CN106120799A CN201610482816.1A CN201610482816A CN106120799A CN 106120799 A CN106120799 A CN 106120799A CN 201610482816 A CN201610482816 A CN 201610482816A CN 106120799 A CN106120799 A CN 106120799A
Authority
CN
China
Prior art keywords
steel reinforcement
reinforcement cage
wall
pipeline
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610482816.1A
Other languages
Chinese (zh)
Inventor
付先进
罗会平
董俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610482816.1A priority Critical patent/CN106120799A/en
Publication of CN106120799A publication Critical patent/CN106120799A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention provides a kind of underground utilities to exempt to change across foundation ditch and move construction method, comprise the following steps: a. excavate pipeline soil at both sides so that it is formation underground tank;B. can co-operatively go along with sb. to guard him outside pipeline according to pipeline shape colligation and it is carried out the first steel reinforcement cage and the second steel reinforcement cage that protection supports;In lifting by crane the first steel reinforcement cage and the second steel reinforcement cage the most simultaneously and being respectively placed in the underground tank of pipeline both sides;D. translate the first steel reinforcement cage and the second steel reinforcement cage to direction, pipeline place simultaneously, make the first steel reinforcement cage and the contact of the second steel reinforcement cage;E. sand pocket is used to fill the space between the first steel reinforcement cage and the corresponding underground tank inwall of the second steel reinforcement cage respectively;The most respectively to the internal casting concrete of the first steel reinforcement cage and the second steel reinforcement cage so that it is form the first wall width and the second wall width respectively;G. after reclaiming sand pocket, the ground-connecting-wall outside construct the first wall width and the second wall width.The present invention rationally solves to exempt to change across foundation ditch underground utilities to move ground-connecting-wall Design of Retaining Structure construction problem under operating mode.

Description

Underground utilities are exempted to change across foundation ditch and are moved construction method
Technical field
The invention belongs to the deep-foundation pit engineering fields such as railway traffic engineering, building engineering, port and pier, be specifically related to A kind of underground utilities are exempted to change across foundation ditch and are moved construction method.
Background technology
Before Design of Excavation Project construction, move former is temporarily or permanently changed for all the adopting of the underground utilities in the range of foundation ditch Then, moving and be changed to outside foundation ditch scope, along with the development of urban construction, urban pipeline problem becomes increasingly conspicuous.Especially for one The most important pipeline such as underground high-voltage line and gas pipeline change that to move difficulty big, and high, the length in cycle of expense has become as control Construction investment and construction period very important factor.But urban pipeline partly plays high-voltage line and Gas Pipe etc Important pipeline cannot change and moves and across construction area, how to move pipeline and can connect walled and protect in construction ground fast and effectively again not changing Structure, guarantees a safety always difficult problem of the prior art during foundation pit construction simultaneously.
Summary of the invention
The purpose of the present invention is aiming at the defect of prior art, it is provided that a kind of underground utilities are exempted to change across foundation ditch and moved construction Method, uses the design mistake of wall two cage, is rationally addressed across foundation ditch underground utilities problem.
The invention provides a kind of underground utilities to exempt to change across foundation ditch and move construction method, it is characterised in that include following step Rapid:
A. excavation is positioned at the pipeline soil at both sides of margin of foundation pit to be dug so that it is in the braced wall position for pattern foundation pit supporting structure Become underground tank;
B. can co-operatively go along with sb. to guard him outside pipeline according to pipeline shape colligation and it is carried out what protection supported the One steel reinforcement cage and the second steel reinforcement cage;
In lifting by crane the first steel reinforcement cage and the second steel reinforcement cage the most simultaneously and being respectively placed in the underground tank of pipeline both sides;
D. translate the first steel reinforcement cage and the second steel reinforcement cage to direction, pipeline place simultaneously, make the first steel reinforcement cage and the second reinforcing bar Cage contacts;
E. sand pocket is used to fill the sky between the first steel reinforcement cage and the corresponding underground tank inwall of the second steel reinforcement cage respectively Between;
The most respectively to the internal casting concrete of the first steel reinforcement cage and the second steel reinforcement cage so that it is form the first wall width and the respectively Two wall width;
G. after reclaiming sand pocket, the ground-connecting-wall outside construct the first wall width and the second wall width, described first wall width, the second wall width The braced wall of the foundation ditch to be dug of integration is formed with ground-connecting-wall.
H. suspension protection measure is taked to carry out suspension protection to across the pipeline within foundation ditch to be dug.
Described step a includes utilizing ground-connecting-wall chute forming machine to scrub the soil body immediately below pipeline, it is ensured that the width of underground tank is more than The width sum of ground-connecting-wall, pipeline and sand pocket.
In described step b, the first steel reinforcement cage and the second steel reinforcement cage are the symmetrically arranged rectangular configuration that can mutually splice, the One steel reinforcement cage and the relative inside edge of the second steel reinforcement cage be provided with pipeline outside the breach that cooperates.
In described step b, the width of the first steel reinforcement cage and the second steel reinforcement cage is not more than the half of ground-connecting-wall.
Described step d lifts by crane the first steel reinforcement cage and the second steel reinforcement cage by lifting machine simultaneously and realizes both translations until the One steel reinforcement cage and the relative inside edge of the second steel reinforcement cage contact with each other clamping;The breach phase of the first steel reinforcement cage and the second steel reinforcement cage Cooperatively form loop configuration mutually to go along with sb. to guard him outside pipeline.
First wall width and the integrated wall body structure of the second wall in described step f.
Present invention additionally comprises step h: the wall that the first wall width, the second wall width and ground-connecting-wall produce in work progress sews up mouth Place uses and carries out slip casting at grouting program abutment joint, uses steel at localized seepage's water of the first wall width, the second wall width and ground-connecting-wall Plate welding closure mode processes.
Compared with the present invention changes with the underground utilities in the range of former foundation ditch and moves processing scheme, new ground-connecting-wall design and construction side Case rationally can solve to avoid moving across changing of foundation ditch pipeline based on self-technique scheme, technology maturation.Have reduce investment outlay, Reduce external coordination, shorten the advantages such as engineering construction cycle, at deep-foundation pit engineering, there is preferable application prospect.The present invention uses The design mistake of one wall two cage, is rationally addressed across foundation ditch underground utilities problem.The present invention is according to job site The shape of pipeline and ground-connecting-wall size assembling reinforcement cage, meet different construction demands.Lift by crane two steel reinforcement cages to be respectively placed in Pipeline both sides, simple to operate while effectively protect pipeline.Concrete perfusion in two steel reinforcement cages, by whole for two supporting construction It is combined into an entirety, effectively protects pipeline, it is achieved exempt to change the purpose moved.Then ground-connecting-wall outside construction, is used in protection pipeline Concrete walls width and outside ground-connecting-wall be integrated.Use at grouting program abutment joint at foundation ditch external wall seam seam simultaneously Carrying out slip casting, if occurring in Excavation Process, localized seepage's hydromining Plate Welding closure mode processes, it is ensured that ground-connecting-wall encloses The safety of protection structure and stagnant water effect.
Accompanying drawing explanation
Fig. 1 is that the present invention has constructed schematic diagram;
Fig. 2 is that reinforcing bar cage hoisting translates schematic diagram;
Fig. 3 is elevation before reinforcing bar cage hoisting
Fig. 4 is that reinforcing bar cage hoisting completes casting concrete elevation;
Fig. 5 is that reinforcing bar cage hoisting completes casting concrete plane graph;
Fig. 6 is that ground-connecting-wall has been constructed other wall width construction plan;
1 pipeline;2 first steel reinforcement cages;3 second steel reinforcement cages;4 ground-connecting-walls;5-underground tank;6-breach;7-sand pocket; 8-the first wall width;9-the second wall width.
Detailed description of the invention
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings, it is simple to is well understood to this Bright, but they do not constitute restriction to the present invention.
Exempt to change across foundation ditch move construction method as it can be seen, the invention provides a kind of underground utilities, it is characterised in that bag Include following steps:
A. excavation is positioned at pipeline 1 soil at both sides of margin of foundation pit to be dug, utilize ground-connecting-wall 4 chute forming machine scrub pipeline 1 just under Necromancer body forms it into underground tank 5, it is ensured that the width of underground tank 5 is more than ground-connecting-wall 4, pipeline 1 and the width sum of sand pocket 7;Ground Even the width of wall 4 is generally 6m, and underground tank 5 width is chosen for 7m+D (D is pipeline 1 diameter or width);The length of underground tank 5 with Ground-connecting-wall 4 keeps consistent.
B. can co-operatively go along with sb. to guard him outside pipeline 1 according to pipeline 1 shape colligation and it is carried out what protection supported First steel reinforcement cage 2 and the second steel reinforcement cage 3;First steel reinforcement cage 2 and the second steel reinforcement cage 3 are the symmetrically arranged reinforcing bar that can mutually splice Cage, the inside edge that the first steel reinforcement cage 2 is relative with the second steel reinforcement cage 3 be provided with pipeline 1 outside the breach 6 that cooperates;The The width of one steel reinforcement cage 2 and the second steel reinforcement cage 3 is not more than the half of ground-connecting-wall 4, therefore width uses 3m, and length is protected with ground-connecting-wall 4 Hold consistent.
Lift by crane the first steel reinforcement cage 2 and the second steel reinforcement cage 3 by lifting machine the most simultaneously and be respectively placed in the ground of pipeline 1 both sides In lower groove 5;
D. lift by crane the first steel reinforcement cage 2 and the second steel reinforcement cage 3 by lifting machine simultaneously realize both translations until the first reinforcing bar The inside edge that cage 2 is relative with the second steel reinforcement cage 3 contacts with each other clamping, it is achieved the first steel reinforcement cage 2 and conjunction of the second steel reinforcement cage 3 Holding together, now the first steel reinforcement cage 2 and the second steel reinforcement cage 3 arrive and specify position i.e. to exempt to change at the pipeline 1 moved;First steel reinforcement cage 2 and The breach 6 of two steel reinforcement cages 3 complements each other to form loop configuration and goes along with sb. to guard him outside pipeline 1, it is achieved the protection to pipeline 1 supports;
E. sand pocket 7 is used to fill respectively between the first steel reinforcement cage 2 and corresponding underground tank 5 inwall of the second steel reinforcement cage 3 Space, it is ensured that the first steel reinforcement cage 2 and the second steel reinforcement cage 3 keep stable in ensuing pouring construction, do not occur excessive Displacement;
The most respectively to the internal casting concrete of the first steel reinforcement cage 2 and the second steel reinforcement cage 3 so that it is form the first wall 8 respectively With the second wall 9, the first wall 8 and the second integrated wall body structure of wall 9, for exempting to change the guarantor that the pipeline 1 moved provides stable Protect;
G. after reclaiming sand pocket 7, the ground-connecting-wall 4 outside construct the first wall 8 and the second wall 9, make the first wall 8 and second The ground-connecting-wall 4 that wall 9 is corresponding with outside it is linked as integral wall, collectively as the supporting construction of foundation ditch to be dug.
H. the wall seam seam produced in work progress at first wall the 8, second wall 9 and ground-connecting-wall 4 uses slip casting Carry out slip casting at scheme abutment joint, at localized seepage's water of first wall the 8, second wall 9 and ground-connecting-wall 4, use Plate Welding envelope Stifled mode processes, it is ensured that the safety of ground-connecting-wall 4 building enclosure and stagnant water effect.
G. suspension protection measure is taked to carry out suspension protection to across the pipeline within foundation ditch to be dug.
The content that this specification is not described in detail belongs to prior art known to professional and technical personnel in the field.

Claims (8)

1. underground utilities are exempted to change across foundation ditch and are moved construction method, it is characterised in that comprise the following steps:
A. excavation is positioned at pipeline (1) soil at both sides of margin of foundation pit to be dug so that it is in the braced wall position for pattern foundation pit supporting structure Become ground-connecting-wall groove (5);
B. according to pipeline (1) shape colligation can co-operatively go along with sb. to guard him in pipeline (1) outside and to its carry out protection support First steel reinforcement cage (2) and the second steel reinforcement cage (3);
Lift by crane the first steel reinforcement cage (2) and the second steel reinforcement cage (3) the most simultaneously and be respectively placed in the underground tank (5) of pipeline (1) both sides In;
D. simultaneously translate the first steel reinforcement cage (2) and the second steel reinforcement cage (3) to pipeline (1) direction, place, make the first steel reinforcement cage (2) and Second steel reinforcement cage (3) contacts;
E. sand pocket (7) is used to fill the first steel reinforcement cage (2) and corresponding underground tank (5) inwall of the second steel reinforcement cage (3) respectively Between space;
The most respectively to the internal casting concrete of the first steel reinforcement cage (2) and the second steel reinforcement cage (3) so that it is form the first wall width respectively (8) and the second wall width (9);
G. after reclaiming sand pocket (7), construct the first wall width (8) and the ground-connecting-wall (4) in the second wall width (9) outside, described first wall width (8), the second wall width (9) and ground-connecting-wall (4) form the braced wall of integrated foundation ditch to be dug.
Underground utilities the most according to claim 1 are exempted to change across foundation ditch and are moved construction method, it is characterised in that also include step H. suspension protection measure is taked to carry out suspension protection to across the pipeline within foundation ditch to be dug.
Underground utilities the most according to claim 1 are exempted to change across foundation ditch and are moved construction method, it is characterised in that step a includes profit The soil body immediately below pipeline (1) is scrubbed, it is ensured that the width of underground tank (5) is more than ground-connecting-wall (4), pipeline with ground-connecting-wall (4) chute forming machine And the width sum of sand pocket (7) (1).
Underground utilities the most according to claim 1 are exempted to change across foundation ditch and are moved construction method, it is characterised in that in step b first Steel reinforcement cage (2) and the second steel reinforcement cage (3) are the symmetrically arranged rectangular configuration that can mutually splice, the first steel reinforcement cage (2) and second The inside edge that steel reinforcement cage (3) is relative is provided with the breach (6) cooperated with pipeline (1) outside.
Underground utilities the most according to claim 1 (1) are exempted to change across foundation ditch and are moved construction method, it is characterised in that in step b The width of the first steel reinforcement cage (2) and the second steel reinforcement cage (3) is not more than the half of ground-connecting-wall (4).
Underground utilities the most according to claim 3 are exempted to change across foundation ditch and are moved construction method, it is characterised in that pass through in step d Lifting machine lifts by crane the first steel reinforcement cage (2) and the second steel reinforcement cage (3) simultaneously and realizes both translations until the first steel reinforcement cage (2) and second The inside edge that steel reinforcement cage (3) is relative contacts with each other clamping;The breach (6) of the first steel reinforcement cage (2) and the second steel reinforcement cage (3) is mutual Cooperatively form loop configuration to go along with sb. to guard him in pipeline (1) outside.
Underground utilities the most according to claim 3 are exempted to change across foundation ditch and are moved construction method, it is characterised in that in step f first Wall width (8) and the second wall width (9) integrated wall body structure.
Underground utilities the most according to claim 3 are exempted to change across foundation ditch and are moved construction method, it is characterised in that also include step The wall seam seam that h: the first wall width (8), the second wall width (9) and ground-connecting-wall (4) produce in work progress uses grouting program Carry out slip casting at abutment joint, at localized seepage's water of the first wall width (8), the second wall width (9) and ground-connecting-wall (4), use Plate Welding Closure mode processes.
CN201610482816.1A 2016-06-27 2016-06-27 Underground utilities are exempted to change across foundation ditch and are moved construction method Pending CN106120799A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610482816.1A CN106120799A (en) 2016-06-27 2016-06-27 Underground utilities are exempted to change across foundation ditch and are moved construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610482816.1A CN106120799A (en) 2016-06-27 2016-06-27 Underground utilities are exempted to change across foundation ditch and are moved construction method

Publications (1)

Publication Number Publication Date
CN106120799A true CN106120799A (en) 2016-11-16

Family

ID=57265834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610482816.1A Pending CN106120799A (en) 2016-06-27 2016-06-27 Underground utilities are exempted to change across foundation ditch and are moved construction method

Country Status (1)

Country Link
CN (1) CN106120799A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442382A (en) * 2018-03-06 2018-08-24 中铁十局集团城市轨道工程有限公司 It crosses the pressure line in-situ conservation of deep basal pit and goes along with sb. to guard him soil-baffling structure and construction method
CN109723065A (en) * 2019-02-26 2019-05-07 济南轨道交通集团有限公司 Deep basal pit freezing partly reinforced construction method in bracing means and rich water sandy pear variety
CN110004919A (en) * 2019-04-30 2019-07-12 中铁十局集团西北工程有限公司 A kind of foundation pit enclosure construction method in pipeline coverage
CN111088792A (en) * 2020-01-07 2020-05-01 中国葛洲坝集团市政工程有限公司 Double L-shaped reinforcement cage hoisting method in underground continuous wall construction
CN111764374A (en) * 2020-05-28 2020-10-13 浙江土工岩土科技有限公司 Construction method of underground continuous wall in low-clearance environment
CN113585275A (en) * 2020-04-30 2021-11-02 中国建筑第四工程局有限公司 Construction method for protecting horizontal branch pipe of thermal spring well in foundation pit
CN113914299A (en) * 2021-11-18 2022-01-11 中铁二局集团有限公司 Construction method of underground diaphragm wall penetrating through foundation pit pipeline

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04108922A (en) * 1990-08-28 1992-04-09 Toda Constr Co Ltd Form construction method for underground structure
CN101914917A (en) * 2010-08-10 2010-12-15 中铁一局集团有限公司 Anti-seepage and leak-blocking construction method for excavation of subway foundation pit in soft soil area
CN203977407U (en) * 2014-07-30 2014-12-03 中国一冶集团有限公司 The device of the pre-buried assembled steel case of a kind of diaphragm wall hole to be provided
CN104846829A (en) * 2014-02-18 2015-08-19 宏润建设集团股份有限公司 Shield-reserved penetration composite type foundation pit support wall and construction method thereof
CN205062858U (en) * 2015-10-19 2016-03-02 苏州大学 Underground continuous wall and whole anti structure of floating of concrete structure bottom plate

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04108922A (en) * 1990-08-28 1992-04-09 Toda Constr Co Ltd Form construction method for underground structure
CN101914917A (en) * 2010-08-10 2010-12-15 中铁一局集团有限公司 Anti-seepage and leak-blocking construction method for excavation of subway foundation pit in soft soil area
CN104846829A (en) * 2014-02-18 2015-08-19 宏润建设集团股份有限公司 Shield-reserved penetration composite type foundation pit support wall and construction method thereof
CN203977407U (en) * 2014-07-30 2014-12-03 中国一冶集团有限公司 The device of the pre-buried assembled steel case of a kind of diaphragm wall hole to be provided
CN205062858U (en) * 2015-10-19 2016-03-02 苏州大学 Underground continuous wall and whole anti structure of floating of concrete structure bottom plate

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
唐春燕: "横跨地下通道基坑的管线原位保护技术", 《建筑施工》 *
梁敦维主编: "《地下工程防水技术》", 31 May 2009 *
谷湘泉: "地铁车站深基坑地下连续墙接缝渗漏原因分析及防治", 《江西建材》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442382A (en) * 2018-03-06 2018-08-24 中铁十局集团城市轨道工程有限公司 It crosses the pressure line in-situ conservation of deep basal pit and goes along with sb. to guard him soil-baffling structure and construction method
CN108442382B (en) * 2018-03-06 2020-06-16 中铁十一局集团城市轨道工程有限公司 In-situ protection and enclosure soil-retaining structure for pressure pipeline crossing deep foundation pit and construction method
CN109723065A (en) * 2019-02-26 2019-05-07 济南轨道交通集团有限公司 Deep basal pit freezing partly reinforced construction method in bracing means and rich water sandy pear variety
CN109723065B (en) * 2019-02-26 2023-11-03 济南轨道交通集团有限公司 Reinforcing device and deep foundation pit local freezing reinforcing construction method in water-rich gravel stratum
CN110004919A (en) * 2019-04-30 2019-07-12 中铁十局集团西北工程有限公司 A kind of foundation pit enclosure construction method in pipeline coverage
CN110004919B (en) * 2019-04-30 2020-11-17 中铁十局集团西北工程有限公司 Foundation pit enclosure construction method used in pipeline influence range
CN111088792A (en) * 2020-01-07 2020-05-01 中国葛洲坝集团市政工程有限公司 Double L-shaped reinforcement cage hoisting method in underground continuous wall construction
CN113585275A (en) * 2020-04-30 2021-11-02 中国建筑第四工程局有限公司 Construction method for protecting horizontal branch pipe of thermal spring well in foundation pit
CN113585275B (en) * 2020-04-30 2022-07-22 中国建筑第四工程局有限公司 Construction method for protecting horizontal branch pipe of thermal spring well in foundation pit
CN111764374A (en) * 2020-05-28 2020-10-13 浙江土工岩土科技有限公司 Construction method of underground continuous wall in low-clearance environment
CN113914299A (en) * 2021-11-18 2022-01-11 中铁二局集团有限公司 Construction method of underground diaphragm wall penetrating through foundation pit pipeline

Similar Documents

Publication Publication Date Title
CN106120799A (en) Underground utilities are exempted to change across foundation ditch and are moved construction method
CN101788082A (en) Construction method for abutting jack pipe underground
CN109372019A (en) Cable duct original position rest construction method
CN105926672A (en) Mined metro station steel pipe column construction method
CN106049502B (en) A kind of underground utilities exploration drilling cutting method
CN105332382B (en) Adjacent river foundation ditch builds island cofferdam clay water stop construction method
CN204851266U (en) Secretly dig shaft structure directly over station
CN203160254U (en) Pit support structure
CN202247942U (en) Overhanging type lifter foundation
CN106758759A (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN207277344U (en) Guiding tool for the backfill of narrow Deep Foundation Pit Excavation
CN109653225A (en) Steel sheet-pile cofferdam and its construction method
CN206513380U (en) A kind of tunnel double-lining vault with rubber seal reserves Grouting Pipe
CN105155578B (en) Complicated geological and environment access subway existing support system construction method
CN209539364U (en) A kind of joint connecting structure of service channel and running tunnel
CN206477240U (en) A kind of trestle pile foundation for deep water drift net riverbed
CN102409701A (en) Concrete wall construction joint processing method and structure
CN107288141B (en) A kind of seamless flexible water construction technology of contrary sequence method
CN206408510U (en) Through tied arch bridge
CN108930323A (en) A kind of pipe jacking construction method
CN205476083U (en) Concrete beam's cover to reinforcement structure
CN107940102A (en) Underground raw water pipe protection construction method
CN110184952B (en) Modification structure of existing bridge abutment and construction method thereof
CN102808406B (en) The construction treating methods of townhouse composite pile wall
CN208455615U (en) A kind of prefabricated guide groove structure of concrete cut

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination