CN204849738U - Can pierce through static pressure tubular pile of sand bed and construction equipment thereof - Google Patents

Can pierce through static pressure tubular pile of sand bed and construction equipment thereof Download PDF

Info

Publication number
CN204849738U
CN204849738U CN201520475037.XU CN201520475037U CN204849738U CN 204849738 U CN204849738 U CN 204849738U CN 201520475037 U CN201520475037 U CN 201520475037U CN 204849738 U CN204849738 U CN 204849738U
Authority
CN
China
Prior art keywords
static pressure
water
stake
pile
tubular pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520475037.XU
Other languages
Chinese (zh)
Inventor
张彦飞
石午江
孙刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520475037.XU priority Critical patent/CN204849738U/en
Application granted granted Critical
Publication of CN204849738U publication Critical patent/CN204849738U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a static pressure tubular pile that can wear the sand bed and a construction equipment of it is used. Pre -buried in this kind of static pressure of its characterized in that tubular pile have two or many logical water steel pipes, and a plurality of spouts of oriented tubular pile hole water spray on the front end stake point of the static pressure tubular pile that first root buried, the logical water steel pipe of each pipe joint stake when pressing the stake pursue the festival and communicate with each other, is equipped with the water inlet and draws water the mouth on lifting by crane the head of static pressure stake, is linked together with slush pump and centrifugal grit pump respectively, starts slush pump water injection and centrifugal grit pump exhausting water respectively when pressing the stake to bury, makes it to form mud and turn over to circulate and get sand. Like this, we use very little cost: the modified has increased the tubular pile of two or many logical water steel pipes, and can the water injection after the transformation and take out the quick -witted tubular pile pressure head of stake of sand, grouting pump of reuse and a grit centrifugal pump, its application range is expanded widely to the geology forbidden zone that just can let the breakthrough of static pressure tubular pile accompany the sand bed.

Description

Static pressure pipe pile and the construction equipment thereof of layer of sand can be penetrated
Technical field
The construction equipment of this pile-type belongs to building foundation field.A kind ofly can penetrate the Novel static pressure pile tube of layer of sand and the special construction equipment of use thereof and construction method specifically.
Background technology
Static pressure pipe pile is a kind of preformed pile of rising in recent years.Because its pile strength is good, save constructional materials again, bearing capacity is high again, and speed of application is fast again.And after construction, do not need the surface structures that just directly can carry out next step through curing time to construct, thus shorten the duration, reduce construction costs, so promoted rapidly.Blemish in an otherwise perfect thing be that current static pressure pipe pile cannot penetrate layer of sand, and in soil layer, accompany that buried depth does not wait, the layer of sand that do not differ of thickness is common geological phenomenon.This is severely limited with regard to making the application of static pressure pipe pile.
Penetrate layer of sand for enabling static pressure pipe pile and arrive precalculated position, the sand being difficult to compress must be taken out the space vacateed and hold pile tube.Domestic existing employing long spire drilling tool bores the way drawing out the grains of sand the hole in the middle of pile tube.But complex structure and effect bad: draw sand speed slowly, draw sand procedure fault and take place frequently.The technician of our design for this reason, machine-building and construction three units improves through test of many times, develops a set of input cost low, and the fast method of speed of application is as follows:
Summary of the invention
The technical problem that we will solve is: those how taking out rapidly static pressure pipe pile stake end are difficult to be compressed the sand grains being also difficult to press to stake week stratum, enable static pressure pipe pile penetrate layer of sand smoothly, arrive precalculated position.
The method that we solve the problems of the technologies described above is: manufacture a kind of static pressure pipe pile and the construction equipment thereof that can penetrate layer of sand, it is characterized in that: pre-buried two or many water flowing steel pipes in static pressure pipe pile, the front end pile top of first static pressure pipe pile buried is provided with the some spouts to pile tube endoporus water spray, water under high pressure in water flowing steel pipe can be sprayed to pile tube endoporus by spout, when piling continues, the water flowing steel pipe of each pipe joint stake is connected section by section by the cannelure of stake end face, static pressure pipe pile end socket is provided with an intake tunnel, a pumping channel, intake tunnel to be connected with a slush pump by high-pressure water pipe and to connect with water flowing steel pipe in stake, pumping channel to be connected with a centrifugal sand stone pump by drinking-water pipe and to communicate with pile tube endoporus, when piling is buried, open slush pump and centrifugal sand stone pump respectively, make it to form mud reacting cycle and get sand.
Accompanying drawing explanation
The first segment of the every pile of Fig. 1 buries pile tube (being second section pile tube above).
Fig. 2 first segment buries the high pressure water jets mouth structure of pile tube
Fig. 3 pile tube end enclosure structure schematic diagram.
Fig. 4 adopts reacting cycle to penetrate the Static Pipe Pile Construction schematic diagram of layer of sand.
In figure: 1. pipe pile end portion pile top, 2. pipe pile end portion steel plate, 3. water flowing (mud) embedded steel tube, 4. concrete filled steel tube wall, 5. prestressed reinforcement, 6. water jet, 7. pile tube end socket, 8. intake tunnel, 9. leakage-proof ring, 10. pumping channel, 11. water inlet slush pumps, 12. draw water gravel pump
Detailed description of the invention
From first segment pile tube press-in soil, namely by the intake tunnel of pile tube pressure head 5 to tube pile high-pressure water filling, water is sprayed by the bottom pile top water jet of first segment pile tube, the soil of press-in pile tube endoporus is cut into mud, mud pit is entered by pressure head pumping channel by the extraction of sandstone centrifugal pump by pile tube endoporus, enter intake tunnel by slush pump again, form reacting cycle.After pile tube enters layer of sand, the mud of ejection carries sand grains and is extracted out by pile tube endoporus, enters the desanding of mud pit precipitation.Circulation is until stake end arrives precalculated position thus.
For ease of lifting and Inlet and outlet water sealing, the steel plate of each root static pressure pipe pile end has a circle groove, pile tube end socket is just stuck in groove, and pile tube end socket of slinging during lifting, just together slings together with pile tube.Prepare two or more pile tube end socket during construction and be convenient to rotation use.Represent now general clipping pressing pile construction process in Fig. 4, when adopting old-fashioned top pressing type pile press, pile tube end socket need only be changed into and having into water (mud) and " the stake compressing head " of smoking sand joint.
In sum, in order to penetrate layer of sand, we only need two or many water flowing steel pipes (prestressed reinforcement of simultaneously holding concurrently uses) pre-buried in pile tube, by to these two or many steel pipe water fillings, (starting is water during piling, injecting with Posterior circle is mud) extract the mud containing sand from pile tube medium pore simultaneously, Drilling by circulation technique during similar holing with slurry wall protection, Reusability after mud sediment desanding.Our increase employs a slush pump, a sandstone centrifugal pump like this, can inhale the pile tube pressure head of sand, just can realize the target that pile tube penetrates layer of sand smoothly, greatly extend the scope of application of tube pile construction after adding transformation in course of exerting pressure slip casting.

Claims (1)

1. one kind can penetrate static pressure pipe pile and the construction equipment thereof of layer of sand, it is characterized in that: pre-buried two or many water flowing steel pipes in static pressure pipe pile, the front end pile top of first static pressure pipe pile buried is provided with the some spouts to pile tube endoporus water spray, piling, during continuous stake, the water flowing steel pipe of each pipe joint stake is communicated section by section by the cannelure of stake end face, static pressure pipe pile end socket is provided with an intake tunnel and a pumping channel, intake tunnel to be connected with a slush pump by high-pressure water pipe and to communicate with water flowing steel pipe, the sandpipe of taking out of pumping channel is connected with a centrifugal sand stone pump and communicates with pile tube endoporus, slush pump water filling is opened respectively and centrifugal sand stone pump draws water when piling is buried, make it to form the desanding of mud reacting cycle, after the desanding of sand laden mud precipitation, repetitive cycling uses.
CN201520475037.XU 2015-06-27 2015-06-27 Can pierce through static pressure tubular pile of sand bed and construction equipment thereof Expired - Fee Related CN204849738U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520475037.XU CN204849738U (en) 2015-06-27 2015-06-27 Can pierce through static pressure tubular pile of sand bed and construction equipment thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520475037.XU CN204849738U (en) 2015-06-27 2015-06-27 Can pierce through static pressure tubular pile of sand bed and construction equipment thereof

Publications (1)

Publication Number Publication Date
CN204849738U true CN204849738U (en) 2015-12-09

Family

ID=54740306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520475037.XU Expired - Fee Related CN204849738U (en) 2015-06-27 2015-06-27 Can pierce through static pressure tubular pile of sand bed and construction equipment thereof

Country Status (1)

Country Link
CN (1) CN204849738U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106555395A (en) * 2016-12-15 2017-04-05 岩土科技股份有限公司 A kind of assembled underground continuous wall and construction method
CN108643169A (en) * 2018-06-11 2018-10-12 北京市地质工程公司 One kind can slip casting prefabricated pile and its piling construction and grouting method
CN109736311A (en) * 2018-12-14 2019-05-10 东南大学 The light-duty intelligent insertion apparatus of base pit dewatering well-point pipe in a kind of river
CN109930605A (en) * 2019-02-25 2019-06-25 上海智平基础工程有限公司 A kind of method that pile foundation construction removes sediment
CN112854203A (en) * 2021-01-18 2021-05-28 中煤江南建设发展集团有限公司 Static pressure pipe pile end self-leading hole construction method
CN114351710A (en) * 2021-12-30 2022-04-15 中国煤炭地质总局地球物理勘探研究院 Static pressure pipe pile construction device capable of penetrating through sand layer

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106555395A (en) * 2016-12-15 2017-04-05 岩土科技股份有限公司 A kind of assembled underground continuous wall and construction method
CN108643169A (en) * 2018-06-11 2018-10-12 北京市地质工程公司 One kind can slip casting prefabricated pile and its piling construction and grouting method
CN109736311A (en) * 2018-12-14 2019-05-10 东南大学 The light-duty intelligent insertion apparatus of base pit dewatering well-point pipe in a kind of river
CN109930605A (en) * 2019-02-25 2019-06-25 上海智平基础工程有限公司 A kind of method that pile foundation construction removes sediment
CN112854203A (en) * 2021-01-18 2021-05-28 中煤江南建设发展集团有限公司 Static pressure pipe pile end self-leading hole construction method
CN114351710A (en) * 2021-12-30 2022-04-15 中国煤炭地质总局地球物理勘探研究院 Static pressure pipe pile construction device capable of penetrating through sand layer
CN114351710B (en) * 2021-12-30 2023-09-22 中国煤炭地质总局地球物理勘探研究院 Static pressure tubular pile construction device capable of penetrating sand layer

Similar Documents

Publication Publication Date Title
CN204849738U (en) Can pierce through static pressure tubular pile of sand bed and construction equipment thereof
CN204112308U (en) A kind of simple and easy sleeve valve grouting device based on bowlder stone, Thief zone coefficient stratum
CN102493437B (en) Grouting-type micro steel pipe pile and grouting reinforcement method
CN105332719A (en) Cement-polyurethane composite grouting process capable of blocking water fast
CN103510957B (en) A kind of combined type coal uncovering method
CN103161478B (en) Impulse-type grouting method
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN105041264A (en) Method for repeated hole sealing on gas extraction drilling hole by rotary jet grouting and solidifying
CN105443121A (en) Carbonate acidizing and fracturing simulation sample, preparation method, simulation device and method
CN204753574U (en) High pressure jet grouting pile stagnant water curtain construction equipment
CN109763479A (en) A kind of supercharged vacuum flexibility pipe well Yield rainfall relation system and its construction method
CN109519150A (en) One kind being directed to the biggish plugging dewatering well device and method of water yield
CN107387035A (en) Gas injection High Pressure Drain system in a kind of well
CN205171496U (en) Foundation stabilization high pressure jet slip casting device
CN103498478B (en) Rock curtain grouting in foundation of dam construction method
CN202324017U (en) Grouting type micro steel pipe pile
CN104711973A (en) Construction method for small-diameter pile composite foundation
CN106677158B (en) A kind of blowing-filling sludge superficial layer Quick uniform processing method and structure recently
CN204185844U (en) Draining slip casting structure
CN103603337A (en) Grouting precast pile and grouting method
CN201826302U (en) Boring device for large-diameter cast-in-situ thin-walled concrete composite pile
CN104975611B (en) The heavy of the well-points dewatering pipe of liquid soil layer sets device and heavy equipment, method
CN102677657B (en) Townhouse waters the construction treating methods of knot thin-walled concrete composite pile wall
CN103883291B (en) Throw gravel in Hydrology well casing and become well equipment and construction method
CN103195063B (en) Fresh water splitting post grouting construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

Termination date: 20170627

CF01 Termination of patent right due to non-payment of annual fee