CN109811610A - Road reconstruction method and apparatus for construction of the highway - Google Patents

Road reconstruction method and apparatus for construction of the highway Download PDF

Info

Publication number
CN109811610A
CN109811610A CN201910159632.5A CN201910159632A CN109811610A CN 109811610 A CN109811610 A CN 109811610A CN 201910159632 A CN201910159632 A CN 201910159632A CN 109811610 A CN109811610 A CN 109811610A
Authority
CN
China
Prior art keywords
road
road surface
pulverizing chamber
construction
highway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910159632.5A
Other languages
Chinese (zh)
Inventor
丁小平
李国威
赵军庆
徐宁
贾飞鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Road and Bridge Group Co Ltd
Original Assignee
CSCEC Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Road and Bridge Group Co Ltd filed Critical CSCEC Road and Bridge Group Co Ltd
Priority to CN201910159632.5A priority Critical patent/CN109811610A/en
Publication of CN109811610A publication Critical patent/CN109811610A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Repair (AREA)

Abstract

The invention discloses a kind of road reconstruction method and apparatus for construction of the highway, wherein method are as follows: road surface is started by pavement crack and will be broken road surface fragment collect;The road surface fragment of collection is ground into the crumbles that partial size is not more than 10cm;The crumbles and bituminous concrete be mixed and stirred for according to volume ratio 1:0.5-1 uniformly, obtaining primary road surfacing material;The primary road surfacing material layering is laid on the region that road surface is started, and the primary road surfacing material of laying is successively compacted;To the region spread sticking layer oil after S4 compacting, it is then laid with glass fiber grid;Compacting, maintenance after laying stone mastic asphalt, that is, complete Pavement Improvement on the glass fiber grid.Its laying that new road surface is carried out using original ground surface material, construction technology is simple, and new laying road surface is sturdy and durable, and saves a large amount of material cost.

Description

Road reconstruction method and apparatus for construction of the highway
Technical field
The present invention relates to pavement construction technical field more particularly to a kind of road reconstruction method for construction of the highway and set It is standby.
Background technique
Highway pavement has the advantages that firm, wear-resisting, long service life, but due to long-term overload operation and it is natural because Element influences, it is likely that has just damaged not arriving Upkeep Period, this just needs road pavement timely to be repaired.Existing Common method is that old plate is abolished to the scheme of reconstruction in Pavement Improvement, and the program completely eliminates the danger of original road deck layer Evil reduces the new easy embrittlement of repair way face and leads to the problem of reflection crack, but without utilizing original ground surface material, shape At a large amount of building waste, huge waste is caused, and constructs and needs to abolish, outer abandoning, the again multiple working procedures such as paving, health, Process interweaves, is complicated, long construction period, and operating expenses itself is high, also polluted environment, the social cost paid is quite huge Greatly.
Summary of the invention
It is an object of the invention to solve at least the above problems, and provide the advantages of at least will be described later.
It is a still further object of the present invention to provide a kind of road reconstruction methods for construction of the highway, utilize original road surface material Material carries out the laying on new road surface, and construction technology is simple, and new laying road surface is sturdy and durable, and saves a large amount of material cost.
To achieve the above object with some other purposes, the present invention adopts the following technical scheme:
A kind of road reconstruction method for construction of the highway, comprising the following steps:
S1, road surface is started by pavement crack and is collected broken road surface fragment;
S2, the road surface fragment of collection is ground into the crumbles that partial size is not more than 10cm;
S3, the crumbles and bituminous concrete be mixed and stirred for uniformly, obtaining just according to volume ratio 1:0.5-1 Grade road surfacing material;
S4, the primary road surfacing material layering is laid on the region that road surface is started, and to the primary road surface of laying Material is laid with successively to be compacted;
S5, to S4 compacting after region spread sticking layer oil, be then laid with glass fiber grid;
S6, it is laid with compacting, maintenance after stone mastic asphalt on the glass fiber grid, that is, completes road surface and changes It makes.
Preferably, in the road reconstruction method for construction of the highway, in the primary road surfacing material in S4 It, need to also be in the region spread priming oil that road surface is started before being successively laid with.
Preferably, in the road reconstruction method for construction of the highway, the material of primary road surfacing described in S4 point The region that road surface is started successively is laid on for layer 2-4.
Preferably, in the road reconstruction method for construction of the highway, by the road surface fragment of collection through more in S2 Secondary crushing, so that the partial size of obtained crumbles is gradually reduced with the increase of the crushing number of road surface fragment;It repeatedly crushes and obtains The crumbles mixed respectively with bituminous concrete, and according in obtained primary road surfacing material the partial size of crumbles it is big It is small to be successively laid on the region that road surface is started.
Preferably, in the road reconstruction method for construction of the highway, successively it is laid on the area that road surface is started According to from the bottom to top, the partial size of the crumbles in the primary road surfacing material is gradually reduced and sets the primary road surfacing material in domain It sets.
A kind of equipment applied to the road reconstruction method for construction of the highway, comprising:
Fuselage, bottom are provided with the idler wheel for being supportted from the ground and driving the fuselage movement;
Road surface starts portion, and the front end of the fuselage is arranged in;The road surface portion of starting include lifting motor, start plate and Export wheel;The lifting motor is set to the front end of the fuselage, and the output shaft of the lifting motor, which is connected to, described starts plate; Described one end for starting plate is fixedly connected on the lifting motor;The other end for starting plate is to the direction in front of the fuselage It extends obliquely downward and close to road surface;The export wheel includes shaft and the gear teeth, and the shaft is rotatably provided at The top for starting plate, the gear teeth are fixedly connected on the shaft, and servo-actuated with the shaft;
Pulverizing chamber is set on the fuselage, and the closely lifting motor setting;The pulverizing chamber is close to the liter It drops and offers feeding inlet on the top surface of the side of motor;It is provided in the pulverizing chamber indoor for crushing the investment crushing The disintegrating mechanism of material;The disintegrating mechanism is formed by motor, drive shaft and crushing vane is crushed;The crushing motor is set to On the top surface of the pulverizing chamber, the top plate that the output shaft for crushing motor penetrates through the pulverizing chamber is protruded into the pulverizing chamber, And described indoor driving axis connection is crushed with being vertically arranged at;The crushing vane is evenly arranged in the bottom of the drive shaft End, and it is servo-actuated with the drive shaft;The bottom of the pulverizing chamber is provided with the discharging for penetrating through the pulverizing chamber and the fuselage Mouthful;
Storage compartment is set on the fuselage, and is located at the rear of the pulverizing chamber;Drip is stored in the storage compartment Green concrete mixture;Feed inlet is provided at the top of the storage compartment, the storage compartment and the connecting pin of the pulverizing chamber are set It is equipped with the conveying mouth of perforation to the pulverizing chamber;
Driver's cabin is set on the fuselage, and is located at the rear of the storage compartment;
Compacting chamber is arranged on the fuselage, and is located at the rear of the driver's cabin, is provided with pressure in the compacting chamber Real roller;The compression roll is connected on the inner wall of the compacting chamber, and the bottom surface of the compression roll is equal with the bottom surface of the idler wheel Together, and under the drive of the idler wheel it rotates.
Preferably, in the equipment for the road reconstruction method of construction of the highway, the discharge port and conveying mouth On be provided with lid;The button for controlling the lid folding is equipped in the driver's cabin.
Preferably, it in the equipment for the road reconstruction method of construction of the highway, is provided in the pulverizing chamber Fluid reservoir, the outer wall of the fluid reservoir are bonded inner wall of the pulverizing chamber close to one end of the lifting motor and are arranged, and described The side wall of the one end of fluid reservoir far from the lifting motor is set as from where the bottom surface of the fluid reservoir to the lifting motor The inclined skew wall in direction;The bottom of the fluid reservoir is provided with the liquid outlet for penetrating through the body bottom surface.
Preferably, in the equipment for the road reconstruction method of construction of the highway, the discharge port, liquid outlet and The width of compression roll starts the of same size of plate with described.
The present invention is include at least the following beneficial effects:
In road reconstruction method for construction of the highway of the invention, by the way that road surface is started and is broken by pavement crack It is broken, so that starting for road surface easily facilitates implementation, difficulty of construction is reduced, while improving efficiency.
By being applied to the laying on new road surface after mixing the material of damaged road surface in proportion with bituminous concrete, so that useless Old material has obtained utilization again, saves the use cost of raw material, while avoiding the generation of a large amount of building wastes, protects Environment has been protected, and has passed through the use in proportion of bituminous concrete, so that the durability on the road surface newly formed is protected Card, and can be avoided the generation in crack.
By the crushing to ground surface material is started, and strict control its granularity, so that bituminous concrete and broken kernel is mixed Close it is more uniform, i.e., so that the quality of new paver formed is further guaranteed.
By being successively laid with so that road surface more consolidation, glass fiber grid can effectively improve the crack resistance on road surface, improve The service life on the road surface newly reconstructed.
Further advantage, target and feature of the invention will be partially reflected by the following instructions, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the flow chart provided by the present invention for the road reconstruction method of construction of the highway;
Fig. 2 is the structure chart provided by the present invention for the equipment of the road reconstruction method of construction of the highway.
Specific embodiment
It elaborates with reference to the accompanying drawing to the present invention, to enable those of ordinary skill in the art refering to energy after this specification It is enough to implement accordingly.
As shown in Figure 1, a kind of road reconstruction method for construction of the highway, comprising the following steps:
S1, road surface is started by pavement crack and is collected broken road surface fragment;
S2, the road surface fragment of collection is ground into the crumbles that partial size is not more than 10cm;
S3, the crumbles and bituminous concrete be mixed and stirred for uniformly, obtaining just according to volume ratio 1:0.5-1 Grade road surfacing material;
S4, the primary road surfacing material layering is laid on the region that road surface is started, and to the primary road surface of laying Material is laid with successively to be compacted;
S5, to S4 compacting after region spread sticking layer oil, be then laid with glass fiber grid;
S6, it is laid with compacting, maintenance after stone mastic asphalt on the glass fiber grid, that is, completes road surface and changes It makes.
In the above scheme, by the way that road surface is started and is crushed by pavement crack, so that starting for road surface easily facilitates Implement, reduces difficulty of construction, while improving efficiency.
By being applied to the laying on new road surface after mixing the material of damaged road surface in proportion with bituminous concrete, so that useless Old material has obtained utilization again, saves the use cost of raw material, while avoiding the generation of a large amount of building wastes, protects Environment has been protected, and has passed through the use in proportion of bituminous concrete, so that the durability on the road surface newly formed is protected Card, and can be avoided the generation in crack.
By the crushing to ground surface material is started, and strict control its granularity, so that bituminous concrete and broken kernel is mixed Close it is more uniform, i.e., so that the quality of new paver formed is further guaranteed.
By being successively laid with so that road surface more consolidation, glass fiber grid can effectively improve the crack resistance on road surface, improve The service life on the road surface newly reconstructed.
In one preferred embodiment, in S4 before the primary road surfacing material is successively laid with, it need to also be started on road surface Region spread priming oil.
In the above scheme, by the spread of priming oil, so that the combination of primary road surfacing material and road surface underlying base layer It is even closer, avoid the gap of interlayer from influencing pavement life.
In one preferred embodiment, the material of primary road surfacing described in S4 is divided into layer 2-4 and is successively laid on what road surface was started Region.
In the above scheme, it is successively laid with by the way that primary road surfacing material is divided into layer 2-4, so that road surfacing is more tied It is real durable.
In one preferred embodiment, the road surface fragment of collection is repeatedly crushed in S2, so that the partial size of obtained crumbles It is gradually reduced with the increase of the crushing number of road surface fragment;It is mixed with bituminous concrete respectively repeatedly to crush the obtained crumbles It closes, and is successively laid on the region that road surface is started according to the size of the partial size of crumbles in obtained primary road surfacing material.
In the above scheme, the difference of the partial size of crumbles in the primary road surfacing material being successively laid with, so that be laid with Road surface bearing capacity and anti-shearing force are stronger.
In one preferred embodiment, be successively laid on the primary road surfacing material in the region that road surface is started according to by down toward On, the partial size of the crumbles in the primary road surfacing material is gradually reduced and is arranged.
In the above scheme, by be arranged successively be laid on the primary road surfacing material in the region that road surface is started according to by Under it is supreme, the partial size of the crumbles in the primary road surfacing material is gradually reduced, and lower layer is tied well with base It closes, and upper layer can preferably cope with the pressure formed when pavement usage, to improve the new service life for being laid with road surface.
As shown in Fig. 2, a kind of equipment applied to the road reconstruction method for construction of the highway, comprising: fuselage 1, bottom Portion is provided with the idler wheel 2 for being supportted from the ground and driving the fuselage movement.
Road surface starts portion, and the front end of the fuselage 1 is arranged in;The road surface portion of starting includes lifting motor 3, starts plate 4 take turns 5 with export;The lifting motor 3 is set to the front end of the fuselage 1, and the output shaft of the lifting motor 3 is connected to described Start plate 4;Described one end for starting plate 4 is fixedly connected on the lifting motor 3;The other end for starting plate 4 is to the machine The direction in 1 front of body extends obliquely downward and close to road surface;The export wheel 5 includes shaft and the gear teeth, and the shaft is can revolve The top for starting plate 4 is arranged in the mode turned, and the gear teeth are fixedly connected on the shaft, and servo-actuated with the shaft.
Pulverizing chamber 6 is set on the fuselage 1, and closely the lifting motor 3 is arranged;The pulverizing chamber 6 is close to institute It states and offers feeding inlet 7 on the top surface of the side of lifting motor 3;It is provided in the pulverizing chamber 6 and puts into the powder for crushing The disintegrating mechanism of material in broken room 6;The disintegrating mechanism is formed by motor 7, drive shaft 8 and crushing vane 9 is crushed;The powder Broken motor 7 is set on the top surface of the pulverizing chamber 6, and the top plate that the output shaft for crushing motor 7 penetrates through the pulverizing chamber 6 is stretched Enter in the pulverizing chamber 6, and is connect with the drive shaft 8 being vertically arranged in the pulverizing chamber 6;The uniform cloth of the crushing vane 9 It sets in the bottom end of the drive shaft 8, and servo-actuated with the drive shaft 8;The bottom of the pulverizing chamber 6 is provided with the perforation crushing The discharge port of room 6 and the fuselage 1.
Storage compartment 10 is set on the fuselage 1, and is located at the rear of the pulverizing chamber 6;10 memory of storage compartment Contain bituminous concrete mixture;The top of the storage compartment 10 is provided with feed inlet 11, the storage compartment 10 and the crushing The connecting pin of room 6 is provided with the conveying mouth 12 of perforation to the pulverizing chamber 6.
Driver's cabin 13 is set on the fuselage 1, and is located at the rear of the storage compartment 10.
Compacting chamber 14 is arranged on the fuselage 1, and is located at the rear of the driver's cabin 13, in the compacting chamber 14 It is provided with compression roll 15;The compression roll 15 is connected on the inner wall of the compacting chamber 14, the bottom surface of the compression roll 15 and institute The bottom surface flush of idler wheel 2 is stated, and is rotated under the drive of the idler wheel 2.
In the above scheme, the personnel of driver's cabin drive the equipment and travel on road surface to be reconstructed, road to be driven to At facial cleft seam, control lifting will start plate and extend downwardly, and protrude into crack, with the traveling of equipment, start plate for top course It starts, the rotation that the upper gear teeth are taken turns in export drives the road surface pellet started to enter in pulverizing chamber, crushes indoor disintegrating mechanism to grain Material is crushed, while being controlled the indoor bituminous concrete of storing and being inputted in pulverizing chamber according to quantity, the pellet and pitch coagulation of crushing Soil is uniformly mixed under the rotation of disintegrating mechanism, is flowed on road surface by discharge port, compression roll is right in the traveling process of equipment The mixture stayed on road surface is compacted, so that the broken progress synchronous with what is be laid on road surface is realized, so that working procedure Greatly reduce, and construction efficiency greatly improves.
In one preferred embodiment, lid is provided in the discharge port and conveying mouth 12;It is equipped in the driver's cabin 13 Control the button of the lid folding.
In the above scheme, by the setting of lid, driver in driver's cabin is enabled to control pitch coagulation at any time The mixing of soil and crushed material, and the primary road surfacing material that mixes are laid on the amount on road surface, in order to guarantee construction Quality.
In one preferred embodiment, it is provided with fluid reservoir 16 in the pulverizing chamber 6, described in the outer wall fitting of the fluid reservoir 16 Pulverizing chamber 6 close to one end of the lifting motor 3 inner wall be arranged, and the fluid reservoir 16 far from the lifting motor 3 one The side wall at end is set as from the inclined skew wall in direction where the bottom surface of the fluid reservoir 16 to the lifting motor 3;The storage The bottom of liquid chamber 16 is provided with the liquid outlet for penetrating through 1 bottom surface of fuselage.
In the above scheme, by the way that fluid reservoir is arranged in pulverizing chamber, so that fluid reservoir can be passed through before road surfacing Road pavement starts the spread that range carries out priming oil etc.;Side wall by the way that the one end of fluid reservoir far from lifting motor is arranged is oblique Wall avoids the top plate of fluid reservoir from influencing export wheel road pavement and starts material importing pulverizing chamber so that the top plate of fluid reservoir is smaller.
In one preferred embodiment, the width of the discharge port, liquid outlet and compression roll 15 with the width for starting plate 4 It is identical.
In the above scheme, by setting discharge port, liquid outlet and compression roll width with the width phase that starts plate Together, so that the laying material of discharge port output can cover and start the road surface range that plate starts, while the liquid of liquid outlet spread Spread range and the compacting range of compression roll, which can cover, starts the road surface range that plate starts, and realizes road surface and starts, is laid with And the synchronous of compacting carries out, and effectively simplifies construction technology, and improve the efficiency of construction.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and the legend herein shown with description.

Claims (9)

1. a kind of road reconstruction method for construction of the highway, wherein the following steps are included:
S1, road surface is started by pavement crack and is collected broken road surface fragment;
S2, the road surface fragment of collection is ground into the crumbles that partial size is not more than 10cm;
S3, the crumbles and bituminous concrete be mixed and stirred for according to volume ratio 1:0.5-1 uniformly, obtaining primary road Face is laid with material;
S4, the primary road surfacing material layering is laid on to the region that road surface is started, and the primary road surfacing to laying Material is successively compacted;
S5, to S4 compacting after region spread sticking layer oil, be then laid with glass fiber grid;
S6, it is laid with compacting, maintenance after stone mastic asphalt on the glass fiber grid, that is, completes Pavement Improvement.
2. being used for the road reconstruction method of construction of the highway as described in claim 1, wherein in the primary road surfacing in S4 It, need to also be in the region spread priming oil that road surface is started before material is successively laid with.
3. being used for the road reconstruction method of construction of the highway as described in claim 1, wherein the material of primary road surfacing described in S4 It is divided into layer 2-4 and is successively laid on the region that road surface is started.
4. being used for the road reconstruction method of construction of the highway as described in claim 1, wherein pass through the road surface fragment of collection in S2 It repeatedly crushes, so that the partial size of obtained crumbles is gradually reduced with the increase of the crushing number of road surface fragment;Repeatedly crush The crumbles arrived are mixed with bituminous concrete respectively, and according to the partial size of crumbles in obtained primary road surfacing material Size is successively laid on the region that road surface is started.
5. being used for the road reconstruction method of construction of the highway as claimed in claim 4, wherein be successively laid on what road surface was started The primary road surfacing material in region according to from the bottom to top, the partial size of the crumbles in the primary road surfacing material be gradually reduced and Setting.
6. a kind of equipment applied to the road reconstruction method as described in claim 1 for construction of the highway, wherein include:
Fuselage, bottom are provided with the idler wheel for being supportted from the ground and driving the fuselage movement;
Road surface starts portion, and the front end of the fuselage is arranged in;The road surface portion of starting includes lifting motor, starts plate and export Wheel;The lifting motor is set to the front end of the fuselage, and the output shaft of the lifting motor, which is connected to, described starts plate;It is described The one end for starting plate is fixedly connected on the lifting motor;The other end for starting plate is tilted to the direction in front of the fuselage It extends downwardly and close to road surface;The export wheel includes shaft and the gear teeth, and the shaft is rotatably provided at described The top of plate is started, the gear teeth are fixedly connected on the shaft, and servo-actuated with the shaft;
Pulverizing chamber is set on the fuselage, and the closely lifting motor setting;The pulverizing chamber is close to the lifting electricity Feeding inlet is offered on the top surface of the side of machine;It is provided in the pulverizing chamber for crushing the investment indoor material of crushing Disintegrating mechanism;The disintegrating mechanism is formed by motor, drive shaft and crushing vane is crushed;The crushing motor is set to described On the top surface of pulverizing chamber, the top plate that the output shaft for crushing motor penetrates through the pulverizing chamber is protruded into the pulverizing chamber, and with It is vertically arranged at the indoor driving axis connection of crushing;The crushing vane is evenly arranged in the bottom end of the drive shaft, and It is servo-actuated with the drive shaft;The bottom of the pulverizing chamber is provided with the discharge port for penetrating through the pulverizing chamber and the fuselage;
Storage compartment is set on the fuselage, and is located at the rear of the pulverizing chamber;It is mixed that pitch is stored in the storage compartment Solidifying soil mixture;Feed inlet is provided at the top of the storage compartment, the storage compartment and the connecting pin of the pulverizing chamber are provided with It penetrates through to the conveying mouth of the pulverizing chamber;
Driver's cabin is set on the fuselage, and is located at the rear of the storage compartment;
Compacting chamber is arranged on the fuselage, and is located at the rear of the driver's cabin, is provided with compacting in the compacting chamber Roller;The compression roll is connected on the inner wall of the compacting chamber, the bottom surface flush of the bottom surface of the compression roll and the idler wheel, And it is rotated under the drive of the idler wheel.
7. the equipment for the road reconstruction method of construction of the highway as claimed in claim 6, wherein the discharge port and conveying Lid is provided on mouthful;The button for controlling the lid folding is equipped in the driver's cabin.
8. the equipment for the road reconstruction method of construction of the highway as claimed in claim 6, wherein setting in the pulverizing chamber There is fluid reservoir, the outer wall of the fluid reservoir is bonded inner wall of the pulverizing chamber close to one end of the lifting motor and is arranged, and institute The side wall for stating the one end of fluid reservoir far from the lifting motor is set as from the bottom surface of the fluid reservoir to the lifting motor institute The inclined skew wall in direction;The bottom of the fluid reservoir is provided with the liquid outlet for penetrating through the body bottom surface.
9. the equipment for the road reconstruction method of construction of the highway as claimed in claim 8, wherein the discharge port goes out liquid The width of mouth and compression roll starts the of same size of plate with described.
CN201910159632.5A 2019-03-04 2019-03-04 Road reconstruction method and apparatus for construction of the highway Pending CN109811610A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910159632.5A CN109811610A (en) 2019-03-04 2019-03-04 Road reconstruction method and apparatus for construction of the highway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910159632.5A CN109811610A (en) 2019-03-04 2019-03-04 Road reconstruction method and apparatus for construction of the highway

Publications (1)

Publication Number Publication Date
CN109811610A true CN109811610A (en) 2019-05-28

Family

ID=66608022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910159632.5A Pending CN109811610A (en) 2019-03-04 2019-03-04 Road reconstruction method and apparatus for construction of the highway

Country Status (1)

Country Link
CN (1) CN109811610A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284409A (en) * 2019-07-10 2019-09-27 河南省光大路桥工程有限公司 Super thick degree paves Vibratory Mixing reworked material Construction of Cement Stabilized Macadam technique
CN110846967A (en) * 2019-11-21 2020-02-28 张中元 Method and apparatus for reconstructing a road surface for highway construction
CN112281572A (en) * 2020-09-29 2021-01-29 河北建设集团股份有限公司 Construction method of stress absorbing layer asphalt pavement
CN113047095A (en) * 2021-03-23 2021-06-29 苏州复达多贸易有限公司 Traffic track roadbed construction system for realizing track reconstruction

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1963027A (en) * 2006-11-29 2007-05-16 杨贻方 Pavement digger
CN106192710A (en) * 2016-08-24 2016-12-07 刘二平 Highway waste asphalt rejects regeneration integrated construction gasifying device
CN106677047A (en) * 2016-12-07 2017-05-17 安徽优特公路养护科技有限公司 Vehicle-mounted local road-repairing device
CN106958185A (en) * 2017-04-19 2017-07-18 临沂大学 A kind of small-sized highway is broken to repair all-in-one
CN108385489A (en) * 2018-03-16 2018-08-10 杭州路建工程机械有限公司 A kind of integrated milling machine of milling laying
CN208072118U (en) * 2018-03-14 2018-11-09 济南市市政工程设计研究院(集团)有限责任公司 A kind of warm-mixed asphalt pavement structure applied to bus rapid transit special lane
CN108978418A (en) * 2018-07-31 2018-12-11 项少平 A kind of asphalt road surface local milling and the integrated apparatus that paves
CN208501460U (en) * 2018-05-30 2019-02-15 东莞泰和沥青产品有限公司 A kind of road surface aged asphalt digs device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1963027A (en) * 2006-11-29 2007-05-16 杨贻方 Pavement digger
CN106192710A (en) * 2016-08-24 2016-12-07 刘二平 Highway waste asphalt rejects regeneration integrated construction gasifying device
CN106677047A (en) * 2016-12-07 2017-05-17 安徽优特公路养护科技有限公司 Vehicle-mounted local road-repairing device
CN106958185A (en) * 2017-04-19 2017-07-18 临沂大学 A kind of small-sized highway is broken to repair all-in-one
CN208072118U (en) * 2018-03-14 2018-11-09 济南市市政工程设计研究院(集团)有限责任公司 A kind of warm-mixed asphalt pavement structure applied to bus rapid transit special lane
CN108385489A (en) * 2018-03-16 2018-08-10 杭州路建工程机械有限公司 A kind of integrated milling machine of milling laying
CN208501460U (en) * 2018-05-30 2019-02-15 东莞泰和沥青产品有限公司 A kind of road surface aged asphalt digs device
CN108978418A (en) * 2018-07-31 2018-12-11 项少平 A kind of asphalt road surface local milling and the integrated apparatus that paves

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284409A (en) * 2019-07-10 2019-09-27 河南省光大路桥工程有限公司 Super thick degree paves Vibratory Mixing reworked material Construction of Cement Stabilized Macadam technique
CN110846967A (en) * 2019-11-21 2020-02-28 张中元 Method and apparatus for reconstructing a road surface for highway construction
CN110846967B (en) * 2019-11-21 2022-04-12 广东省建筑工程机械施工有限公司 Method and apparatus for reconstructing a road surface for highway construction
CN112281572A (en) * 2020-09-29 2021-01-29 河北建设集团股份有限公司 Construction method of stress absorbing layer asphalt pavement
CN113047095A (en) * 2021-03-23 2021-06-29 苏州复达多贸易有限公司 Traffic track roadbed construction system for realizing track reconstruction

Similar Documents

Publication Publication Date Title
CN109811610A (en) Road reconstruction method and apparatus for construction of the highway
CN107447638A (en) A kind of municipal road surface quick-restoring device
CN207314110U (en) A kind of municipal administration road surface quick-restoring device
CN207126599U (en) A kind of municipal afforestation soil restoring device
CN109944146A (en) A kind of bituminous pavement flattening device
CN110409276B (en) Road surface laying machine for mixed paving of road
CN206746743U (en) A kind of gardens environment-friendly type dead leaf waste treatment device
CN102505600A (en) On-site construction method of cold recycling asphalt pavement
CN208113263U (en) A kind of urban landscaping soil restoring device
CN108221560A (en) The construction technology on rubber powder modified asphalt road surface
CN205893847U (en) Cement concrete pavement's repair structure
CN110485248A (en) Highway waste asphalt, which is rejected, regenerates construction integrated device
CN109629386A (en) Road repair crushing device
CN207973978U (en) A kind of Multifunctional asphalt road surface repair machine
CN207121794U (en) Multipurpose road building vehicle
CN209759985U (en) Quick prosthetic devices of road surface crack
CN106120507A (en) A kind of over-wet soil roadbed rapid constructing method
CN108330797A (en) A kind of asphalt pavement crack maintenance repair apparatus
CN107419706A (en) The mesoclimate of high altitude localities asphaltic concrete core wall construction builds method
CN207121801U (en) A kind of multi-functional municipal road maintenance of equipment
CN108212416B (en) Concrete crusher
CN207259932U (en) A kind of asphalt road surface gap filling machine
CN205510743U (en) Municipal administration ecological garden soil environmental protection restoration tiling device
CN205839553U (en) A kind of road roller
CN107675576B (en) A kind of processing method of building waste

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned
AD01 Patent right deemed abandoned

Effective date of abandoning: 20220429