CN106555395B - A kind of assembled underground continuous wall and construction method - Google Patents

A kind of assembled underground continuous wall and construction method Download PDF

Info

Publication number
CN106555395B
CN106555395B CN201611157638.1A CN201611157638A CN106555395B CN 106555395 B CN106555395 B CN 106555395B CN 201611157638 A CN201611157638 A CN 201611157638A CN 106555395 B CN106555395 B CN 106555395B
Authority
CN
China
Prior art keywords
wall
shaft
chain
cutting shoe
underground continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611157638.1A
Other languages
Chinese (zh)
Other versions
CN106555395A (en
Inventor
王智群
殷树芳
王强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEOTECHNICAL TECHNOLOGY Co Ltd
Original Assignee
GEOTECHNICAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEOTECHNICAL TECHNOLOGY Co Ltd filed Critical GEOTECHNICAL TECHNOLOGY Co Ltd
Priority to CN201611157638.1A priority Critical patent/CN106555395B/en
Publication of CN106555395A publication Critical patent/CN106555395A/en
Application granted granted Critical
Publication of CN106555395B publication Critical patent/CN106555395B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/24Placing by using fluid jets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/04Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with digging screws

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Composite Materials (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention provides a kind of assembled underground continuous wall and construction methods, belong to technical field of buildings, are related to a kind of diaphram wall.It solves the problems, such as to construct in the prior art slow.This assembled underground continuous wall and construction method, the diaphragm wall is spliced by independent multistage wall, the junction of wall is provided with corresponding concave-convex splicing construction, pipeline is provided in wall, pipeline between the two walls unicom with the connection of wall, wall lower end is provided with cutting shoe, and the hole for water spraying with wall body vessel unicom is provided in cutting shoe.First segment wall with cutting shoe is inserted in the job location for needing that diaphragm wall is arranged;Then, the pipeline into wall squeezes into pressure water so that water sprays scouring sediment from the hole for water spraying in cutting shoe and wall is sunk, by second segment wall connecting on first segment wall, the present invention can in order to avoid deep trouth excavation, constructed using prefabricated module-assembled, facilitate construction, shortens the construction time.

Description

A kind of assembled underground continuous wall and construction method
Technical field
The invention belongs to technical field of buildings, are related to a kind of diaphram wall, especially a kind of assembled underground continuous wall And construction method.
Background technology
Diaphram wall is that foundation engineering uses a kind of trench machine on the ground, along all side axis of deep excavation project Line excavates out a long and narrow deep trouth under the conditions of mud off, after clear slot, steel reinforcement cage is hung in slot, then uses tremie method Underwater concreting with tremie method builds up a unit groove section, so carries out paragraph by paragraph, and continuous reinforced concrete wall together is built up in underground Wall.However this wall needs dig out deep trouth in advance, are limited by excavating equipment, and deeper diaphragm wall cannot be built, and need to apply Working hour casting concrete etc. so that construction is slow.
Invention content
The purpose of the present invention is there is the above problem in view of the prior art, it is proposed that a kind of assembled underground continuous wall and Construction method, this assembled underground continuous wall and construction method can in order to avoid deep trouth excavation, using prefabricated module-assembled Construction facilitates construction, shortens the construction time.
Object of the invention can be realized by the following technical scheme:A kind of assembled underground continuous wall, including wall, The diaphragm wall is spliced by independent multistage wall, and the junction of wall is provided with corresponding concave-convex splicing construction, wall It is inside provided with pipeline, the pipeline between two walls is with the connection of wall and unicom, wall lower end are provided with cutting shoe, is set in cutting shoe It is equipped with the hole for water spraying with wall body vessel unicom.
Shaft reamer device is provided in above-mentioned assembled underground continuous wall, at cutting shoe, device group becomes:In cutting shoe It is arranged with shaft, reamer blade is provided in shaft, sprocket wheel is provided in shaft, drive sprocket rotation is combined on sprocket wheel Chain, wall of the chain ring around the cutting shoe top is driven by driving device to be rotated.
In above-mentioned assembled underground continuous wall, axle sleeve is provided in shaft, axle sleeve is supported on supporting rod one end, support The other end of bar is hingedly connected in cutting shoe, is provided with sliding block on supporting rod, one end of sliding block hinge connection connecting rod, connecting rod it is another One end is hingedly connected in cutting shoe, and connecting rod is telescopic rod.By to two different direction traction chains so that the position of shaft It sets and certain change occurs.
It is cavity in above-mentioned assembled underground continuous wall, in shaft, unicom cavity and outside is distributed in shaft Hole, roller end are provided with the swivel joint of unicom cavity, and swivel joint passes through water pipe and water pump unicom.It is rotated in shaft When squeeze into water into shaft cavity so that water from shaft hole spray.
In above-mentioned assembled underground continuous wall, diaphragm wall is rectangular open caisson formula wall, the opposite metope of two of which Under cutting shoe at be both provided with shaft reamer device.
In above-mentioned assembled underground continuous wall, one end of the chain of two shaft reamer devices respectively with four rope grab The other end of two and half bucket connections, two chains is connect with the opening and closing steel wire rope both ends of control grab bucket respectively.
The construction method of above-mentioned assembled underground continuous wall is that first, the first segment wall with cutting shoe, which is inserted in, to be needed The job location of diaphragm wall is set;Then, the pipeline into wall squeezes into pressure water so that water is sprayed from the hole for water spraying in cutting shoe Going out scouring sediment makes wall sink, after wall drops to certain depth, by second segment wall connecting on first segment wall, Pipeline unicom in two sections of walls squeezes into pressure water into pipeline and wall is made to continue to sink.
The construction method of above-mentioned assembled underground continuous wall is, when soil layer is harder, driving device drive chain band Turn shaft rotation is dynamic so that reamer blade cuts soil layer, while water can be squeezed into shaft by the water pipe that roller end connects, and makes Water is ejected from the hole in shaft, when needing to cut the soil of wall cutting shoe side, can to the side-lining chain, It, can be to other side traction chain when needing to cut the soil of the wall other side.
The construction method of above-mentioned assembled underground continuous wall is, when grabbing bucket decentralization, driving device traction is located at open caisson Chain outside wall rises so that the chain in open caisson wall follows grab bucket to transfer together, continues to lead after grab bucket reaches soil layer Draw chain to draw the two halves bucket of grab bucket to both sides so that grab bucket, which is opened, is inserted into silt, then the reversed traction of driving device traction Chain so that the opening and closing steel wire rope that the chain in open caisson wall is pulled up opening and closing steel wire rope grab bucket makes grab bucket be closed, simultaneously Lifting device of grabbing bucket promotes grab bucket and rises.
Compared with prior art, this assembled underground continuous wall and construction method have the following advantages:
The assembled underground continuous wall and construction method of the present invention utilizes the pipe in wall using prefabricated wall body module Road so that current scour soil layer is sprayed at cutting shoe to be applied as the new module of the lower general who has surrendered of wall is assembled on the wall declined Work fast and easy.
Description of the drawings
Fig. 1 is the structural schematic diagram of invention;
Fig. 2 is the overlooking structure diagram of Fig. 1;
Fig. 3 is two structural schematic diagram of embodiment;
Fig. 4 is the structural schematic diagram of the shaft reamer device of embodiment two;
Fig. 5 is the side view of Fig. 4;
Fig. 6 be to the left traction chain when working state schematic representation;
Fig. 7 be to the right traction chain when working state schematic representation;
Fig. 8 is the schematic diagram of embodiment three.
In figure, wall 1, pipeline 2, cutting shoe 3, hole for water spraying 4, shaft 5, blade 6, sprocket wheel 7, chain 8, axle sleeve 9, supporting rod 10, sliding block 11, connecting rod 12, swivel joint 13, water pipe 14, hole 15 is opened and closed steel wire rope 16, half bucket 17, driving device 18.
Specific implementation mode
The following is specific embodiments of the present invention, and technical scheme of the present invention will be further described in conjunction with attached drawing, However, the present invention is not limited to these examples.
Embodiment one
As shown in Figure 1, a kind of assembled underground continuous wall and construction method, by taking rectangular open caisson formula wall 1 as an example, i.e., by only The junction of the open caisson that vertical multistage wall is spliced, wall is provided with corresponding concave-convex splicing construction, such as happy together high building blocks Equally, open caisson can be divided into sectional connection from top to bottom.As shown in Fig. 2, can be spliced by Pork-pieces wall per face wall body, Pipeline 2 is provided in wall, the pipeline between two walls is with the connection of wall and unicom, wall lower end are provided with cutting shoe 3, sword The hole for water spraying 4 with wall body vessel unicom is provided on foot, can be using wall body vessel as water-supply-pipe, it can also be in wall Pipeline in be inserted into other independent water-supply-pipes and be used to provide water source for cutting shoe hole for water spraying.
In the construction method of above-mentioned assembled underground continuous wall, first, the first segment wall with cutting shoe, which is inserted in, to be needed The job location of diaphragm wall is set;Then, the pipeline into wall squeezes into pressure water so that water is sprayed from the hole for water spraying in cutting shoe Going out scouring sediment makes wall sink, after wall drops to certain depth, by second segment wall connecting on first segment wall, Pipeline unicom in two sections of walls squeezes into pressure water into pipeline and wall is made to continue to sink.
Embodiment two
As shown in Figure 3,4, what is different from the first embodiment is that being provided with shaft reamer device at cutting shoe, device group becomes: Cutting shoe is arranged with shaft 5, and reamer blade 6 is provided in shaft, and blade can be arranged as required into certain angle of inclination Or helical structure, the material and model of blade can be selected according to the hardness of soil layer, and sprocket wheel 7 is provided in shaft, is matched on sprocket wheel Close the chain 8 for thering is drive sprocket to rotate, naturally it is also possible to which, using the mechanism of other traction drive rotations, chain ring is around the cutting shoe The wall on top is driven by chain traction driving device 18 and is rotated.Certainly, can be arranged accordingly to control the trend of chain The mechanisms such as directive wheel or tensioning wheel.Certainly it is applied to that cutting shoe can not also be arranged when shaft reamer device.
Further, axle sleeve 9 is provided in shaft, is equivalent to bearing, axle sleeve is supported on 10 one end of supporting rod, supporting rod it is another One end is hingedly connected in cutting shoe, is provided with sliding block 11 on supporting rod, one end of sliding block hinge connection connecting rod, connecting rod 12 it is another End is hingedly connected in cutting shoe, and connecting rod is telescopic rod, for example, two sockets can relative telescopic telescopic rod.Pass through Quality Initiative The lead of item, in the range of telescopic rod controls so that certain change occurs relative to the position of wall for shaft, to The soil of wall not homonymy is cut.Telescopic rod may be hydraulic cylinder, and the extension and contraction control by controlling hydraulic cylinder turns The position of axis.
Further, it is cavity in shaft, unicom cavity and external hole is distributed in shaft, roller end is provided with unicom The swivel joint 13 of cavity, swivel joint pass through water pipe 14 and water pump unicom.It is beaten into shaft cavity when shaft is rotated Enter water so that water is sprayed from the hole 15 in shaft.
If the construction method of the above-mentioned assembled underground continuous wall in Fig. 5,6,7 is, when soil layer is harder, driving device is driven Dynamic chain-driving shaft rotation so that reamer blade cuts soil layer, while can be by the water pipe that roller end connects into shaft Squeeze into water so that water is ejected from the hole in shaft, can be to the side when needing to cut the soil of wall cutting shoe side Traction chain can be to other side traction chain when needing to cut the soil of the wall other side.
Embodiment three
As shown in figure 8, unlike embodiment one, two, diaphragm wall is rectangular open caisson formula wall, and two of which is opposite Shaft reamer device is both provided at cutting shoe under metope.One end of the chain of two shaft reamer devices respectively with four rope grab The other end of two and half buckets, 17 connection, two chains is connect with 16 both ends of opening and closing steel wire rope of control grab bucket respectively.
The construction method of above-mentioned assembled underground continuous wall is, when grabbing bucket decentralization, driving device traction is located at open caisson Chain outside wall rises so that the chain in open caisson wall follows grab bucket to transfer together, continues to lead after grab bucket reaches soil layer Draw chain to draw the two halves bucket of grab bucket to both sides so that grab bucket, which is opened, is inserted into silt, then the reversed traction of driving device traction Chain so that the opening and closing steel wire rope that the chain in open caisson wall is pulled up opening and closing steel wire rope grab bucket makes grab bucket be closed, simultaneously Lifting device of grabbing bucket promotes grab bucket and rises.After grab bucket rises to well head, opens grab bucket and unload silt.
Specific embodiment described herein is only an example for the spirit of the invention.Technology belonging to the present invention is led The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.
Although some terms are used more herein, it does not preclude the possibility of using other terms.Use these Term is only for the convenience of describing and explaining the nature of the invention;It is construed as any one of the additional limitations all It is disagreed with spirit of that invention.

Claims (6)

1. a kind of assembled underground continuous wall, including wall, which is characterized in that the diaphragm wall is spliced by independent multistage wall It forming, the junction of wall is provided with corresponding concave-convex splicing construction, and the vertical pipeline of unicom or more wall is provided in wall, Pipeline between two walls is connected to the connection of wall, and wall lower end is provided with cutting shoe, be provided in cutting shoe in wall The hole for water spraying of pipeline connection;Shaft reamer device is provided at cutting shoe, which becomes:It is arranged in cutting shoe Shaft is provided with reamer blade in shaft, sprocket wheel is provided in shaft, and the chain of drive sprocket rotation, chain are combined on sprocket wheel Wall of the item around the cutting shoe top is driven by driving device to be rotated;Coordinate independent chain per the shaft on side edge foot, passes through The chain rotation that driving device draws the side can drive the side shaft rotation;Axle sleeve is provided in shaft, axle sleeve is supported on support The other end of bar one end, supporting rod is hingedly connected in cutting shoe, is provided with sliding block on supporting rod, and the one of sliding block hinge connection connecting rod End, the other end of connecting rod are hingedly connected in cutting shoe, and connecting rod is telescopic rod.
2. assembled underground continuous wall according to claim 1, which is characterized in that be cavity in shaft, be distributed in shaft Have a connection cavity and external hole, roller end is provided with the swivel joint of connection cavity, swivel joint by water pipe with Water pump is connected to.
3. assembled underground continuous wall according to claim 1, which is characterized in that diaphragm wall is rectangular open caisson wall, In be both provided with shaft reamer device at cutting shoe under two opposite metopes.
4. assembled underground continuous wall according to claim 3, which is characterized in that the one of the chain of two shaft reamer devices End is connected with two and half buckets of four rope grab respectively, and the other end is connect with the opening and closing steel wire rope both ends of control grab bucket respectively.
5. the construction method of assembled underground continuous wall according to claim 4, which is characterized in that when soil layer is harder When, driving device drive chain drives shaft rotation so that and reamer blade cuts soil layer, while can be connected by roller end Water pipe squeezes into water into shaft so that water is ejected from the hole in shaft, when the soil for needing cutting wall cutting shoe side When, it can be to the side-lining chain, it, can be to other side traction chain when needing to cut the soil of the wall other side.
6. the construction method of assembled underground continuous wall according to claim 4, which is characterized in that when grabbing bucket decentralization, Driving device traction is located at the chain outside open caisson wall and rises so that and the chain in open caisson wall follows grab bucket to transfer together, Continuation traction chain draws the two halves bucket of grab bucket to both sides after grab bucket reaches soil layer so that grab bucket, which is opened, is inserted into silt, then Driving device draws reversed traction chain so that the chain in open caisson wall is pulled up the opening and closing steel wire rope of grab bucket so that grabs Bucket is closed, while lifting device of grabbing bucket promotes grab bucket and rises.
CN201611157638.1A 2016-12-15 2016-12-15 A kind of assembled underground continuous wall and construction method Active CN106555395B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611157638.1A CN106555395B (en) 2016-12-15 2016-12-15 A kind of assembled underground continuous wall and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611157638.1A CN106555395B (en) 2016-12-15 2016-12-15 A kind of assembled underground continuous wall and construction method

Publications (2)

Publication Number Publication Date
CN106555395A CN106555395A (en) 2017-04-05
CN106555395B true CN106555395B (en) 2018-09-18

Family

ID=58446139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611157638.1A Active CN106555395B (en) 2016-12-15 2016-12-15 A kind of assembled underground continuous wall and construction method

Country Status (1)

Country Link
CN (1) CN106555395B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930286A (en) * 2017-05-24 2018-12-04 润弘精密工程事业股份有限公司 The underground structure for forming the construction method of underground structure and being completed with this construction method
CN107700475B (en) * 2017-11-16 2023-07-28 浙江杰立建设集团有限公司 Assembled concrete underground diaphragm wall structure and construction process
CN107975029B (en) * 2017-12-29 2019-09-24 章胜南 It is a kind of integrally to descend wall construction method
CN108487284A (en) * 2018-06-27 2018-09-04 上海城建市政工程(集团)有限公司 A kind of sinking construction method of prefabricated after-pouring formula open caisson
CN108842798B (en) * 2018-06-27 2021-10-19 上海城建市政工程(集团)有限公司 Static pressure sinking construction method of prefabricated pouring type open caisson
CN110485450B (en) * 2019-08-15 2021-06-04 滁州职业技术学院 Water stopping method for civil engineering foundation
CN112982678B (en) * 2021-02-19 2022-06-03 甘肃筑铭建设工程有限公司 Prefabricated house and installation method thereof
CN114108797A (en) * 2021-10-21 2022-03-01 王树生 Wall foundation and construction device and method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010101025A (en) * 2008-10-21 2010-05-06 Honmagumi:Kk Construction method and construction apparatus for diaphragm wall
CN201520969U (en) * 2009-08-25 2010-07-07 天津一建建筑工程有限公司 Prefabricated hollow diaphragm wall body
CN204849738U (en) * 2015-06-27 2015-12-09 石午江 Can pierce through static pressure tubular pile of sand bed and construction equipment thereof
CN105089044B (en) * 2015-08-31 2017-03-15 中国建筑股份有限公司 A kind of construction method of horizontal pushing tow compression type coercion underground continuous wall system
CN105544579B (en) * 2015-12-04 2017-08-29 黄国庆 A kind of construction method of pile foundation
CN105926582B (en) * 2016-05-09 2018-12-28 江苏鸿基节能新技术股份有限公司 Prefabricated hollow component underground tunneling construction assembly, diaphragm wall and construction method

Also Published As

Publication number Publication date
CN106555395A (en) 2017-04-05

Similar Documents

Publication Publication Date Title
CN106555395B (en) A kind of assembled underground continuous wall and construction method
US3004392A (en) Submarine pipe line trencher and method
CN204326136U (en) A kind of environmental protection strand inhales dredger
CN105649083A (en) All-casing one-time rotary cutting type pile removing device and pile removing method thereof
CN104404951B (en) Long spire stake machine with expander and pile making method
CN101538857A (en) Pile extraction construction method
CN206368373U (en) A kind of open caisson construction equipment
CN106978815B (en) A kind of open caisson construction device and construction method
CN102182180A (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN206298891U (en) A kind of construction of diaphragm wall device
CN104532893B (en) Both arms drilling and digging machine
CN215057096U (en) Small-size rotary drilling rig
CN212477725U (en) Pile machine of split combined type full-pile casing
CN204326133U (en) A kind of environmental protection strand inhales the excavating gear jacking system of dredger
CN208039236U (en) It is a kind of belong to underground pile connect wall construction method at wall equipment
CN108952568B (en) Drilling machine
CN207160104U (en) Cutter suction dredger
KR20180120357A (en) Two-way swivel of ground excavator
CN1309226A (en) Relay drilling machine without drill rods for rock and clay
JPH0718665A (en) Screw rod for underground boring machine
CN108442363A (en) Underground pile connects wall construction method and its at wall equipment
JPH0718664A (en) Rotary joint for underground boring machine
CN104947685B (en) Stake machine driving system and the foundation pit enclosure technique using this machine driving system
ITPS990007A1 (en) PERFORATION PROCEDURE FOR LARGE DIAMETER HOLES WITH HIGH DEPTH AND DRILL SUITABLE FOR IMPLEMENTING THAT PROCEDURE
JP2016017350A (en) Horizontal erection device and horizontal erection method for board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A prefabricated underground continuous wall and its construction method

Effective date of registration: 20220704

Granted publication date: 20180918

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou

Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd.

Registration number: Y2022980009767

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20180918

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou

Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd.

Registration number: Y2022980009767

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A prefabricated underground continuous wall and construction method

Granted publication date: 20180918

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou

Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd.

Registration number: Y2024980026444