CN106050260A - Non-stop production reconstruction method for tower-type external shaft hoisting system - Google Patents

Non-stop production reconstruction method for tower-type external shaft hoisting system Download PDF

Info

Publication number
CN106050260A
CN106050260A CN201610649131.1A CN201610649131A CN106050260A CN 106050260 A CN106050260 A CN 106050260A CN 201610649131 A CN201610649131 A CN 201610649131A CN 106050260 A CN106050260 A CN 106050260A
Authority
CN
China
Prior art keywords
new
elevator
former
headframe
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610649131.1A
Other languages
Chinese (zh)
Other versions
CN106050260B (en
Inventor
陈兴
侯大德
杨家冕
肖益盖
汪亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority to CN201610649131.1A priority Critical patent/CN106050260B/en
Publication of CN106050260A publication Critical patent/CN106050260A/en
Application granted granted Critical
Publication of CN106050260B publication Critical patent/CN106050260B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B17/00Hoistway equipment

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses a non-stop production reconstruction method for a tower-type external shaft hoisting system. The method comprises the steps that a new shaft tower framework (9) is constructed on the periphery of an original shaft tower (1), the upper portion, exceeding the tower top of the original shaft tower (1), of the new shaft tower framework (9) is reconstructed to be a closed new shaft tower upper framework body (1'), and a new guide wheel support platform (19) and a new hoister support platform (20) are constructed in the new shaft tower upper framework body (1') from bottom to top; a new traveling crane (8'), a new hoister (2'), a new electronic control system (4') and a new guide wheel (3') are installed and adjusted; an original hoister (2) and an original guide wheel (3) are removed or moved in maintenance or holiday time, steel wire ropes (15) of the new hoister (2') are connected with a hoisting container (5), in this way, renovation and reconstruction of the hoisting system are completed, and using of the original hoister (2) is stopped. According to the non-stop production reformation method for the tower-type external shaft hoisting system, an external shaft multi-rope friction wheel hoister used in normal production can be replaced on the condition that non-stop production of the external shaft is achieved, upgrading and reconstruction are conducted on the hoisting system, and the economic effect is obvious.

Description

A kind of tower bright shaft hoisting system non-stop production reformation method
Technical field
The present invention relates to the remodeling method of a kind of bright shaft hoisting system, particularly relate to a kind of tower bright shaft hoisting system System remodeling method, can be at tower bright shaft hoisting system non-stop production reformations of underground mine such as iron and steel, coloured, gold, chemical industry, coals Middle application.
Background technology
Bright shaft hoisting is widely used in the underground mine of the industry such as iron and steel, coloured, gold, chemical industry, coal, wherein many ropes Friction pulley promotes, and can be divided into tower and console model lifting two kinds.
In China, there are many mines using frictional geared to promote, owing to the original elevator selected is less than normal, at pit shaft After extension, original elevator can not meet safety requirements;Some mine, owing to original design hoisting power is less than normal, along with life The development produced, need to strengthen hoisting power, then need change bigger skip bucket or single decker cage is replaced with two-deck(er) cage.Above Situation, all refers to change increasing elevator, the problem promoting system.But utilize existing technical method, if wanted Change elevator, then need pit shaft is stopped using a very long time, first existing equipment is removed, placing installation base the most again Plinth beam, installation elevator, 1 year at least off-time, more than 1 year at most.But reality is, most mine, its Lifting system is the project of primary importance in mine, it is impossible to stop production transformation for a long time, and therefore, bright vertical shaft multi rope winding seldom has renewal to change Situation about making, major part be all newly dig well cylinder be updated transformation, cause investment substantial increase.
Chinese patent CN103967503A discloses a kind of tower interior shaft and promotes system non-stop production reformation method, carries former Rising the L distance of the surface of machine chamber, one new lifting system improving machine chamber of new driving, in its underpart, excavation newly promotes system Directive wheel chamber, promotes on system directive wheel chamber bottom plate rock pillar new, utilizes the some new lifting systems of rock drill down Drilling Steel wire rope cord hole, and through with former elevator chamber top board, finally utilize maintenance or stop the not time, by former elevator and former guiding Wheel removes displacement, is connected by newly promoting system ropes cord hole and hoisting container by the steel wire rope newly promoting system improving machine, So, promoting system update and transformed, former elevator is stopped using.This patent can be right in the case of interior shaft does not stops production The normal interior shaft multi-rope friction hoist produced is changed, thus lifting system is carried out upgrading.But the method is uncomfortable Should be less than normal in the tower bright original lifting means of shaft hoisting system and need to change not the stopping of elevator to strengthen hoisting power Produce transformation.
Summary of the invention
The purpose of the present invention is aiming at current tower bright shaft hoisting system and causes original carrying to solve shaft stretch The equipment of liter is less than normal and needs to change elevator to strengthen hoisting power, but the one that can not stop production for a long time and propose is tower Bright shaft hoisting system non-stop production reformation method.
For realizing the above-mentioned purpose of the present invention, a kind of tower bright shaft hoisting system non-stop production reformation method of the present invention uses Techniques below scheme:
In former headframe building, be provided with former elevator, former directive wheel, former electric-control system and hoisting container, People's Bank of China's stair, elevator, Former driving, the framework platform in former headframe building is provided with large equipment hole for hoist, elevator installing hole, People's Bank of China's stair hole and lifting Steel wire rope passes through hole.Following steps are used to carry out non-stop production reformation:
1) needing between the tower bright shaft hoisting system normal production period of transformation, the L distance peripheral in former headframe building, newly construct One new headframe building framework, described new headframe building frame height is after beyond former headframe building roof certain altitude M, and top is made into Close new headframe portion's Framework Building upstairs, have from bottom to top in new headframe upstairs portion's Framework Building new directive wheel support platform, New elevator support platform.
The big part being provided with on framework platform in new directive wheel support platform, new elevator support platform and former headframe building Equipment hoisting hole, elevator installing hole, People's Bank of China's stair hole and boom hoist cable pass through the correspondence position up and down in hole, are respectively equipped with top Pass through hole in equipment hoisting hole, upper elevator installing hole, top People's Bank of China stair hole, top boom hoist cable.
Described L distance basis, former headframe building will not be produced destruction with new headframe building frame foundation and convenient construction is Principle, the smaller the better, and all directions L can take different value.
Described M distance is advisable with 0.5m~2m, former headframe building roof is carried out cutting operation determines for principle facilitating.
2), after at new headframe, upstairs portion's Framework Building is built up, former headframe building roof is installed with large equipment hole for hoist, elevator Hole, People's Bank of China's stair hole and boom hoist cable pass through hole correspondence position up and down cut, People's Bank of China's stair are continued up extension install To Shang Yan People's Bank of China stair position, described Shang Yan People's Bank of China stair are inclined and mounted on new directive wheel support platform, new elevator supports Between platform;Elevator is moved up by elevator installing hole, upper elevator installing hole respectively and is installed to new elevator and supports flat Upper shifting elevator is become on platform.
3), after above-mentioned work completes, new driving, new elevator and new electric-control system, the installation of new directive wheel, debugging are started; New driving is arranged on the top in new headframe portion's Framework Building upstairs, and new directive wheel is arranged in new directive wheel support platform, newly carries The machine of liter is arranged in new elevator support platform, and new electric-control system is arranged in new directive wheel support platform;
4) finally utilize maintenance or holiday time, former elevator and former directive wheel are removed displacement, by the steel wire of new elevator Rope and hoisting container connect, and so, promote system update and have transformed, and former elevator is stopped using.
The size of above-mentioned L, M does not limits, according to building and installing setting of safety, construction cost and installation space size Meter requires specifically to determine.
For making structure stress more reasonable, described new headframe building framework is to be combined by frame column, Vierendeel girder and tie-beam Constitute, frame column is vertically mounted on ground, and Vierendeel girder is horizontally arranged on frame column, tie-beam be horizontally arranged at frame column with Between former headframe building.If construction does not affect existing production, tie-beam can be crossed former headframe building and the framework of opposite side Beam connects.
Described new headframe building frame column, Vierendeel girder and the quantity of tie-beam, highly, position, specification, size etc. do not limit, The sequencing of part retrofit work does not limits.
After a kind of tower bright shaft hoisting system non-stop production reformation method of the present invention uses above technical scheme, have following Beneficial effect: in the case of bright vertical shaft does not stops production, the normal bright vertical shaft multi-rope friction hoist produced can be changed, thus Lifting system is carried out upgrading.
Main advantages of the present invention: avoid mine and can not stop production replacing lifting means because promoting bright vertical shaft, and have to New pick promotes pit shaft separately, or lifting system update transformation must stop production for a long time and affect the situation of mine economic profit, economical Effect is obvious.
Accompanying drawing explanation
Fig. 1 be a kind of tower bright shaft hoisting system non-stop production reformation method of the present invention the lifting system reform before and after section Schematic diagram;
Fig. 2 is the lifting system reform anterior-posterior plane schematic diagram of a kind of tower bright shaft hoisting system non-stop production reformation method of the present invention.
Reference is:
1-former headframe building;1 '-new headframe portion's Framework Building upstairs;The former elevator of 2-;2 '-new elevator;The former directive wheel of 3-; 3 '-new directive wheel;The former electric-control system of 4-;4 '-new electric-control system;5-hoisting container;6-protoplast's row stair;6 '-above prolong People's Bank of China's stair;7-elevator;7 '-above move elevator;The former driving of 8-;8 '-newly drive a vehicle;9-new headframe building framework;The former headframe of 10- Building roof;11-equipment hoisting hole;Equipment hoisting hole, 11 '-top;12-elevator installing hole;12 '-upper elevator installing hole; 13-People's Bank of China stair hole;13 '-top People's Bank of China stair hole;14-boom hoist cable passes through hole;14 '-top boom hoist cable leads to Row hole;15-steel wire rope;16-frame column;17-Vierendeel girder;18-tie-beam;19-new directive wheel support platform;20-newly carries Rise machine support platform.
Detailed description of the invention
For further describing the present invention, tower bright shaft hoisting system a kind of to the present invention with embodiment below in conjunction with the accompanying drawings Non-stop production reformation method is described in further details.
Before and after a kind of tower bright shaft hoisting system non-stop production reformation method of the present invention as shown in Figure 1 promotes the system reform Generalized section also combines Fig. 2 and finds out, a kind of tower bright shaft hoisting system non-stop production reformation method of the present invention, in former headframe building In 1, former elevator 2, former directive wheel 3, former electric-control system 4 and hoisting container 5, People's Bank of China's stair 6, elevator 7, former driving 8 are installed, It is provided with large equipment hole for hoist 11, elevator installing hole 12, People's Bank of China's stair hole 13 on framework platform in former headframe building 1 and promotes Steel wire rope passes through hole 14.Following steps are used to carry out non-stop production reformation:
1) needing between the tower bright shaft hoisting system normal production period of transformation, in the periphery in former headframe building 1, new construction one New headframe building framework 9, described new headframe building framework 9 height is after beyond former headframe building 1 roof, and the new well closed is made on top into High building upper frame building 1 ', interior has new directive wheel support platform 19 from bottom to top at new headframe portion's Framework Building 1 ' upstairs, newly carries Rise machine support platform 20.
Described new headframe building framework 9 is to be combined by frame column 16, Vierendeel girder 17 and tie-beam 18 to constitute, and frame column 16 hangs down Directly being arranged on ground, Vierendeel girder 17 is horizontally arranged on frame column 16, and tie-beam 18 is horizontally arranged at frame column 16 and Yuan Jing Between high building 1.If construction does not affect existing production, tie-beam 18 also can highly cross former headframe building 1 and right at certain Marginal frame beam 17 connects.
At new directive wheel support platform 19, new elevator support platform 20 and large equipment hole for hoist 11, elevator installing hole 12, People's Bank of China's stair hole 13 and boom hoist cable pass through the correspondence position up and down in hole 14, be respectively equipped with equipment hoisting hole, top 11 ', Upper elevator installing hole 12 ', top People's Bank of China stair hole 13 ', top boom hoist cable pass through hole 14 '.
2) by former headframe building roof 10 and large equipment hole for hoist 11, elevator installing hole 12, People's Bank of China's stair hole 13 and lifting Steel wire rope pass through hole 14 correspondence position up and down cut, People's Bank of China's stair 6 are continued up extension and are installed to Shang Yan People's Bank of China stair 6 ' Position, described Shang Yan People's Bank of China stair 6 ' are inclined and mounted between new directive wheel support platform 19, new elevator support platform 20; Elevator 7 is moved up be installed in new elevator support platform by elevator installing hole 12, upper elevator installing hole 12 ' respectively Become upper shifting elevator 7 '.
3), after above-mentioned work completes, new driving 8 ', new elevator 2 ' and new electric-control system 4 ', the peace of new directive wheel 3 ' are started Dress, debugging;New driving 8 ' is arranged on the new headframe top that upstairs portion's Framework Building 1 ' is interior, and new directive wheel 3 ' is arranged on new directive wheel and props up On support platform 19, new elevator 2 ' is arranged in new elevator support platform 20, and new electric-control system 4 ' is arranged on new directive wheel and props up On support platform 19;
4) finally utilize maintenance or holiday time, former elevator 2 and former directive wheel 3 are removed displacement, by new elevator 2 ' Steel wire rope 15 and hoisting container 5 connect, and so, promote system update and have transformed, and former elevator 2 is stopped using.

Claims (3)

1. a tower bright shaft hoisting system non-stop production reformation method, in former headframe building (1), be provided with former elevator (2), Former directive wheel (3), former electric-control system (4) and hoisting container (5), People's Bank of China's stair (6), elevator (7), former driving (8), at former headframe Framework platform in building (1) is provided with large equipment hole for hoist (11), elevator installing hole (12), People's Bank of China's stair hole (13) and promotes Steel wire rope passes through hole (14), it is characterised in that use following steps to carry out non-stop production reformation:
1) needing between the tower bright shaft hoisting system normal production period of transformation, in the periphery of former headframe building (1), newly constructing one Individual new headframe building framework (9), described new headframe building framework (9) height is after beyond former headframe building (1) roof, and envelope is made on top into The new headframe closed portion's Framework Building (1 ') upstairs, has new directive wheel in new headframe upstairs portion's Framework Building (1 ') from bottom to top and supports Platform (19), new elevator support platform (20);
Install with large equipment hole for hoist (11), elevator in new directive wheel support platform (19), new elevator support platform (20) Hole (12), People's Bank of China's stair hole (13) and boom hoist cable pass through the correspondence position up and down in hole (14), are respectively equipped with top equipment and hang Dress hole (11 '), upper elevator installing hole (12 '), top People's Bank of China stair hole (13 '), top boom hoist cable pass through hole (14 ');
2) by former headframe building roof (10) and large equipment hole for hoist (11), elevator installing hole (12), People's Bank of China's stair hole (13) and Boom hoist cable pass through hole (14) correspondence position up and down cut, People's Bank of China's stair (6) are continued up extension and are installed to prolong people Row stair (6 ') position, described Shang Yan People's Bank of China stair (6 ') is inclined and mounted on new directive wheel support platform (19), new elevator Between support platform (20);Elevator (7) is moved up by elevator installing hole (12), upper elevator installing hole (12 ') respectively It is installed in new elevator support platform become upper shifting elevator (7 ');
3), after above-mentioned work completes, new driving (8 '), new elevator (2 ') and new electric-control system (4 '), new directive wheel (3 ') are started Installation, debugging;New driving (8 ') is arranged on the top in new headframe portion's Framework Building (1 ') upstairs, and new directive wheel (3 ') is arranged on In new directive wheel support platform (19), new elevator (2 ') is arranged on new elevator support platform (20), new electric-control system (4 ') are arranged on new directive wheel support platform (19);
4) finally utilize maintenance or holiday time, former elevator (2) and former directive wheel (3) are removed displacement, by new elevator The steel wire rope (15) of (2 ') and hoisting container (5) connect, and so, promote system update and have transformed, and former elevator (2) stops making With.
2. a kind of tower bright shaft hoisting system non-stop production reformation method as claimed in claim 1, it is characterised in that: described New headframe building framework (9) is to be combined by frame column (16), Vierendeel girder (17) and tie-beam (18) to constitute, and frame column (16) is vertically pacified Being contained on ground, Vierendeel girder (17) is horizontally arranged on frame column (16), tie-beam (18) be horizontally arranged at frame column (16) with Between former headframe building (1).
A kind of tower bright shaft hoisting the most as claimed in claim 1 changes the non-stop production reformation method that console model promotes, its feature It is: described new headframe building framework (9) is to be combined by frame column (16), Vierendeel girder (17) and tie-beam (18) to constitute, framework Post (16) is vertically mounted on ground, and Vierendeel girder (17) is horizontally arranged on frame column (16), and tie-beam (18) crosses former headframe The Vierendeel girder (17) of building (1) and opposite side connects.
CN201610649131.1A 2016-08-10 2016-08-10 A kind of tower bright shaft hoisting system non-stop production reformation method Active CN106050260B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610649131.1A CN106050260B (en) 2016-08-10 2016-08-10 A kind of tower bright shaft hoisting system non-stop production reformation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610649131.1A CN106050260B (en) 2016-08-10 2016-08-10 A kind of tower bright shaft hoisting system non-stop production reformation method

Publications (2)

Publication Number Publication Date
CN106050260A true CN106050260A (en) 2016-10-26
CN106050260B CN106050260B (en) 2018-11-16

Family

ID=57481815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610649131.1A Active CN106050260B (en) 2016-08-10 2016-08-10 A kind of tower bright shaft hoisting system non-stop production reformation method

Country Status (1)

Country Link
CN (1) CN106050260B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109353925A (en) * 2018-11-12 2019-02-19 中国恩菲工程技术有限公司 Console mode head sheave chamber and console mode lifting system
CN113833471A (en) * 2021-09-06 2021-12-24 中国华冶科工集团有限公司 Method for transforming skip well into basic construction mixed well
CN114476907A (en) * 2022-02-11 2022-05-13 中钢集团马鞍山矿山研究总院股份有限公司 Non-stop production transformation method for changing single-rope winding type lifting system of exposed shaft into multi-rope floor type lifting system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100984883B1 (en) * 2009-05-22 2010-10-01 위성배 The construction method of shield tunneling
CN103964284A (en) * 2014-05-07 2014-08-06 中钢集团马鞍山矿山研究院有限公司 Non-production-stopping modifying method for hoisting system with multi-rope friction pulley for hoisting internal shaft
CN103967503A (en) * 2014-05-07 2014-08-06 中钢集团马鞍山矿山研究院有限公司 Production-stop-free transformation method for tower type interior shaft elevating system
CN103964285A (en) * 2014-05-07 2014-08-06 中钢集团马鞍山矿山研究院有限公司 Interior shaft hoisting system on-line improvement method for changing multi-rope floor type into tower type
WO2014161379A1 (en) * 2013-04-03 2014-10-09 中国矿业大学 Guide rail rope deflection inhibition mechanism and method for parallel soft cable suspension system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100984883B1 (en) * 2009-05-22 2010-10-01 위성배 The construction method of shield tunneling
WO2014161379A1 (en) * 2013-04-03 2014-10-09 中国矿业大学 Guide rail rope deflection inhibition mechanism and method for parallel soft cable suspension system
CN103964284A (en) * 2014-05-07 2014-08-06 中钢集团马鞍山矿山研究院有限公司 Non-production-stopping modifying method for hoisting system with multi-rope friction pulley for hoisting internal shaft
CN103967503A (en) * 2014-05-07 2014-08-06 中钢集团马鞍山矿山研究院有限公司 Production-stop-free transformation method for tower type interior shaft elevating system
CN103964285A (en) * 2014-05-07 2014-08-06 中钢集团马鞍山矿山研究院有限公司 Interior shaft hoisting system on-line improvement method for changing multi-rope floor type into tower type

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109353925A (en) * 2018-11-12 2019-02-19 中国恩菲工程技术有限公司 Console mode head sheave chamber and console mode lifting system
CN113833471A (en) * 2021-09-06 2021-12-24 中国华冶科工集团有限公司 Method for transforming skip well into basic construction mixed well
CN113833471B (en) * 2021-09-06 2023-08-22 中国华冶科工集团有限公司 Method for reforming skip well into basic construction mixing well
CN114476907A (en) * 2022-02-11 2022-05-13 中钢集团马鞍山矿山研究总院股份有限公司 Non-stop production transformation method for changing single-rope winding type lifting system of exposed shaft into multi-rope floor type lifting system
CN114476907B (en) * 2022-02-11 2024-01-12 中钢集团马鞍山矿山研究总院股份有限公司 Non-stop production reconstruction method for open shaft lifting system

Also Published As

Publication number Publication date
CN106050260B (en) 2018-11-16

Similar Documents

Publication Publication Date Title
CN106241579B (en) A kind of tower bright shaft hoisting changes the non-stop production reformation method of console mode lifting
CN110552703B (en) Duct piece mounting system applied to shaft construction
CN106050260B (en) A kind of tower bright shaft hoisting system non-stop production reformation method
CN103696774A (en) Development method of blind shaft frame for surface and underground parallel construction
CN103964285B (en) A kind of many rope floor types change tower interior shaft elevator system non-stop production reformation method
CN205222535U (en) Dismounting device of tower machine balancing weight piece
CN203794089U (en) Chain bucket type continuous elevator system
CN206367981U (en) It is a kind of to facilitate the hanging beam mechanism that separating component is lifted in shield auger
CN103967503B (en) A kind of tower interior shaft Hoisting System non-stop production reformation method
CN103964284B (en) Frictional geared promotes interior shaft elevator system non-stop production reformation method
CN104196446A (en) Six-arm full hydraulic anchor rod and anchor cable drill carriage used in cooperation with continuous miner
CN204024469U (en) The all-hydraulic anchor shaft anchor cable drill carriage of six arms that a kind of supporting continuous miner uses
CN206384699U (en) A kind of tower bright shaft hoisting system of non-stop production reformation
CN107288640B (en) A kind of nothing is surely restricted self-supporting modularization vertical shaft driving and masonry construction device
CN103277104A (en) Sinking platform in-well hanging equipment and method
CN110107302A (en) A kind of multi-functional trolley suitable for drill bursting construction
CN205892406U (en) Elevator well structure
CN105298500B (en) The method of headframe is changed to by steel headframe suitable for underground mining lifting system
CN210152652U (en) Multifunctional trolley suitable for drilling and blasting construction
CN205444137U (en) Pressure regulating well construction operation platform
CN209567749U (en) A kind of single roller multiple spot lift for the method swing type shaft excavation machine that sinks
CN103206232A (en) Synchronous pre-support and anchorage device for follow-up heading machines
CN201714388U (en) Rock drill bracket special for digging a tunnel
CN203212227U (en) Suspending and fixing device of underground electric hoist
CN207390908U (en) A kind of concrete transportation dispatching device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Patentee after: MAANSHAN Mine Research Institute Co.,Ltd.

Address before: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd.