CN106115283B - A kind of automated container terminal handling method - Google Patents

A kind of automated container terminal handling method Download PDF

Info

Publication number
CN106115283B
CN106115283B CN201610527099.XA CN201610527099A CN106115283B CN 106115283 B CN106115283 B CN 106115283B CN 201610527099 A CN201610527099 A CN 201610527099A CN 106115283 B CN106115283 B CN 106115283B
Authority
CN
China
Prior art keywords
track
transport vehicle
container
equipment
case area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610527099.XA
Other languages
Chinese (zh)
Other versions
CN106115283A (en
Inventor
张艳伟
杨紫灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Technology WUT
Original Assignee
Wuhan University of Technology WUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Technology WUT filed Critical Wuhan University of Technology WUT
Priority to CN201610527099.XA priority Critical patent/CN106115283B/en
Publication of CN106115283A publication Critical patent/CN106115283A/en
Application granted granted Critical
Publication of CN106115283B publication Critical patent/CN106115283B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G63/00Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
    • B65G63/04Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations with essentially-horizontal transit by bridges equipped with conveyors
    • B65G63/042Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations with essentially-horizontal transit by bridges equipped with conveyors for articles

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

The invention discloses a kind of automated container terminal handling system and methods, include: pier storage yard each case area in be equipped at least one case area delivering device, case area delivering device includes the first transport vehicle, for the first track of the first transport vehicle operation, and the first hoisting apparatus for the cargo on the first transport vehicle to be unloaded to each shellfish position in case area;It is equipped with transhipment distributing equipment, transhipment the second transport vehicle of distributing equipment in stockyard forward position, and for the second track of the second transport vehicle operation, the second transport vehicle is equipped with for grabbing and the second hoisting apparatus of arrangement of goods;It further include horizontal trasportation equipment, horizontal trasportation equipment includes third transport vehicle, and for the third track of third transport vehicle operation.

Description

A kind of automated container terminal handling method
Technical field
The invention belongs to harbor equipment fields, and in particular to a kind of automated container terminal handling method.
Background technique
At abroad, human resources are relatively deficient, labour cost is higher, research of the European Countries to automated container terminal It starts to walk more early, Netherlands Rotterdam Euromax harbour has built up in the world automated container terminal earlier, technology mode That take from wharf apron to the horizontal transportation system the stockyard of rear is AGV trolley (AGV:Automated Guided Vehicle, automatic guided vehicle), what stockyard was taken be full rotation type RMG (RMG:Rail Mounted Gantry Crane, Rail-mounted gantry crane).Port of Rotterdam started to extend in 2008, compared to previous Euromax harbour, its biggest characteristic is that Horizontal transportation system takes Liftable type ALV (Automated lifting vehicle) trolley using battery as power, whole A process system is below the backreach of gantry crane and the front edge portion in stockyard is equipped with buffer area, when gantry crane by container from ship On carry out the handling of next container in the buffer area that can directly be placed on container under gantry crane when unloading, when ALV is small When vehicle reaches buffer area below gantry crane backreach, voluntarily lifts container and transported toward buffer area in front of stockyard, by container It is discharged in the transhipment for going to gantry crane lower section to carry out next container again after the buffer area in front of stockyard.Bridge completes upper one on the spot When container stack task, i.e., stacking voluntarily is carried out toward stockyard in stockyard forward position buffer area lifting container.Take AGV/ALV Process system of the trolley as horizontal transport machinery, Wharf Construction is at high cost, operating efficiency it is more traditional take truck as water The low efficiency of flat Transport Machinery.
The country starts late to the research of automated container terminal, and the main technique that represents has Shanghai Zhenhua heavy industry joint The elevating rack bridge container track shuttle system of the major colleges and universities' research and development of China.There are some problems, such as gantry crane backreach to divide into There is an overpass, system is different at two by container horizontal distribution along the coastline and perpendicular to the transfer designs of frontage It is carried out in plane, for the novel process system schema for harbour operator, cost is higher, and in addition system flexibility needs to be mentioned Height, when the equipment of a certain link breaks down in this process system, the operation of whole system will be affected, and then will affect whole A system effectiveness.
Summary of the invention:
In order to overcome the defect of above-mentioned background technique, the present invention provides a kind of automated container terminal handling method, subtracts Few Wharf Construction cost, improves operating efficiency.
In order to solve the above-mentioned technical problem used technical solution of the invention are as follows:
A kind of automated container terminal handling method, comprising:
At least one case area delivering device is equipped in each case area of pier storage yard, case area delivering device includes the first fortune Defeated vehicle, the first track run for the first transport vehicle, and it is each in case area for the cargo on the first transport vehicle to be unloaded to First hoisting apparatus of shellfish position;
It is equipped with transhipment distributing equipment in stockyard forward position, transports the second transport vehicle of distributing equipment, and transport for the second transport vehicle The second capable track, the second track connect with an end of each first track, the second transport vehicle be equipped with for grab and Second hoisting apparatus of arrangement of goods;
It further include horizontal trasportation equipment, horizontal trasportation equipment includes third transport vehicle, and for the operation of third transport vehicle Third track, third track include connecing goods end, and the discharge end for connecting with the second track for what is coupled with gantry crane.
Several horizontal trasportation equipments are configured to rest against the ship of harbour, horizontal trasportation equipment extremely transports Container Transport Distributing equipment transports distributing equipment for the case area delivering device of container transshipment to each case area, each area Suo Xiang delivering device Container is placed into corresponding shellfish position.
Each horizontal trasportation equipment connects goods end from gantry crane receiver container, and container passes through the of third tracks travel Three transport vehicles are transported to discharge end;Second hoisting apparatus grabs container from third transport vehicle, and is placed on the second transport vehicle, Second transport vehicle runs the end of the first track to purpose case area on the second track;Second hoisting apparatus is from the second transport vehicle Container is grabbed, and is placed on the first transport vehicle;First transport vehicle by Container Transport to institute the first track and purpose shellfish position Container is offloaded to purpose shellfish position by corresponding position, the first hoisting apparatus.
Preferably, the first refitting is set to rail-mounted gantry crane.
Preferably, the second hoisting apparatus is crane arm.
Preferably, horizontal trasportation equipment is equipped with several layers of third track, several layers of third track are respectively used to third transport vehicle Goods end is connect from connecing goods end and being transported to discharge end or be transported to third transport vehicle from discharge end;It is equipped between each layer third track For transporting the lifting machine of third transport vehicle.
Preferably, include upper layer third track and lower layer's third track, upper layer third track be used for by third transport vehicle from It connects goods end and is transported to discharge end, lower layer's third track connects goods end for third transport vehicle to be transported to from discharge end;Upper layer third The connecing to be equipped between goods end of track and lower layer's third track connects goods end lifting machine, for by third transport vehicle from lower layer's third track Raising is to upper layer third track;It is equipped with discharge end lifting machine between upper layer third track and the discharge end of lower layer's third track, uses In by third transport vehicle from upper layer third orbit transports to lower layer's third track.
Preferably, length direction of the second track of transhipment distributing equipment along stockyard is longitudinally disposed at the front in case area, respectively A first track is vertical with the second track.
Preferably, further including the transporting facility track moved horizontally for horizontal trasportation equipment along the second track, transport is set Standby track and the second parallel track are arranged.
The beneficial effects of the present invention are: horizontal distance of the container from wharf apron to stockyard forward position passes through horizontal transport Equipment is carried, and every gantry crane configures horizontal trasportation equipment, the transporting equipment that horizontal trasportation equipment is laid with by its bottom Track is mobile, when being moved to next shellfish position after gantry crane is by the container handling of a shellfish position on ship, horizontal transport Equipment moves together in horizontal rail with gantry crane.Horizontal trasportation equipment is set as the knot of upper layer and lower layer track or multilayer track Structure is walked for the third transport vehicle of conveying container, and both ends are equipped with vertical lifting mechanism, and lifting mechanism leads to track Such multilayered structure setting is crossed, multiple third transport vehicles can be made to participate in the carrying of container, improve transporting velocity and efficiency, The loss of transport vehicle can also be reduced, the service life is extended.
Joining place is equipped with container transshipment distributing equipment in front of horizontal trasportation equipment and stockyard, the of the second transporting equipment The second transport vehicle travelled on two tracks is equipped with the second hoisting apparatus, and the second hoisting apparatus is set as crane arm, and crane arm is from the Grab and container and be placed on the second transport vehicle on three transport vehicles, transport the container to the corresponding position in goal box area it Afterwards, then by crane arm container is grabbed, and be placed on first transport vehicle in corresponding case area.First transport vehicle is on the first track Advance to after the corresponding position of target shellfish position, by the first hoisting apparatus rail-mounted gantry crane by container handling stacking to Target shellfish position.
The stockyard of bank formula of hanging down arrangement is divided into several case areas, and each case area is equipped with a casing area delivering device, is used for The container to come will be received from transhipment distributing equipment, handling pass through on the first track again in target shellfish position, case area delivering device First transport vehicle receiver container of walking, and be transported to after position corresponding with target shellfish position, it is filled by the first hoisting apparatus Stacking is unloaded to target shellfish position.
