CN106223611A - Standpipe hole presetting mold and construction method thereof - Google Patents

Standpipe hole presetting mold and construction method thereof Download PDF

Info

Publication number
CN106223611A
CN106223611A CN201610595181.6A CN201610595181A CN106223611A CN 106223611 A CN106223611 A CN 106223611A CN 201610595181 A CN201610595181 A CN 201610595181A CN 106223611 A CN106223611 A CN 106223611A
Authority
CN
China
Prior art keywords
hole
main body
casing main
sleeve pipe
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610595181.6A
Other languages
Chinese (zh)
Inventor
赵立军
乔晓航
徐勇
冯雷
滕非
杨德宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhong Tie Chengjian Group Co Ltd
China Railway Urban Construction Group Co Ltd
Third Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Original Assignee
Zhong Tie Chengjian Group Co Ltd
Third Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhong Tie Chengjian Group Co Ltd, Third Engineering Co Ltd of China Railway Urban Construction Group Co Ltd filed Critical Zhong Tie Chengjian Group Co Ltd
Priority to CN201610595181.6A priority Critical patent/CN106223611A/en
Publication of CN106223611A publication Critical patent/CN106223611A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/063Re-usable forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of simple in construction, easy construction, avoid running mould and the standpipe hole presetting mold of deformation and construction method thereof, including reserving hole sleeve pipe, described reserving hole sleeve pipe includes casing main body and preformed hole para-position parts, the cross section of described casing main body is circular, and described casing main body is the top circular cross section diameter taper mesa-shaped more than bottom circular cross section diameter.Using reserving hole sleeve pipe and bolt, wherein bolt the application devises handle up, conveniently picks and places.

Description

Standpipe hole presetting mold and construction method thereof
Technical field
The present invention relates to technical field of building construction, particularly relate to standpipe hole presetting mold and construction method thereof.
Background technology
In building pipe construction process, the reserving hole of through-flooring is a critically important operation, reserving hole Specification and size, position and quality, be all normally carried out the presentation quality with concrete slab by directly affect subsequent handling. Traditionally, often occur to run mould, deformation and concrete pour in sleeve pipe etc. is unfavorable for the phenomenon carried out of constructing.Standpipe After passing, closure is wasted time and energy, and need to expend higher artificial.
Summary of the invention
In order to solve above-mentioned technical problem, the invention provides a kind of simple in construction, easy construction, avoid running mould and deformation Standpipe hole presetting mold and construction method.
The technical problem to be solved is achieved through the following technical solutions:
The standpipe hole presetting mold of the present invention, including reserving hole sleeve pipe, described reserving hole sleeve pipe includes sleeve pipe master Body and preformed hole para-position parts, the cross section of described casing main body is circular, and described casing main body is that top circular cross section diameter is big Taper mesa-shaped in bottom circular cross section diameter;
Described preformed hole para-position parts are strip, and described preformed hole para-position parts are layed in described casing main body upper surface, Described preformed hole para-position parts are laid along the centrage of described casing main body upper surface, and the center of described preformed hole para-position parts is opened Being provided with through hole, described through hole runs through preformed hole para-position parts and casing main body from top to bottom;
Removably being provided with bolt in described through hole, described reserving hole sleeve pipe is removably assemblied in by bolt and needs On the floor of reserving hole.
Further, described bolt includes being provided with externally threaded screw rod and being fixed on the handle of screw rod upper end.
Further, described preformed hole para-position parts are multiple, are respectively placed in inside casing main body upper surface, casing main body With casing main body lower surface, multiple described preformed hole para-position parts all offering through hole, multiple described through holes are arranged concentrically.
Further, a diameter of 88.5-245mm of described casing main body upper surface, described casing main body lower surface straight Footpath is 60-219mm, a diameter of 50-200mm of described through hole.
Further, a diameter of 88.5mm of described casing main body upper surface, described casing main body lower surface a diameter of 60mm, a diameter of 50mm of described through hole.
Further, a diameter of 245mm of described casing main body upper surface, described casing main body lower surface a diameter of 219mm, a diameter of 200mm of described through hole.
The construction method of the standpipe hole presetting mold of the present invention, comprises the steps:
S1, preparation: in time starting formwork supporting plate, at the outer surface brushing releasing agent equably of casing main body;
S2, reserving hole position mark: complete until formwork, reinforcing bar is when not yet starting colligation, and the paint eye-catching by color exists Need to indicate on the floor of reserving hole the plan-position of reserving hole sleeve pipe;
S3, fixing: before assembling reinforcement, bolt to be assembled together with reserving hole sleeve pipe, then, band reserving hole Being bolted to of sleeve pipe needs on the floor of reserving hole, and finally, upper strata iron plate hides;
S4, pour the dismounting of rear reserving hole sleeve pipe: after concreting completes, its intensity can reach to design requirement Time, extract reserving hole sleeve pipe;
S5, cleaning: the reserving hole sleeve pipe extracted is cleaned out, in order to next time uses.
The standpipe hole presetting mold of the present invention and the beneficial effect of construction method thereof:
Using reserving hole sleeve pipe and bolt, wherein bolt the application devises handle up, conveniently picks and places.Preformed hole Hole sleeve pipe uses the mode of " head big foot is little " to stand on the floor needing reserving hole, and is bolted and leaves through hole, Constructing very convenient, installation and removal operation is the simplest, has saved cost of labor, furthermore, the standpipe reserving hole of the application Mould reusable edible, has saved resource for construction.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, And can be practiced according to the content of description, below with presently preferred embodiments of the present invention and coordinate accompanying drawing describe in detail as after.
Accompanying drawing explanation
Fig. 1 is the structural representation of the reserving hole sleeve pipe of the standpipe hole presetting mold of the present invention;
Fig. 2 is the structural representation of the bolt of the standpipe hole presetting mold shown in Fig. 1;
Fig. 3 is the structural representation of the Construction State of the standpipe hole presetting mold shown in Fig. 1.
1, casing main body;2, preformed hole para-position parts;3, through hole;4, casing main body upper surface;5, casing main body lower surface; 6, screw rod;7, handle;8, floor.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment, the detailed description of the invention of the present invention is described in further detail.Hereinafter implement Example is used for illustrating the present invention, but is not limited to the scope of the present invention.
Seeing shown in Fig. 1-3, standpipe hole presetting mold, including reserving hole sleeve pipe, reserving hole sleeve pipe includes sleeve pipe Main body 1 and preformed hole para-position parts 2, the cross section of casing main body 1 is circular, and casing main body 1 is more than in top circular cross section diameter The taper mesa-shaped of bottom circular cross section diameter;
Preformed hole para-position parts 2 are in strip, and preformed hole para-position parts 2 are layed in casing main body upper surface 4, preformed hole para-position Parts 2 are laid along the centrage of casing main body upper surface 4, and the center of preformed hole para-position parts 2 offers through hole 3, and through hole 3 is from upper Preformed hole para-position parts 2 and casing main body 1 is run through under and;
Removably being provided with bolt in through hole 3, reserving hole sleeve pipe is removably assemblied in by bolt and needs preformed hole On the floor 8 in hole.
Bolt includes being provided with externally threaded screw rod 6 and being fixed on the handle 7 of screw rod 6 upper end.
Preformed hole para-position parts 2 are multiple, are respectively placed in casing main body upper surface 4, casing main body 1 inside and casing main body Lower surface 5, multiple preformed hole para-position parts 2 all offer through hole 3, and multiple through holes 3 are arranged concentrically.
Preformed hole para-position parts 2 can be multiple structure mentioned above, it is also possible to is designed to the structure of packaging type, the most in advance Para-position parts 2 of boxing out are wrapped in the outer ring of casing main body 1.Or other structures, as long as its effect played describes with the present invention Identical, broadly fall into protection scope of the present invention.
A diameter of 88.5-245mm of casing main body upper surface 4, a diameter of 60-219mm of casing main body lower surface 5 are logical A diameter of 50-200mm in hole 3.
A diameter of 88.5mm of casing main body upper surface 4, a diameter of 60mm of casing main body lower surface 5, the diameter of through hole 3 For 50mm.
A diameter of 245mm of casing main body upper surface 4, a diameter of 219mm of casing main body lower surface 5, the diameter 3 of through hole For 200mm.
It is only more than several situations of the size of casing main body 1 of the present invention and through hole 3, according to Practical Calculation and construction warp Testing, the present invention has summed up a diameter of 88.5-245mm of casing main body upper surface 4, a diameter of 60-of casing main body lower surface 5 219mm, a diameter of 50-200mm of through hole 3 are that optimum size coordinates, and concrete size needs to require to set according to practice of construction.
The construction method of the standpipe hole presetting mold of the present invention, comprises the steps:
S1, preparation: in time starting formwork supporting plate, at the outer surface brushing releasing agent equably of casing main body 1;
S2, reserving hole position mark: complete until formwork, reinforcing bar is when not yet starting colligation, and the paint eye-catching by color exists Need to indicate on the floor 8 of reserving hole the plan-position of reserving hole sleeve pipe;
S3, fixing: before assembling reinforcement, bolt to be assembled together with reserving hole sleeve pipe, then, band reserving hole Being bolted to of sleeve pipe needs on the floor 8 of reserving hole, and finally, upper strata iron plate hides;
S4, pour the dismounting of rear reserving hole sleeve pipe: after concreting completes, its intensity can reach to design requirement Time, extract reserving hole sleeve pipe;
S5, cleaning: the reserving hole sleeve pipe extracted is cleaned out, in order to next time uses.
The hole presetting mold of the present invention can use engineering waste material to make, the scrap iron sheet that stays in advance such as engineering, unnecessary Sheet material etc., may serve to make the hole presetting mold of the present invention, economical and practical, has accomplished again twice laid, has saved Construction cost.
Using reserving hole sleeve pipe and bolt, wherein bolt the application devises handle 7 up, conveniently picks and places.Reserved Hole sleeve pipe uses the mode of " head big foot is little " to stand on the floor 8 needing reserving hole, and is bolted and leaves logical Hole 3, constructs very convenient, and installation and removal operation is the simplest, has saved cost of labor, furthermore, the standpipe of the application is reserved Hole mould reusable edible, has saved resource for construction.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, And can be practiced according to the content of description, below with presently preferred embodiments of the present invention and coordinate accompanying drawing describe in detail as after.
The above is only the preferred embodiment of the present invention, is not limited to the present invention, it is noted that for this skill For the those of ordinary skill in art field, on the premise of without departing from the technology of the present invention principle, it is also possible to make some improvement and Modification, these improve and modification also should be regarded as protection scope of the present invention.

Claims (7)

1. standpipe hole presetting mold, including reserving hole sleeve pipe, it is characterised in that described reserving hole sleeve pipe includes sleeve pipe master Body (1) and preformed hole para-position parts (2), the cross section of described casing main body (1) is circular, and described casing main body (1) is circle in top Tee section diameter is more than the taper mesa-shaped of bottom circular cross section diameter;
Described preformed hole para-position parts (2) is in strip, and described preformed hole para-position parts (2) is layed in described casing main body upper surface (4), described preformed hole para-position parts (2) is laid along the centrage of described casing main body upper surface (4), described preformed hole contraposition part The center of part (2) offers through hole (3), and described through hole (3) runs through preformed hole para-position parts (2) and casing main body from top to bottom (1);
Removably being provided with bolt in described through hole (3), described reserving hole sleeve pipe is removably assemblied in by bolt and needs On the floor (8) of reserving hole.
Standpipe hole presetting mold the most according to claim 1, it is characterised in that described bolt includes being provided with external screw thread Screw rod (6) and be fixed on the handle (7) of screw rod (6) upper end.
Standpipe hole presetting mold the most according to claim 1, it is characterised in that described preformed hole para-position parts (2) is Multiple, it is respectively placed in casing main body upper surface (4), casing main body (1) inside and casing main body lower surface (5), multiple described pre- Boxing out and all offer through hole (3) on para-position parts (2), multiple described through holes (3) are arranged concentrically.
Standpipe hole presetting mold the most according to claim 1, it is characterised in that described casing main body upper surface (4) A diameter of 88.5-245mm, a diameter of 60-219mm of described casing main body lower surface (5), a diameter of 50-of described through hole (3) 200mm。
Standpipe hole presetting mold the most according to claim 4, it is characterised in that described casing main body upper surface (4) A diameter of 88.5mm, a diameter of 60mm of described casing main body lower surface (5), a diameter of 50mm of described through hole (3).
Standpipe hole presetting mold the most according to claim 4, it is characterised in that described casing main body upper surface (4) A diameter of 245mm, a diameter of 219mm of described casing main body lower surface (5), a diameter of 200mm of described through hole (3).
7. the construction method of standpipe hole presetting mold, it is characterised in that comprise the steps:
S1, preparation: in time starting formwork supporting plate, at the outer surface brushing releasing agent equably of casing main body (1);
S2, reserving hole position mark: complete until formwork, reinforcing bar is when not yet starting colligation, with the eye-catching paint of color need pre- Box out and indicate the plan-position of reserving hole sleeve pipe on the floor in hole;
S3, fixing: before assembling reinforcement, bolt to be assembled together with reserving hole sleeve pipe, then, band reserving hole sleeve pipe Be bolted to need on the floor (8) of reserving hole, finally, upper strata iron plate hides;
S4, pouring the dismounting of rear reserving hole sleeve pipe: after concreting completes, its intensity can reach design when requiring, Extract reserving hole sleeve pipe;
S5, cleaning: the reserving hole sleeve pipe extracted is cleaned out, in order to next time uses.
CN201610595181.6A 2016-07-22 2016-07-22 Standpipe hole presetting mold and construction method thereof Pending CN106223611A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610595181.6A CN106223611A (en) 2016-07-22 2016-07-22 Standpipe hole presetting mold and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610595181.6A CN106223611A (en) 2016-07-22 2016-07-22 Standpipe hole presetting mold and construction method thereof

Publications (1)

Publication Number Publication Date
CN106223611A true CN106223611A (en) 2016-12-14

Family

ID=57533543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610595181.6A Pending CN106223611A (en) 2016-07-22 2016-07-22 Standpipe hole presetting mold and construction method thereof

Country Status (1)

Country Link
CN (1) CN106223611A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107214821A (en) * 2017-06-28 2017-09-29 中国二十二冶集团有限公司 Assembled plate class member hole reserves mould and its application method
CN107237493A (en) * 2017-06-13 2017-10-10 中建三局第二建设工程有限责任公司 Quickly remove formula and reserve device in concrete floor hole
CN107268989A (en) * 2017-06-21 2017-10-20 中国航天建设集团有限公司 Pipeline wears beam casing pipe construction method of installation
CN110207628A (en) * 2019-06-14 2019-09-06 成都和鸿科技有限公司 A kind of heavy combustion engine turbine blade film cooling holes position degree determines method
CN113235919A (en) * 2021-05-31 2021-08-10 江苏永创建设有限公司 Adjustable through-floor sleeve fixing frame and installation method of through-floor sleeve

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4427173A (en) * 1982-02-22 1984-01-24 Mackay Robert K Self-leveling sleeve insert for concrete passages
DE3246165A1 (en) * 1982-12-14 1984-06-14 Gerhard 5164 Nörvenich Matschke Device for making an opening in a wall or ceiling
CN2599138Y (en) * 2002-11-13 2004-01-14 程光明 Building storage pipeline preleft hole mould
CN2683762Y (en) * 2003-09-20 2005-03-09 程光明 Device used for preformed hole of building conduit
CN101525899A (en) * 2009-04-07 2009-09-09 湖北全洲扬子江建设工程有限公司 Novel device for installing discharge ducts of kitchens and toilets and method therefor
CN201443203U (en) * 2009-05-18 2010-04-28 青岛市胶州建设集团有限公司 Mold of preformed hole of cast-in-place reinforced concrete slab
CN201695679U (en) * 2010-06-02 2011-01-05 中国三冶集团有限公司第二建筑工程公司 Limiting device for concrete floorslab
CN102121315A (en) * 2011-01-07 2011-07-13 中建五局第三建设有限公司 Construction method for reserved hole of tightly-fixed steel sleeve
CN104264883A (en) * 2014-09-02 2015-01-07 中国建筑第八工程局有限公司 Concrete slab reserved hole structure and construction method thereof
CN205206317U (en) * 2015-10-28 2016-05-04 中国建筑第八工程局有限公司 Sheathed tube fixing device is reserved to floor

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4427173A (en) * 1982-02-22 1984-01-24 Mackay Robert K Self-leveling sleeve insert for concrete passages
DE3246165A1 (en) * 1982-12-14 1984-06-14 Gerhard 5164 Nörvenich Matschke Device for making an opening in a wall or ceiling
CN2599138Y (en) * 2002-11-13 2004-01-14 程光明 Building storage pipeline preleft hole mould
CN2683762Y (en) * 2003-09-20 2005-03-09 程光明 Device used for preformed hole of building conduit
CN101525899A (en) * 2009-04-07 2009-09-09 湖北全洲扬子江建设工程有限公司 Novel device for installing discharge ducts of kitchens and toilets and method therefor
CN201443203U (en) * 2009-05-18 2010-04-28 青岛市胶州建设集团有限公司 Mold of preformed hole of cast-in-place reinforced concrete slab
CN201695679U (en) * 2010-06-02 2011-01-05 中国三冶集团有限公司第二建筑工程公司 Limiting device for concrete floorslab
CN102121315A (en) * 2011-01-07 2011-07-13 中建五局第三建设有限公司 Construction method for reserved hole of tightly-fixed steel sleeve
CN104264883A (en) * 2014-09-02 2015-01-07 中国建筑第八工程局有限公司 Concrete slab reserved hole structure and construction method thereof
CN205206317U (en) * 2015-10-28 2016-05-04 中国建筑第八工程局有限公司 Sheathed tube fixing device is reserved to floor

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237493A (en) * 2017-06-13 2017-10-10 中建三局第二建设工程有限责任公司 Quickly remove formula and reserve device in concrete floor hole
CN107268989A (en) * 2017-06-21 2017-10-20 中国航天建设集团有限公司 Pipeline wears beam casing pipe construction method of installation
CN107214821A (en) * 2017-06-28 2017-09-29 中国二十二冶集团有限公司 Assembled plate class member hole reserves mould and its application method
CN110207628A (en) * 2019-06-14 2019-09-06 成都和鸿科技有限公司 A kind of heavy combustion engine turbine blade film cooling holes position degree determines method
CN113235919A (en) * 2021-05-31 2021-08-10 江苏永创建设有限公司 Adjustable through-floor sleeve fixing frame and installation method of through-floor sleeve
CN113235919B (en) * 2021-05-31 2022-05-17 江苏永创建设有限公司 Adjustable through-floor sleeve fixing frame and installation method of through-floor sleeve

Similar Documents

Publication Publication Date Title
CN106223611A (en) Standpipe hole presetting mold and construction method thereof
CN208056637U (en) A kind of concrete shear force wall sealing hole device
CN206903215U (en) Girder with rolled steel section en cased in concrete is without scaffold formwork
CN205743004U (en) A kind of hole to be provided construction mould based on assembled steel sleeve pipe
CN203856202U (en) Simple pullable sizing device of reserved holes
CN206174120U (en) Prefabricated constructional column and structure thereof
CN106049862A (en) Inflatable adjustable type construction mold for reserved hole in concrete structure plate, and construction method
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN105155843A (en) Construction method and construction device of constructional columns
CN206071050U (en) Mould is hung in a kind of pipeline pipe root closure
CN105604339B (en) Secondary structure constructs column reinforcing method
CN104453235B (en) Current conversion station fire wall construction technology
CN110499914A (en) Anti- bank formwork reinforcement built-in fitting, anti-bank formwork reinforcement structure and its construction method
CN203097290U (en) Assembled type split bolt
CN206815804U (en) A kind of new builder's jack girder steel built-in fitting
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN206753037U (en) Slding form operation vertical reinforcement locating rack
CN104499712A (en) Building formwork pull rod
CN205990764U (en) A kind of PVC service sleeve being readily disassembled turnover
CN205743005U (en) Inflatable adjustable concrete structural slab hole to be provided construction mould
CN207277853U (en) For the pump line plugging device for preventing concrete from trickling down
CN104047429B (en) A kind of method for improving construction work concrete seam quality
CN208633518U (en) Prestressed concrete laminated floor slab hangs mould pouring construction structure
CN207063499U (en) A kind of detachable lossless template climbing frame is encorbelmented channel-section steel fixing device
CN206554510U (en) Bolt assembly for improving architectural engineering concrete seam quality

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161214