CN108517899A - Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall - Google Patents

Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall Download PDF

Info

Publication number
CN108517899A
CN108517899A CN201810519345.6A CN201810519345A CN108517899A CN 108517899 A CN108517899 A CN 108517899A CN 201810519345 A CN201810519345 A CN 201810519345A CN 108517899 A CN108517899 A CN 108517899A
Authority
CN
China
Prior art keywords
mouth
drilling
buried
leakage
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810519345.6A
Other languages
Chinese (zh)
Inventor
赵建国
许国兵
李超
雷斌
杨小伟
周明佳
崔炳辰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Gongkan Geotechnical Group Co Ltd
Original Assignee
Shenzhen Gongkan Geotechnical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Gongkan Geotechnical Group Co Ltd filed Critical Shenzhen Gongkan Geotechnical Group Co Ltd
Priority to CN201810519345.6A priority Critical patent/CN108517899A/en
Publication of CN108517899A publication Critical patent/CN108517899A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sealing Material Composition (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of leakage drillings of deep basal pit diaphram wall to bury mouth high-pressure grouting leak stopping processing method, is related to deep foundation pit support construction of diaphragm wall field;The present invention includes the following steps:A, leached surface is cleared up;B, tunneling boring drills;C, mouth is buried;D, high-pressure grouting;E, it clears up;F, it seals;The beneficial effects of the invention are as follows:Using the mixing of oil soluble polyurethane and soluble polyurethane, the advantages of making full use of two kinds of materials, not only plugging effect is more obvious, but also has the function of reinforcement and strengthening, to achieve the effect that sealing plugging leaks, barrier performance are good.

Description

Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall
Technical field
The present invention relates to deep foundation pit support construction of diaphragm wall fields, more particularly, it relates to a kind of depth base Mouth high-pressure grouting leak stopping processing method is buried in hole diaphram wall leakage drilling.
Background technology
The more and more common use of deep basal pit diaphram wall support form, construction technology are constructed by slot section framing, Joint mostly uses I-shaped steel joint and is connected, and adjacent two groove segments joint area is often the weak spot of percolating water, in deep base During cheating later stage excavation construction, the problem of being frequently encountered percolating water at underground continuous wall connector.To avoid diaphram wall The common quality defect of joint percolating water, it will usually in the pre-buried high-pressure slip-casting pipe in joint, slip casting, but practical behaviour are carried out after grooving In work leaking for joint area is influenced or is difficult to avoid that by stratum.Further, since the improper equal other reasons of concreting Also it will appear the leakage problem at other positions.
During practice of construction, in the case of diaphram wall part leak paths are obvious, generally use water conservancy diversion Tube Drain first blocks diversion pipe surrounding with plugging materials such as double-quick cements, is blocked up again after the intensity that plugging material reaches certain disconnected Flow in diversion pipe is handled.It is the case where larger for leakage area and no apparent breakthrough and leak paths, above-mentioned Method is difficult to be effectively treated.
Diaphram wall is mostly two-in-one design at present, must properly be located to the leakage in the diaphram wall face of appearance Reason, to ensure the waterproof effect of underground structure.
Invention content
For overcome the deficiencies in the prior art, mouth high pressure is buried in a kind of deep basal pit diaphram wall leakage drilling of present invention offer Grouting leak-stopping processing method forms the foaming induration with good sealing performance by this method, and to reach, sealing is stifled to be oozed The effect of leakage, barrier performance are good.
The technical solution adopted by the present invention to solve the technical problems is:A kind of leakage drilling of deep basal pit diaphram wall is buried Mouth high-pressure grouting leak stopping processing method, thes improvement is that:This method includes the following steps:
A, leakage or moist position are manually chiseled in the cleaning of leached surface, and detailed to check, analyze leakage scenarios, determination is oozed The position of water spot and coverage;The region for needing leak stopping is cleaned out, concrete surface loosening junk is cut, it is ensured that surface is dry Only;
B, tunneling boring drills, and tunneling boring drilling is carried out in leakage range, and according to the range of percolating water and position, setting Drilling hole amount and range, and drilled by quincunx setting within the scope of the leakage with the center for leaking range, hereafter use electricity Hammer drills in leakage range;
C, mouth is buried, slip casting is buried in drilling in stepb and buries mouth, i.e. Water slop injector, slip casting is made to bury the interior of mouth and drilling Gapless between wall, it is water-tight;
D, high-pressure grouting includes the following steps:
D1, grouting material is chosen, using polyurethane as sealing grouting material, polyurethane is divided into water-soluble and oil-soluble two Kind, by oil soluble polyurethane and soluble polyurethane by volume 1:2 ratio is mixed, and mixed solution is formed;
D2, choose bottler placer, the maximum output pressure of the bottler placer of selection is 10000psi, provide lasting pressure with It is irrigated, pouring material is pressed into concrete structure inside microgap, slit and pore interstitital texture;
The mixed solution of the formation of oil soluble polyurethane and soluble polyurethane is poured into perfusion by d3, progress high-pressure slip-casting In the material cup of machine, mixed solution is perfused into drilling by burying mouth in the interior inbuilt slip casting of drilling using bottler placer, had been perfused Cheng Zhong is carried out around since the larger centre of leak, and the pouring squence on vertical metope is from top to bottom, molten when mixing When liquid is emerged from crack, it should stop being perfused immediately;It moves into the slip casting closed on and buries and continue to be perfused in mouth;Pouring material is in concrete structure Foaming induration is formed inside interior microgap, slit and pore interstitital texture;
E, it clears up, after grouting, the grouting material of cured spilling can be cleared up after confirmation is water-tight.
Further, further include following step after the step E:
F, it seals, the drilling of grouting is repaired using quick hardening cement, sealing treatment.
Further, in the step B, the bore diameter is 14mm, spacing of wells 10-20cm, drilling depth For 17cm.
Further, in the step C, it is TT-A10 type Water slop injectors that mouth is buried in the slip casting, and the straight of mouth is buried in slip casting Diameter is 13mm, and the length that mouth is buried in slip casting is 19cm.
Further, mouth is buried in the slip casting, and there is unidirectional flow, slip casting to bury when can prevent perfusion after mouth is tightened not Spillage does not flow back.
The beneficial effects of the invention are as follows:The present invention uses the mixing of oil soluble polyurethane and soluble polyurethane, fully profit The advantages of with two kinds of materials, not only plugging effect is more obvious, but also has the function of reinforcement and strengthening.Soluble polyurethane Bao Shui Amount is big, and penetration radius is big, and consolidation body elasticity is good, is suitable for the leak stopping of dynamic water layer.Oil soluble polyurethane anti-permeability is good, material Elasticity is small, but concretion body strength is big.The mixed proportion of the two can be suitably adjusted according to seepage velocity to reach best plugging effect. In the present invention, it is drilled using quincunx laying in ground-connecting-wall leakage range, when diaphram wall leakage area is larger, drilling It is arranged more, grouting amount is bigger, and when construction can be used two or more high-pressure bottler placers are carried out at the same time perfusion, and construction is flexible, Save the time;Compared with other techniques, this method fully meets construction safety, requirement efficiently, environmentally friendly.In addition, construction is main Equipment be electric hammer and bottler placer, it is easy to operate, light, be easy to execute-in-place;Using the bottler placer of high pressure, pressure is high, flow is big, Polyurethane plugging material and water reaction speed are fast, can quick sealing, plugging effect is apparent, and with the good property such as corrosion-resistant Energy;Polyurethane plugging material belongs to safe and nontoxic environment-friendly materials, to environment without any harmful effect, and with good resistance to Long property.
Description of the drawings
The flow that Fig. 1 buries mouth high-pressure grouting leak stopping processing method for the deep basal pit diaphram wall leakage drilling of the present invention is shown It is intended to.
Specific implementation mode
Present invention will be further explained below with reference to the attached drawings and examples.
The technique effect of the design of the present invention, concrete structure and generation is carried out below with reference to embodiment and attached drawing clear Chu is fully described by, to be completely understood by the purpose of the present invention, feature and effect.Obviously, described embodiment is this hair Bright a part of the embodiment, rather than whole embodiments, based on the embodiment of the present invention, those skilled in the art are not being paid The other embodiment obtained under the premise of creative work, belongs to the scope of protection of the invention.In addition, being arrived involved in patent All connection/connection relations, not singly refer to component and directly connect, and refer to can according to specific implementation situation, by addition or Couple auxiliary is reduced, to form more preferably coupling structure.Each technical characteristic in the invention, in not conflicting conflict Under the premise of can be with combination of interactions.
Present invention is disclosed a kind of leakage drillings of deep basal pit diaphram wall to bury mouth high-pressure grouting leak stopping processing method, this hair The bright immense pressure generated using bottler placer, by mixed oil soluble polyurethane and soluble polyurethane by being embedded in wall Bury mouth, pour into diaphram wall percolating water position, polyurethane is spread centered on position among crack around under high pressure, Cavity concrete gap is infiltrated into, along flow in fracture, expands and hardens rapidly after being contacted with water, ultimately forms and stops with good The foaming induration of aqueous energy, concrete gap, crack is permanently blocked, to achieve the effect that sealing plugging leaks.
Shown in referring to Fig.1, a kind of above-mentioned deep basal pit diaphram wall leakage drilling is buried at mouth high-pressure grouting leak stopping Reason method, the present invention provides a specific embodiments, specifically, in the present embodiment, this method includes following step:
A, leakage or moist position are manually chiseled in the cleaning of leached surface, and detailed to check, analyze leakage scenarios, determination is oozed The position of water spot and coverage;The region for needing leak stopping is cleaned out, concrete surface loosening junk is cut, it is ensured that surface is dry Only;
B, tunneling boring drills, and tunneling boring drilling is carried out in leakage range, and according to the range of percolating water and position, setting Drilling hole amount and range, and drilled by quincunx setting within the scope of the leakage with the center for leaking range, hereafter use electricity Hammer drills in leakage range;The bore diameter is 14mm, spacing of wells 10-20cm, drilling depth 17cm;
C, mouth is buried, slip casting is buried in drilling in stepb and buries mouth, i.e. Water slop injector;In the present embodiment, the note It is TT-A10 type Water slop injectors that slurry, which buries mouth, and a diameter of 13mm of mouth is buried in slip casting, and the length that mouth is buried in slip casting is 19cm, above-mentioned step In B, it is short 2cm that the depth of drilling than slip casting buries mouth, that is, the length that the depth of drilling buries mouth according to slip casting is adjusted;In this reality It applies in example, being screwed into slip casting using dedicated interior hexagonal socket wrench buries mouth, and tightens, and injecting glue is made to bury nothing between mouth and drill hole inner wall Gap, water-tight, mouth is buried in slip casting has a unidirectional flow, slip casting bury when can prevent perfusion after mouth is tightened not spillage, do not flow back;
D, high-pressure grouting includes the following steps:
D1, grouting material is chosen, using polyurethane as sealing grouting material, polyurethane is divided into water-soluble and oil-soluble two Kind, by oil soluble polyurethane and soluble polyurethane by volume 1:2 ratio is mixed, and forms mixed solution, wherein water Soluble polyurethane packet water is big, and penetration radius is big, and consolidation body elasticity is good, is suitable for the leak stopping of dynamic water layer;Oil soluble polyurethane Anti-permeability is good, and elastic properties of materials is small, but concretion body strength is big;By by oil soluble polyurethane and soluble polyurethane by volume 1:2 ratio is mixed, the advantages of can integrating two kinds of materials, reaches best plugging effect;
D2, choose bottler placer, the maximum output pressure of the bottler placer of selection is 10000psi, provide lasting pressure with It is irrigated, pouring material is pressed into concrete structure inside microgap, slit and pore interstitital texture;In the present embodiment, choose Bottler placer single machine weight about 7.5Kg, 4500psi (about 31Mpa) above operating pressure can be rapidly achieved in a few seconds;
The mixed solution of the formation of oil soluble polyurethane and soluble polyurethane is poured into perfusion by d3, progress high-pressure slip-casting In the material cup of machine, mixed solution is perfused into drilling by burying mouth in the interior inbuilt slip casting of drilling using bottler placer, had been perfused Cheng Zhong is carried out around since the larger centre of leak, and the pouring squence on vertical metope is from top to bottom, molten when mixing When liquid is emerged from crack, it should stop being perfused immediately;It moves into the slip casting closed on and buries and continue to be perfused in mouth;Pouring material is in concrete structure Foaming induration is formed inside interior microgap, slit and pore interstitital texture;
E, it clears up, after grouting, the grouting material of cured spilling can be cleared up after confirmation is water-tight;
F, it seals, the drilling of grouting is repaired using quick hardening cement, sealing treatment.
Mouth high-pressure grouting leak stopping processing method is buried in such deep basal pit diaphram wall leakage drilling of the present invention, is different from existing There is the two fluid grouting that cement and waterglass are used in technology, the present invention is using the mixed of oil soluble polyurethane and soluble polyurethane The advantages of closing, making full use of two kinds of materials, not only plugging effect is more obvious, but also has the function of reinforcement and strengthening.It is water-soluble Polyurethane packet water is big, and penetration radius is big, and consolidation body elasticity is good, is suitable for the leak stopping of dynamic water layer.Oil soluble polyurethane antiseepage Permeability is good, and elastic properties of materials is small, but concretion body strength is big.The mixed proportion of the two can be suitably adjusted according to seepage velocity to reach most Good plugging effect.In the present invention, it is drilled using quincunx laying in ground-connecting-wall leakage range, diaphram wall leakage area When larger, drilling setting is more, and grouting amount is bigger, and when construction can be used two or more high-pressure bottler placers are carried out at the same time filling Note, construction is flexible, saves the time;Compared with other techniques, this method fully meets construction safety, requirement efficiently, environmentally friendly.Separately Outside, construction capital equipment be electric hammer and bottler placer, it is easy to operate, light, be easy to execute-in-place;Using the bottler placer of high pressure, pressure Power is high, flow is big, and polyurethane plugging material and water reaction speed are fast, can quick sealing, plugging effect is apparent, and with well The performances such as corrosion-resistant;Polyurethane plugging material belongs to safe and nontoxic environment-friendly materials, to environment without any harmful effect, and With good durability.
It is to be illustrated to the preferable implementation of the present invention, but the invention is not limited to the implementation above Example, those skilled in the art can also make various equivalent variations or be replaced under the premise of without prejudice to spirit of that invention It changes, these equivalent deformations or replacement are all contained in the application claim limited range.

Claims (5)

1. mouth high-pressure grouting leak stopping processing method is buried in a kind of deep basal pit diaphram wall leakage drilling, it is characterised in that:This method Include the following steps:
A, leakage or moist position are manually chiseled in the cleaning of leached surface, detailed to check, analyze leakage scenarios, determine seepage point Position and coverage;The region for needing leak stopping is cleaned out, cuts concrete surface loosening junk, it is ensured that surface is clean;
B, tunneling boring drills, and tunneling boring drilling is carried out in leakage range, and according to the range of percolating water and position, setting drilling Quantity and range, and drilled by quincunx setting within the scope of the leakage with the center for leaking range, hereafter existed using electric hammer It drills in leakage range;
C, bury mouth, slip casting buried in drilling in stepb and buries mouth, i.e. Water slop injector, make slip casting bury mouth and drilling inner wall it Between gapless, it is water-tight;
D, high-pressure grouting includes the following steps:
D1, grouting material is chosen, using polyurethane as sealing grouting material, polyurethane is divided into water-soluble and two kinds of oil-soluble, By oil soluble polyurethane and soluble polyurethane by volume 1:2 ratio is mixed, and mixed solution is formed;
D2, bottler placer is chosen, the maximum output pressure of the bottler placer of selection is 10000psi, provides lasting pressure to carry out Pouring material is pressed into concrete structure inside microgap, slit and pore interstitital texture by perfusion;
The mixed solution of the formation of oil soluble polyurethane and soluble polyurethane is poured into bottler placer by d3, progress high-pressure slip-casting In material cup, mixed solution is perfused into drilling by burying mouth in the interior inbuilt slip casting of drilling using bottler placer, in filling process, Carried out around since the larger centre of leak, the pouring squence on vertical metope from top to bottom, when mixed solution from When emerging at crack, it should stop being perfused immediately;It moves into the slip casting closed on and buries and continue to be perfused in mouth;Pouring material is micro- in concrete structure Foaming induration is formed inside gap, slit and pore interstitital texture;
E, it clears up, after grouting, the grouting material of cured spilling can be cleared up after confirmation is water-tight.
2. mouth high-pressure grouting leak stopping processing method is buried in deep basal pit diaphram wall leakage drilling according to claim 1, It is characterized in that:Further include following step after the step E:
F, it seals, the drilling of grouting is repaired using quick hardening cement, sealing treatment.
3. mouth high-pressure grouting leak stopping processing method is buried in deep basal pit diaphram wall leakage drilling according to claim 1, It is characterized in that:In the step B, the bore diameter is 14mm, spacing of wells 10-20cm, drilling depth 17cm.
4. mouth high-pressure grouting leak stopping processing method is buried in deep basal pit diaphram wall leakage drilling according to claim 1, It is characterized in that:In the step C, it is TT-A10 type Water slop injectors that mouth is buried in the slip casting, and a diameter of 13mm of mouth is buried in slip casting, The length that mouth is buried in slip casting is 19cm.
5. mouth high-pressure grouting leak stopping processing method is buried in deep basal pit diaphram wall leakage drilling according to claim 4, It is characterized in that:The slip casting bury mouth have unidirectional flow, slip casting bury can be prevented after mouth is tightened perfusion when not spillage, do not return Stream.
CN201810519345.6A 2018-05-28 2018-05-28 Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall Pending CN108517899A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810519345.6A CN108517899A (en) 2018-05-28 2018-05-28 Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810519345.6A CN108517899A (en) 2018-05-28 2018-05-28 Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall

Publications (1)

Publication Number Publication Date
CN108517899A true CN108517899A (en) 2018-09-11

Family

ID=63427709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810519345.6A Pending CN108517899A (en) 2018-05-28 2018-05-28 Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall

Country Status (1)

Country Link
CN (1) CN108517899A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109611121A (en) * 2018-12-25 2019-04-12 中铁六局集团天津铁路建设有限公司 Tunnel leaching infiltration water hole section blocks water grouting method
CN109811778A (en) * 2019-03-27 2019-05-28 中建四局第一建筑工程有限公司 A kind of ultra-deep foundation pit goes along with sb. to guard him water sealing structure and method
CN109838113A (en) * 2019-03-04 2019-06-04 山东建筑大学 Microorganism induction generates the method that calcium carbonate blocks Basement Crack
CN110030021A (en) * 2019-06-04 2019-07-19 中铁九局集团第七工程有限公司 Existing railway tunnel overhaul polyurethane leak-stopping agent high-pressure grouting construction
CN110952644A (en) * 2019-12-31 2020-04-03 黑龙江科顺防水堵漏技术有限公司 Leakage detection and leakage stoppage integrated device and method
CN111021428A (en) * 2019-05-22 2020-04-17 四川童燊防水工程有限公司 Underground building bottom plate plugging grouting and reinforcing construction method
CN111472818A (en) * 2020-04-22 2020-07-31 中国五冶集团有限公司 Grouting construction method for water seepage of tunnel
CN113006516A (en) * 2021-03-04 2021-06-22 南京康泰建筑灌浆科技有限公司 Quick plugging construction method for plugging quickly without dismantling grouting nozzle
CN113738152A (en) * 2021-09-22 2021-12-03 苏州佳固士新材料科技有限公司 Leakage maintenance construction method for water-return beam
CN113756604A (en) * 2021-10-08 2021-12-07 苏州佳固士新材料科技有限公司 Leakage treatment method for concrete honeycomb pitted surface
CN113775199A (en) * 2021-09-28 2021-12-10 黑龙江科顺防水堵漏技术有限公司 Wall heat preservation and water leakage repairing integrated device and process method thereof
CN113846637A (en) * 2021-10-20 2021-12-28 中电建冀交高速公路投资发展有限公司 Asphalt grouting seepage-proofing and leakage-stopping method
CN114837208A (en) * 2022-05-16 2022-08-02 中铁七局集团郑州工程有限公司 Method for disposing leakage water of underground diaphragm wall
CN117211235A (en) * 2023-11-09 2023-12-12 水利部交通运输部国家能源局南京水利科学研究院 Panel dam impervious wall leakage disease repairing method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741723A (en) * 2013-12-16 2014-04-23 上海电力设计院有限公司 Joint waterproof structure of underground diaphragm wall of underground substation
CN205152995U (en) * 2015-11-13 2016-04-13 武汉市市政建设集团有限公司 Local seepage processing apparatus of underground continuous wall
CN105625447A (en) * 2014-12-26 2016-06-01 中国铁建大桥工程局集团有限公司 Plugging construction method for underground structure in soft soil area

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741723A (en) * 2013-12-16 2014-04-23 上海电力设计院有限公司 Joint waterproof structure of underground diaphragm wall of underground substation
CN105625447A (en) * 2014-12-26 2016-06-01 中国铁建大桥工程局集团有限公司 Plugging construction method for underground structure in soft soil area
CN205152995U (en) * 2015-11-13 2016-04-13 武汉市市政建设集团有限公司 Local seepage processing apparatus of underground continuous wall

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
XUEQZHONG: "堵漏方案", 《百度文库》 *
周睿等: "油溶性聚氨酯溶液在地下连续墙渗漏抢险中的应用", 《建筑施工》 *
缪喵360: "地下室注浆堵漏方案", 《百度文库》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109611121A (en) * 2018-12-25 2019-04-12 中铁六局集团天津铁路建设有限公司 Tunnel leaching infiltration water hole section blocks water grouting method
CN109838113A (en) * 2019-03-04 2019-06-04 山东建筑大学 Microorganism induction generates the method that calcium carbonate blocks Basement Crack
CN109811778A (en) * 2019-03-27 2019-05-28 中建四局第一建筑工程有限公司 A kind of ultra-deep foundation pit goes along with sb. to guard him water sealing structure and method
CN111021428A (en) * 2019-05-22 2020-04-17 四川童燊防水工程有限公司 Underground building bottom plate plugging grouting and reinforcing construction method
CN110030021A (en) * 2019-06-04 2019-07-19 中铁九局集团第七工程有限公司 Existing railway tunnel overhaul polyurethane leak-stopping agent high-pressure grouting construction
CN110952644A (en) * 2019-12-31 2020-04-03 黑龙江科顺防水堵漏技术有限公司 Leakage detection and leakage stoppage integrated device and method
CN110952644B (en) * 2019-12-31 2021-04-02 黑龙江科顺防水堵漏技术有限公司 Leakage detection and leakage stoppage integrated device and process method thereof
CN111472818A (en) * 2020-04-22 2020-07-31 中国五冶集团有限公司 Grouting construction method for water seepage of tunnel
CN113006516A (en) * 2021-03-04 2021-06-22 南京康泰建筑灌浆科技有限公司 Quick plugging construction method for plugging quickly without dismantling grouting nozzle
CN113738152A (en) * 2021-09-22 2021-12-03 苏州佳固士新材料科技有限公司 Leakage maintenance construction method for water-return beam
CN113775199A (en) * 2021-09-28 2021-12-10 黑龙江科顺防水堵漏技术有限公司 Wall heat preservation and water leakage repairing integrated device and process method thereof
CN113756604A (en) * 2021-10-08 2021-12-07 苏州佳固士新材料科技有限公司 Leakage treatment method for concrete honeycomb pitted surface
CN113846637A (en) * 2021-10-20 2021-12-28 中电建冀交高速公路投资发展有限公司 Asphalt grouting seepage-proofing and leakage-stopping method
CN114837208A (en) * 2022-05-16 2022-08-02 中铁七局集团郑州工程有限公司 Method for disposing leakage water of underground diaphragm wall
CN117211235A (en) * 2023-11-09 2023-12-12 水利部交通运输部国家能源局南京水利科学研究院 Panel dam impervious wall leakage disease repairing method
CN117211235B (en) * 2023-11-09 2024-02-06 水利部交通运输部国家能源局南京水利科学研究院 Panel dam impervious wall leakage disease repairing method

Similar Documents

Publication Publication Date Title
CN108517899A (en) Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall
CN107387123B (en) The construction method of pressure grouting leak stopping is carried out for shield duct piece piece leakage phenomenon
CN107217691A (en) For city underground leak stopping and the method for strengthening construction
CN107620312A (en) High hydraulic pressure precipitation well construction and hydrostatic slip casting method for blocking in a kind of Metro station excavation
CN107762532A (en) Tunnel vault band mould grouting construction method
CN104912574B (en) A kind of tunnel-liner percolating water Treatment Methods
CN109098213A (en) A kind of basement blocking method
CN106381840B (en) Fracture plugging grouting method under a kind of high pressure moving water state
CN105951859A (en) Treatment method of plugging water stop construction for foundation pit dewatering well to penetrate through concrete base plate of basement
CN103643657A (en) Deep-hole chemical grouting construction method applied to water leakage treatment of hydroelectric dam
CN106480993B (en) Administration structure and construction method in a kind of construction exterior wall leak repairing reinforcement
CN109024641A (en) Triple tube double-liquid rotary spray is used for the construction method of deep basal pit leak stopping
CN108374567A (en) A kind of biliquid single system air pressure energy storage slip casting machine and grouting process
CN105926624A (en) Non-return type collecting hole grouting device and construction method thereof
CN101936113A (en) Method for grouting sealing of gap between steel door frame of protective sealed door and wall
CN110438998A (en) A kind of outer bored grouting raising has become the structure and method of pile bearing capacity
CN205558920U (en) Fissured repair structure of last lining cutting of tunnel wall
CN106284295A (en) Multichannel high-pressure vibro-grouting jet groutinl construction method
CN110939404A (en) Hydraulic joint cutting pressure relief device and method for coal mine tunnel broken surrounding rock roof
CN104314106A (en) Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof
CN105731978A (en) Grouting slurry for reinforcing tunnel face of jacking culvert of fine-sand layer and grouting method
CN103031847A (en) Reducing overlap joint combined type orifice pipe grouting method
CN205369234U (en) Freeze high pressure jet grouting pile
CN101979820B (en) Process for sealing elevation drill hole water-stopping sleeves
CN109235668A (en) Residential building curtain wall and wall crack plugging structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180911

RJ01 Rejection of invention patent application after publication