CN106050260B - A kind of tower bright shaft hoisting system non-stop production reformation method - Google Patents

A kind of tower bright shaft hoisting system non-stop production reformation method Download PDF

Info

Publication number
CN106050260B
CN106050260B CN201610649131.1A CN201610649131A CN106050260B CN 106050260 B CN106050260 B CN 106050260B CN 201610649131 A CN201610649131 A CN 201610649131A CN 106050260 B CN106050260 B CN 106050260B
Authority
CN
China
Prior art keywords
new
elevator
former
headframe
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610649131.1A
Other languages
Chinese (zh)
Other versions
CN106050260A (en
Inventor
陈兴
侯大德
杨家冕
肖益盖
汪亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority to CN201610649131.1A priority Critical patent/CN106050260B/en
Publication of CN106050260A publication Critical patent/CN106050260A/en
Application granted granted Critical
Publication of CN106050260B publication Critical patent/CN106050260B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B17/00Hoistway equipment

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses a kind of tower bright shaft hoisting system non-stop production reformation methods, in former headframe building(1)Periphery, newly construct a new headframe building frame(9), new headframe building frame(9)Height is beyond former headframe building(1)After roof, top is changed to closed new headframe portion's Framework Building upstairs(1′), and new directive wheel support platform is had from bottom to top(19), new elevator support platform(20);Installation, the new driving of debugging(8′), new elevator(2′)And new electric-control system(4′), new directive wheel(3′);Using maintenance or holiday time, by former elevator(2)With former directive wheel(3)Displacement is removed, by new elevator(2′)Wirerope(15)And hoisting container(5)Connection, the completion in this way, lifting system renovates, former elevator(2)It stops using.The present invention can replace the bright vertical shaft multi-rope friction hoist normally produced in the case where bright vertical shaft does not stop production, to carry out upgrading to lifting system, economic effect is obvious.

Description

A kind of tower bright shaft hoisting system non-stop production reformation method
Technical field
The present invention relates to a kind of remodeling methods of bright shaft hoisting system, more particularly to a kind of tower bright shaft hoisting system System remodeling method, can be in the tower bright shaft hoisting system non-stop production reformation of the underground mines such as steel, coloured, gold, chemical industry, coal Middle application.
Background technique
Bright shaft hoisting is widely used in the underground mine of the industries such as steel, coloured, gold, chemical industry, coal, wherein more ropes Friction pulley is promoted, and can be divided into tower and console mode and be promoted two kinds.
In China, there are many mines promoted using frictional geared, since the elevator selected originally is less than normal, in pit shaft After extension, original elevator is no longer satisfied safety requirements;Some mines, since original design hoisting power is less than normal, with life The development of production, need to increase hoisting power, then need replacing bigger skip bucket or single decker cage is replaced with two-deck(er) cage.More than Situation all refers to the problem of needing to change increasing elevator, promoting system.But existing technical method is utilized, if wanted Elevator is replaced, then needs to stop using pit shaft into a very long time, first removes existing equipment, then placing installation base again Plinth beam, installation elevator, the off-time few then 1 year, more then 1 years or more.But reality is, most mine, Lifting system is the project of primary importance in mine, and cannot stop production transformation for a long time, and therefore, the bright few updates of vertical shaft multi rope winding change The case where making, most of is all that cylinder of newly digging well is updated transformation, causes investment substantial increase.
Chinese patent CN103967503A discloses a kind of tower interior shaft lifting system non-stop production reformation method, mentions in original The L distance of the surface of machine chamber is risen, a new lifting system elevator chamber is newly tunneled, excavates new lifting system in its underpart Directive wheel chamber utilizes rock drill several new lifting systems of Drilling down on new lifting system directive wheel chamber bottom plate rock pillar Wirerope cord hole, and be oriented to former elevator and original finally using overhauling or stopping the not time with former elevator chamber top plate perforation Wheel removes displacement, and the wirerope of new lifting system elevator is connected by new lifting system wirerope cord hole with hoisting container, The completion in this way, lifting system renovates, former elevator are stopped using.The patent can be right in the case where interior shaft does not stop production The interior shaft multi-rope friction hoist replacement normally produced, to carry out upgrading to lifting system.But this method is uncomfortable Should be less than normal in the tower bright original lifting means of shaft hoisting system and not stopping for elevator be needed replacing in order to increase hoisting power Produce transformation.
Summary of the invention
The purpose of the present invention is to current tower bright shaft hoisting systems to lead to original mention to solve shaft stretch Liter equipment is less than normal and needs replacing elevator to increase hoisting power, but the one kind that cannot be stopped production and propose for a long time is tower Bright shaft hoisting system non-stop production reformation method.
Above-mentioned purpose to realize the present invention, a kind of tower bright shaft hoisting system non-stop production reformation method of the present invention use Following technical scheme:
In former headframe building, former elevator, former directive wheel, former electric-control system and hoisting container, pedestrian stair, electricity are installed Ladder, former driving, be equipped on the framework platform in former headframe building large equipment hole for hoist, elevator mounting hole, pedestrian stair hole and Boom hoist cable passage hole.Non-stop production reformation is carried out using following steps:
1)Between needing the tower bright shaft hoisting system normal production period be transformed, L distance in former headframe building periphery, newly One new headframe building frame of construction, the new headframe building frame height is after beyond former headframe building roof certain altitude M, top It is changed to closed new headframe portion's Framework Building upstairs, it is flat to have new directive wheel support from bottom to top in new headframe upstairs portion's Framework Building Platform, new elevator support platform.
The big part being equipped on the framework platform in new directive wheel support platform, new elevator support platform and former headframe building The corresponding position up and down in the current hole of equipment hoisting hole, elevator mounting hole, pedestrian stair hole and boom hoist cable, is respectively equipped with top Equipment hoisting hole, upper elevator mounting hole, top pedestrian stair hole, the current hole of top boom hoist cable.
The L distance, which will not generate former headframe building basis with new headframe building frame foundation, to be destroyed and facilitates the construction to be Principle, it is the smaller the better, and all directions L can take different value.
The M distance is advisable with 0.5m~2m, is determined to former headframe building roof progress cutting operation as principle using facilitating.
2)After in new headframe, upstairs portion's Framework Building is built up, former headframe building roof and large equipment hole for hoist, elevator are installed The corresponding position up and down in the current hole of hole, pedestrian stair hole and boom hoist cable is cut, and pedestrian stair is continued up extension installation To above prolonging pedestrian stair position, it is described on prolong pedestrian stair and be tiltedly mounted on new directive wheel support platform, the support of new elevator Between platform;Elevator is passed through to elevator mounting hole respectively, upper elevator mounting hole moves up that be installed to the support of new elevator flat Become moving up elevator on platform.
3)After the completion of above-mentioned work, start new driving, new elevator and new electric-control system, the installation of new directive wheel, debugging; New driving is mounted on top of the new headframe upstairs in portion's Framework Building, and new directive wheel is mounted in new directive wheel support platform, newly mentions The machine of liter is mounted in new elevator support platform, and new electric-control system is mounted in new directive wheel support platform;
4)Finally using maintenance or holiday time, former elevator and former directive wheel are removed into displacement, by new elevator Wirerope is connected with hoisting container, and the completion in this way, lifting system renovates, former elevator is stopped using.
The size of above-mentioned L, M are unlimited, according to construction with safety is installed, construction cost and equipment installation space size are set Meter requires specific determine.
To keep structure stress more reasonable, the new headframe building frame is combined by frame column, Vierendeel girder and attachment beam Constitute, frame column is vertically mounted on ground, and Vierendeel girder is horizontally arranged on frame column, attachment beam be horizontally arranged at frame column with Between former headframe building.If construction does not influence existing production, attachment beam can be crossed to the frame in former headframe building and opposite side Beam connects.
Quantity, height, position, specification, the size of new headframe building frame column, Vierendeel girder and attachment beam etc. are unlimited, The sequencing of part retrofit work is unlimited.
A kind of tower bright shaft hoisting system non-stop production reformation method of the invention after the above technical solution is adopted, has following Beneficial effect:The bright vertical shaft multi-rope friction hoist normally produced can be replaced in the case where bright vertical shaft does not stop production, thus Upgrading is carried out to lifting system.
Main advantages of the present invention:It avoids mine and replaces lifting means because the bright vertical shaft of promotion cannot stop production, and have to Separately newly pick promotes pit shaft or lifting system renovates necessary the case where halt production influences mine economic profit for a long time, economical Effect is obvious.
Detailed description of the invention
Fig. 1 is a kind of lifting system transformation front and back section of tower bright shaft hoisting system non-stop production reformation method of the invention Schematic diagram;
Fig. 2 is a kind of lifting system transformation anterior-posterior plane of tower bright shaft hoisting system non-stop production reformation method of the invention Schematic diagram.
Appended drawing reference is:
1- original headframe building;1 '-new headframe upstairs portion's Framework Building;2- original elevator;2 '-new elevators;3- original guiding Wheel;3 '-new directive wheels;4- original electric-control system;4 '-new electric-control systems;5- hoisting container;6- original pedestrian stair;On 6 '- Prolong pedestrian stair;7- elevator;7 '-move up elevator;The driving of 8- original;8 '-new drivings;The new headframe building frame of 9-;10- original well High building roof;11- equipment hoisting hole;11 '-tops equipment hoisting hole;12- elevator mounting hole;The installation of 12 '-upper elevators Hole;13- pedestrian stair hole;13 '-tops pedestrian stair hole;14- boom hoist cable passage hole;14 '-tops promote steel wire The current hole of rope;15- wirerope;16- frame column;17- Vierendeel girder;18- attachment beam;The new directive wheel support platform of 19-;20- New elevator support platform.
Specific embodiment
To further describe the present invention, with reference to the accompanying drawings and examples to a kind of tower bright shaft hoisting system of the invention Non-stop production reformation method is described in further details.
A kind of tower bright shaft hoisting system non-stop production reformation method lifting system transformation front and back of the present invention as shown in Figure 1 Diagrammatic cross-section simultaneously combines Fig. 2 to find out, a kind of tower bright shaft hoisting system non-stop production reformation method of the present invention, in former headframe building In 1, former elevator 2, former directive wheel 3, former electric-control system 4 and hoisting container 5, pedestrian stair 6, elevator 7, former driving 8 are installed, It is equipped with large equipment hole for hoist 11, elevator mounting hole 12, pedestrian stair hole 13 on the framework platform in former headframe building 1 and is promoted Wirerope passage hole 14.Non-stop production reformation is carried out using following steps:
1)It is new to construct in the periphery in former headframe building 1 between the tower bright shaft hoisting system normal production period for needing to be transformed One new headframe building frame 9, after beyond 1 roof of former headframe building, top is changed to closed 9 height of new headframe building frame New headframe upstairs portion's Framework Building 1 ', new headframe upstairs portion's Framework Building 1 ' it is interior have from bottom to top new directive wheel support platform 19, New elevator support platform 20.
The new headframe building frame 9 is made of the combination of frame column 16, Vierendeel girder 17 and attachment beam 18, and frame column 16 hangs down It is directly mounted on ground, Vierendeel girder 17 is horizontally arranged on frame column 16, and attachment beam 18 is horizontally arranged at frame column 16 and Yuan Jing Between high building 1.If construction does not influence existing production, attachment beam 18 can also highly cross former headframe building 1 and right at some Marginal frame beam 17 connects.
In new directive wheel support platform 19, new elevator support platform 20 and large equipment hole for hoist 11, elevator mounting hole 12, the corresponding position up and down in the current hole 14 of pedestrian stair hole 13 and boom hoist cable, be respectively equipped with top equipment hoisting hole 11 ', Upper elevator mounting hole 12 ', top pedestrian stair hole 13 ', the current hole 14 ' of top boom hoist cable.
2)By former headframe building roof 10 and large equipment hole for hoist 11, elevator mounting hole 12, pedestrian stair hole 13 and promotion The corresponding position up and down in the current hole 14 of wirerope is cut, and pedestrian stair 6 is continued up extension and is installed to and prolongs pedestrian stair 6 ' Position, it is described on prolong pedestrian stair 6 ' and be tiltedly mounted between new directive wheel support platform 19, new elevator support platform 20; Elevator 7 is moved up and is installed in new elevator support platform by elevator mounting hole 12, upper elevator mounting hole 12 ' respectively Become moving up elevator 7 '.
3)After the completion of above-mentioned work, start the peace of new driving 8 ', new elevator 2 ' and new electric-control system 4 ', new directive wheel 3 ' Dress, debugging;New driving 8 ' is mounted on the new headframe interior top of portion's Framework Building 1 ' upstairs, and new directive wheel 3 ' is mounted on new directive wheel branch It supports on platform 19, new elevator 2 ' is mounted in new elevator support platform 20, and new electric-control system 4 ' is mounted on new directive wheel branch It supports on platform 19;
4)Finally using maintenance or holiday time, former elevator 2 and former directive wheel 3 are removed into displacement, by new elevator 2 ' wirerope 15 and hoisting container 5 connection, the completion in this way, lifting system renovates, former elevator 2 are stopped using.

Claims (2)

1. a kind of tower bright shaft hoisting system non-stop production reformation method, in former headframe building (1), be equipped with former elevator (2), Former directive wheel (3), former electric-control system (4) and hoisting container (5), pedestrian stair (6), elevator (7), former driving (8), in former headframe Framework platform in building (1) is equipped with large equipment hole for hoist (11), elevator mounting hole (12), pedestrian stair hole (13) and is promoted Wirerope is current hole (14), it is characterised in that carries out non-stop production reformation using following steps:
1) between needing the tower bright shaft hoisting system normal production period be transformed, in the periphery of former headframe building (1), one is newly constructed A new headframe building frame (9), for the new headframe building frame (9) highly after beyond former headframe building (1) roof, top is changed to envelope The new headframe closed upstairs portion's Framework Building (1 ') has new directive wheel support from bottom to top in new headframe upstairs portion's Framework Building (1 ') Platform (19), new elevator support platform (20);
The new headframe building frame (9) is made of the combination of frame column (16), Vierendeel girder (17) and attachment beam (18), frame column (16) it is vertically mounted on ground, Vierendeel girder (17) is horizontally arranged on frame column (16), and attachment beam (18) is horizontally arranged at frame Between trestle (16) and former headframe building (1);
It is installed in new directive wheel support platform (19), new elevator support platform (20) and large equipment hole for hoist (11), elevator The corresponding position up and down of hole (12), pedestrian stair hole (13) and boom hoist cable current hole (14), is respectively equipped with top equipment and hangs Dress hole (11 '), upper elevator mounting hole (12 '), top pedestrian stair hole (13 '), top boom hoist cable are current hole (14 ');
2) by former headframe building roof (10) and large equipment hole for hoist (11), elevator mounting hole (12), pedestrian stair hole (13) and The corresponding position up and down of boom hoist cable current hole (14) is cut, and pedestrian stair (6) is continued up extension and is installed to and prolongs people Row stair (6 ') position, it is described on prolong pedestrian stair (6 ') and be tiltedly mounted on new directive wheel support platform (19), new elevator Between support platform (20);Elevator (7) is moved up by elevator mounting hole (12), upper elevator mounting hole (12 ') respectively Being installed to becomes moving up elevator (7 ') in new elevator support platform;
3) above-mentioned steps 1), after the completion of step 2) work, start new driving (8 '), new elevator (2 ') and new electric-control system Installation, the debugging of (4 '), new directive wheel (3 ');New driving (8 ') is mounted on top of the new headframe upstairs in portion's Framework Building (1 '), New directive wheel (3 ') is mounted on new directive wheel support platform (19), and new elevator (2 ') is mounted on new elevator support platform (20) on, new electric-control system (4 ') is mounted on new directive wheel support platform (19);
4) finally using maintenance or holiday time, former elevator (2) and former directive wheel (3) are removed into displacement, by new elevator The wirerope (15) and hoisting container (5) of (2 ') connect, the completion in this way, lifting system renovates, and former elevator (2) stops making With.
2. a kind of tower bright shaft hoisting system non-stop production reformation method, in former headframe building (1), be equipped with former elevator (2), Former directive wheel (3), former electric-control system (4) and hoisting container (5), pedestrian stair (6), elevator (7), former driving (8), in former headframe Framework platform in building (1) is equipped with large equipment hole for hoist (11), elevator mounting hole (12), pedestrian stair hole (13) and is promoted Wirerope is current hole (14), it is characterised in that carries out non-stop production reformation using following steps:
1) between needing the tower bright shaft hoisting system normal production period be transformed, in the periphery of former headframe building (1), one is newly constructed A new headframe building frame (9), for the new headframe building frame (9) highly after beyond former headframe building (1) roof, top is changed to envelope The new headframe closed upstairs portion's Framework Building (1 ') has new directive wheel support from bottom to top in new headframe upstairs portion's Framework Building (1 ') Platform (19), new elevator support platform (20);
The new headframe building frame (9) is made of the combination of frame column (16), Vierendeel girder (17) and attachment beam (18), frame column (16) it is vertically mounted on ground, Vierendeel girder (17) is horizontally arranged on frame column (16), and attachment beam (18) crosses former headframe building (1) connect with the Vierendeel girder of opposite side (17);
It is installed in new directive wheel support platform (19), new elevator support platform (20) and large equipment hole for hoist (11), elevator The corresponding position up and down of hole (12), pedestrian stair hole (13) and boom hoist cable current hole (14), is respectively equipped with top equipment and hangs Dress hole (11 '), upper elevator mounting hole (12 '), top pedestrian stair hole (13 '), top boom hoist cable are current hole (14 ');
2) by former headframe building roof (10) and large equipment hole for hoist (11), elevator mounting hole (12), pedestrian stair hole (13) and The corresponding position up and down of boom hoist cable current hole (14) is cut, and pedestrian stair (6) is continued up extension and is installed to and prolongs people Row stair (6 ') position, it is described on prolong pedestrian stair (6 ') and be tiltedly mounted on new directive wheel support platform (19), new elevator Between support platform (20);Elevator (7) is moved up by elevator mounting hole (12), upper elevator mounting hole (12 ') respectively Being installed to becomes moving up elevator (7 ') in new elevator support platform;
3) above-mentioned steps 1), after the completion of step 2) work, start new driving (8 '), new elevator (2 ') and new electric-control system Installation, the debugging of (4 '), new directive wheel (3 ');New driving (8 ') is mounted on top of the new headframe upstairs in portion's Framework Building (1 '), New directive wheel (3 ') is mounted on new directive wheel support platform (19), and new elevator (2 ') is mounted on new elevator support platform (20) on, new electric-control system (4 ') is mounted on new directive wheel support platform (19);
4) finally using maintenance or holiday time, former elevator (2) and former directive wheel (3) are removed into displacement, by new elevator The wirerope (15) and hoisting container (5) of (2 ') connect, the completion in this way, lifting system renovates, and former elevator (2) stops making With.
CN201610649131.1A 2016-08-10 2016-08-10 A kind of tower bright shaft hoisting system non-stop production reformation method Active CN106050260B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610649131.1A CN106050260B (en) 2016-08-10 2016-08-10 A kind of tower bright shaft hoisting system non-stop production reformation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610649131.1A CN106050260B (en) 2016-08-10 2016-08-10 A kind of tower bright shaft hoisting system non-stop production reformation method

Publications (2)

Publication Number Publication Date
CN106050260A CN106050260A (en) 2016-10-26
CN106050260B true CN106050260B (en) 2018-11-16

Family

ID=57481815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610649131.1A Active CN106050260B (en) 2016-08-10 2016-08-10 A kind of tower bright shaft hoisting system non-stop production reformation method

Country Status (1)

Country Link
CN (1) CN106050260B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109353925A (en) * 2018-11-12 2019-02-19 中国恩菲工程技术有限公司 Console mode head sheave chamber and console mode lifting system
CN113833471B (en) * 2021-09-06 2023-08-22 中国华冶科工集团有限公司 Method for reforming skip well into basic construction mixing well
CN114476907B (en) * 2022-02-11 2024-01-12 中钢集团马鞍山矿山研究总院股份有限公司 Non-stop production reconstruction method for open shaft lifting system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100984883B1 (en) * 2009-05-22 2010-10-01 위성배 The construction method of shield tunneling
CN103183034B (en) * 2013-04-03 2015-08-19 中国矿业大学 Parallel flexible cable suspension system guide rail rope deflection restraining mechanism and method
CN103964284B (en) * 2014-05-07 2015-09-09 中钢集团马鞍山矿山研究院有限公司 Frictional geared promotes interior shaft elevator system non-stop production reformation method
CN103967503B (en) * 2014-05-07 2016-02-24 中钢集团马鞍山矿山研究院有限公司 A kind of tower interior shaft Hoisting System non-stop production reformation method
CN103964285B (en) * 2014-05-07 2015-09-09 中钢集团马鞍山矿山研究院有限公司 A kind of many rope floor types change tower interior shaft elevator system non-stop production reformation method

Also Published As

Publication number Publication date
CN106050260A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN104963301B (en) The dilatory translation downward putting device and method removed for pier top beam section and bridge pier
CN106050260B (en) A kind of tower bright shaft hoisting system non-stop production reformation method
CN106241579B (en) A kind of tower bright shaft hoisting changes the non-stop production reformation method of console mode lifting
CN104632088A (en) Petroleum drilling machine tower-shaped derrick sleeving mounting method
CN103696774A (en) Development method of blind shaft frame for surface and underground parallel construction
CN205222535U (en) Dismounting device of tower machine balancing weight piece
CN103964285B (en) A kind of many rope floor types change tower interior shaft elevator system non-stop production reformation method
CN103967503B (en) A kind of tower interior shaft Hoisting System non-stop production reformation method
CN103964284B (en) Frictional geared promotes interior shaft elevator system non-stop production reformation method
CN104612391B (en) Construction of prevention work platform for skyscraper
CN206384699U (en) A kind of tower bright shaft hoisting system of non-stop production reformation
CN206667458U (en) The constructing device of vestibule system steel structure girder
CN107288640B (en) A kind of nothing is surely restricted self-supporting modularization vertical shaft driving and masonry construction device
CN110748347B (en) Rapid installation method for ultra-deep vertical shaft equipment
CN109339399B (en) Sectional construction method of steel structure in elevator hoistway
CN204492830U (en) The supporting job platform of a kind of colliery driving suspension device
CN205892406U (en) Elevator well structure
CN202390106U (en) Lifting hook portal crane easy to maintain
CN105298500B (en) The method of headframe is changed to by steel headframe suitable for underground mining lifting system
CN202465100U (en) Single-beam gantry crane with double V-shaped supporting legs
CN205444137U (en) Pressure regulating well construction operation platform
CN209567749U (en) A kind of single roller multiple spot lift for the method swing type shaft excavation machine that sinks
CN209337920U (en) It is a kind of for drop shaft, the interim lift headframe of ore storage bin
CN208830688U (en) External wall of high-rise building maintenance device
CN102887415B (en) Elevator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Patentee after: MAANSHAN Mine Research Institute Co.,Ltd.

Address before: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd.