CN106012783A - Double-layer stress absorption band integrated construction train - Google Patents
Double-layer stress absorption band integrated construction train Download PDFInfo
- Publication number
- CN106012783A CN106012783A CN201610559363.8A CN201610559363A CN106012783A CN 106012783 A CN106012783 A CN 106012783A CN 201610559363 A CN201610559363 A CN 201610559363A CN 106012783 A CN106012783 A CN 106012783A
- Authority
- CN
- China
- Prior art keywords
- absorption band
- stress absorption
- valve
- temperature sensor
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/06—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Machines (AREA)
Abstract
The invention belongs to the field of road engineering, and relates to a double-layer stress absorption band integrated construction train. The double-layer stress absorption band integrated construction train comprises a train body and a carriage which is dragged by the train body; a first stress absorption band preparation and pavement device, a second stress absorption band preparation and pavement device and a compacting device are arranged in the carriage in the axial direction of the carriage in sequence; a data acquisition and control device which is connected with the first stress absorption band preparation and pavement device and the second stress absorption band preparation and pavement device is also arranged in the carriage; the data acquisition and control device comprises a control box; a controller, and a heating control chip and a switch driver which are respectively connected with the controller are arranged in the control box. The double-layer stress absorption band integrated construction train has the advantages that the structure is simple, the design is reasonable, the use and operation are convenient, the use effect is good, the preparation and pavement of a double-layer stress absorption band can be completed conveniently and quickly, and the preparing and paving processes are easy to control.
Description
Technical field
The invention belongs to field of road, relate to road engineering maintenance of equipment, particularly relate to a kind of double-layer stress
Absorption band integrated construction train.
Background technology
The reconstruction technology of " paracetamol " refers to keep old pavement globality, takes grouting reinforcement under plate, locally
The measures such as displacement or repairing, then directly overlay the technology of skin coat on Old cement concrete.This
Mode can make full use of the structure residual intensity of Old cement concrete, thinning thickness.But this skill
One of difficult problem that overlay reflection crack problem always highway circle that art faces is faced.Depositing of reflection crack
, not only break up the bulk strength of pavement structure, and owing to surface water permeates downwards along reflection crack, made
Surface layer is the most inharmonious to come off, and subgrade strength reduces, and has a strong impact on the service life on road surface.
In order to prevent or delay the early reflection crack problem of old cement concrete road Laying Asphalt Surface Course, research worker exists
Stress absorbing layer, geotextile interlayer, grid interlayer it is provided with between existing cement-concrete pavement plate and asphalt overlay,
But the processing method of this full paving formula significantly increases construction costs.Proposition is awarded to penetrating judgment in conjunction with Tongji University's what is said or talked about
The soft interlayer in local is set and can effectively reduce the achievement in research of overlay temperature stress, we have developed double-layer stress
Absorption band, disposes for the local in old concrete plate seam and crack.At present, stress absorption band construction machinery is
Artificial hand dynamic formula, is manually brushed to stress absorption carrying material at pavement crack by the instrument of hairbrush.This side
Method efficiency is low, and stress absorption carrying material is scattered more, and waste of material is serious.Additionally, painting tool does not heat
Equipment, stress absorption band viscosity of material is big, in construction gradually adhesive aggregation on painting device, operation extremely inconvenience.
Existing stress absorption band paving equipment is also suitable only for the mechanized construction of monolayer stress absorption band, it is impossible to solve
The certainly problem of double-layer stress absorption band integrated construction, has had a strong impact on the integration of levels stress-absorbed material,
And existing equipment is it is difficult to ensure that the thickness of stress absorption band and flatness.
Summary of the invention
The technical problem to be solved is for above-mentioned deficiency of the prior art, it is provided that a kind of double-deck
Stress absorption band integrated construction train, its simple in construction, reasonable in design and use easy and simple to handle, using effect
Good, energy is easy, be rapidly completed preparation and the making of double-layer stress absorption band, and preparation is prone to paving process
Control.
For solving above-mentioned technical problem, the technical solution used in the present invention is:
A kind of double-layer stress absorption band integrated construction train, it is characterised in that: described double-layer stress absorption band one
Bodyization construction train includes train body and the railway carriage dragged by train body;Along railway carriage inside described railway carriage
Axially it is disposed with the preparation of ground floor stress absorption band and making device, the preparation of second layer stress absorption band and paving
Build device and compaction apparatus;It is additionally provided with inside described railway carriage and the preparation of ground floor stress absorption band and making dress
Put and the second layer stress absorption band preparation and making device be connected data collection and control device;Described data
Gather and control device and include control chamber;Described control chamber be internally provided with controller and respectively with controller phase
Computer heating control chip even and switch driver.
As preferably, ground floor stress absorption band of the present invention preparation and making device and the second layer should
The preparation of power absorption band and making device all include stress absorption band compound preparation facilities, stress absorption band compound
Making device and Fibergrass polyester mat making device;Described stress absorption band compound preparation facilities includes Colophonium
Heat treatment apparatus, collection material processing device, device for processing mineral powder and agitated kettle;Described Colophonium heat treated fills
Put, collect material processing device and device for processing mineral powder connects with agitated kettle respectively;Described stress absorption band mixes
The making device of material includes hopper, feed appliance, thickness adjusted screw rod, helical spreader and shakeouts plate;Described
Hopper connects with agitated kettle;Described feed appliance includes feed appliance import and feed appliance outlet;Described feed appliance
Import is stretched in hopper;Described helical spreader is placed in feed appliance exit;Described thickness adjusted screw rod with shakeout
Plate is connected;The described plate that shakeouts is placed in helical spreader end;Described Fibergrass polyester mat making device is placed in and shakeouts plate
End.
As preferably, Colophonium heat treatment apparatus of the present invention include Asphaltum heating pot, agitator,
One LOAD CELLS, flowline;First temperature sensor, primary heater and Asphaltum heating pot valve;Institute
State Asphaltum heating pot and be internally provided with agitator, the first temperature sensor and primary heater;Described first temperature
Degree sensor is connected with controller;Described controller is connected with primary heater by computer heating control chip;Described
Asphaltum heating pot is connected with agitated kettle by flowline;Described Asphaltum heating pot is arranged with the contact position of flowline
There is the first LOAD CELLS;Asphaltum heating pot valve it is provided with on described flowline;Described controller is by switch
Driver is connected with Asphaltum heating pot valve;Described controller and the first LOAD CELLS are connected.
As preferably, collection material processing device of the present invention includes cold burden storehouse, the first discharge nozzle, cold burden storehouse
Valve, drying drum, the second discharge nozzle, drying drum valve, the second temperature sensor, secondary heater,
Hot aggregate bin, three-temperature sensor, the 3rd heater, hot aggregate bin valve, the 3rd discharge nozzle and the 3rd are weighed
Sensor;Described cold burden storehouse pass sequentially through the first discharge nozzle, drying drum, the second discharge nozzle, hot aggregate bin and
3rd discharge nozzle connects with agitated kettle;Cold burden storehouse valve it is provided with on described first discharge nozzle;Described second goes out
It is provided with drying drum valve on material pipe;It is provided with hot aggregate bin valve on described 3rd discharge nozzle;Described dry rolling
Cylinder is internally provided with the second temperature sensor and secondary heater;Described hot aggregate bin is internally provided with the 3rd temperature
Sensor, the 3rd LOAD CELLS and the 3rd heater;Described controller respectively with the second temperature sensor with
And three-temperature sensor is connected;Described controller by computer heating control chip respectively with secondary heater and the
Three heaters are connected;Described controller by switch driver respectively with cold burden storehouse valve, drying drum valve with
And hot aggregate bin valve is connected.
As preferably, device for processing mineral powder of the present invention includes mineral powder bin, mineral powder bin discharge nozzle, breeze
Storehouse valve and the second LOAD CELLS;Described mineral powder bin is connected with agitated kettle by mineral powder bin discharge nozzle;Institute
State and on mineral powder bin discharge nozzle, be provided with mineral powder bin valve;Described mineral powder bin is arranged with the contact position of mineral powder bin discharge nozzle
There is the second LOAD CELLS;Described controller is connected with mineral powder bin valve by switch driver;Described controller
It is connected with the second LOAD CELLS.
As preferably, agitated kettle of the present invention is internally provided with the 4th temperature sensor, the 4th heater
And valve;Described controller is connected with valve by switch driver;Described controller passes through computer heating control core
Sheet and the 4th heater are connected;Described controller and the 4th temperature sensor are connected;Described agitated kettle passes through valve
Connect with hopper.
As preferably, hopper of the present invention is internally provided with the 5th temperature sensor and the 5th heating
Device;Described controller is connected by computer heating control chip and the 5th heater;Described controller and the 5th temperature pass
Sensor is connected;Described stand flat plate bottom is provided with the 6th temperature sensor and the 6th heater;Described controller
It is connected by computer heating control chip and the 6th heater;Described controller and the 6th temperature sensor are connected.
As preferably, the width of helical spreader of the present invention is 30cm, a diameter of 1cm;Described stand
The width of flat board is 30cm, and thickness is 5mm;Described Fibergrass polyester mat making device includes Train Wheel and polyester
Glass-fiber-fabric roller;Described Train Wheel is by treating that making Fibergrass polyester mat is connected with Fibergrass polyester mat roller;Described poly-
Train Wheel is driven to rotate when ester glass-fiber-fabric roller rotates;Company between described Train Wheel and Fibergrass polyester mat roller
Angular adjustment lining device it is provided with between line and horizontal direction.
As preferably, compaction apparatus of the present invention includes the axially set gradually first compacting along railway carriage
Steel wheel and the second compacting steel wheel.
As preferably, control chamber of the present invention is provided with result output screen, parameter input keyboard with
And the control switch being connected with controller.
The present invention compared with prior art has the advantage that
The invention provides a kind of double-layer stress absorption band integrated construction train, including train body and by arranging
The railway carriage that car car body drags;Inside railway carriage along railway carriage be axially disposed with ground floor stress absorption band preparation and
The preparation of making device, second layer stress absorption band and making device and compaction apparatus;It is additionally provided with inside railway carriage
With ground floor stress absorption band preparation and making device and the second layer stress absorption band preparation and making device phase
Data collection and control device even;Data collection and control device includes control chamber;Control chamber is internally provided with
Controller and the computer heating control chip being connected with controller respectively and switch driver.It is provided with on control chamber
Result output screen, parameter input keyboard and the control switch being connected with controller.Provided by the present invention double
Ply stress absorption band integrated construction train relates to ground floor during double-layer stress absorption band site operation should
The the mixing and stirring of power absorption band compound, pave, be compacted;The paving of ground floor Fibergrass polyester mat, it is compacted;The second layer
The the mixing and stirring of stress absorption band compound, pave, be compacted;The paving of second layer Fibergrass polyester mat, it is compacted;This
Equipment is automatically performed intensive for this series of process in a machine, simple in construction, reasonable in design and installation
And using easy and simple to handle, input cost is relatively low, installs compact, and private space is less.Second, parameter of the present invention
Adjust simplicity, the parameters such as heating-up temperature, heat time heating time, stirring persistent period, stir speed (S.S.) can be adjusted,
And it is provided with control chamber, controls simple, can accurately control material temperature, mixing time, stir speed (S.S.), with
Time Asphaltum heating pot, hot aggregate bin and mineral powder bin on be provided with LOAD CELLS, accurately the First Astronautic Research Institute for Measurement and Test can add modification drip
Green grass or young crops, fine aggregate, the weight of breeze;Additionally at Asphaltum heating pot, drying drum, hot aggregate bin, agitated kettle, material
Heating-up temperature can effectively be monitored by bucket and the temperature sensor shakeout on plate so that stress absorption band compound
Mix and stir, pave, to roll temperature easily controllable.3rd, the efficiency of construction of the present invention is high, can complete 5 per hour
The double-layer stress absorption band making work of kilometer.4th, using effect of the present invention is good and practical value high, profile
Attractive in appearance, facilitate the work progress of double-layer stress absorption band largely, and work progress is easily controllable,
There is efficiency of construction height, automation mechanized operation, the metering advantage such as accurately, prepared double-layer stress can be effectively ensured and inhale
The performance of take-up.In sum, the present invention has considered double-layer stress absorption band material behavior, convenient construction
Property, simple in construction, reasonable in design and use easy and simple to handle, using effect good, energy is easy, is rapidly completed bilayer
The work progress of stress absorption band, and work progress is easily controllable.
Accompanying drawing explanation
Fig. 1 is the structural representation of double-layer stress absorption band integrated construction train provided by the present invention;
Fig. 2 is stress absorption band of the present invention preparation and the structural representation of making device;
Fig. 3 is the circuit theory schematic diagram of data collection and control device of the present invention;
Description of reference numerals:
1-train body;The preparation of 2-ground floor stress absorption band and making device;3-second layer stress absorption band system
Standby and making device;4-compaction apparatus;5-bridge;6-Train Wheel;9-railway carriage;10-Asphaltum heating pot;
11-agitator;12-cold burden storehouse;13-mineral powder bin;14-drying drum;15-hot aggregate bin;16-agitated kettle;17-
Valve;18-hopper;19-feed appliance;20-helical spreader;21-thickness adjusted screw rod;22-shakeouts plate;
23-Fibergrass polyester mat roller;24-angular adjustment lining device;25-the first LOAD CELLS;26-the second weighing and sensing
Device;27-control chamber;29-Asphaltum heating pot valve;30-hot aggregate bin valve;31-mineral powder bin valve;32-
One temperature sensor;33-the first computer heating control chip;34-switch driver;35-flowline;36-first goes out
Material pipe;37-cold burden storehouse valve;38-the second discharge nozzle;39-drying drum valve;40-the second temperature sensor;
41-the second computer heating control chip;42-three-temperature sensor;43-the 3rd computer heating control chip;44-the 3rd goes out
Material pipe;45-the 4th temperature sensor;46-the 4th computer heating control chip;47-mineral powder bin discharge nozzle;48-the 5th
Temperature sensor;49-the 5th computer heating control chip;50-the 6th temperature sensor;51-the 6th computer heating control core
Sheet;93-first is compacted steel wheel;94-second is compacted steel wheel;95-the 3rd LOAD CELLS;96-controller;98-
Control switch;99-result output screen;100-parameter input keyboard.
Detailed description of the invention
Below in conjunction with embodiment, the present invention is described in further detail:
Embodiment
Seeing Fig. 1, the invention provides a kind of double-layer stress absorption band integrated construction train, double-layer stress is inhaled
Take-up integrated construction train includes train body 1 and the railway carriage 9 dragged by train body 1;The internal edge of railway carriage 9
The ground floor stress absorption band that is axially disposed with of railway carriage 9 is prepared and making device 2, second layer stress absorption band
Preparation and making device 3 and compaction apparatus 4;Internal being additionally provided with of railway carriage 9 is prepared with ground floor stress absorption band
And the data collection and control dress that prepared by making device 2 and second layer stress absorption band and making device 3 is connected
Put;Data collection and control device includes control chamber 27;Control chamber 27 is internally provided with controller 96 and difference
The computer heating control chip being connected with controller 96 and switch driver 34.Result output it is provided with on control chamber 27
Screen 99, parameter input keyboard 100 and the control switch 98 being connected with controller.
As shown in FIG. 2 and 3, the present invention carries used ground floor stress absorption band preparation and making device 2
Including stress absorption band compound preparation facilities, the making device of stress absorption band compound and Fibergrass polyester mat
Making device;Stress absorption band compound preparation facilities include Colophonium heat treatment apparatus, collection material processing device,
Device for processing mineral powder and agitated kettle 16;Colophonium heat treatment apparatus, collection material processing device and breeze process dress
Put and connect with agitated kettle 16 respectively;The making device of stress absorption band compound include hopper 18, feed appliance 19,
Thickness adjusted screw rod 21, helical spreader 20 and shakeout plate 22;Hopper 18 connects with agitated kettle 16;Feeding
Device 19 includes feed appliance import and feed appliance outlet;Feed appliance import is stretched in hopper 18;Helical spreader 20
It is placed in feed appliance exit;Thickness adjusted screw rod 21 is connected with shakeouing plate 22;Shakeout plate 22 and be placed in helical spreader
20 ends;Fibergrass polyester mat making device is placed in and shakeouts plate 22 end.
Asphaltum heating pot 10 that stress absorption band preparation and making device include from top to bottom installing, cold burden storehouse 12,
Mineral powder bin 13, drying drum 14, hot aggregate bin 15, agitated kettle 16, hopper 18, helical spreader 20, thickness are adjusted
Save screw rod 21, shakeout plate 22, Fibergrass polyester mat roller 23, angular adjustment lining cutting 24.
It is provided with in Asphaltum heating pot 10 and inserts agitator 11 in Asphaltum heating pot 10 from left to right;Agitator 11
By driving motor to be driven, drive motor to be arranged in the tank body of Asphaltum heating pot 10, drive motor and control
Device 96 connects.
The first temperature sensor 32, primary heater, the first computer heating control chip it is provided with in Asphaltum heating pot 10
33, valve the 29, first LOAD CELLS 25, flowline 35;First temperature sensor the 32, first weighing and sensing
Device the 25, first computer heating control chip 33 connects with controller 96, the first computer heating control chip 33 and primary heater
It is connected and drives primary heater to work;Valve 29 connects with switch driver 34.
The bottom in cold burden storehouse 12 is provided with the first discharge nozzle 36, cold burden storehouse valve 37;Cold burden storehouse valve 37 and switch
Driver 34 connects.
Be provided with in drying drum 14 second temperature sensor 40, secondary heater, the second computer heating control chip 41,
Second discharge nozzle 38, drying drum valve 39;Second temperature sensor the 40, second computer heating control chip 41 and control
Device 96 processed connects;Second computer heating control chip 41 is connected with secondary heater and drives secondary heater to work;
Valve 39 connects with switch driver 34.
Be provided with in hot aggregate bin 15 three-temperature sensor the 42, the 3rd heater, the 3rd computer heating control chip 43,
3rd discharge nozzle 44, hot aggregate bin valve 30, the 3rd LOAD CELLS 95;Hot aggregate bin valve 30 and switch driver
34 connect;Three-temperature sensor the 42, the 3rd computer heating control chip 43, LOAD CELLS 95 and controller 96
Connect.3rd computer heating control chip 43 is connected with the 3rd heater and drives the 3rd heater work;
Be provided with in agitated kettle 16 the 4th temperature sensor the 45, the 4th heater, the 4th computer heating control chip 46,
Valve 17;Valve 17 connects with switch driver 34, the 4th temperature sensor the 45, the 4th computer heating control chip 46
Connect with controller 96.4th computer heating control chip 46 is connected with the 4th heater and drives the 4th heater work
Make;
The second LOAD CELLS 26, mineral powder bin valve 31, mineral powder bin discharge nozzle 47 it is provided with in mineral powder bin 13;Ore deposit
Powder cabin valve 31 connects with switch driver 34, and the second LOAD CELLS 26 connects with controller 96.
Asphaltum heating pot 10 is connected with agitated kettle 16 by flowline 35, and cold burden storehouse 12 is by the first discharge nozzle 36
Connecting with drying drum 14, drying drum 14 is connected with hot aggregate bin 15 by the second discharge nozzle 38, hot aggregate bin 15
Being connected with agitated kettle 16 by the 3rd discharge nozzle 44, mineral powder bin 13 is by mineral powder bin discharge nozzle 47 and agitated kettle 16
Connect.
Feed appliance the 19, the 5th temperature sensor the 48, the 5th heater, the 5th computer heating control it is provided with in hopper 18
Chip 49;5th temperature sensor the 48, the 5th computer heating control chip 49 connects with controller 96.Slender acanthopanax thermal control
Coremaking sheet 49 is connected with the 5th heater and drives the 5th heater work;
Helical spreader 20 is arranged on hopper 18 back lower place, thickness adjusted screw rod 21 and shakeout plate 22 and be arranged on spiral
The rear of spreader 20.Helical spreader 20 width be 30cm, a diameter of 1cm.
Shakeout plate 22 and be provided with the 6th temperature sensor the 50, the 6th heater, the 6th computer heating control chip 51;The
Six temperature sensor the 50, the 6th computer heating control chips 51 connect with controller 96.The width shakeouing plate 22 is 30cm,
Thickness is 5mm.6th computer heating control chip 51 is connected with the 6th heater and drives the 6th heater work;
First computer heating control chip the 33, second computer heating control chip the 41, the 3rd computer heating control of the present invention
Chip the 43, the 4th computer heating control chip the 46, the 5th computer heating control chip 49 and the 6th computer heating control chip 51
Can be realized by a computer heating control chip, it is possible to realized by multiple computer heating control chips.
Asphaltum heating pot 10, cold burden storehouse 12, mineral powder bin 13, drying drum 14, hot aggregate bin 15, agitated kettle 16,
Hopper 18 completes the preparation of stress absorption band compound jointly.
Hopper 18, feed appliance 19, helical spreader 20, thickness adjusted screw rod 21 and shakeout plate 22 jointly complete should
The making of power absorption band compound.
Fibergrass polyester mat making device includes Fibergrass polyester mat roller 23 and angular adjustment lining device 24, wherein, poly-
Ester glass-fiber-fabric roller 23 is rolled into the Fibergrass polyester mat of volume for placing;Angular adjustment lining device 24 is used for regulating polyester glass
With the making angle on road surface in fine cloth paving process;Fibergrass polyester mat roller 23, angular adjustment lining device 24 and train
Wheel 6 completes the making of Fibergrass polyester mat jointly, and is pressed into by Fibergrass polyester mat in stress absorption band compound.
The preparation of second layer stress absorption band and making device 3 are prepared and making device 2 with ground floor stress absorption band
Structure identical, working method is the most identical, is not repeated at this.
Compaction apparatus 4 is positioned at the rearmost of train body 1, and including compacting steel wheel 93 and compacting steel wheel 94, it completes
The compacting of double-layer stress absorption band compound, guarantee in two layers polyester glass-fiber-fabric embedment stress absorption band compound.
Claims (10)
1. a double-layer stress absorption band integrated construction train, it is characterised in that: described double-layer stress absorption band integrated construction train includes train body (1) and the railway carriage (9) dragged by train body (1);Described railway carriage (9) is internal is axially disposed with the preparation of ground floor stress absorption band and making device (2), the preparation of second layer stress absorption band and making device (3) and compaction apparatus (4) along railway carriage (9);Described railway carriage (9) is internal is additionally provided with the data collection and control device being connected with the preparation of ground floor stress absorption band and making device (2) and the preparation of second layer stress absorption band and making device (3);Described data collection and control device includes control chamber (27);Described control chamber (27) is internally provided with controller (96) and the computer heating control chip being connected respectively and switch driver (34) with controller (96).
Double-layer stress absorption band integrated construction train the most according to claim 1, it is characterised in that: the preparation of described ground floor stress absorption band and making device (2) and the preparation of second layer stress absorption band and making device (3) all include stress absorption band compound preparation facilities, the making device of stress absorption band compound and Fibergrass polyester mat making device;Described stress absorption band compound preparation facilities includes Colophonium heat treatment apparatus, collection material processing device, device for processing mineral powder and agitated kettle (16);Described Colophonium heat treatment apparatus, collection material processing device and device for processing mineral powder connect with agitated kettle (16) respectively;The making device of described stress absorption band compound includes hopper (18), feed appliance (19), thickness adjusted screw rod (21), helical spreader (20) and shakeouts plate (22);Described hopper (18) connects with agitated kettle (16);Described feed appliance (19) includes feed appliance import and feed appliance outlet;Described feed appliance import is stretched in hopper (18);Described helical spreader (20) is placed in feed appliance exit;Described thickness adjusted screw rod (21) is connected with shakeouing plate (22);The described plate (22) that shakeouts is placed in helical spreader (20) end;Described Fibergrass polyester mat making device is placed in and shakeouts plate (22) end.
Double-layer stress absorption band integrated construction train the most according to claim 2, it is characterised in that: described Colophonium heat treatment apparatus includes Asphaltum heating pot (10), agitator (11), the first LOAD CELLS (25), flowline (35);First temperature sensor (32), primary heater and Asphaltum heating pot valve (29);Described Asphaltum heating pot (10) is internally provided with agitator (11), the first temperature sensor (32) and primary heater;Described first temperature sensor (32) is connected with controller (96);Described controller (96) is connected with primary heater by computer heating control chip;Described Asphaltum heating pot (10) is connected with agitated kettle (16) by flowline (35);Described Asphaltum heating pot (10) is provided with the first LOAD CELLS (25) with the contact position of flowline (35);Asphaltum heating pot valve (29) it is provided with on described flowline (35);Described controller (96) is connected with Asphaltum heating pot valve (29) by switch driver (34);Described controller (96) is connected with the first LOAD CELLS (25).
Double-layer stress absorption band integrated construction train the most according to claim 3, it is characterised in that: described collection material processing device includes cold burden storehouse (12), the first discharge nozzle (36), cold burden storehouse valve (37), drying drum (14), the second discharge nozzle (38), drying drum valve (39), the second temperature sensor (40), secondary heater, hot aggregate bin (15), three-temperature sensor (42), the 3rd heater, hot aggregate bin valve (30), the 3rd discharge nozzle (44) and the 3rd LOAD CELLS (95);Described cold burden storehouse (12) passes sequentially through the first discharge nozzle (36), drying drum (14), the second discharge nozzle (38), hot aggregate bin (15) and the 3rd discharge nozzle (44) and connects with agitated kettle (16);It is provided with cold burden storehouse valve (37) on described first discharge nozzle (36);It is provided with drying drum valve (39) on described second discharge nozzle (38);It is provided with hot aggregate bin valve (30) on described 3rd discharge nozzle (44);Described drying drum (14) is internally provided with the second temperature sensor (40) and secondary heater;Described hot aggregate bin (15) is internally provided with three-temperature sensor (42), the 3rd LOAD CELLS (95) and the 3rd heater;Described controller (96) is connected with the second temperature sensor (40) and three-temperature sensor (42) respectively;Described controller (96) is connected with secondary heater and the 3rd heater respectively by computer heating control chip;Described controller (96) is connected with cold burden storehouse valve (37), drying drum valve (39) and hot aggregate bin valve (30) respectively by switch driver (34).
Double-layer stress absorption band integrated construction train the most according to claim 4, it is characterised in that: described device for processing mineral powder includes mineral powder bin (13), mineral powder bin discharge nozzle (47), mineral powder bin valve (31) and the second LOAD CELLS (26);Described mineral powder bin (13) is connected with agitated kettle (16) by mineral powder bin discharge nozzle (47);It is provided with mineral powder bin valve (31) on described mineral powder bin discharge nozzle (47);Described mineral powder bin (13) is provided with the second LOAD CELLS (26) with the contact position of mineral powder bin discharge nozzle (47);Described controller (96) is connected with mineral powder bin valve (31) by switch driver (34);Described controller (96) is connected with the second LOAD CELLS (26).
Double-layer stress absorption band integrated construction train the most according to claim 5, it is characterised in that: described agitated kettle (16) is internally provided with the 4th temperature sensor (45), the 4th heater and valve (17);Described controller (96) is connected with valve (17) by switch driver (34);Described controller (96) is connected by computer heating control chip and the 4th heater;Described controller (96) is connected with the 4th temperature sensor (45);Described agitated kettle (16) is connected with hopper (18) by valve (17).
7. according to the double-layer stress absorption band integrated construction train described in Claims 2 or 3 or 4 or 5 or 6, it is characterised in that: described hopper (18) is internally provided with the 5th temperature sensor (48) and the 5th heater;Described controller (96) is connected by computer heating control chip and the 5th heater;Described controller (96) is connected with the 5th temperature sensor (48);Described plate (22) bottom of shakeouing is provided with the 6th temperature sensor (50) and the 6th heater;Described controller (96) is connected by computer heating control chip and the 6th heater;Described controller (96) is connected with the 6th temperature sensor (50).
Double-layer stress absorption band integrated construction train the most according to claim 7, it is characterised in that: the width of described helical spreader (20) is 30cm, a diameter of 1cm;The described width shakeouing plate (22) is 30cm, and thickness is 5mm;Described Fibergrass polyester mat making device includes Train Wheel (6) and Fibergrass polyester mat roller (23);Described Train Wheel (6) is by treating that making Fibergrass polyester mat is connected with Fibergrass polyester mat roller (23);Train Wheel (6) is driven to rotate when described Fibergrass polyester mat roller (23) rotates;Angular adjustment lining device (24) it is provided with between line and horizontal direction between described Train Wheel (6) and Fibergrass polyester mat roller (23).
Double-layer stress absorption band integrated construction train the most according to claim 8, it is characterised in that: described compaction apparatus (4) includes the axially set gradually first compacting steel wheel (93) along railway carriage (9) and the second compacting steel wheel (94).
Double-layer stress absorption band integrated construction train the most according to claim 9, it is characterised in that: it is provided with result output screen (99), parameter input keyboard (100) and control switch (98) being connected with controller on described control chamber (27).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610559363.8A CN106012783B (en) | 2016-07-15 | 2016-07-15 | A kind of double-layer stress absorption band integrated construction train |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610559363.8A CN106012783B (en) | 2016-07-15 | 2016-07-15 | A kind of double-layer stress absorption band integrated construction train |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106012783A true CN106012783A (en) | 2016-10-12 |
CN106012783B CN106012783B (en) | 2018-02-02 |
Family
ID=57118305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610559363.8A Expired - Fee Related CN106012783B (en) | 2016-07-15 | 2016-07-15 | A kind of double-layer stress absorption band integrated construction train |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106012783B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867275A (en) * | 2018-08-14 | 2018-11-23 | 李淑平 | A kind of cement is laid with and curing means |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101100839A (en) * | 2007-07-27 | 2008-01-09 | 长沙中联重工科技发展股份有限公司 | Double-layer lying device for hot in-place regeneration remixer |
KR20090112040A (en) * | 2008-04-23 | 2009-10-28 | 정운규 | The movable equipment for the re-construction of damage part in paved road and its method |
CN102787548A (en) * | 2012-08-30 | 2012-11-21 | 重庆交通大学 | In-site heating regeneration maintenance vehicle for asphalt pavements |
CN104727208A (en) * | 2015-03-19 | 2015-06-24 | 山东省路桥集团有限公司 | In-place heat regeneration integrated machine for bituminous pavements and control method |
CN205975317U (en) * | 2016-07-15 | 2017-02-22 | 山西省交通科学研究院 | Double -deck stress absorption zone integrated construction train |
-
2016
- 2016-07-15 CN CN201610559363.8A patent/CN106012783B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101100839A (en) * | 2007-07-27 | 2008-01-09 | 长沙中联重工科技发展股份有限公司 | Double-layer lying device for hot in-place regeneration remixer |
KR20090112040A (en) * | 2008-04-23 | 2009-10-28 | 정운규 | The movable equipment for the re-construction of damage part in paved road and its method |
CN102787548A (en) * | 2012-08-30 | 2012-11-21 | 重庆交通大学 | In-site heating regeneration maintenance vehicle for asphalt pavements |
CN104727208A (en) * | 2015-03-19 | 2015-06-24 | 山东省路桥集团有限公司 | In-place heat regeneration integrated machine for bituminous pavements and control method |
CN205975317U (en) * | 2016-07-15 | 2017-02-22 | 山西省交通科学研究院 | Double -deck stress absorption zone integrated construction train |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867275A (en) * | 2018-08-14 | 2018-11-23 | 李淑平 | A kind of cement is laid with and curing means |
CN108867275B (en) * | 2018-08-14 | 2020-08-25 | 深圳市路桥建设集团有限公司 | Cement laying and maintaining device |
Also Published As
Publication number | Publication date |
---|---|
CN106012783B (en) | 2018-02-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102011362B (en) | Hot in-place recycling ultrathin overlaying machine of bituminous pavement and construction method thereof | |
CN105350421B (en) | A kind of thin overlay construction method suitable for road surface medium-capital overhauling and preventive maintenance | |
CN104762862B (en) | SMA asphaltic road-mix surface course construction methods | |
CN201770923U (en) | Ultrathin covering machine for hot in-place recycling of bituminous pavements | |
CN207314110U (en) | A kind of municipal administration road surface quick-restoring device | |
CN109853349A (en) | Asphalt pavement pit repairing machine and method for repairing and mending | |
CN109763395A (en) | Double steel wheels and pneumatic-tired rollers are formed a team to Asphalt Concrete Pavement Compaction construction | |
CN106245506A (en) | Multifunction road regenerating device and pavement recycling construction method | |
CN102505600A (en) | On-site construction method of cold recycling asphalt pavement | |
CN205839551U (en) | A kind of adjustable bituminous distributor of nozzle height | |
CN209443349U (en) | Asphalt pavement rut repair machine | |
CN106223179A (en) | Road surface hot recycling machine and road surface hot reproduction construction method | |
CN109811610A (en) | Road reconstruction method and apparatus for construction of the highway | |
CN110258236A (en) | A kind of high-performance steel slag road surface and its construction method | |
CN205975318U (en) | Stress absorption zone preparation and making device | |
CN106968155A (en) | A kind of asphalt-spreader | |
CN106012783A (en) | Double-layer stress absorption band integrated construction train | |
CN205975317U (en) | Double -deck stress absorption zone integrated construction train | |
CN102912712A (en) | Cold-stirring and cold-paving all-in-one machine | |
CN207159764U (en) | A kind of pitch-rood | |
CN104695308B (en) | Asphalt pavement on-site heat recoveryremixer twin-tub agitator kettle | |
CN213867237U (en) | Layered laying device for asphalt pavement | |
CN107419706A (en) | The mesoclimate of high altitude localities asphaltic concrete core wall construction builds method | |
CN210238225U (en) | System for synchronous spraying of cement paste between base course layers of semi-rigid pavement and base course paving | |
CN206768548U (en) | A kind of asphalt-spreader |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180202 Termination date: 20180715 |