CN106012783A - Double-layer stress absorption band integrated construction train - Google Patents

Double-layer stress absorption band integrated construction train Download PDF

Info

Publication number
CN106012783A
CN106012783A CN201610559363.8A CN201610559363A CN106012783A CN 106012783 A CN106012783 A CN 106012783A CN 201610559363 A CN201610559363 A CN 201610559363A CN 106012783 A CN106012783 A CN 106012783A
Authority
CN
China
Prior art keywords
absorption band
stress absorption
valve
temperature sensor
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610559363.8A
Other languages
Chinese (zh)
Other versions
CN106012783B (en
Inventor
沈佳
王新生
尹志钢
王慧
徐晓洛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201610559363.8A priority Critical patent/CN106012783B/en
Publication of CN106012783A publication Critical patent/CN106012783A/en
Application granted granted Critical
Publication of CN106012783B publication Critical patent/CN106012783B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Machines (AREA)

Abstract

The invention belongs to the field of road engineering, and relates to a double-layer stress absorption band integrated construction train. The double-layer stress absorption band integrated construction train comprises a train body and a carriage which is dragged by the train body; a first stress absorption band preparation and pavement device, a second stress absorption band preparation and pavement device and a compacting device are arranged in the carriage in the axial direction of the carriage in sequence; a data acquisition and control device which is connected with the first stress absorption band preparation and pavement device and the second stress absorption band preparation and pavement device is also arranged in the carriage; the data acquisition and control device comprises a control box; a controller, and a heating control chip and a switch driver which are respectively connected with the controller are arranged in the control box. The double-layer stress absorption band integrated construction train has the advantages that the structure is simple, the design is reasonable, the use and operation are convenient, the use effect is good, the preparation and pavement of a double-layer stress absorption band can be completed conveniently and quickly, and the preparing and paving processes are easy to control.

Description

A kind of double-layer stress absorption band integrated construction train
Technical field
The invention belongs to field of road, relate to road engineering maintenance of equipment, particularly relate to a kind of double-layer stress Absorption band integrated construction train.
Background technology
The reconstruction technology of " paracetamol " refers to keep old pavement globality, takes grouting reinforcement under plate, locally The measures such as displacement or repairing, then directly overlay the technology of skin coat on Old cement concrete.This Mode can make full use of the structure residual intensity of Old cement concrete, thinning thickness.But this skill One of difficult problem that overlay reflection crack problem always highway circle that art faces is faced.Depositing of reflection crack , not only break up the bulk strength of pavement structure, and owing to surface water permeates downwards along reflection crack, made Surface layer is the most inharmonious to come off, and subgrade strength reduces, and has a strong impact on the service life on road surface.
In order to prevent or delay the early reflection crack problem of old cement concrete road Laying Asphalt Surface Course, research worker exists Stress absorbing layer, geotextile interlayer, grid interlayer it is provided with between existing cement-concrete pavement plate and asphalt overlay, But the processing method of this full paving formula significantly increases construction costs.Proposition is awarded to penetrating judgment in conjunction with Tongji University's what is said or talked about The soft interlayer in local is set and can effectively reduce the achievement in research of overlay temperature stress, we have developed double-layer stress Absorption band, disposes for the local in old concrete plate seam and crack.At present, stress absorption band construction machinery is Artificial hand dynamic formula, is manually brushed to stress absorption carrying material at pavement crack by the instrument of hairbrush.This side Method efficiency is low, and stress absorption carrying material is scattered more, and waste of material is serious.Additionally, painting tool does not heat Equipment, stress absorption band viscosity of material is big, in construction gradually adhesive aggregation on painting device, operation extremely inconvenience. Existing stress absorption band paving equipment is also suitable only for the mechanized construction of monolayer stress absorption band, it is impossible to solve The certainly problem of double-layer stress absorption band integrated construction, has had a strong impact on the integration of levels stress-absorbed material, And existing equipment is it is difficult to ensure that the thickness of stress absorption band and flatness.
Summary of the invention
The technical problem to be solved is for above-mentioned deficiency of the prior art, it is provided that a kind of double-deck Stress absorption band integrated construction train, its simple in construction, reasonable in design and use easy and simple to handle, using effect Good, energy is easy, be rapidly completed preparation and the making of double-layer stress absorption band, and preparation is prone to paving process Control.
For solving above-mentioned technical problem, the technical solution used in the present invention is:
A kind of double-layer stress absorption band integrated construction train, it is characterised in that: described double-layer stress absorption band one Bodyization construction train includes train body and the railway carriage dragged by train body;Along railway carriage inside described railway carriage Axially it is disposed with the preparation of ground floor stress absorption band and making device, the preparation of second layer stress absorption band and paving Build device and compaction apparatus;It is additionally provided with inside described railway carriage and the preparation of ground floor stress absorption band and making dress Put and the second layer stress absorption band preparation and making device be connected data collection and control device;Described data Gather and control device and include control chamber;Described control chamber be internally provided with controller and respectively with controller phase Computer heating control chip even and switch driver.
As preferably, ground floor stress absorption band of the present invention preparation and making device and the second layer should The preparation of power absorption band and making device all include stress absorption band compound preparation facilities, stress absorption band compound Making device and Fibergrass polyester mat making device;Described stress absorption band compound preparation facilities includes Colophonium Heat treatment apparatus, collection material processing device, device for processing mineral powder and agitated kettle;Described Colophonium heat treated fills Put, collect material processing device and device for processing mineral powder connects with agitated kettle respectively;Described stress absorption band mixes The making device of material includes hopper, feed appliance, thickness adjusted screw rod, helical spreader and shakeouts plate;Described Hopper connects with agitated kettle;Described feed appliance includes feed appliance import and feed appliance outlet;Described feed appliance Import is stretched in hopper;Described helical spreader is placed in feed appliance exit;Described thickness adjusted screw rod with shakeout Plate is connected;The described plate that shakeouts is placed in helical spreader end;Described Fibergrass polyester mat making device is placed in and shakeouts plate End.
As preferably, Colophonium heat treatment apparatus of the present invention include Asphaltum heating pot, agitator, One LOAD CELLS, flowline;First temperature sensor, primary heater and Asphaltum heating pot valve;Institute State Asphaltum heating pot and be internally provided with agitator, the first temperature sensor and primary heater;Described first temperature Degree sensor is connected with controller;Described controller is connected with primary heater by computer heating control chip;Described Asphaltum heating pot is connected with agitated kettle by flowline;Described Asphaltum heating pot is arranged with the contact position of flowline There is the first LOAD CELLS;Asphaltum heating pot valve it is provided with on described flowline;Described controller is by switch Driver is connected with Asphaltum heating pot valve;Described controller and the first LOAD CELLS are connected.
As preferably, collection material processing device of the present invention includes cold burden storehouse, the first discharge nozzle, cold burden storehouse Valve, drying drum, the second discharge nozzle, drying drum valve, the second temperature sensor, secondary heater, Hot aggregate bin, three-temperature sensor, the 3rd heater, hot aggregate bin valve, the 3rd discharge nozzle and the 3rd are weighed Sensor;Described cold burden storehouse pass sequentially through the first discharge nozzle, drying drum, the second discharge nozzle, hot aggregate bin and 3rd discharge nozzle connects with agitated kettle;Cold burden storehouse valve it is provided with on described first discharge nozzle;Described second goes out It is provided with drying drum valve on material pipe;It is provided with hot aggregate bin valve on described 3rd discharge nozzle;Described dry rolling Cylinder is internally provided with the second temperature sensor and secondary heater;Described hot aggregate bin is internally provided with the 3rd temperature Sensor, the 3rd LOAD CELLS and the 3rd heater;Described controller respectively with the second temperature sensor with And three-temperature sensor is connected;Described controller by computer heating control chip respectively with secondary heater and the Three heaters are connected;Described controller by switch driver respectively with cold burden storehouse valve, drying drum valve with And hot aggregate bin valve is connected.
As preferably, device for processing mineral powder of the present invention includes mineral powder bin, mineral powder bin discharge nozzle, breeze Storehouse valve and the second LOAD CELLS;Described mineral powder bin is connected with agitated kettle by mineral powder bin discharge nozzle;Institute State and on mineral powder bin discharge nozzle, be provided with mineral powder bin valve;Described mineral powder bin is arranged with the contact position of mineral powder bin discharge nozzle There is the second LOAD CELLS;Described controller is connected with mineral powder bin valve by switch driver;Described controller It is connected with the second LOAD CELLS.
As preferably, agitated kettle of the present invention is internally provided with the 4th temperature sensor, the 4th heater And valve;Described controller is connected with valve by switch driver;Described controller passes through computer heating control core Sheet and the 4th heater are connected;Described controller and the 4th temperature sensor are connected;Described agitated kettle passes through valve Connect with hopper.
As preferably, hopper of the present invention is internally provided with the 5th temperature sensor and the 5th heating Device;Described controller is connected by computer heating control chip and the 5th heater;Described controller and the 5th temperature pass Sensor is connected;Described stand flat plate bottom is provided with the 6th temperature sensor and the 6th heater;Described controller It is connected by computer heating control chip and the 6th heater;Described controller and the 6th temperature sensor are connected.
As preferably, the width of helical spreader of the present invention is 30cm, a diameter of 1cm;Described stand The width of flat board is 30cm, and thickness is 5mm;Described Fibergrass polyester mat making device includes Train Wheel and polyester Glass-fiber-fabric roller;Described Train Wheel is by treating that making Fibergrass polyester mat is connected with Fibergrass polyester mat roller;Described poly- Train Wheel is driven to rotate when ester glass-fiber-fabric roller rotates;Company between described Train Wheel and Fibergrass polyester mat roller Angular adjustment lining device it is provided with between line and horizontal direction.
As preferably, compaction apparatus of the present invention includes the axially set gradually first compacting along railway carriage Steel wheel and the second compacting steel wheel.
As preferably, control chamber of the present invention is provided with result output screen, parameter input keyboard with And the control switch being connected with controller.
The present invention compared with prior art has the advantage that
The invention provides a kind of double-layer stress absorption band integrated construction train, including train body and by arranging The railway carriage that car car body drags;Inside railway carriage along railway carriage be axially disposed with ground floor stress absorption band preparation and The preparation of making device, second layer stress absorption band and making device and compaction apparatus;It is additionally provided with inside railway carriage With ground floor stress absorption band preparation and making device and the second layer stress absorption band preparation and making device phase Data collection and control device even;Data collection and control device includes control chamber;Control chamber is internally provided with Controller and the computer heating control chip being connected with controller respectively and switch driver.It is provided with on control chamber Result output screen, parameter input keyboard and the control switch being connected with controller.Provided by the present invention double Ply stress absorption band integrated construction train relates to ground floor during double-layer stress absorption band site operation should The the mixing and stirring of power absorption band compound, pave, be compacted;The paving of ground floor Fibergrass polyester mat, it is compacted;The second layer The the mixing and stirring of stress absorption band compound, pave, be compacted;The paving of second layer Fibergrass polyester mat, it is compacted;This Equipment is automatically performed intensive for this series of process in a machine, simple in construction, reasonable in design and installation And using easy and simple to handle, input cost is relatively low, installs compact, and private space is less.Second, parameter of the present invention Adjust simplicity, the parameters such as heating-up temperature, heat time heating time, stirring persistent period, stir speed (S.S.) can be adjusted, And it is provided with control chamber, controls simple, can accurately control material temperature, mixing time, stir speed (S.S.), with Time Asphaltum heating pot, hot aggregate bin and mineral powder bin on be provided with LOAD CELLS, accurately the First Astronautic Research Institute for Measurement and Test can add modification drip Green grass or young crops, fine aggregate, the weight of breeze;Additionally at Asphaltum heating pot, drying drum, hot aggregate bin, agitated kettle, material Heating-up temperature can effectively be monitored by bucket and the temperature sensor shakeout on plate so that stress absorption band compound Mix and stir, pave, to roll temperature easily controllable.3rd, the efficiency of construction of the present invention is high, can complete 5 per hour The double-layer stress absorption band making work of kilometer.4th, using effect of the present invention is good and practical value high, profile Attractive in appearance, facilitate the work progress of double-layer stress absorption band largely, and work progress is easily controllable, There is efficiency of construction height, automation mechanized operation, the metering advantage such as accurately, prepared double-layer stress can be effectively ensured and inhale The performance of take-up.In sum, the present invention has considered double-layer stress absorption band material behavior, convenient construction Property, simple in construction, reasonable in design and use easy and simple to handle, using effect good, energy is easy, is rapidly completed bilayer The work progress of stress absorption band, and work progress is easily controllable.
Accompanying drawing explanation
Fig. 1 is the structural representation of double-layer stress absorption band integrated construction train provided by the present invention;
Fig. 2 is stress absorption band of the present invention preparation and the structural representation of making device;
Fig. 3 is the circuit theory schematic diagram of data collection and control device of the present invention;
Description of reference numerals:
1-train body;The preparation of 2-ground floor stress absorption band and making device;3-second layer stress absorption band system Standby and making device;4-compaction apparatus;5-bridge;6-Train Wheel;9-railway carriage;10-Asphaltum heating pot; 11-agitator;12-cold burden storehouse;13-mineral powder bin;14-drying drum;15-hot aggregate bin;16-agitated kettle;17- Valve;18-hopper;19-feed appliance;20-helical spreader;21-thickness adjusted screw rod;22-shakeouts plate; 23-Fibergrass polyester mat roller;24-angular adjustment lining device;25-the first LOAD CELLS;26-the second weighing and sensing Device;27-control chamber;29-Asphaltum heating pot valve;30-hot aggregate bin valve;31-mineral powder bin valve;32- One temperature sensor;33-the first computer heating control chip;34-switch driver;35-flowline;36-first goes out Material pipe;37-cold burden storehouse valve;38-the second discharge nozzle;39-drying drum valve;40-the second temperature sensor; 41-the second computer heating control chip;42-three-temperature sensor;43-the 3rd computer heating control chip;44-the 3rd goes out Material pipe;45-the 4th temperature sensor;46-the 4th computer heating control chip;47-mineral powder bin discharge nozzle;48-the 5th Temperature sensor;49-the 5th computer heating control chip;50-the 6th temperature sensor;51-the 6th computer heating control core Sheet;93-first is compacted steel wheel;94-second is compacted steel wheel;95-the 3rd LOAD CELLS;96-controller;98- Control switch;99-result output screen;100-parameter input keyboard.
Detailed description of the invention
Below in conjunction with embodiment, the present invention is described in further detail:
Embodiment
Seeing Fig. 1, the invention provides a kind of double-layer stress absorption band integrated construction train, double-layer stress is inhaled Take-up integrated construction train includes train body 1 and the railway carriage 9 dragged by train body 1;The internal edge of railway carriage 9 The ground floor stress absorption band that is axially disposed with of railway carriage 9 is prepared and making device 2, second layer stress absorption band Preparation and making device 3 and compaction apparatus 4;Internal being additionally provided with of railway carriage 9 is prepared with ground floor stress absorption band And the data collection and control dress that prepared by making device 2 and second layer stress absorption band and making device 3 is connected Put;Data collection and control device includes control chamber 27;Control chamber 27 is internally provided with controller 96 and difference The computer heating control chip being connected with controller 96 and switch driver 34.Result output it is provided with on control chamber 27 Screen 99, parameter input keyboard 100 and the control switch 98 being connected with controller.
As shown in FIG. 2 and 3, the present invention carries used ground floor stress absorption band preparation and making device 2 Including stress absorption band compound preparation facilities, the making device of stress absorption band compound and Fibergrass polyester mat Making device;Stress absorption band compound preparation facilities include Colophonium heat treatment apparatus, collection material processing device, Device for processing mineral powder and agitated kettle 16;Colophonium heat treatment apparatus, collection material processing device and breeze process dress Put and connect with agitated kettle 16 respectively;The making device of stress absorption band compound include hopper 18, feed appliance 19, Thickness adjusted screw rod 21, helical spreader 20 and shakeout plate 22;Hopper 18 connects with agitated kettle 16;Feeding Device 19 includes feed appliance import and feed appliance outlet;Feed appliance import is stretched in hopper 18;Helical spreader 20 It is placed in feed appliance exit;Thickness adjusted screw rod 21 is connected with shakeouing plate 22;Shakeout plate 22 and be placed in helical spreader 20 ends;Fibergrass polyester mat making device is placed in and shakeouts plate 22 end.
Asphaltum heating pot 10 that stress absorption band preparation and making device include from top to bottom installing, cold burden storehouse 12, Mineral powder bin 13, drying drum 14, hot aggregate bin 15, agitated kettle 16, hopper 18, helical spreader 20, thickness are adjusted Save screw rod 21, shakeout plate 22, Fibergrass polyester mat roller 23, angular adjustment lining cutting 24.
It is provided with in Asphaltum heating pot 10 and inserts agitator 11 in Asphaltum heating pot 10 from left to right;Agitator 11 By driving motor to be driven, drive motor to be arranged in the tank body of Asphaltum heating pot 10, drive motor and control Device 96 connects.
The first temperature sensor 32, primary heater, the first computer heating control chip it is provided with in Asphaltum heating pot 10 33, valve the 29, first LOAD CELLS 25, flowline 35;First temperature sensor the 32, first weighing and sensing Device the 25, first computer heating control chip 33 connects with controller 96, the first computer heating control chip 33 and primary heater It is connected and drives primary heater to work;Valve 29 connects with switch driver 34.
The bottom in cold burden storehouse 12 is provided with the first discharge nozzle 36, cold burden storehouse valve 37;Cold burden storehouse valve 37 and switch Driver 34 connects.
Be provided with in drying drum 14 second temperature sensor 40, secondary heater, the second computer heating control chip 41, Second discharge nozzle 38, drying drum valve 39;Second temperature sensor the 40, second computer heating control chip 41 and control Device 96 processed connects;Second computer heating control chip 41 is connected with secondary heater and drives secondary heater to work;
Valve 39 connects with switch driver 34.
Be provided with in hot aggregate bin 15 three-temperature sensor the 42, the 3rd heater, the 3rd computer heating control chip 43, 3rd discharge nozzle 44, hot aggregate bin valve 30, the 3rd LOAD CELLS 95;Hot aggregate bin valve 30 and switch driver 34 connect;Three-temperature sensor the 42, the 3rd computer heating control chip 43, LOAD CELLS 95 and controller 96 Connect.3rd computer heating control chip 43 is connected with the 3rd heater and drives the 3rd heater work;
Be provided with in agitated kettle 16 the 4th temperature sensor the 45, the 4th heater, the 4th computer heating control chip 46, Valve 17;Valve 17 connects with switch driver 34, the 4th temperature sensor the 45, the 4th computer heating control chip 46 Connect with controller 96.4th computer heating control chip 46 is connected with the 4th heater and drives the 4th heater work Make;
The second LOAD CELLS 26, mineral powder bin valve 31, mineral powder bin discharge nozzle 47 it is provided with in mineral powder bin 13;Ore deposit Powder cabin valve 31 connects with switch driver 34, and the second LOAD CELLS 26 connects with controller 96.
Asphaltum heating pot 10 is connected with agitated kettle 16 by flowline 35, and cold burden storehouse 12 is by the first discharge nozzle 36 Connecting with drying drum 14, drying drum 14 is connected with hot aggregate bin 15 by the second discharge nozzle 38, hot aggregate bin 15 Being connected with agitated kettle 16 by the 3rd discharge nozzle 44, mineral powder bin 13 is by mineral powder bin discharge nozzle 47 and agitated kettle 16 Connect.
Feed appliance the 19, the 5th temperature sensor the 48, the 5th heater, the 5th computer heating control it is provided with in hopper 18 Chip 49;5th temperature sensor the 48, the 5th computer heating control chip 49 connects with controller 96.Slender acanthopanax thermal control Coremaking sheet 49 is connected with the 5th heater and drives the 5th heater work;
Helical spreader 20 is arranged on hopper 18 back lower place, thickness adjusted screw rod 21 and shakeout plate 22 and be arranged on spiral The rear of spreader 20.Helical spreader 20 width be 30cm, a diameter of 1cm.
Shakeout plate 22 and be provided with the 6th temperature sensor the 50, the 6th heater, the 6th computer heating control chip 51;The Six temperature sensor the 50, the 6th computer heating control chips 51 connect with controller 96.The width shakeouing plate 22 is 30cm, Thickness is 5mm.6th computer heating control chip 51 is connected with the 6th heater and drives the 6th heater work;
First computer heating control chip the 33, second computer heating control chip the 41, the 3rd computer heating control of the present invention Chip the 43, the 4th computer heating control chip the 46, the 5th computer heating control chip 49 and the 6th computer heating control chip 51 Can be realized by a computer heating control chip, it is possible to realized by multiple computer heating control chips.
Asphaltum heating pot 10, cold burden storehouse 12, mineral powder bin 13, drying drum 14, hot aggregate bin 15, agitated kettle 16, Hopper 18 completes the preparation of stress absorption band compound jointly.
Hopper 18, feed appliance 19, helical spreader 20, thickness adjusted screw rod 21 and shakeout plate 22 jointly complete should The making of power absorption band compound.
Fibergrass polyester mat making device includes Fibergrass polyester mat roller 23 and angular adjustment lining device 24, wherein, poly- Ester glass-fiber-fabric roller 23 is rolled into the Fibergrass polyester mat of volume for placing;Angular adjustment lining device 24 is used for regulating polyester glass With the making angle on road surface in fine cloth paving process;Fibergrass polyester mat roller 23, angular adjustment lining device 24 and train Wheel 6 completes the making of Fibergrass polyester mat jointly, and is pressed into by Fibergrass polyester mat in stress absorption band compound.
The preparation of second layer stress absorption band and making device 3 are prepared and making device 2 with ground floor stress absorption band Structure identical, working method is the most identical, is not repeated at this.
Compaction apparatus 4 is positioned at the rearmost of train body 1, and including compacting steel wheel 93 and compacting steel wheel 94, it completes The compacting of double-layer stress absorption band compound, guarantee in two layers polyester glass-fiber-fabric embedment stress absorption band compound.

Claims (10)

1. a double-layer stress absorption band integrated construction train, it is characterised in that: described double-layer stress absorption band integrated construction train includes train body (1) and the railway carriage (9) dragged by train body (1);Described railway carriage (9) is internal is axially disposed with the preparation of ground floor stress absorption band and making device (2), the preparation of second layer stress absorption band and making device (3) and compaction apparatus (4) along railway carriage (9);Described railway carriage (9) is internal is additionally provided with the data collection and control device being connected with the preparation of ground floor stress absorption band and making device (2) and the preparation of second layer stress absorption band and making device (3);Described data collection and control device includes control chamber (27);Described control chamber (27) is internally provided with controller (96) and the computer heating control chip being connected respectively and switch driver (34) with controller (96).
Double-layer stress absorption band integrated construction train the most according to claim 1, it is characterised in that: the preparation of described ground floor stress absorption band and making device (2) and the preparation of second layer stress absorption band and making device (3) all include stress absorption band compound preparation facilities, the making device of stress absorption band compound and Fibergrass polyester mat making device;Described stress absorption band compound preparation facilities includes Colophonium heat treatment apparatus, collection material processing device, device for processing mineral powder and agitated kettle (16);Described Colophonium heat treatment apparatus, collection material processing device and device for processing mineral powder connect with agitated kettle (16) respectively;The making device of described stress absorption band compound includes hopper (18), feed appliance (19), thickness adjusted screw rod (21), helical spreader (20) and shakeouts plate (22);Described hopper (18) connects with agitated kettle (16);Described feed appliance (19) includes feed appliance import and feed appliance outlet;Described feed appliance import is stretched in hopper (18);Described helical spreader (20) is placed in feed appliance exit;Described thickness adjusted screw rod (21) is connected with shakeouing plate (22);The described plate (22) that shakeouts is placed in helical spreader (20) end;Described Fibergrass polyester mat making device is placed in and shakeouts plate (22) end.
Double-layer stress absorption band integrated construction train the most according to claim 2, it is characterised in that: described Colophonium heat treatment apparatus includes Asphaltum heating pot (10), agitator (11), the first LOAD CELLS (25), flowline (35);First temperature sensor (32), primary heater and Asphaltum heating pot valve (29);Described Asphaltum heating pot (10) is internally provided with agitator (11), the first temperature sensor (32) and primary heater;Described first temperature sensor (32) is connected with controller (96);Described controller (96) is connected with primary heater by computer heating control chip;Described Asphaltum heating pot (10) is connected with agitated kettle (16) by flowline (35);Described Asphaltum heating pot (10) is provided with the first LOAD CELLS (25) with the contact position of flowline (35);Asphaltum heating pot valve (29) it is provided with on described flowline (35);Described controller (96) is connected with Asphaltum heating pot valve (29) by switch driver (34);Described controller (96) is connected with the first LOAD CELLS (25).
Double-layer stress absorption band integrated construction train the most according to claim 3, it is characterised in that: described collection material processing device includes cold burden storehouse (12), the first discharge nozzle (36), cold burden storehouse valve (37), drying drum (14), the second discharge nozzle (38), drying drum valve (39), the second temperature sensor (40), secondary heater, hot aggregate bin (15), three-temperature sensor (42), the 3rd heater, hot aggregate bin valve (30), the 3rd discharge nozzle (44) and the 3rd LOAD CELLS (95);Described cold burden storehouse (12) passes sequentially through the first discharge nozzle (36), drying drum (14), the second discharge nozzle (38), hot aggregate bin (15) and the 3rd discharge nozzle (44) and connects with agitated kettle (16);It is provided with cold burden storehouse valve (37) on described first discharge nozzle (36);It is provided with drying drum valve (39) on described second discharge nozzle (38);It is provided with hot aggregate bin valve (30) on described 3rd discharge nozzle (44);Described drying drum (14) is internally provided with the second temperature sensor (40) and secondary heater;Described hot aggregate bin (15) is internally provided with three-temperature sensor (42), the 3rd LOAD CELLS (95) and the 3rd heater;Described controller (96) is connected with the second temperature sensor (40) and three-temperature sensor (42) respectively;Described controller (96) is connected with secondary heater and the 3rd heater respectively by computer heating control chip;Described controller (96) is connected with cold burden storehouse valve (37), drying drum valve (39) and hot aggregate bin valve (30) respectively by switch driver (34).
Double-layer stress absorption band integrated construction train the most according to claim 4, it is characterised in that: described device for processing mineral powder includes mineral powder bin (13), mineral powder bin discharge nozzle (47), mineral powder bin valve (31) and the second LOAD CELLS (26);Described mineral powder bin (13) is connected with agitated kettle (16) by mineral powder bin discharge nozzle (47);It is provided with mineral powder bin valve (31) on described mineral powder bin discharge nozzle (47);Described mineral powder bin (13) is provided with the second LOAD CELLS (26) with the contact position of mineral powder bin discharge nozzle (47);Described controller (96) is connected with mineral powder bin valve (31) by switch driver (34);Described controller (96) is connected with the second LOAD CELLS (26).
Double-layer stress absorption band integrated construction train the most according to claim 5, it is characterised in that: described agitated kettle (16) is internally provided with the 4th temperature sensor (45), the 4th heater and valve (17);Described controller (96) is connected with valve (17) by switch driver (34);Described controller (96) is connected by computer heating control chip and the 4th heater;Described controller (96) is connected with the 4th temperature sensor (45);Described agitated kettle (16) is connected with hopper (18) by valve (17).
7. according to the double-layer stress absorption band integrated construction train described in Claims 2 or 3 or 4 or 5 or 6, it is characterised in that: described hopper (18) is internally provided with the 5th temperature sensor (48) and the 5th heater;Described controller (96) is connected by computer heating control chip and the 5th heater;Described controller (96) is connected with the 5th temperature sensor (48);Described plate (22) bottom of shakeouing is provided with the 6th temperature sensor (50) and the 6th heater;Described controller (96) is connected by computer heating control chip and the 6th heater;Described controller (96) is connected with the 6th temperature sensor (50).
Double-layer stress absorption band integrated construction train the most according to claim 7, it is characterised in that: the width of described helical spreader (20) is 30cm, a diameter of 1cm;The described width shakeouing plate (22) is 30cm, and thickness is 5mm;Described Fibergrass polyester mat making device includes Train Wheel (6) and Fibergrass polyester mat roller (23);Described Train Wheel (6) is by treating that making Fibergrass polyester mat is connected with Fibergrass polyester mat roller (23);Train Wheel (6) is driven to rotate when described Fibergrass polyester mat roller (23) rotates;Angular adjustment lining device (24) it is provided with between line and horizontal direction between described Train Wheel (6) and Fibergrass polyester mat roller (23).
Double-layer stress absorption band integrated construction train the most according to claim 8, it is characterised in that: described compaction apparatus (4) includes the axially set gradually first compacting steel wheel (93) along railway carriage (9) and the second compacting steel wheel (94).
Double-layer stress absorption band integrated construction train the most according to claim 9, it is characterised in that: it is provided with result output screen (99), parameter input keyboard (100) and control switch (98) being connected with controller on described control chamber (27).
CN201610559363.8A 2016-07-15 2016-07-15 A kind of double-layer stress absorption band integrated construction train Expired - Fee Related CN106012783B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610559363.8A CN106012783B (en) 2016-07-15 2016-07-15 A kind of double-layer stress absorption band integrated construction train

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610559363.8A CN106012783B (en) 2016-07-15 2016-07-15 A kind of double-layer stress absorption band integrated construction train

Publications (2)

Publication Number Publication Date
CN106012783A true CN106012783A (en) 2016-10-12
CN106012783B CN106012783B (en) 2018-02-02

Family

ID=57118305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610559363.8A Expired - Fee Related CN106012783B (en) 2016-07-15 2016-07-15 A kind of double-layer stress absorption band integrated construction train

Country Status (1)

Country Link
CN (1) CN106012783B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867275A (en) * 2018-08-14 2018-11-23 李淑平 A kind of cement is laid with and curing means

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100839A (en) * 2007-07-27 2008-01-09 长沙中联重工科技发展股份有限公司 Double-layer lying device for hot in-place regeneration remixer
KR20090112040A (en) * 2008-04-23 2009-10-28 정운규 The movable equipment for the re-construction of damage part in paved road and its method
CN102787548A (en) * 2012-08-30 2012-11-21 重庆交通大学 In-site heating regeneration maintenance vehicle for asphalt pavements
CN104727208A (en) * 2015-03-19 2015-06-24 山东省路桥集团有限公司 In-place heat regeneration integrated machine for bituminous pavements and control method
CN205975317U (en) * 2016-07-15 2017-02-22 山西省交通科学研究院 Double -deck stress absorption zone integrated construction train

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100839A (en) * 2007-07-27 2008-01-09 长沙中联重工科技发展股份有限公司 Double-layer lying device for hot in-place regeneration remixer
KR20090112040A (en) * 2008-04-23 2009-10-28 정운규 The movable equipment for the re-construction of damage part in paved road and its method
CN102787548A (en) * 2012-08-30 2012-11-21 重庆交通大学 In-site heating regeneration maintenance vehicle for asphalt pavements
CN104727208A (en) * 2015-03-19 2015-06-24 山东省路桥集团有限公司 In-place heat regeneration integrated machine for bituminous pavements and control method
CN205975317U (en) * 2016-07-15 2017-02-22 山西省交通科学研究院 Double -deck stress absorption zone integrated construction train

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867275A (en) * 2018-08-14 2018-11-23 李淑平 A kind of cement is laid with and curing means
CN108867275B (en) * 2018-08-14 2020-08-25 深圳市路桥建设集团有限公司 Cement laying and maintaining device

Also Published As

Publication number Publication date
CN106012783B (en) 2018-02-02

Similar Documents

Publication Publication Date Title
CN102011362B (en) Hot in-place recycling ultrathin overlaying machine of bituminous pavement and construction method thereof
CN105350421B (en) A kind of thin overlay construction method suitable for road surface medium-capital overhauling and preventive maintenance
CN104762862B (en) SMA asphaltic road-mix surface course construction methods
CN201770923U (en) Ultrathin covering machine for hot in-place recycling of bituminous pavements
CN207314110U (en) A kind of municipal administration road surface quick-restoring device
CN109853349A (en) Asphalt pavement pit repairing machine and method for repairing and mending
CN109763395A (en) Double steel wheels and pneumatic-tired rollers are formed a team to Asphalt Concrete Pavement Compaction construction
CN106245506A (en) Multifunction road regenerating device and pavement recycling construction method
CN102505600A (en) On-site construction method of cold recycling asphalt pavement
CN205839551U (en) A kind of adjustable bituminous distributor of nozzle height
CN209443349U (en) Asphalt pavement rut repair machine
CN106223179A (en) Road surface hot recycling machine and road surface hot reproduction construction method
CN109811610A (en) Road reconstruction method and apparatus for construction of the highway
CN110258236A (en) A kind of high-performance steel slag road surface and its construction method
CN205975318U (en) Stress absorption zone preparation and making device
CN106968155A (en) A kind of asphalt-spreader
CN106012783A (en) Double-layer stress absorption band integrated construction train
CN205975317U (en) Double -deck stress absorption zone integrated construction train
CN102912712A (en) Cold-stirring and cold-paving all-in-one machine
CN207159764U (en) A kind of pitch-rood
CN104695308B (en) Asphalt pavement on-site heat recoveryremixer twin-tub agitator kettle
CN213867237U (en) Layered laying device for asphalt pavement
CN107419706A (en) The mesoclimate of high altitude localities asphaltic concrete core wall construction builds method
CN210238225U (en) System for synchronous spraying of cement paste between base course layers of semi-rigid pavement and base course paving
CN206768548U (en) A kind of asphalt-spreader

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180202

Termination date: 20180715