CN105951683A - Construction method for corbel steel reinforcements of gate pier - Google Patents

Construction method for corbel steel reinforcements of gate pier Download PDF

Info

Publication number
CN105951683A
CN105951683A CN201610335602.1A CN201610335602A CN105951683A CN 105951683 A CN105951683 A CN 105951683A CN 201610335602 A CN201610335602 A CN 201610335602A CN 105951683 A CN105951683 A CN 105951683A
Authority
CN
China
Prior art keywords
reinforcing bar
cage body
gate pier
pier
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610335602.1A
Other languages
Chinese (zh)
Other versions
CN105951683B (en
Inventor
肖伟明
刘武
徐保峰
陆昌荷
何毅
李新明
刘昌宇
熊建武
胡方华
岳珂珂
黎学皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 1 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 1 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 1 Engineering Co Ltd filed Critical China Gezhouba Group No 1 Engineering Co Ltd
Priority to CN201610335602.1A priority Critical patent/CN105951683B/en
Publication of CN105951683A publication Critical patent/CN105951683A/en
Application granted granted Critical
Publication of CN105951683B publication Critical patent/CN105951683B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a construction method for corbel steel reinforcements of a gate pier. The construction method comprises the steps of 1, fabricating a steel reinforcement cage in a site beyond the gate pier and welding an inner bracket in the steel reinforcement cage, 2, disposing an outer bracket for supporting the steel reinforcement cage on placed gate pier concrete, 3, disposing overhanging scaffold support devices for supporting a corbel bottom form on the placed gate pier concrete, 4, hoisting and accurately positioning the whole steel reinforcement cage, 5, connecting and forming the steel reinforcement cage with other steel reinforcement structures of the body of the gate pier, and 6, removing the inner bracket and the outer bracket and waiting for concrete placing for corbel cavities. One-time integral prefabrication and hoisting construction of left and right corbel steel reinforcements of a hydraulic gate pier are realized through the above steps. Hoisting, positioning and one-time forming of the steel reinforcement cage are realized through the above steps without secondary welding construction of the steel reinforcements of the steel reinforcement cage along with the rising of the pier body; therefore, disturbance to construction is avoided, while the work efficiency is improved, and the amount of working aloft is greatly reduced, resulting in a decrease in the safety risk. Further, the construction method is good in economical efficiency.

Description

Gate pier bracket Joint Re-bar Construction
Technical field
The present invention relates to hydraulic structure construction field, particularly a kind of gate pier bracket Joint Re-bar Construction.
Background technology
Water conservancy project gate pier bracket, as gate pier critical function works, has that design structure is complicated, bar-mat reinforcement is intensive, built-in fitting is many, construction space is narrow and construction precision requirement high, sees Fig. 7.Traditional bracket reinforcement installation technique is, by single reinforcing bar according to design specification and pattern after reinforcement yard's completion of processing, then be hoisted in bracket storehouse, high-altitude, bracket reinforcing bar welds successively along with pier shaft rises, welding direction non-horizontal to.The technique of reinforcing bar scene directly welding needs the spreading of increasing that can carry out reinforcing bar after storehouse, pier shaft bottom time satisfies the requirements to construct.Owing in bracket sector reinforcing bar, bracket, embedded part, the distribution bar of gate pier pier shaft itself and bracket mould plate supporting device are constructed the most simultaneously, the most traditional mounting process can cause operation cross interference.Reinforcement welding and wear muscle, embedded part construction amount of high-altitude operation huge, working procedure is loaded down with trivial details, long construction period, and work efficiency is low, and high-altitude pier body construction narrow space, there is also bigger security risk.
Summary of the invention
The technical problem to be solved is to provide a kind of gate pier bracket Joint Re-bar Construction, it is capable of smooth location under the reinforcing bar cage body pier of gate pier left and right bracket integral prefabricated, cage body lifting location one-shot forming, the construction of cage body reinforcing bar secondary welding is carried out without rising with pier shaft, construction interference can be avoided as far as possible, improve work efficiency, greatly reduce work high above the ground work amount, reduce security risk.
For solving above-mentioned technical problem, the technical solution adopted in the present invention is: a kind of gate pier bracket Joint Re-bar Construction, comprises the following steps:
One, the place beyond gate pier makes reinforcing bar cage body, welds inner support in steel reinforcement cage body;
Two, pier concrete is being poured and is being provided for the external support of spacer bar cage body;
Three, pour pier concrete be provided for support bracket bed die overhanging scaffold support means;
Four, integral hoisting reinforcing bar cage body being accurately positioned;
Five, reinforcing bar cage body is connected molding with other bar constructions of gate pier pier shaft;
Six, remove inner support and external support, wait the concreting of bracket storehouse;
Realized by above step that water conservancy project gate pier bracket reinforcing bar is integral prefabricated, lifting construction.
Preferably in scheme, described inner support and external support use channel-section steel to process.
Preferably in scheme, described inner support is welded on portion in steel reinforcement cage body, becomes frame structure, and the top of inner support is provided with hanger.
Preferably in scheme, described reinforcing bar cage body upper surface and lower surface are plane, and upper surface and lower surface parallel to each other, external support is tilt stand, so that reinforcing bar cage body keeps inclination after integral hoisting, one end that reinforcing bar cage body props up hinge near gate is relatively low.
Preferably in scheme, each angle point and veil in reinforcing bar cage body are provided with control point labelling, with the template sideline with bracket bed die, corresponding with the reinforcing bar poured on pier concrete.
Preferably in scheme, described control point is labeled as the steel bar end of " T " font.
Preferably in scheme, in described steel reinforcement cage body, it is fixedly provided with a hinge embedded part.
Preferably in scheme, described inner support is provided with the brace being connected to bottom from top.
Preferably in scheme, in step 4, before lifting, the steel reinforcement cage body weight heart is checked;
Preferably in scheme, in hoisting process, hand fit's crane utilizes cable wind rope traction to carry out lifting location to position, bracket storehouse;Controlling to coordinate manually by total powerstation, utilize external support to be finely adjusted, bracket bed die and reinforcing bar cage body are measured and checked, it is ensured that the exterior contour of reinforcing bar cage body is accurately positioned, the reinforcing bar of reinforcing bar cage body is accurately positioned with gate pier pier shaft reinforcing bar and docks.
Preferably in scheme, in step 5, after reinforcing bar cage body is accurately positioned, carrying out the integral solder construction with gate pier pier shaft reinforcing bar, gate pier pier shaft reinforcing bar is made up of gate pier pier shaft sector distribution bar and other structure reinforcing bars.
A kind of gate pier bracket Joint Re-bar Construction that the present invention provides, prefabricated by carrying out bracket reinforcing bar cage body at gate pier bottom smooth location, the channel-section steel inner support being equipped with, it is welded as a whole with reinforcing bar cage body, stablizing when guaranteeing to lift reinforcing bar cage body, realize the lifting location one-shot forming of reinforcing bar cage body, it is not necessary to rise with pier shaft and carry out the construction of reinforcing bar cage body reinforcing bar secondary welding;By the hanger of welding on channel-section steel inner support, it is ensured that the safety in transhipment translation and hoisting process of the reinforcing bar cage body;The spacer bar arranged by reinforcing bar cage body, it is achieved the exterior contour of reinforcing bar cage body is accurately positioned, reinforcing bar cage body reinforcing bar being accurately positioned with other gate pier pier shaft bar constructions and docking;By being arranged on the external support on pier shaft casting concrete face, the reinforcing bar cage body after lifting is accurately positioned and guarantees stablizing of whole reinforcing bar cage body intermediate structure, and guarantees that the gradient of reinforcing bar cage body meets design requirement;Recycling of material can be realized by the dismounting of channel-section steel inner support and support arm.Easy construction of the present invention is quick, gate pier left and right bracket steel reinforcement cage body disposable integral hoisting can have been realized, workable, parallel operations face can be opened in small space, it is to avoid the work holdup more, avoid construction interference, improve work efficiency, greatly reduce work high above the ground work amount, reduce security risk, good economy performance.
Accompanying drawing explanation
The invention will be further described with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation during lifting of the present invention.
Fig. 2 is the side-looking structural representation of the present invention.
Fig. 3 is reinforcing bar cage body and the structural representation of external support in the present invention.
Fig. 4 is the frame structure schematic top plan view of inner support in the present invention.
Fig. 5 is external support and the schematic diagram of gate pier pier shaft reinforcing bar in the present invention.
Fig. 6 is the connection diagram that in the present invention, a hinge embedded part and gate prop up hinge.
Fig. 7 is the overall structure schematic diagram of gate in the present invention.
In figure: reinforcing bar cage body 1, inner support 2, external support 3, brace 4, bracket bed die 5, overhanging scaffold support means 6, pour pier concrete 7, gate pier pier shaft reinforcing bar 8, a hinge embedded part 9, gate props up hinge 10, gate 11.
Detailed description of the invention
In Fig. 1 ~ 5, a kind of gate pier bracket Joint Re-bar Construction, comprise the following steps:
One, the place beyond gate pier makes reinforcing bar cage body 1, welds inner support 2 in reinforcing bar cage body 1;Preferably, channel-section steel inner support 2 is arranged in the middle part of reinforcing bar cage body 1.
Smooth location near steel bar meter district places sleeper draw-in groove, draw-in groove is used for being accurately positioned main muscle spacing bottom design bracket, laying reinforcing bar cage body 1 bottom layer of the reinforcing steel net according to design drawing, process the inner support 2 of dimension size simultaneously, preferred inner support 2 uses channel-section steel to process.Preferably employing 18# channel-section steel in this example, inner support 2 becomes frame structure, as shown in Fig. 1,3,4.Inner support 2 welds with bottom layer of the reinforcing steel net.Preferably, inner support 2 top uses round steel to be welded into 4 hangers, lifts by crane stress action spot as reinforcing bar cage body 1, and the top of inner support 2 is respectively to the brace 4 of bracket both sides 3 diameter 20mm of bottom welding.Single gate pier has both sides bracket, and the reinforcing bar cage body between the bracket of both sides is connected to an entirety as shown in Fig. 1,3,4.Preferably in scheme, it is fixedly provided with a hinge embedded part 9 in described reinforcing bar cage body 1, as shown in Figure 6.
Bracket reinforcing bar cage body 1 adds man-hour, the reinforcement welding of side and end face is carried out by design drawing, bracket horizontal connection reinforcement welding in the middle of the gate pier in two ends is formed and arranges rectangle channel-section steel inner support 2 in the middle of an entirety, reinforcing bar cage body 1, it is ensured that steel reinforcement cage rigidity during handling and stability.In the bracket steel reinforcement cage of two ends, steel plate and a hinge embedded part 9 are buried underground by design, and it is firm with reinforcing bar cage body 1 integral solder that a hinge embedded part 9 utilizes reinforcing bar sample rack to support.Preferably in scheme; each angle point and veil in reinforcing bar cage body 1 are provided with control point labelling, i.e. each angle point of reinforcing bar cage body 1 and each welding spacer bar, and reinforcing bar wire side is by the reserved protective layer thickness of design; preferably in scheme, described control point is labeled as the steel bar end of " T " font.Thus structure, with template sideline, corresponding with the reinforcing bar poured on pier concrete 7.So that gate pier two ends bracket reinforcing bar cage body 1 realizes in level land installation, a welded and installed molding, manual operation is simple and efficient, and it is convenient accurately that embedded part installs location.
Two, pier concrete 7 is being poured and is being provided for the external support 3 of spacer bar cage body 1;External support 3 is arranged in gate pier, for the lifting location of reinforcing bar cage body 1 outline and load-bearing rest effect.Channel-section steel external support 3 uses 18# channel-section steel processing and fabricating.
Preferably in scheme, described reinforcing bar cage body 1 is the structure of similar cuboid, upper surface and lower surface are plane, and upper surface and lower surface parallel to each other, external support 3 is tilt stand, so that reinforcing bar cage body 1 keeps the angle of inclination of design after integral hoisting, one end that reinforcing bar cage body 1 props up hinge 10 near gate is relatively low.Such as Fig. 2, as shown in 7.
Three, pour pier concrete 7 be provided for support bracket bed die 5 overhanging scaffold support means 6;
Bracket bed die 5 utilizes the gate pier big plane template of many cards to have employed overhanging scaffold and supports, and obtains overhanging scaffold support means 6.The collateral point of gate pier has many strap forms locating cone and B7 bolt.Such as Fig. 1, as shown in 2.
Four, integral hoisting reinforcing bar cage body 1 utilize spacer bar accurately to lift location;
The reinforcing bar cage body 1 of machine-shaping, is transported through with flat car, before lifting checks reinforcing bar cage body 1 center of gravity.After the reinforcing bar cage body 1 of molding is transported to construction part, 100t crane is utilized to carry out lifting operation.In hoisting process, hand fit's crane utilizes cable wind rope traction to carry out lifting location to position, bracket storehouse.Control to coordinate manually by total powerstation, channel-section steel external support 3 is utilized to be finely adjusted, bracket bed die 5 and reinforcing bar cage body 1 are measured and check, it is achieved the exterior contour of reinforcing bar cage body 1 is accurately positioned, the reinforcing bar of reinforcing bar cage body is accurately positioned and docks with gate pier pier shaft reinforcing bar 8, as shown in Figure 5.
Five, reinforcing bar cage body 1 is connected molding with other bar constructions of gate pier pier shaft;
After bracket reinforcing bar cage body 1 is accurately positioned, carry out the gate pier pier shaft reinforcing bar 8 integral solder construction of reinforcing bar cage body 1 and gate pier pier shaft sector distribution bar and other structure reinforcing bars composition.So far, reinforcing bar cage body 1 reinforcing bar and embedded part realize whole once mounting molding.
Six, remove inner support 2 and external support 3, wait the concreting of bracket storehouse;
After the operation before the concreting of bracket storehouse is fully completed, remove inner support 2 and external support 3, it is achieved recycling of inner support 2 and external support 3.
After entering bracket storehouse template construction and concreting operation.It is complete that water conservancy project bracket typically divides multiple liter layer storehouse time just can pour, and gate pier left and right bracket the most individually divides storehouse to construct, and bracket reinforcing bar is by storehouse time construction, and construction efficiency is low.After bracket reinforcing bar cage body 1 integrated construction molding in the present invention, when next liter layer storehouse, it is not necessary to carry out the secondary welding construction of bracket reinforcing bar again, it is ensured that the globality of bracket steel reinforcement cage 1, the stress condition improving bracket structure is had positive role.
Realize the water conservancy project gate pier prefabricated integral hoisting of bracket steel reinforcement cage by above step to construct.Bracket after pouring and having assembled and gate see Fig. 6, shown in 7.
The above embodiments are only the preferred technical solution of the present invention; and it is not construed as the restriction for the present invention; technical characteristic described in the present invention; on the premise of not conflicting; use can be combined with each other; the technical scheme that protection scope of the present invention should be recorded with claim, is protection domain including the equivalents of technical characteristic in the technical scheme that claim is recorded.Equivalent the most in this range is improved, also within protection scope of the present invention.

Claims (10)

1. a gate pier bracket Joint Re-bar Construction, is characterized in that comprising the following steps:
One, the place beyond gate pier makes reinforcing bar cage body (1), welds inner support (2) in reinforcing bar cage body (1);
Two, pier concrete (7) is being poured and is being provided for the external support (3) of spacer bar cage body (1);
Three, pour pier concrete (7) be provided for support bracket bed die (5) overhanging scaffold support means (6);
Four, integral hoisting reinforcing bar cage body (1) being accurately positioned;
Five, reinforcing bar cage body (1) is connected molding with other bar constructions of gate pier pier shaft;
Six, remove inner support (2) and external support (3), wait the concreting of bracket storehouse;
Realize the water conservancy project gate pier prefabricated integral hoisting of bracket steel reinforcement cage by above step to construct.
A kind of gate pier bracket Joint Re-bar Construction the most according to claim 1, is characterized in that: described inner support (2) and external support (3) use channel-section steel to process.
A kind of gate pier bracket Joint Re-bar Construction the most according to claim 1, is characterized in that: it is internal that described inner support (2) is welded on reinforcing bar cage body (1), becoming frame structure, the top of inner support (2) is provided with hanger.
A kind of gate pier bracket Joint Re-bar Construction the most according to claim 1, it is characterized in that: described reinforcing bar cage body (1) upper surface and lower surface are plane, and upper surface and lower surface parallel to each other, external support (3) is tilt stand, so that reinforcing bar cage body (1) keeps tilting after integral hoisting, one end that reinforcing bar cage body (1) props up hinge (10) near gate is relatively low.
A kind of gate pier bracket Joint Re-bar Construction the most according to claim 1, it is characterized in that: each angle point and veil in reinforcing bar cage body (1) are provided with control point labelling, with the template sideline with bracket bed die (5), corresponding with the reinforcing bar poured on pier concrete (7).
A kind of gate pier bracket Joint Re-bar Construction the most according to claim 5, is characterized in that: described control point is labeled as the steel bar end of " T " font.
A kind of gate pier bracket Joint Re-bar Construction the most according to claim 1, is characterized in that: be fixedly provided with hinge embedded part (9) in described reinforcing bar cage body (1).
A kind of gate pier bracket Joint Re-bar Construction the most according to claim 1, is characterized in that: described inner support (2) is provided with the brace (4) being connected to bottom from top.
A kind of gate pier bracket Joint Re-bar Construction the most according to claim 1, is characterized in that: in step 4, before lifting checks reinforcing bar cage body (1) center of gravity;
In hoisting process, hand fit's crane utilizes cable wind rope traction to carry out lifting location to position, bracket storehouse;Control to coordinate manually by total powerstation, external support (3) is utilized to be finely adjusted, bracket bed die (5) and reinforcing bar cage body (1) being measured and checked, it is ensured that the exterior contour of reinforcing bar cage body (1) is accurately positioned, the reinforcing bar of reinforcing bar cage body (1) is accurately positioned with gate pier pier shaft reinforcing bar (8) and docks.
A kind of gate pier bracket Joint Re-bar Construction the most according to claim 1, it is characterized in that: in step 5, after reinforcing bar cage body (1) is accurately positioned, carrying out the integral solder construction of (1) and gate pier pier shaft reinforcing bar (8), gate pier pier shaft reinforcing bar (8) is made up of gate pier pier shaft sector distribution bar and other structure reinforcing bars.
CN201610335602.1A 2016-05-19 2016-05-19 Gate pier bracket Joint Re-bar Construction Active CN105951683B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610335602.1A CN105951683B (en) 2016-05-19 2016-05-19 Gate pier bracket Joint Re-bar Construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610335602.1A CN105951683B (en) 2016-05-19 2016-05-19 Gate pier bracket Joint Re-bar Construction

Publications (2)

Publication Number Publication Date
CN105951683A true CN105951683A (en) 2016-09-21
CN105951683B CN105951683B (en) 2018-03-23

Family

ID=56913226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610335602.1A Active CN105951683B (en) 2016-05-19 2016-05-19 Gate pier bracket Joint Re-bar Construction

Country Status (1)

Country Link
CN (1) CN105951683B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110304588A (en) * 2019-07-05 2019-10-08 河南省水利第二工程局 A kind of gate construction method for hanging under narrow working space
CN111305166A (en) * 2020-03-25 2020-06-19 中铁二十局集团第六工程有限公司 Construction method for support frame of bracket template for arc door hinge of overflow gate dam
CN113481944A (en) * 2021-07-26 2021-10-08 中国三峡建工(集团)有限公司 Dam surface hole connection girder supporting structure and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2913453Y (en) * 2006-06-30 2007-06-20 北京中水科海利工程技术有限公司 Gate frusta corbel pre-tensioned nondestructive reinforcing structure
CN101629454A (en) * 2008-07-15 2010-01-20 中国葛洲坝集团股份有限公司 Bracket concrete construction formwork
CN102677638A (en) * 2012-05-25 2012-09-19 黄河勘测规划设计有限公司 Disposing and supporting method for top-exposed arc-door hydraulic hoist
CN103276705A (en) * 2013-05-07 2013-09-04 葛洲坝集团第六工程有限公司 Method for blocking diversion tunnel by cast-in-situ reinforced concrete without gate cutoff and blocking reinforcement cage
CA2922284A1 (en) * 2013-08-31 2015-03-05 Henry Obermeyer Abutment plate for water control gate
CN204456014U (en) * 2015-01-06 2015-07-08 中国电建集团华东勘测设计研究院有限公司 A kind of gate pier ruggedized construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2913453Y (en) * 2006-06-30 2007-06-20 北京中水科海利工程技术有限公司 Gate frusta corbel pre-tensioned nondestructive reinforcing structure
CN101629454A (en) * 2008-07-15 2010-01-20 中国葛洲坝集团股份有限公司 Bracket concrete construction formwork
CN102677638A (en) * 2012-05-25 2012-09-19 黄河勘测规划设计有限公司 Disposing and supporting method for top-exposed arc-door hydraulic hoist
CN103276705A (en) * 2013-05-07 2013-09-04 葛洲坝集团第六工程有限公司 Method for blocking diversion tunnel by cast-in-situ reinforced concrete without gate cutoff and blocking reinforcement cage
CA2922284A1 (en) * 2013-08-31 2015-03-05 Henry Obermeyer Abutment plate for water control gate
CN204456014U (en) * 2015-01-06 2015-07-08 中国电建集团华东勘测设计研究院有限公司 A kind of gate pier ruggedized construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110304588A (en) * 2019-07-05 2019-10-08 河南省水利第二工程局 A kind of gate construction method for hanging under narrow working space
CN111305166A (en) * 2020-03-25 2020-06-19 中铁二十局集团第六工程有限公司 Construction method for support frame of bracket template for arc door hinge of overflow gate dam
CN113481944A (en) * 2021-07-26 2021-10-08 中国三峡建工(集团)有限公司 Dam surface hole connection girder supporting structure and construction method
CN113481944B (en) * 2021-07-26 2022-07-15 中国三峡建工(集团)有限公司 Construction method of dam surface hole connection girder supporting structure

Also Published As

Publication number Publication date
CN105951683B (en) 2018-03-23

Similar Documents

Publication Publication Date Title
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN102661054B (en) Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method
CN102019998B (en) Erection embarking method of upper and lower water side cabins
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN209780230U (en) Construction hydraulic pressure template climbing device
CN106958253A (en) A kind of new type of deep-water combined steel plate pile cofferdam construction method
CN107795122A (en) Concrete stack shell constructing device and construction method
CN105951683A (en) Construction method for corbel steel reinforcements of gate pier
CN107269085A (en) A kind of construction method of large-diameter concrete silo top conical shell structure
CN202064281U (en) Slip form frame
CN102691267A (en) High pier construction method for external whole operation platform
CN106836255B (en) The integral prefabricated structure of basement bottom board catch pit steel mesh and method of construction
CN201972095U (en) Chain block lifting platform for thin-walled hollow piers of bridges
CN209603163U (en) A kind of tower crane bearing platform ruggedized construction
CN209145296U (en) A kind of installation lifting device for material distributing machine
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN207293909U (en) A kind of precast beam reinforced bar skeleton hanging apparatus
CN206941596U (en) A kind of shoulder pole boom device for lifting steel reinforcement cage
CN105970988B (en) The construction method of elevator sidewall reinforcing bar is installed in raft foundation
CN109763658A (en) A kind of support device and its construction method for arrangement material distributing machine in elevator
CN106049972B (en) Reverse cone-shape water-tower water tank lifts system and method in place
CN214573768U (en) Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot
CN210530314U (en) Formwork frame is pour to steel concrete combination shear wall T type node
CN212406744U (en) Template platform truck is filled to high-speed railway tunnel center ditch secondary
CN212479255U (en) Construction equipment for two linings of anchor chamber vault of suspension bridge tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant