CN106978815B - A kind of open caisson construction device and construction method - Google Patents

A kind of open caisson construction device and construction method Download PDF

Info

Publication number
CN106978815B
CN106978815B CN201611157606.1A CN201611157606A CN106978815B CN 106978815 B CN106978815 B CN 106978815B CN 201611157606 A CN201611157606 A CN 201611157606A CN 106978815 B CN106978815 B CN 106978815B
Authority
CN
China
Prior art keywords
open caisson
chain
well body
shaft
cutting shoe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611157606.1A
Other languages
Chinese (zh)
Other versions
CN106978815A (en
Inventor
潘金龙
周顺
叶建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEOTECHNICAL TECHNOLOGY Co Ltd
Original Assignee
GEOTECHNICAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEOTECHNICAL TECHNOLOGY Co Ltd filed Critical GEOTECHNICAL TECHNOLOGY Co Ltd
Priority to CN201611157606.1A priority Critical patent/CN106978815B/en
Publication of CN106978815A publication Critical patent/CN106978815A/en
Application granted granted Critical
Publication of CN106978815B publication Critical patent/CN106978815B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention provides a kind of open caisson construction device and construction methods, belong to technical field of buildings, are related to a kind of underground open caisson.It solves the problems, such as to construct in the prior art slow.This open caisson construction device and construction method, including open caisson, open caisson well body is formed by connecting from top to bottom by multistage well body, bottom open caisson lower end is provided with cutting shoe, the hole for water spraying with well body vessel unicom is provided in cutting shoe, the supply line of unicom hole for water spraying is provided in open caisson, cutting shoe lower port is provided with holder, reamer blade is set under holder, the power plant of control reamer blade rotation is provided on holder, the present invention using well body dead weight while being declined, by the pipeline that is arranged in well body, injection water washes away soil layer at cutting shoe, simultaneously soil layer is cut in the bottom nozzle of well body setting rotary reamer, accelerate the decline of open caisson.

