CN106429867A - Large-span high-speed container portal crane - Google Patents

Large-span high-speed container portal crane Download PDF

Info

Publication number
CN106429867A
CN106429867A CN201610670137.7A CN201610670137A CN106429867A CN 106429867 A CN106429867 A CN 106429867A CN 201610670137 A CN201610670137 A CN 201610670137A CN 106429867 A CN106429867 A CN 106429867A
Authority
CN
China
Prior art keywords
leg
girder
high speed
cart
large span
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610670137.7A
Other languages
Chinese (zh)
Inventor
林宇村
琚贻超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG ZHONGYI HEAVY INDUSTRY CO LTD
Original Assignee
GUANGDONG ZHONGYI HEAVY INDUSTRY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG ZHONGYI HEAVY INDUSTRY CO LTD filed Critical GUANGDONG ZHONGYI HEAVY INDUSTRY CO LTD
Priority to CN201610670137.7A priority Critical patent/CN106429867A/en
Publication of CN106429867A publication Critical patent/CN106429867A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B66C19/007Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries for containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/48Automatic control of crane drives for producing a single or repeated working cycle; Programme control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • B66C5/04Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods with runways or tracks supported for movements relative to bridge or gantry
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C9/00Travelling gear incorporated in or fitted to trolleys or cranes
    • B66C9/16Travelling gear incorporated in or fitted to trolleys or cranes with means for maintaining alignment between wheels and track
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/01General aspects of mobile cranes, overhead travelling cranes, gantry cranes, loading bridges, cranes for building ships on slipways, cranes for foundries or cranes for public works
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/08Electrical assemblies or electrical control devices for cranes, winches, capstans or electrical hoists

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The invention discloses a large-span high-speed container portal crane. According to essentials of the technical scheme, the large-span high-speed container portal crane comprises a flexible leg and a rigid leg, which can move on ground rails, wherein a main beam is erected on the flexible leg and the rigid leg; the main beam is provided with trolley rails and a trolley capable of sliding along the trolley rails; the trolley is connected with a hanger for hanging a container 7 through a hoisting steel wire rope; the span distance between the flexible leg and the rigid leg is 45m; 15 rows of container cabinets can be stored in the 45-meter span distance; three rows of container cabinets can be stored in a cantilever at each of two ends; each row comprises 21 container cabinets; compared with a traditional container gantry crane, another 10 container cabinets can be stored and the utilization rate of a storage yard is greatly improved. The operation speed of a cart is 50m/min or higher, and the operation speed of the trolley is 90m/min to 120m/min; the operation speeds of the cart and the trolley are greatly improved; the lifting speed of the hanger is 30m/min to 45m/min, and the loading and unloading efficiency is improved to 25 boxes per hour from 20 boxes per hour.

Description

A kind of large span high speed gantry container crane
【Technical field】
The present invention relates to a kind of large span high speed gantry container crane.
【Background technology】
Conventional rails formula gantry container crane has the disadvantages that:
1st, span is little, is usually no more than 35 meters, and 35m collapses away from interior 11 row's container cabinets of placing, and unilateral cantilever is used for loading and unloading Container, without counter, single at most can only place 11 container cabinets;
2nd, the cart speed of service is not higher than 40m/min, and crab traversing speed is not higher than 70m/min, cart and trolley travelling Speed is all relatively low;Suspender lifting velocity is 18-25m/min, and the efficiency of loading and unloading is low;
3rd, electrical house is arranged on dolly, adds the load of the girder of complete machine;
4th, dolly uses two to take turns diagonal angle driving or four-wheel drives entirely, and car wheel perpendicularity, linearity, interior beam angle control Within 1/400, deviation is bigger;
5th, within corner wheel group diagonal deviation 10mm of cart, wheel linearity, perpendicularity, the control of toeing-in angle 1/400, deviation is still bigger;
6th, during trolley travelling, it is to be run to certain speed by PLC control vehicle motor that suspender beat subtracts the mode of shaking, then Promote another speed, reduce suspender beat.During dolly low cruise, the experience of operation driver and PLC step-governor d is relied on to reduce Suspender beat.Skilled driver typically can control within 3 degree, but little vehicle speed is promoted to 120m/min, this technical side Case is just unworkable;
7th, girder manufacture craft is to make the moulding bed consistent with girder camber, the level height by moulding bed for the camber of girder Difference ensures, the wave degree of web is adjusted by the theodolite correction in messenger wire and making, the camber of girder and moulding bed camber Completely the same.Using this kind of manufacture craft, girder web plate wave degree can control within 3/1000;
The present invention is namely based on what this situation was made.
【Content of the invention】
The present invention seeks to overcome the deficiencies in the prior art, a kind of structural behaviour of offer is stable, highly reliable, user Just large span high speed gantry container crane.
The present invention is achieved by the following technical solutions:
A kind of large span high speed gantry container crane, it is characterised in that:Include and can walk on ground rail Soft leg 1 and firm leg 2, at described soft leg 1 with firm leg 2 is added is provided with girder 3, be provided with trolley track 4 and can be along dolly on girder 3 The dolly 5 that track 4 slides, is connected with for taking the suspender 8 hanging container 7 by hoist rope 14 on described dolly 5, The fixing end of described hoist rope 14 is provided with for measuring suspender 8 deflection angle to reduce the angular transducer of suspender beat 10.
Large span high speed gantry container crane as above, it is characterised in that:On described dolly 5 at least provided with Four wheels 11, are provided with horizontal wheels deviation correcting device 12 on unilateral wheel 11.
Large span high speed gantry container crane as above, it is characterised in that:At described soft leg 1 and firm leg 2 Bottom is respectively provided with the cart 13 of walking, and the wheel of described cart 13 uses corner wheel group, sets on described cart 13 There is cart deviation correcting device 6.
Large span high speed gantry container crane as above, it is characterised in that:Described cart deviation correcting device 6 includes Have light signal encoder, the signal receiving described smooth signal encoder collection for gathering both sides range ability described to control The PLC module of the motor automatic deviation correction speed of service of cart 13.
Large span high speed gantry container crane as above, it is characterised in that:Described cart 13 speed of service is 50m/min;Described crab traversing speed is 90-120m/min;Described suspender 8 lifting velocity is 30-45m/min.
Large span high speed gantry container crane as above, it is characterised in that:Described girder 3 be provided with described The electrical house 15 that dolly 5 separates.
Large span high speed gantry container crane as above, it is characterised in that:Described soft leg 1 and firm leg 2 it Between girder 3 be provided with the dolly 5 described in, described girder 3 stretches out and stretches on cantilever the 9th, the described girder 3 of described soft leg 1 Go out the dolly 5 being respectively provided with on the cantilever 9 of described firm leg 2 described in;Span between described soft leg 1 and firm leg 2 is 45 meters, 45 Can place the container 7 described in 15 rows in rice span, the cantilever 9 at two ends is each can take the container 7 hanging described in three rows.
Large span high speed gantry container crane as above, it is characterised in that:Described girder 3 a length of 80 Rice, point three sections of welding, the girder 3 between respectively soft leg 1 and firm leg 2 and the cantilever 9 at girder 3 two ends.
Large span high speed gantry container crane as above, it is characterised in that:The docking side of described trolley track 4 Formula uses welding, and the rail height difference of trolley track 4 is 0-0.2mm with lateral dislocation deviation;The docking side of described ground rail Formula uses welding, and the rail height difference of ground rail is 0-0.2mm with lateral dislocation deviation.
Large span high speed gantry container crane as above, it is characterised in that:With main abdomen when described girder 3 makes Plate, as datum level, uses horizontal moulding bed.
Compared with prior art, the present invention has the following advantages:
1st, the span between the soft leg of the present invention and firm leg is 45 meters, and 45 meters are collapsed and accommodate 15 row's container cabinets, two ends away from interior Cantilever respectively can accommodate 3 row's container cabinets, single totally 21 cabinet containers, accommodates 10 than traditional gantry container crane more Cabinet container, stockyard utilization rate is greatly improved.
2nd, the cart speed of service of the present invention is at least 50m/min, and crab traversing speed is 90-120m/min, cart and little The car speed of service is greatly improved;Suspender lifting velocity is 30-45m/min, and the efficiency of loading and unloading is brought up to 25 casees/little by 20 casees/hour When.
3rd, electrical house of the present invention separates with dolly, and electrical house is arranged on girder;Dolly assembly is not provided with engine house, dolly Assembly weight reduces about 7 tons, effectively reduces load and the complete machine structure weight of girder.
4th, the present invention is provided with horizontal wheels deviation correcting device on the unilateral wheel of dolly, simultaneously on assembly precision, and control Car wheel perpendicularity, linearity, interior beam angle control within 1/1000.
5th, be provided with cart deviation correcting device 6 on cart wheel of the present invention, by light signal encoder gather both sides run away from From signal, be then sent to PLC module, PLC module sends instruction with this to cargo motor, cargo motor to the speed of service from Dynamic correction, cart left and right range ability deviation controls within 1/1000.Simultaneously control wheel group diagonal deviation 5mm with In, wheel linearity, perpendicularity, toeing-in angle control within 1/1000;After cart dolly uses automatic deviation rectifying device, greatly Car trolley travelling is stable, without gnawing rail phenomenon, saves maintaining expense.
6th, conventional hoist of the present invention uses PLC classification acceleration to control suspender beat, but when dolly high-speed cruising, hangs Tool beat is still very big, and the present invention is by hoist rope fixing end setting angle sensor, accurately measurement suspender deflection angle Degree, on the opportunity of control dolly acceleration and deceleration, reduces suspender beat to greatest extent, and by this method, suspender beat can control 3 Within degree.
7th, girder manufacture craft is to make the moulding bed consistent with girder web plate width, and the horizontal difference of height of moulding bed is not more than 3mm, the wave degree of web is adjusted by messenger wire when moulding bed and making and level meter correction, and the camber of girder passes through web setting-out Ensure that girder camber is completely the same.Using this kind of manufacture craft, girder web plate wave degree can control within 1.5/1000.
8th, trolley track of the present invention and ground rail docking mode all use welding, rail height difference and lateral dislocation control Within 0.2mm.
【Brief description】
Fig. 1 is front view of the present invention;
Fig. 2 is side view of the present invention;
Fig. 3 is dolly floor plan of the present invention;
Fig. 4 is that hoist rope of the present invention is wound around schematic diagram.
In figure:1 is soft leg;2 is firm leg;3 is girder;4 is trolley track;5 is dolly;6 is cart deviation correcting device;7 are Container;8 is suspender;9 is cantilever;10 is angular transducer;11 is wheel;12 is horizontal wheels deviation correcting device;13 is cart;14 For hoist rope;15 is electrical house;16 is anchoring device.
【Detailed description of the invention】
Below in conjunction with the accompanying drawings the technology of the present invention feature is described in further detail in order to described skilled person manages Solve.
A kind of large span high speed gantry container crane, as shown in Figures 1 to 4, including can be up at ground rail The soft leg 1 walked and firm leg 2, at described soft leg 1 with firm leg 2 is added is provided with girder 3, be provided with trolley track 4 and can edge on girder 3 The dolly 5 that trolley track 4 slides, is connected with for taking the suspender hanging container 7 by hoist rope 14 on described dolly 5 8, described hoist rope 14 is provided with for measuring suspender 8 deflection angle to reduce the angular transducer of suspender beat 10, described crane also includes anchoring device 16.The present invention is by the fixing end setting angle sensing at hoist rope 14 Device 10, accurately measurement suspender 8 deflection angle, on the opportunity of control dolly 5 acceleration and deceleration, reduce suspender beat, to greatest extent by this Individual method, suspender beat can control within 3 degree.
Large span high speed gantry container crane as above, at least provided with four wheels 11 on described dolly 5, Unilateral wheel 11 is provided with horizontal wheels deviation correcting device 12, as shown in Figure 3.Control car wheel vertical on assembly precision simultaneously Degree, linearity, interior beam angle control within 1/1000.
Large span high speed gantry container crane as above, is respectively equipped with bottom described soft leg 1 and firm leg 2 For the cart 13 of walking, the wheel of described cart 13 uses corner wheel group, is provided with cart correction dress on described cart 13 Put 6.
Large span high speed gantry container crane as above, described cart deviation correcting device 6 includes for gathering The light signal encoder of both sides range ability, receive the signal of described smooth signal encoder collection to control the electricity of described cart 13 The PLC module of the machine automatic deviation correction speed of service.Gathered the signal of both sides range ability by light signal encoder, be then sent to PLC module, PLC module sends instruction with this to cargo motor, and cargo motor is to speed of service automatic deviation correction so that left and right two Side travelling mechanism synchronous operation, control errors is within 1/1000, i.e. within 45mm.Control wheel straight on assembly precision simultaneously Dimension, perpendicularity, toeing-in angle control within 1/1000, and stability is more preferable.
After cart dolly uses automatic deviation rectifying device, cart trolley travelling is stable, without gnawing rail phenomenon, saves maintaining expense With.
Large span high speed gantry container crane as above, described cart 13 speed of service is 50m/min;Described Crab traversing speed is 90-120m/min, and cart and crab traversing speed are greatly improved;Described suspender 8 lifting velocity is 30- 45m/min, the efficiency of loading and unloading is brought up to 25 casees/hour by 20 casees/hour.
As above large span high speed gantry container crane, described girder 3 is provided with and separates with described dolly 5 Electrical house 15, electrical house 15 is located on firm leg 2, and therefore the weight of dolly reduce about 7 tons, dolly 5 is not provided with engine house, has Imitate reduces girder 3 load, crane complete machine weight reduction about 5%.
Large span high speed gantry container crane as above, on the girder 3 between described soft leg 1 and firm leg 2 It is provided with the dolly 5 described in, described girder 3 stretches out and on cantilever the 9th, the described girder 3 of described soft leg 1, stretches out described firm leg 2 Cantilever 9 on be respectively provided with the dolly 5 described in;Span between described soft leg 1 and firm leg 2 is 45 meters, can in 45 meters of spans Placing the container 7 described in 15 rows, the cantilever 9 at two ends is each can take the container 7 hanging described in three rows.
Large span high speed gantry container crane as above, a length of 80 meters of described girder 3, point three sections of welderings Connect, the girder 3 between respectively soft leg 1 and firm leg 2 and the cantilever 9 at girder 3 two ends.
Large span high speed gantry container crane as above, the docking mode of described trolley track 4 uses welding, The rail height difference of trolley track 4 is 0-0.2mm with lateral dislocation deviation;The docking mode of described ground rail uses welding, The rail height difference of ground rail is 0-0.2mm with lateral dislocation deviation.
Large span high speed gantry container crane as above, using main web as benchmark when described girder 3 makes Face, uses horizontal moulding bed, it is ensured that major and minor web wave degree.Using this kind of manufacture craft, girder web plate wave degree can be more convenient Control within 1.5/1000.
Trolley track 4 of the present invention and ground rail docking mode all use welding, rail height difference and lateral dislocation control Within 0.2mm.
Being described in detail the present invention above in association with accompanying drawing embodiment, those skilled in the art can be according to upper State and bright make many variations example to the present invention.Thus, some details in embodiment should not constitute limitation of the invention, this Invention by the scope that defines using appended claims as protection scope of the present invention.

Claims (10)

1. a large span high speed gantry container crane, it is characterised in that:Include can walk on ground rail soft Leg (1) and firm leg (2), be provided with girder (3) described soft leg (1) and firm leg (2) are added, be provided with trolley track on girder (3) (4) and the dolly (5) that can slide along trolley track (4), on described dolly (5) by hoist rope (14) be connected with for Taking the suspender (8) hanging container (7), the fixing end at described hoist rope (14) is provided with for measuring suspender (8) beat Angle is to reduce the angular transducer (10) of suspender beat.
2. large span high speed gantry container crane according to claim 1, it is characterised in that:Described dolly (5) On at least provided with four wheels (11), unilateral wheel (11) is provided with horizontal wheels deviation correcting device (12).
3. large span high speed gantry container crane according to claim 1, it is characterised in that:At described soft leg (1) and being respectively provided with the cart (13) of walking bottom firm leg (2), the wheel of described cart (13) uses corner wheel group, Described cart (13) is provided with cart deviation correcting device (6).
4. large span high speed gantry container crane according to claim 3, it is characterised in that:Described cart correction dress Put (6) to include for the light signal encoder gathering both sides range ability, the signal receiving the collection of described smooth signal encoder PLC module with the motor automatic deviation correction speed of service of the described cart (13) of control.
5. large span high speed gantry container crane according to claim 3, it is characterised in that:Described cart (13) is transported Line speed is 50m/min;Described crab traversing speed is 90-120m/min;Described suspender (8) lifting velocity is 30-45m/ min.
6. large span high speed gantry container crane according to claim 1, it is characterised in that:On described girder (3) It is provided with the electrical house (15) separating with described dolly (5).
7. large span high speed gantry container crane according to claim 1, it is characterised in that:Described soft leg (1) With the girder (3) between described firm leg (2) is provided with the dolly (5) described in, described girder (3) stretches out described soft leg (1) stretch out on cantilever (9), described girder (3) and be respectively provided with the dolly (5) described on the cantilever (9) of described firm leg (2); Span between described soft leg (1) and firm leg (2) is 45 meters, can place the container (7) described in 15 rows in 45 meters of spans, two The cantilever (9) of end is each can take the container (7) hanging described in three rows.
8. large span high speed gantry container crane according to claim 7, it is characterised in that:Described girder (3) A length of 80 meters, point three sections of welding, the girder (3) between respectively soft leg (1) and firm leg (2) and the cantilever at girder (3) two ends (9).
9. large span high speed gantry container crane according to claim 1, it is characterised in that:Described trolley track (4) docking mode uses welding, and the rail height difference of trolley track (4) is 0-0.2mm with lateral dislocation deviation;Described ground The docking mode of track uses welding, and the rail height difference of ground rail is 0-0.2mm with lateral dislocation deviation.
10. large span high speed gantry container crane according to claim 1, it is characterised in that:Described girder (3) is made Using main web as datum level when making, use horizontal moulding bed.
CN201610670137.7A 2016-08-15 2016-08-15 Large-span high-speed container portal crane Pending CN106429867A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610670137.7A CN106429867A (en) 2016-08-15 2016-08-15 Large-span high-speed container portal crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610670137.7A CN106429867A (en) 2016-08-15 2016-08-15 Large-span high-speed container portal crane

Publications (1)

Publication Number Publication Date
CN106429867A true CN106429867A (en) 2017-02-22

Family

ID=58181196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610670137.7A Pending CN106429867A (en) 2016-08-15 2016-08-15 Large-span high-speed container portal crane

Country Status (1)

Country Link
CN (1) CN106429867A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107150958A (en) * 2017-06-23 2017-09-12 李雨林 A kind of road and bridge construction crane
CN109132610A (en) * 2018-09-13 2019-01-04 深圳归朴科技有限公司 A kind of list case span stockyard Crane Automation terminal loading and unloading system and method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2804044Y (en) * 2005-04-29 2006-08-09 上海港机重工有限公司 Frame crane for containers
CN101037174A (en) * 2007-04-24 2007-09-19 青岛港(集团)有限公司 Deviation rectifying method of tyre type container gantry crane
CN102107819A (en) * 2010-12-09 2011-06-29 河南科技大学 Anti-shaking control method for container shore bridge hanger
CN202449760U (en) * 2012-01-19 2012-09-26 胡相兰 Container portal crane with rails
CN202518946U (en) * 2012-01-13 2012-11-07 上海船厂船舶有限公司 Deviation correcting system for gantry crane
WO2013011199A8 (en) * 2011-07-18 2013-03-21 Konecranes Plc Crane and method for controlling crane
CN103332611A (en) * 2013-04-23 2013-10-02 上海振华重工(集团)股份有限公司 Fabrication method of arm support of crane
CN205170203U (en) * 2015-11-17 2016-04-20 广东中艺重工有限公司 Trolley operation deviation correcting device suitable for container hoisting structure
CN205932990U (en) * 2016-08-15 2017-02-08 广东中艺重工有限公司 Novel high -speed container gantry crane of large -span

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2804044Y (en) * 2005-04-29 2006-08-09 上海港机重工有限公司 Frame crane for containers
CN101037174A (en) * 2007-04-24 2007-09-19 青岛港(集团)有限公司 Deviation rectifying method of tyre type container gantry crane
CN102107819A (en) * 2010-12-09 2011-06-29 河南科技大学 Anti-shaking control method for container shore bridge hanger
WO2013011199A8 (en) * 2011-07-18 2013-03-21 Konecranes Plc Crane and method for controlling crane
CN202518946U (en) * 2012-01-13 2012-11-07 上海船厂船舶有限公司 Deviation correcting system for gantry crane
CN202449760U (en) * 2012-01-19 2012-09-26 胡相兰 Container portal crane with rails
CN103332611A (en) * 2013-04-23 2013-10-02 上海振华重工(集团)股份有限公司 Fabrication method of arm support of crane
CN205170203U (en) * 2015-11-17 2016-04-20 广东中艺重工有限公司 Trolley operation deviation correcting device suitable for container hoisting structure
CN205932990U (en) * 2016-08-15 2017-02-08 广东中艺重工有限公司 Novel high -speed container gantry crane of large -span

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107150958A (en) * 2017-06-23 2017-09-12 李雨林 A kind of road and bridge construction crane
CN109132610A (en) * 2018-09-13 2019-01-04 深圳归朴科技有限公司 A kind of list case span stockyard Crane Automation terminal loading and unloading system and method

Similar Documents

Publication Publication Date Title
CN205932990U (en) Novel high -speed container gantry crane of large -span
CN106081924B (en) A kind of lightweight Multifunctional container gantry crane and its assemble method
CN102424277B (en) Assembling and disassembling system for port container and assembling and disassembling technology thereoffor
CN201825671U (en) Hoisting trolley for track plate
CN106029547B (en) A kind of stakcer crane provided with storage area among container
CN105883635B (en) The walking carriage and wheel quick change method of a kind of gantry container crane
CN106429867A (en) Large-span high-speed container portal crane
CN204641430U (en) There is the display electric heavy-duty bogie wagon of detection of obstacles function
CN206368329U (en) A kind of small curve precast beam Bridge Erector
CN102826094B (en) Rail transit train system
CN210655817U (en) Transport mechanism for a suspended rail system and suspended rail system
CN202743237U (en) Rail transit train system
CN210655789U (en) Transport mechanism for a suspended rail system and suspended rail system
CN203306934U (en) Small-sized container crane
CN207739151U (en) Two straddle type Bridge Erectors
CN207497887U (en) A kind of dedicated unit for being used to lift ladle turret
CN202594657U (en) Portal crane
CN202369275U (en) Improved suspension type double-rail overhead travelling crane structure
CN202245805U (en) Traveling gantry crane
CN208948698U (en) A kind of track obstacle avoiding type lifting transportation system
CN211541212U (en) Rigid lifting shaft heavy truss robot
CN103924523B (en) A kind of single armed box beam bridge formation machine
CN203878478U (en) A bridge girder erection machine with a single arm box girder
CN209853595U (en) Novel lower trolley system
CN207904776U (en) Cross tunnel beam car

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170222