The present invention takes level conveyor that container is transported to stockyard forward position, trolley on level conveyor from wharf apron It orbits, is convenient for automation control, improve the degree of automation, reduce cost of labor.
Detailed description of the invention
Fig. 1 is system of embodiment of the present invention side structure schematic diagram;
Fig. 2 is the side structure schematic diagram of horizontal trasportation equipment of the embodiment of the present invention;
Fig. 3 is system of embodiment of the present invention overlooking structure diagram.
In figure: 1- case area, 2- case area delivering device, the first transport vehicle of 2.1-, the first track of 2.2-, the refitting of 2.3 the firsts It sets, 3- transhipment distributing equipment, the second track of 3.1-, the second transport vehicle of 3.2-, 4- horizontal trasportation equipment, 4.1- third track, 4.1.1- upper layer third track, 4.1.2- lower layer third track, 4.1.3- connect goods end lifting machine, 4.1.4 discharge end lifting machine, 4.2- third transport vehicle, 5- transporting facility track, 6- gantry crane, 7- ship.
Specific embodiment
With reference to the accompanying drawing 1 to 3 and embodiment the present invention is described further.
Embodiment
A kind of automated container terminal handling method includes: as shown in figures 1 and 3
Horizontal trasportation equipment 4, horizontal trasportation equipment 4 include third transport vehicle 4.2, and run for third transport vehicle 4.2 Third track 4.1, third track 4.1 includes connecing goods end for what is coupled with gantry crane 6, and be used for and 3.1 phase of the second track The discharge end connect.First hoisting apparatus 2.3 is rail-mounted gantry crane.
It is equipped with transhipment distributing equipment 3 in stockyard forward position, transports 3 second transport vehicle 3.2 of distributing equipment, and for the second transport The second track 3.1 that vehicle 3.2 is run, the second track 3.1 connect with an end of each first track 2.2, the second transport vehicle 3.2 are equipped with for grabbing and the second hoisting apparatus of arrangement of goods;Second hoisting apparatus is crane arm.
It is equipped at least one case area delivering device 2 in each case area 1 of pier storage yard, case area delivering device 2 includes the One transport vehicle 2.1, for the first track 2.2 of the first transport vehicle 2.1 operation, and for by the cargo on the first transport vehicle 2.1 It is unloaded to the first hoisting apparatus 2.3 of each shellfish position in case area 1;First track 2.2 is layed in the longitudinally central line in case area 1.
The horizontal trasportation equipment 4 of the present embodiment be equipped with two layers of third track 4.1, be respectively used to by third transport vehicle 4.2 from It connects goods end and is transported to discharge end or is transported to third transport vehicle 4.2 from discharge end and connect goods end;Between each layer third track 4.1 Equipped with the lifting machine for transporting third transport vehicle 4.2.
The present embodiment further includes the transporting facility track 5 moved horizontally for horizontal trasportation equipment 4 along the second track 3.1, Transporting facility track 5 is arranged in parallel with the second track 3.1.Horizontal distance of the container from wharf apron to stockyard forward position passes through water Flat transporting equipment 4 is carried, and every gantry crane 6 configures horizontal trasportation equipment 4, and horizontal trasportation equipment 4 is laid with by its bottom Transporting facility track 5 it is mobile, when gantry crane 6 will be moved to next shellfish after the container handling of a shellfish position on ship 7 When position, horizontal trasportation equipment 4 moves together on transporting facility track 5 with gantry crane.
Specifically, as shown in Fig. 2, two layers of third track 4.1 of the present embodiment respectively be upper layer third track 4.1.1 and Lower layer third track 4.1.2, upper layer third track 4.1.1 are used to third transport vehicle 4.2 being transported to discharge end from goods end is connect, under Layer third track 4.1.2 connects goods end for third transport vehicle 4.2 to be transported to from discharge end;Upper layer third track 4.1.1 is under The connecing to be equipped between goods end of layer third track 4.1.2 meets goods end lifting machine 4.1.3, for by third transport vehicle 4.2 from lower layer the Three track 4.1.2 raisings are to upper layer third track 4.1.1;The unloading of upper layer third track 4.1.1 and lower layer third track 4.1.2 Discharge end lifting machine 4.1.4 is equipped between end, for third transport vehicle 4.2 to be delivered to lower layer from upper layer third track 4.1.1 Third track 4.1.2.
The front that length direction of the second track 3.1 of distributing equipment 3 along stockyard is longitudinally disposed at case area 1 is transported, it is each First track 2.2 is vertical with the second track 3.1.
In the present embodiment, the ship 7 for resting against harbour is configured with three sets of gantry cranes 6 and horizontal trasportation equipment 4, is denoted as one respectively Number 6, No. two gantry cranes 6 of gantry crane and No. three gantry cranes 6, three gantry cranes 6 are transported 4, No. two horizontal transports of No.1 horizontal trasportation equipment respectively and are set It is coupled for 4 and No. three horizontal trasportation equipments 4.Gantry crane 6 and the tricks of horizontal trasportation equipment 4 are according to 7 size of ship, container quantity In conjunction with economy synthetic setting.The stockyard of harbour is divided into equal-sized several along the length direction of transhipment distributing equipment 3 Case area 1, stockyard shown in the present embodiment are divided for four areas Ge Xiang 1, are denoted as the case of case area, No.1 case area 1, two 1, three respectively Area 1 and No. four case areas 1.It transports distributing equipment 3 and supplies front end of the second track 3.1 of the second transport vehicle 3.2 operation from No.1 case area 1 The front end in No. four case areas 1 is extended to, is connected respectively with the front end of first track 2.2 in four areas Ge Xiang 1.
The method that the present embodiment carries out automated container terminal handling using above system, comprising: to rest against harbour Ship 7 configure several horizontal trasportation equipments 4, horizontal trasportation equipment 4 is by Container Transport to transhipment distributing equipment 3, transhipment point With equipment 3 by the case area delivering device 2 of container transshipment to each case area 1, each area Suo Xiang delivering device 2 places container To corresponding shellfish position.
Horizontal trasportation equipment 4 under the init state that unloads, the third transport vehicle 4.2 on the third track 4.1.1 of upper layer Rest in the underface of coupled 6 backreach of gantry crane.
Container is discharged at the horizontal trasportation equipment stopped below 6 backreach of gantry crane in advance on ship 7 after the lifting of gantry crane 6 On 4 third transport vehicle 4.2.
Horizontal trasportation equipment 4 connects goods end from 6 receiver container of gantry crane, and container passes through in upper layer third track 4.1.1 The third transport vehicle 4.2 of operation is transported to discharge end;
And third transport vehicle 4.2 drops to lower layer third track 4.1.2 by discharge end lifting machine 4.1.4 in discharge end, the Three transport vehicles 4.2 connect goods end running to by discharge end on lower layer third track 4.1.2, then by meeting goods end lifting machine 4.1.3 From lower layer's third track 4.1.2 raising to upper layer third track 4.1.1, can be entirely recycled in third track 4.1 in this way Multiple third transport vehicles 4.2, work at the same time, raising efficiency.
Second hoisting apparatus grabs container from third transport vehicle 4.2, and is placed on the second transport vehicle 3.2, the second fortune Defeated vehicle 3.2 is run on the second track 3.1 to the end of first track 2.2 in purpose case area 1;
Second hoisting apparatus grabs container from the second transport vehicle 3.2, and is placed on the first transport vehicle 2.1, and band case revolves It turn 90 degrees;First transport vehicle 2.1 is by Container Transport to the first track 2.2 of institute position corresponding with purpose shellfish, the first lifting Container is offloaded to purpose shellfish position by device 2.3.
It, should after the container on container ship 7 with three gantry cranes 6 on any one corresponding shellfish position, which is unloaded, to be finished Gantry crane 6 will be moved into next 7 shellfish of ship position and carry out container handling, at this time the corresponding horizontal trasportation equipment 4 of gantry crane 6 along It is moved horizontally on transporting facility track 5, is moved to next 7 shellfish of ship position, continuation is coupled with the gantry crane 6, after making gantry crane 6 It stretches on the third transport vehicle 4.2 that the container away from lower section can be directly discharged on horizontal trasportation equipment 4.
It is to illustrate specific operational method and process of the invention, production is in practice by taking the unloading process at harbour as an example above Each mechanical quantitative proportion and each crab traversing speed setting according to harbour goodput, obtain mix proportion scheme.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (6)

1. a kind of automated container terminal handling method, it is characterised in that:
At least one case area delivering device (2), case area delivering device (2) are equipped in each case area (1) of pier storage yard Including the first transport vehicle (2.1), the first track (2.2) run for the first transport vehicle (2.1), and for being transported described first Cargo on defeated vehicle (2.1) is unloaded to the first hoisting apparatus (2.3) of each shellfish position in the case area (1);
It is equipped with transhipment distributing equipment (3) in the stockyard forward position, the transhipment distributing equipment (3) includes the second transport vehicle (3.2), And the second track (3.1) for the second transport vehicle (3.2) operation, second track (3.1) and each first track (2.2) a end connects, and second transport vehicle (3.2) is equipped with for grabbing second refitting with arrangement of goods It sets;
It further include horizontal trasportation equipment (4), the horizontal trasportation equipment (4) includes third transport vehicle (4.2), and is transported for third The third track (4.1) of defeated vehicle (4.2) operation, the third track (4.1) include for connecing goods end with what gantry crane (6) coupled, And the discharge end for connecting with second track (3.1);
The horizontal trasportation equipment (4) is equipped with the several layers of third track (4.1), and the several layers of third track (4.1) are used respectively In the third transport vehicle (4.2) is transported to the discharge end or by the third transport vehicle (4.2) from unloading from goods end is connect End connects goods end described in being transported to;It is equipped between each layer third track (4.1) for transporting the third transport vehicle (4.2) Lifting machine;
Including upper layer third track (4.1.1) and lower layer's third track (4.1.2), the upper layer third track (4.1.1) is used for The third transport vehicle (4.2) is transported to the discharge end from goods end is connect, lower layer's third track (4.1.2) is used for institute It states third transport vehicle (4.2) and is transported to from discharge end and described connect goods end;The upper layer third track (4.1.1) and the lower layer Three tracks (4.1.2) connect between goods end be equipped with connect goods end lifting machine (4.1.3), for by the third transport vehicle (4.2) from Lower layer's third track (4.1.2) rises and rises to the upper layer third track (4.1.1);The upper layer third track (4.1.1) It is equipped with discharge end lifting machine (4.1.4) between the discharge end of lower layer's third track (4.1.2), for transporting the third Defeated vehicle (4.2) is delivered to lower layer's third track (4.1.2) from the upper layer third track (4.1.1);
Several horizontal trasportation equipments (4) are configured to rest against the ship (7) of harbour, and the horizontal trasportation equipment (4) is by the collection Vanning transport is to the transhipment distributing equipment (3), and the transhipment distributing equipment (3) is by the container transshipment to each case area (1) container is placed into corresponding shellfish position by case area delivering device (2), each area Suo Xiang delivering device (2);
From gantry crane (6) reception container, the container passes through at the goods end that connects of each horizontal trasportation equipment (4) In the third transport vehicle (4.2) transport that the third track (4.1) is slided to the discharge end;Second hoisting apparatus The container is grabbed from the third transport vehicle (4.2), and is placed on second transport vehicle (3.2), second fortune Defeated vehicle (3.2) is run on second track (3.1) to the end of first track (2.2) in purpose case area (1);Described second Hoisting apparatus grabs the container from second transport vehicle (3.2), and is placed on first transport vehicle (2.1);Institute The first transport vehicle (2.1) is stated by the Container Transport to the first track of institute (2.2) position corresponding with purpose shellfish, described the The container is offloaded to the purpose shellfish position by one hoisting apparatus (2.3).
2. a kind of automated container terminal handling method according to claim 1, it is characterised in that: first lifting Device (2.3) is rail-mounted gantry crane.
3. a kind of automated container terminal handling method according to claim 1, it is characterised in that: second lifting Device is crane arm.
4. a kind of automated container terminal handling method according to claim 1, it is characterised in that: the transhipment distribution Length direction of second track (3.1) of equipment (3) along the stockyard is longitudinally disposed at the front of the case area (1), respectively A first track (2.2) is vertical with the second track (3.1).
5. a kind of automated container terminal handling method according to claim 1, it is characterised in that: further include for described The transporting facility track (5) that horizontal trasportation equipment (4) is moved horizontally along second track (3.1), the transporting equipment rail Road (5) is arranged in parallel with second track (3.1).
6. a kind of automated container terminal handling method according to claim 1, it is characterised in that: every rests against institute The ship (7) of harbour is stated configured with several horizontal trasportation equipments (4).
CN201610527099.XA 2016-07-06 2016-07-06 A kind of automated container terminal handling method Active CN106115283B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610527099.XA CN106115283B (en) 2016-07-06 2016-07-06 A kind of automated container terminal handling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610527099.XA CN106115283B (en) 2016-07-06 2016-07-06 A kind of automated container terminal handling method

Publications (2)

Publication Number Publication Date
CN106115283A CN106115283A (en) 2016-11-16
CN106115283B true CN106115283B (en) 2019-04-19

Family

ID=57283245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610527099.XA Active CN106115283B (en) 2016-07-06 2016-07-06 A kind of automated container terminal handling method

Country Status (1)

Country Link
CN (1) CN106115283B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107244535A (en) * 2017-07-17 2017-10-13 佛山市诚嘉机电设备有限公司 Double-layer ceramic tile induction system
CN108382870B (en) * 2018-02-05 2019-04-19 青岛港国际股份有限公司 AGV passes in and out the optimization method and system in operation lane under gantry crane
CN108469749A (en) * 2018-04-03 2018-08-31 北京巨得力机电有限公司 A kind of container operation system and its control method
CN108861642A (en) * 2018-06-13 2018-11-23 中铁武汉勘察设计研究院有限公司 The operating system and method that molten iron through transport railway port station to the stockyard Gang Qu is unloaded
CN110255209A (en) * 2019-07-05 2019-09-20 上海振华重工(集团)股份有限公司 Transport vehicle and container transshipment system
CN110921342A (en) * 2019-12-16 2020-03-27 王静波 Automatic container port and construction and installation method
CN111776941B (en) * 2020-07-13 2021-12-21 福建省港航勘察设计院有限公司 Overall arrangement and loading and unloading process of three-dimensional automatic container wharf
CN112520338B (en) * 2020-12-17 2022-06-17 上海振华重工(集团)股份有限公司 Automatic storage yard, working method thereof and storage medium
CN114030906B (en) * 2021-11-01 2023-11-21 青岛港国际股份有限公司 Automatic wharf container loading and unloading system and loading and unloading method
CN113895974B (en) * 2021-11-02 2024-01-30 青岛海西重机有限责任公司 Circulating container horizontal transportation system and method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1346520A (en) * 1971-02-05 1974-02-13 Andersson L Loading and unloading installations for use with ships
JPS60242134A (en) * 1984-05-16 1985-12-02 Ishikawajima Harima Heavy Ind Co Ltd Container transfer device
JPH1053335A (en) * 1996-08-13 1998-02-24 Ishikawajima Harima Heavy Ind Co Ltd Container terminal
JPH11292290A (en) * 1998-04-14 1999-10-26 Ishikawajima Harima Heavy Ind Co Ltd Container terminal
CN101229883A (en) * 2008-01-24 2008-07-30 上海振华港口机械(集团)股份有限公司 Container terminal loading and unloading system
CN103010767A (en) * 2012-12-13 2013-04-03 武汉理工大学 Novel container handling system
CN103523679A (en) * 2013-10-14 2014-01-22 华电重工股份有限公司 Container loading and unloading system with double-layer sea-crossing trestle bridge
CN104108611A (en) * 2013-04-18 2014-10-22 天津港(集团)有限公司 Automated container wharf handling system and handling method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1346520A (en) * 1971-02-05 1974-02-13 Andersson L Loading and unloading installations for use with ships
JPS60242134A (en) * 1984-05-16 1985-12-02 Ishikawajima Harima Heavy Ind Co Ltd Container transfer device
JPH1053335A (en) * 1996-08-13 1998-02-24 Ishikawajima Harima Heavy Ind Co Ltd Container terminal
JPH11292290A (en) * 1998-04-14 1999-10-26 Ishikawajima Harima Heavy Ind Co Ltd Container terminal
CN101229883A (en) * 2008-01-24 2008-07-30 上海振华港口机械(集团)股份有限公司 Container terminal loading and unloading system
CN103010767A (en) * 2012-12-13 2013-04-03 武汉理工大学 Novel container handling system
CN104108611A (en) * 2013-04-18 2014-10-22 天津港(集团)有限公司 Automated container wharf handling system and handling method thereof
CN103523679A (en) * 2013-10-14 2014-01-22 华电重工股份有限公司 Container loading and unloading system with double-layer sea-crossing trestle bridge

Also Published As

Publication number Publication date
CN106115283A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN106115283B (en) A kind of automated container terminal handling method
CN101229883A (en) Container terminal loading and unloading system
CN112794096B (en) Automatic loading, unloading and stacking system and method for wharf container
CN112010053B (en) Three-dimensional automatic container terminal
CN108675156B (en) A kind of method for arranging of underground container cargo distribution ground handling system
CN204250737U (en) A kind of high density shift-forward type agility stores sorting system
CN109132610B (en) Automatic wharf loading and unloading system and method for single-box span yard crane
CN105621264B (en) Basin formula automated container terminal handling operation system and operational method
CN108002070B (en) Bridge approach type automatic container terminal loading and unloading operation system and operation method
Kim et al. New conceptual handling systems in container terminals
CN207737916U (en) Consolidating the load caching system and hopper store radio frequency
KR101298895B1 (en) Container terminal system
CN108792482A (en) A kind of dock container goods yard and its conveying device
WO2022061509A1 (en) Three-dimensional automated container wharf
CN109626004A (en) A kind of container terminal of three side water front and handling system and its working method
CN207876879U (en) A kind of approach bridge type automated container terminal handling operation system
CN110304469A (en) A kind of efficient movement system of water-land-water and method of container
CN112794109A (en) Direct taking, loading and unloading operation system and method for molten iron combined transport vehicle and ship at front edge of container terminal
CN201151567Y (en) Loading and unloading system for container pier
CN207810542U (en) A kind of container handling equipment
CN112794111A (en) Direct-taking continuous loading and unloading system and method for container molten iron combined transport vehicle and ship
CN112850230A (en) Three-dimensional continuous loading and unloading operation system and method for directly taking container vehicles and ships
CN112794110A (en) Direct-taking three-dimensional continuous loading and unloading operation system and method for container molten iron combined transport vehicle and ship
CN211109535U (en) Non-balanced type takes rail lift conveying equipment
CN105314408B (en) A kind of container terminal automation Orbital Transport Systems and operation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant