter as described in claim 1 and summer dual-purpose type curing means, feature exist
In:The supporting rod(4)With both ends supporting rod(4)It is detachably connected.
4. a kind of construction beam strorage area precast beam winter as described in claim 1 and summer dual-purpose type curing means, feature exist
In:The stand(3)By vertical supporting(31), cross-brace(32)And longitudinal bracing(33)It is assembled by bowl buckle.
5. a kind of construction beam strorage area precast beam winter as claimed in claim 4 and summer dual-purpose type curing means, feature exist
In:The cross-brace(32)Long 60 ~ 100cm, the longitudinal bracing(33)It is longer than precast beam(2)Longitudinal length 200cm ~
300cm, the vertical supporting(31)Higher than precast beam(2)80 ~ 100cm of top.
6. a kind of construction beam strorage area precast beam winter as claimed in claim 4 and summer dual-purpose type curing means, feature exist
In:The supporting rod(4)It is made of caliber of the steel pipe of 6 ~ 9cm.
7. a kind of construction beam strorage area precast beam winter and summer dual-purpose type maintenance dress as described in claim 1 ~ 6 any one
It puts, it is characterised in that:The spray piping(5)Ground elevation is higher than precast beam(2)50 ~ 100cm of top ground absolute altitude.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721661490.5U CN207549071U (en) | 2017-12-04 | 2017-12-04 | Winter and summer dual-purpose type curing means of roof beam district precast beam is deposited in construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721661490.5U CN207549071U (en) | 2017-12-04 | 2017-12-04 | Winter and summer dual-purpose type curing means of roof beam district precast beam is deposited in construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207549071U true CN207549071U (en) | 2018-06-29 |
Family
ID=62679001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721661490.5U Active CN207549071U (en) | 2017-12-04 | 2017-12-04 | Winter and summer dual-purpose type curing means of roof beam district precast beam is deposited in construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207549071U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110759748A (en) * | 2019-11-15 | 2020-02-07 | 河北建设集团股份有限公司 | Movable beam and slab curing device and beam and slab curing process |
-
2017
- 2017-12-04 CN CN201721661490.5U patent/CN207549071U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110759748A (en) * | 2019-11-15 | 2020-02-07 | 河北建设集团股份有限公司 | Movable beam and slab curing device and beam and slab curing process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107964979A (en) | A kind of transmission line of electricity combining structure assembled cushion cap anchor rod foundation | |
CN204401650U (en) | Square longitudinally connection prestressed assembly formula underground pipe gallery | |
CN207549071U (en) | Winter and summer dual-purpose type curing means of roof beam district precast beam is deposited in construction | |
CN108668706B (en) | Triangular space truss and large-span upright-column-free greenhouse | |
CN204023410U (en) | Winter deck paving heat preservation construction device | |
CN203125684U (en) | Maintenance shed for concrete prefabricated component | |
CN204491659U (en) | Jack arch shape prestressed structure pin-connected panel underground pipe gallery | |
CN208387423U (en) | A kind of triangle space truss and large-span non-upright post greenhouse | |
CN207795271U (en) | A kind of tunnel double-lining concrete is totally-enclosed to exempt from watering spray moisture-keeping maintaining trolley structure | |
CN108391539A (en) | A kind of super span stacked high energy greenhouse and its building method | |
CN202324250U (en) | Novel thermal-insulation and energy-saving wall body | |
CN204282845U (en) | Buildings in cold roof insulating structure | |
CN207714358U (en) | A kind of transmission line of electricity composite structure assembled cushion cap anchor rod foundation | |
CN207660094U (en) | A kind of Quick assembling structure of house foundation | |
CN201024584Y (en) | Water heating ground heat pipeline pavement template | |
CN202524829U (en) | Heat preservation wall body for sunlight greenhouse | |
CN211909854U (en) | Energy-conserving sunlight greenhouse of easy dismouting removal | |
CN102763577B (en) | Dual-purpose demountable sunlight greenhouse used in winter and summer | |
CN202857414U (en) | Disassembling type sunlight greenhouse usable in summer and winter | |
CN205314601U (en) | A scalable instrument for protection of tower crane entrance to a cave | |
CN202248376U (en) | Heat insulation wall for vegetable greenhouse | |
CN104115698A (en) | Assembly type light roof greening system | |
CN209243751U (en) | A kind of low-rise building | |
CN204090621U (en) | A kind of fabricated lightweight roof greening system | |
CN204080859U (en) | High-strength resistance to compression centripetal-stress Urban Underground pipe gallery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |