CN204040284U - A kind of stone material composite honeycomb board installation of ceiling system - Google Patents

A kind of stone material composite honeycomb board installation of ceiling system Download PDF

Info

Publication number
CN204040284U
CN204040284U CN201420431307.2U CN201420431307U CN204040284U CN 204040284 U CN204040284 U CN 204040284U CN 201420431307 U CN201420431307 U CN 201420431307U CN 204040284 U CN204040284 U CN 204040284U
Authority
CN
China
Prior art keywords
stone material
furred ceiling
honeycomb
suspension rod
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420431307.2U
Other languages
Chinese (zh)
Inventor
钟少龙
段智辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA NATIONAL DECORATION Co Ltd
Original Assignee
CHINA NATIONAL DECORATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA NATIONAL DECORATION Co Ltd filed Critical CHINA NATIONAL DECORATION Co Ltd
Priority to CN201420431307.2U priority Critical patent/CN204040284U/en
Application granted granted Critical
Publication of CN204040284U publication Critical patent/CN204040284U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a kind of stone material composite honeycomb board installation of ceiling system, comprise the furred ceiling suspension rod (1) be fixed on by angle steel (6) on original building floor (14), it is characterized in that: described furred ceiling suspension rod is connected with channel (2) by furred ceiling hanging piece (3); Described furred ceiling suspension rod (1) is also connected with honeycomb composite stone material (5) by keel Z-type suspension member (4).The utility model not only solves the technical problem having and carbon fiber strip (13) layer furred ceiling portion's original building floor (14) carries out furred ceiling, the installation seam crossing out-of-flatness that the difference also solving prior art material causes, easily loosen, affect attractive in appearance, bring the problems such as hidden danger to safety.

Description

A kind of stone material composite honeycomb board installation of ceiling system
Technical field
The utility model relates to a kind of building operations installation, particularly relates to and is applicable to a kind of stone material composite honeycomb board installation of ceiling system that original building floor has carbon fiber structural layer.
Background technology
At present, building storey construction furred ceiling is because different metope characteristics, there is different technical problems in furred ceiling technique, if as roof has carbon fiber structural band within the walls, carry out installation of ceiling, if furred ceiling according to a conventional method, just there will be and seam crossing out-of-flatness is installed, easily loosen, affect attractive in appearance, return safety and bring the problems such as hidden danger.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of building operations installation, especially provide and be applicable to a kind of stone material composite honeycomb board installation of ceiling system that original building floor has carbon fiber structural layer, solve above-mentioned existing stone material and there is inconvenient installation of ceiling problem on carbon fiber structural layer.
This has come by the following technical programs by novel technical problem to be solved:
A kind of stone material composite honeycomb board installation of ceiling system, comprises the furred ceiling suspension rod be fixed on by angle steel on original building floor; Described furred ceiling suspension rod is connected with channel by furred ceiling hanging piece; Described furred ceiling suspension rod is also connected with honeycomb composite stone material by keel Z-type suspension member; The ear type dry hanging article that described Z-type suspension member comprises angle steel, coordinates with described angle steel, described ear type dry hanging article is connected with described honeycomb wall panel by pre-embedded bolt;
Described furred ceiling suspension rod is for connecting described angle steel and keel.Described furred ceiling hanging piece is used for described connection suspension rod and honeycomb composite stone material.Described channel is for hanging suspension rod.Described keel Z-type suspension member is for connecting suspension rod and honeycomb composite stone material.
Also comprise support channel-section steel, and be bolted on described original building floor.
Described zinc-plated built-in fitting has the effect of being fixedly connected with.
Connection described above for being fixedly connected with mode or the connected mode by other known connecting elementss, as being spirally connected, welding etc.;
Described furred ceiling suspension rod is screw thread suspension rod; Described angle steel is Zinc-coated angle steel; Described keel Z-type suspension member is aluminum suspension member; Described honeycomb composite stone material is aluminium honeycomb composite stone material; Described pre-embedded bolt is stainless steel bolt; Described honeycomb wall panel is aluminium honeycomb wall panel; Described ear type dry hanging article is aluminum material; Described built-in fitting is zinc-plated built-in fitting.
Described furred ceiling suspension rod is fixed on described original building floor by angle steel, Zinc-coated angle steel cross-over connection, expansion bolt;
Described support channel-section steel is fixed on described original building floor by zinc-plated built-in fitting, expansion bolt; Described honeycomb composite stone material is supported on the base surface of described original building floor;
Described furred ceiling portion original building floor has carbon fiber strip, and the utility model especially carries out designing and innovate for the building floor furred ceiling with carbon fiber strip.
The utility model adopts technique scheme to have following technical characteristic:
The utility model not only solves the technical problem having and carbon fiber board belt furred ceiling portion original building floor carries out furred ceiling, the installation seam crossing out-of-flatness that the difference also solving prior art body of wall material causes, easily loosen, affect attractive in appearance, bring the problems such as hidden danger to safety.
Accompanying drawing explanation
Fig. 1 is the utility model architectural schematic
Fig. 2 is the utility model system upper part structural representation
Fig. 3 is the utility model system intermediate supports segment structure schematic diagram
Fig. 4 is the utility model system lower part structural representation
Wherein, 1-furred ceiling suspension rod, 2-channel, 3-furred ceiling hanging piece, 4-keel Z-type suspension member, 5-honeycomb composite stone material, 6-Zinc-coated angle steel, 7-expansion bolt, 8-supports channel-section steel; 9-stainless steel pre-embedded bolt, 10-ear type dry hanging article, the cross-over connection of 11-Zinc-coated angle steel, the zinc-plated built-in fitting of 12-, 13-carbon fiber strip, 14-original building floor
Detailed description of the invention
A kind of stone material composite honeycomb board of the utility model installation of ceiling system as shown in Figure 1, Figure 2, Figure 3, Figure 4, concrete installation engineering method: comprise and install furred ceiling suspension rod 1; Make channel 2; The installation of furred ceiling screw rod 1 Z-type suspension member bone 3; The installation of stone material cellular compound plate 4.
Specific as follows:
1. equipment construction instrument, the preparation before construction and inspection:
With regard to suspended ceiling modeling, highly, corner detailed treatment, typesetting lattice etc. have carried out corresponding Deepen Design.And the way of each special lamp of holding a conference or consultation, air port, inspection hole and other equipment reserved openings.Ceiling board blanking and processing, and consider in basic unit's operation.
According to typesetting drawing, furred ceiling elevation line, metope horizon eject, and check.
Audit fire-fighting in furred ceiling, air-conditioning, the Career Information such as electric, respective lines Trunk Line has been constructed, and has carried out routing Design.Minimizing conflicts with installation of ceiling, meets ceiling construction condition.,
The built-in fitting specification of ultra-thin stone composite board, position acceptance(check) are on inspection installed.
2. furred ceiling suspension rod 1 is installed:
According to room level control line, eject the position line of main joist in furred ceiling.According to the main joist position line, determine corresponding suspension rod point position.Suspension rod adopts the screw thread suspension rod of Φ 10, and suspension rod should be straight, and spacing is not more than 1000mm.
Should be noted and to reinforce because this engineering original building top board has carried out carbon fiber 13, carry out should be noted when suspension rod 1 is constructed, expansion bolt 7 punching should avoid described existing carbon fiber strip.Perforated interval should in strip gap.Meet and carbon fiber strips conflict situations, use angle steel 6 to add expansion bolt 7 and carry out angle steel cross-over connection 11.Connect furred ceiling rod member 1 again in the correct position of main joist.When the equipment such as ventilating duct, wire casing that runs into hinders.Equally also use angle steel to add expansion bolt 7 and carry out cross-over connection.
3. main joist 5 is installed:
According to furred ceiling way, to furred ceiling finished surface, return way technology height to channel position.Get furred ceiling absolute altitude control line, in furred ceiling, pull out elongated white line for controlling and detecting keel installation.
Connect Special keel suspension member to be connected with suspension rod, and main joist 2 be installed) and adapter lug, and straightening suspension rod 1, the carrying furred ceiling load making it even, stable.
With reference to furred ceiling absolute altitude control line, leveling main joist of suspended ceiling.It is noted that main joist installation site, Z-type hanging keel, stone panel pre-embedded bolt position should the requirement of corresponding relevant art way.Ensure the levelness in the glacing flatness of channel 5 and the direction of height.
4. furred ceiling screw rod 1 and Z-type part keel 4 are installed:
After leveling main joist, contrast ceiling tile pre-embedded bolt 9 installation site.Keel are installed in ceiling tile.Z-type keel installation answers level and straight.Connect Z-type keel hanger 3 and screw rod 1 for subsequent use.
After main joist leveling, Z-type keel are installed and hang 3 and screw rod 1, prepare to carry out panel stone material 5 and install.
5. stone panel is installed
Horizontal control lines and the orthogonal control lines of this face wall body is taken out of before installation.Erection sequence is by a deferred installation in direction.To the stone panel 5 of Z-type part be connected during installation, be connected with hanging screw rod 2.Carry out leveling, between adjacent plate, the smooth of seam crossing should be noted.Exist and connect the irregular situation of stubble, stubble situation should be rubbed with the hands according to control line and panel.Adjust the tight of adjusting bolt.Ensure smooth.After installing one horizontal direction masonry slab, guiding ruler, ruler inspection AQL, verticality and stone material gap need be used.
For ensureing workmanship, furred ceiling lamp hole, air port and access hole all complete perforate in producer.And carry out the process of respective edges.
Quality control
The kind of surface-veneer engineered material therefor, specification, performance and grade, should meet the regulation of designing requirement and product national standard.Decoration panel seam, filleting way should meet designing requirement.Veneered surfaces is smooth, clean, color and luster consistent, no marking, polishing scratch, warpage, crackle and defect; Stone surface should without pollutions such as the accumulation of salt in the surface soil.Stone plate seam should straight, smooth, width unanimously, in length and breadth cross-stitch misplace without obvious faulting of slab ends; Use caulking material, fill out and embeddingly continuous, closely knit, the degree of depth, color should should meet designing requirement.Close joint facing is without clear gap, and suture is straight.

Claims (7)

1. a stone material composite honeycomb board installation of ceiling system, it is characterized in that: comprise the furred ceiling suspension rod (1) be fixed on by angle steel (6) on original building floor (14), described furred ceiling suspension rod is connected with channel (2) by furred ceiling hanging piece (3); Described furred ceiling suspension rod (1) is also connected with honeycomb composite stone material (5) by keel Z-type suspension member (4).
2. stone material composite honeycomb board installation of ceiling system according to claim 1, is characterized in that: the ear type dry hanging article (10) that described Z-type suspension member (4) comprises angle steel (6), coordinates with described angle steel (6); Described ear type dry hanging article (10) is connected with described honeycomb wall panel (15) by pre-embedded bolt (9).
3. stone material composite honeycomb board installation of ceiling system according to claim 1 and 2, is characterized in that: described connection is for being fixedly connected with mode.
4. stone material composite honeycomb board installation of ceiling system according to claim 2, is characterized in that: described furred ceiling suspension rod (1) is screw thread suspension rod; Described angle steel (6) is Zinc-coated angle steel; Described keel Z-type suspension member (4) is aluminum suspension member; Described honeycomb composite stone material (5) is aluminium honeycomb composite stone material; Described pre-embedded bolt (9) is stainless steel bolt; Described honeycomb wall panel (15) is aluminium honeycomb wall panel; Described ear type dry hanging article (10) is aluminum suspension member; Described built-in fitting (12) is zinc-plated built-in fitting.
5. stone material composite honeycomb board installation of ceiling system according to claim 1 and 2, is characterized in that: described furred ceiling suspension rod (1) is fixed on described original building floor (14) by angle steel (6), Zinc-coated angle steel cross-over connection (11), expansion bolt (7).
6. stone material composite honeycomb board installation of ceiling system according to claim 1 and 2, it is characterized in that: also comprise and support channel-section steel (8), described support channel-section steel (8) is fixed on described original building floor (14) by zinc-plated built-in fitting (12), expansion bolt (7); Described honeycomb composite stone material (5) is supported on the base surface of described original building floor (14).
7. stone material composite honeycomb board installation of ceiling system according to claim 1 and 2, is characterized in that: described furred ceiling portion original building floor (14) has carbon fiber strip (13).
CN201420431307.2U 2014-07-31 2014-07-31 A kind of stone material composite honeycomb board installation of ceiling system Expired - Fee Related CN204040284U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420431307.2U CN204040284U (en) 2014-07-31 2014-07-31 A kind of stone material composite honeycomb board installation of ceiling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420431307.2U CN204040284U (en) 2014-07-31 2014-07-31 A kind of stone material composite honeycomb board installation of ceiling system

Publications (1)

Publication Number Publication Date
CN204040284U true CN204040284U (en) 2014-12-24

Family

ID=52240967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420431307.2U Expired - Fee Related CN204040284U (en) 2014-07-31 2014-07-31 A kind of stone material composite honeycomb board installation of ceiling system

Country Status (1)

Country Link
CN (1) CN204040284U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537793A (en) * 2018-12-06 2019-03-29 河南三阳建材科技有限公司 It is easily installed the ceiling structure and its installation method of leveling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537793A (en) * 2018-12-06 2019-03-29 河南三阳建材科技有限公司 It is easily installed the ceiling structure and its installation method of leveling
CN109537793B (en) * 2018-12-06 2024-02-23 河南三阳建材科技有限公司 Suspended ceiling structure convenient to install and level and installation method thereof

Similar Documents

Publication Publication Date Title
US8578673B2 (en) Suspended ceiling gusset stay
CN106013585B (en) Furred ceiling falls stage arrangement and installation method
CN205935362U (en) Light gauge steel furred ceiling building structure
CN210177784U (en) Assembled adjustable large-block-plate suspended ceiling
CN204238408U (en) A kind of hoisting structure of suspended ceiling
CN104727514A (en) Wooden facing hanging plate wall body
CN205382610U (en) Abnormal shape suspended ceiling structure
CN206016026U (en) A kind of fast-assembling suspended ceiling device
CN204040284U (en) A kind of stone material composite honeycomb board installation of ceiling system
CN112726931A (en) Green construction method of light steel keel gypsum plasterboard
CN204983333U (en) Light gauge steel rolls over light trough structure
CN212802126U (en) Light steel keel gypsum board bearing partition wall
CN204676757U (en) Suspended-ceiling suspension device
CN201605697U (en) Double-elevation openable sound-adsorbing sound-insulating hung ceiling
CN203626109U (en) Suspended ceiling structure
CN208733900U (en) Build ceiling component
CN203160503U (en) Invertedly concave connecting structure of indoor ceiling and wall body
CN208202203U (en) A kind of toilet wall body structure
CN206034855U (en) Novel ground keel structure
CN206360156U (en) Adjustable walling system
EP2090707B1 (en) Ceiling and method of arranging the same
CN110607874A (en) Large-area inclined plane perforation gypsum board suspended ceiling falling-level molding installation structure
CN214614898U (en) Steel bar truss floor support plate with suspension ribs
CN213682989U (en) Keel structure with decorative lines for detachable embedded wallboard
CN204571180U (en) A kind of wooden facing link plate wall body

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141224

Termination date: 20210731