Description

A kind of open caisson construction device and construction method
Technical field
The invention belongs to technical field of buildings, are related to a kind of open caisson, especially a kind of open caisson construction device and construction method.
Background technology
Open caisson is the works of pit shaft shape, it is sunk after overcoming borehole wall frictional resistance by its own gravity with cutting the earth in well To designed elevation, then passes through concrete sealing bottom and clog wellhole, become the basis of Bridge Pier or other structures object.One As construction Bridge Piers foundation pit, sewage pumping station, large equipment base, people's air defense shelter, shield assembly well, underground driveway with It is used when the water conservancy project foundation construction enclosure device of station.However the gravity for relying only on open caisson makes the slow of well sinking, using it His equipment stretches to deeper shaft bottom and excavates also inconvenience.
Invention content
The purpose of the present invention is there is the above problem in view of the prior art, it is proposed that a kind of open caisson construction device and construction Method, this open caisson construction device and construction method are carried while being sunk using open caisson own wt using open caisson bottom Rotary reamer carries out shaft bottom soil layer comprehensive excavation simultaneously, and speed of application is fast.
Object of the invention can be realized by the following technical scheme:A kind of open caisson construction device, including well body, open caisson Well body is formed by connecting from top to bottom by multistage well body, and bottom open caisson lower end is provided with cutting shoe, be provided in cutting shoe in well body The hole for water spraying of pipeline unicom, is provided with the supply line of unicom hole for water spraying in open caisson, and cutting shoe lower port is provided with holder, under holder Reamer blade is set, the power plant of control reamer blade rotation is provided on holder.
In above-mentioned open caisson construction device, open caisson is rectangular open caisson, and shaft reamer device is provided at caisson cutting edge, dress Setting group becomes:It is arranged with shaft in cutting shoe, reamer blade is provided in shaft, sprocket wheel is provided in shaft, is coordinated on sprocket wheel There is the chain that drive sprocket rotates, well body of the chain ring around the cutting shoe top is driven by driving device to be rotated.By to two not Same direction traction chain so that certain change occurs for the position of shaft.
In above-mentioned open caisson construction device, axle sleeve is provided in shaft, axle sleeve is supported on supporting rod one end, supporting rod The other end is hingedly connected in cutting shoe, and sliding block, one end of sliding block hinge connection connecting rod, the other end of connecting rod are provided on supporting rod It is hingedly connected in cutting shoe, connecting rod is telescopic rod.
It is cavity in above-mentioned open caisson construction device, in shaft, unicom cavity and external hole is distributed in shaft, turns Shaft end is provided with the swivel joint of unicom cavity, and swivel joint passes through water pipe and water pump unicom.When shaft is rotated to Water is squeezed into shaft cavity so that water is sprayed from the hole in shaft.
In above-mentioned open caisson construction device, one end of the chain of two shaft reamer devices two with four rope grab respectively The other end of half bucket connection, two chains is connect with the opening and closing steel wire rope both ends of control grab bucket respectively.
The construction method of above-mentioned open caisson construction device is first, the first segment well body with cutting shoe to be inserted in needs and is set Set the job location of open caisson;Then, the pipeline into well body squeezes into pressure water so that water is washed away from the hole for water spraying ejection in cutting shoe Silt makes well body sink, while controlling the rotation of reamer blade, and stirring the soil layer in the middle part of open caisson makes it be quickly turned to mud, waits for well After body drops to certain depth, second segment well body is connected in first segment well body, the pipeline unicom in two sections of well bodies, to pipeline In squeeze into pressure water well body made to continue to sink.
The construction method of above-mentioned open caisson construction device is, when soil layer is harder, driving device drive chain band turn Shaft rotation is dynamic so that reamer blade cuts soil layer, while water can be squeezed into shaft by the water pipe that roller end connects so that water It is ejected from the hole in shaft, it, can be to the side-lining chain, when need when needing to cut the soil of well body cutting shoe side It, can be to the other side traction chain when cutting the soil of the well body other side.
The construction method of above-mentioned open caisson construction device is, when grabbing bucket decentralization, driving device traction is located at open caisson well body Outer chain rises so that the chain in open caisson well body follows grab bucket to transfer together, continues haulage chain after grab bucket reaches soil layer Item draws the two halves bucket of grab bucket to both sides so that and grab bucket, which is opened, is inserted into silt, and then driving device draws reversed traction chain, So that the opening and closing steel wire rope that the chain in open caisson well body is pulled up opening and closing steel wire rope grab bucket makes grab bucket be closed, while grab bucket carries It rises device and promotes grab bucket rising.
Compared with prior art, this open caisson construction device and construction method have the following advantages:
The open caisson construction device and construction method of the present invention, while being declined using well body dead weight, by being arranged in well Internal pipeline injection water from cutting shoe washes away soil layer, while cutting soil layer in the bottom nozzle of well body setting rotary reamer, adds The decline of fast open caisson, it is easy for construction quick.
Description of the drawings
Fig. 1 is the structural schematic diagram of invention;
Fig. 2 is the present invention looks up structural representation of Fig. 1;
Fig. 3 is two structural schematic diagram of embodiment;
Fig. 4 is the structural schematic diagram of the shaft reamer device of embodiment two;
Fig. 5 is the side view of Fig. 4;
Fig. 6 be to the left traction chain when working state schematic representation;
Fig. 7 be to the right traction chain when working state schematic representation;
Fig. 8 is the schematic diagram of embodiment three.
In figure, well body 1, pipeline 2, cutting shoe 3, hole for water spraying 4, shaft 5, blade 6, sprocket wheel 7, chain 8, axle sleeve 9, supporting rod 10, sliding block 11, connecting rod 12, swivel joint 13, water pipe 14, hole 15 is opened and closed steel wire rope 16, half bucket 17, chain traction driving dress Set 18, holder 19, reamer blade 20, power plant 21.
Specific implementation mode
The following is specific embodiments of the present invention, and technical scheme of the present invention will be further described in conjunction with attached drawing, However, the present invention is not limited to these examples.
Embodiment one
As shown in Figure 1, 2, open caisson construction device, including well body 1, well body are round well body, and open caisson well body is by multistage well body It is formed by connecting from top to bottom, bottom open caisson lower end is provided with cutting shoe 3, and the spray with 2 unicom of well body vessel is provided in cutting shoe Water hole, the supply line of unicom hole for water spraying 4 is provided in open caisson, and cutting shoe lower port is provided with holder 19, reamer is arranged under holder Blade 20 is provided with the power plant 21 of control reamer blade rotation on holder, such as waterproof machine or hydraulic motor.
In the construction method of above-mentioned open caisson construction device, first, the first segment well body with cutting shoe is inserted in needs and is set Set the job location of open caisson;Then, the pipeline into well body squeezes into pressure water so that water is washed away from the hole for water spraying ejection in cutting shoe Silt makes well body sink, while controlling the rotation of reamer blade, and stirring the soil layer in the middle part of open caisson makes it be quickly turned to mud, waits for well After body drops to certain depth, second segment well body is connected in first segment well body, the pipeline unicom in two sections of well bodies, to pipeline In squeeze into pressure water well body made to continue to sink.
Embodiment two
As shown in Figure 3,4, what is different from the first embodiment is that open caisson is rectangular open caisson, shaft reamer dress is provided at cutting shoe It sets, device group becomes:It is arranged with shaft 5 in cutting shoe, reamer blade 6 is provided in shaft, blade can be arranged as required into With certain angle of inclination or helical structure, the material and model of blade can be selected according to the hardness of soil layer, be arranged in shaft There is sprocket wheel 7, the chain 8 of drive sprocket rotation is combined on sprocket wheel, naturally it is also possible to use the machine of other traction drive rotations Structure, well body of the chain ring around the cutting shoe top is driven by chain traction driving device 18 to be rotated.Certainly, in order to control walking for chain To the mechanisms such as corresponding directive wheel or tensioning wheel can be arranged.Certainly it is applied to that sword can not also be arranged when shaft reamer device Foot.
Further, axle sleeve 9 is provided in shaft, is equivalent to bearing, axle sleeve is supported on 10 one end of supporting rod, supporting rod it is another One end is hingedly connected in cutting shoe, is provided with sliding block 11 on supporting rod, one end of sliding block hinge connection connecting rod, connecting rod 12 it is another End is hingedly connected in cutting shoe, and connecting rod is telescopic rod, for example, two sockets can relative telescopic telescopic rod.Pass through Quality Initiative The lead of item, in the range of telescopic rod controls so that certain change occurs relative to the position of well body for shaft, to The soil of well body not homonymy is cut.Telescopic rod may be hydraulic cylinder, and the extension and contraction control by controlling hydraulic cylinder turns The position of axis.
Further, it is cavity in shaft, unicom cavity and external hole is distributed in shaft, roller end is provided with unicom The swivel joint 13 of cavity, swivel joint pass through water pipe 14 and water pump unicom.It is beaten into shaft cavity when shaft is rotated Enter water so that water is sprayed from the hole 15 in shaft.
If the construction method of the above-mentioned open caisson construction device in Fig. 5,6,7 is, when soil layer is harder, driving device drive chain Band turn shaft rotation is dynamic so that reamer blade cuts soil layer, while can be squeezed into shaft by the water pipe that roller end connects Water so that water is ejected from the hole in shaft, can be to the side-lining when needing to cut the soil of well body cutting shoe side Chain can be to other side traction chain when needing to cut the soil of the well body other side.If the shaft reamer of the embodiment fills It sets and is used simultaneously with the spiral reamer device of embodiment 1, then the diameter of spiral reamer should be reduced
Embodiment three
As shown in figure 8, unlike embodiment one, two, it is both provided at the cutting shoe under the opposite metope of two of which Shaft reamer device.One end of the chain of two shaft reamer devices is connect with two and half buckets 17 of four rope grab respectively, two chains The other end respectively with control grab bucket 16 both ends of opening and closing steel wire rope connect.
The construction method of above-mentioned open caisson construction device is, when grabbing bucket decentralization, driving device traction is located at open caisson well body Outer chain rises so that the chain in open caisson well body follows grab bucket to transfer together, continues haulage chain after grab bucket reaches soil layer Item draws the two halves bucket of grab bucket to both sides so that and grab bucket, which is opened, is inserted into silt, and then driving device draws reversed traction chain, So that the opening and closing steel wire rope that the chain in open caisson well body is pulled up opening and closing steel wire rope grab bucket makes grab bucket be closed, while grab bucket carries It rises device and promotes grab bucket rising.After grab bucket rises to well head, opens grab bucket and unload silt.
Specific embodiment described herein is only an example for the spirit of the invention.Technology belonging to the present invention is led The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.
Although some terms are used more herein, it does not preclude the possibility of using other terms.Use these Term is only for the convenience of describing and explaining the nature of the invention;It is construed as any one of the additional limitations all It is disagreed with spirit of that invention.

Claims (5)

1. a kind of open caisson construction device, including open caisson, which is characterized in that open caisson well body connected from top to bottom by multistage well body and At lowermost open caisson lower end is provided with cutting shoe, and hole for water spraying is provided in cutting shoe, and the feed pipe of connection hole for water spraying is provided in open caisson Road, cutting shoe lower port are provided with holder, reamer blade are arranged under holder, and the power of control reamer blade rotation is provided on holder Device;Open caisson is rectangular open caisson, and shaft reamer device is provided at caisson cutting edge, which becomes:In cutting shoe It is arranged with shaft, reamer blade is provided in shaft, sprocket wheel is provided in shaft, drive sprocket rotation is combined on sprocket wheel Chain, chain ring around the cutting shoe top well body and driven by chain traction driving device;Axle sleeve, axle sleeve branch are provided in shaft In supporting rod one end, the other end of supporting rod is hingedly connected in cutting shoe, and sliding block, sliding block hinge connection are provided on supporting rod for support The other end of one end of connecting rod, connecting rod is hingedly connected in cutting shoe, and connecting rod is telescopic rod.
2. open caisson construction device according to claim 1, which is characterized in that it is cavity in shaft, the company of being distributed in shaft Logical cavity and external hole, roller end are provided with the swivel joint of connection cavity, and swivel joint passes through water pipe and water pump Connection.
3. open caisson construction device according to claim 2, which is characterized in that one end of the chain of two shaft reamer devices point It is not connected with two and half buckets of four rope grab, the other end is connect with the opening and closing steel wire rope both ends of control grab bucket respectively.
4. the construction method of open caisson construction device according to claim 3, which is characterized in that when soil layer is harder, chain Item is driven by chain traction driving device to drive shaft to rotate so that reamer blade cuts soil layer, while can pass through shaft The water pipe of end connection squeezes into water into shaft so that water is ejected from the hole in shaft, the rotation meeting of chain different directions Affect supporting rod to well body difference lateral deviation turn, then drive shaft to well body difference side deviate, when need cut open caisson on the inside of It, can be to haulage chain on the outside of open caisson when needing to cut the soil on the outside of open caisson to traction chain on the inside of open caisson when soil Item.
5. the construction method of open caisson construction device according to claim 3, which is characterized in that when grabbing bucket decentralization, chain Traction drive traction is located at the chain outside open caisson well body and rises so that the chain in open caisson well body follows grab bucket one to remove It puts, continues traction chain after grab bucket reaches soil layer and draw the two halves bucket of grab bucket to both sides so that grab bucket, which is opened, is inserted into silt, Then the reversed traction chain of chain traction driving device so that the chain in open caisson well body is pulled up opening and closing steel wire rope grab bucket Opening and closing steel wire rope makes grab bucket be closed, while lifting device of grabbing bucket promotes grab bucket and rises.
CN201611157606.1A 2016-12-15 2016-12-15 A kind of open caisson construction device and construction method Active CN106978815B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611157606.1A CN106978815B (en) 2016-12-15 2016-12-15 A kind of open caisson construction device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611157606.1A CN106978815B (en) 2016-12-15 2016-12-15 A kind of open caisson construction device and construction method

Publications (2)

Publication Number Publication Date
CN106978815A CN106978815A (en) 2017-07-25
CN106978815B true CN106978815B (en) 2018-09-18

Family

ID=59340487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611157606.1A Active CN106978815B (en) 2016-12-15 2016-12-15 A kind of open caisson construction device and construction method

Country Status (1)

Country Link
CN (1) CN106978815B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487285A (en) * 2018-04-09 2018-09-04 大连久鼎祥瑞特种工程技术研究院有限公司 No-dig technique or drilling immersed tube, open caisson or Caisson method
CN108951677B (en) * 2018-07-04 2021-01-19 岩土科技股份有限公司 Open caisson construction method for underground space of mucky soil part
CN111139855A (en) * 2019-12-25 2020-05-12 孙华章 Bottom concrete caisson capable of self-weight forced landing and construction method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0220720A (en) * 1988-07-07 1990-01-24 Taisei Corp Underground construction method by muddy water excavation
CN1958966A (en) * 2006-07-20 2007-05-09 廖河山 Underground consecutive sinking well type openweb wall body, and construction method
CN103205978B (en) * 2013-04-18 2014-12-10 南通英雄建设集团有限公司 High-permeability zone under-water-level elevator foundation pit open caisson moulding bed construction method
CN106168033B (en) * 2016-08-09 2018-09-18 岩土科技股份有限公司 A kind of vertical mud and water balance constructing device

Also Published As

Publication number Publication date
CN106978815A (en) 2017-07-25

Similar Documents

Publication Publication Date Title
CN106555395B (en) A kind of assembled underground continuous wall and construction method
CN106978815B (en) A kind of open caisson construction device and construction method
CN104763328A (en) Hydraulic reaming circulation drilling machine and reaming pile construction technology thereof
CN106194030B (en) A kind of double power head long spire rotation drill machine with casing and the method using its bored pile
JP6144542B2 (en) Nakabori excavator
WO2009049470A1 (en) A bored pile drilling machine
CN206368373U (en) A kind of open caisson construction equipment
CN104404951B (en) Long spire stake machine with expander and pile making method
CN105649083A (en) All-casing one-time rotary cutting type pile removing device and pile removing method thereof
CN106088064A (en) A kind of hard stratum precrushing three axle cement mixing pile drilling tool and construction method thereof
CN102182180B (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN102330536A (en) Lifting type diving rotary drilling rig with turbine pump
CN205387708U (en) Clear stake device of disposable rotary -cut formula of a complete set of pipe
CN201746831U (en) Turbopump-lifting downhole and rotary drilling machine
CN104532893B (en) Both arms drilling and digging machine
CN206844193U (en) Bore support integral type pile hole forming device
CN205100881U (en) Side direction is smashed formula and is dug crowded counterboring machine soon
CN204627406U (en) A kind of hydraulic pressure reaming circulation drilling machine
RU156918U1 (en) DRILLING RIG
CN201318123Y (en) Jet-flow rotary-type pore-forming device
CN206298891U (en) A kind of construction of diaphragm wall device
CN215367480U (en) Open caisson excavating gear
CN113846664B (en) Continuous soil-taking and sinking machine for non-drainage open caisson
CN204825876U (en) Spiral bamboo joint stake of prestressing force prefabricated component
JP3022435B2 (en) Drilling rig

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An open caisson construction device and construction method

Effective date of registration: 20220704

Granted publication date: 20180918

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou

Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd.

Registration number: Y2022980009767

PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20180918

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou

Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd.

Registration number: Y2022980009767

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A sinking well construction device and construction method

Granted publication date: 20180918

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou

Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd.