CN209780230U - Construction hydraulic pressure template climbing device - Google Patents

Construction hydraulic pressure template climbing device Download PDF

Info

Publication number
CN209780230U
CN209780230U CN201920101642.9U CN201920101642U CN209780230U CN 209780230 U CN209780230 U CN 209780230U CN 201920101642 U CN201920101642 U CN 201920101642U CN 209780230 U CN209780230 U CN 209780230U
Authority
CN
China
Prior art keywords
platform
construction
climbing device
template
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920101642.9U
Other languages
Chinese (zh)
Inventor
***
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201920101642.9U priority Critical patent/CN209780230U/en
Application granted granted Critical
Publication of CN209780230U publication Critical patent/CN209780230U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

the utility model discloses a construction hydraulic template climbing device relates to construction technical field, a construction hydraulic template climbing device, hang the platform including rising, the inside that rises to hang the platform is provided with the structural support, the one side that rises to hang the platform is provided with the guide rail, the guide rail is kept away from to rise one side that hangs the platform and is provided with fixed subassembly and attaches the wall support, fixed subassembly with attach one side that the wall supported and be provided with the pouring wall body, the top that rises to hang the platform is provided with supporting platform. This construction hydraulic template climbing device hangs the seat through setting up the embedded part, wear the wall lead screw and attach the wall support and fix the guide rail, when using, pour through the concrete, make fixed subassembly can be better fixed, then rise through the hoist and mount and hang the platform and assemble fixed climbing device, build construction platform, pour the thickness of wall body as required, change the distance between two templates through flexible post, then carry out pouring of wall body through tying up the reinforcing bar.

Description

construction hydraulic pressure template climbing device
Technical Field
the utility model relates to a construction technical field specifically is a construction hydraulic template climbing device.
Background
Climbing formwork (climbing formwork) is an effective formwork system of reinforced concrete structure for engineering construction of shear wall system and cylinder system, is usually applied to high-rise building and high-volume structure construction, is widely popularized and applied in all countries in the world, is a formwork process suitable for cast-in-place reinforced concrete vertical or inclined structure construction, such as wall, bridge, tower column and the like, is attached to a building vertical structure in the structural construction stage, ascends layer by layer along with the structural construction, so that the formwork does not occupy the construction site and does not use other vertical transportation equipment, in addition, an operation scaffold is arranged, a reliable safe enclosure is provided during construction, so that an external scaffold does not need to be set up, and the climbing formwork system is particularly suitable for building multi-layer or high-rise buildings on narrow sites, when the existing formwork climbing device is constructed, when concreting, most of the concrete can only be poured into the wall with fixed width, but in practical application, the concrete often needs to be poured into the wall with different thicknesses, so that the concrete is very inconvenient, and therefore the hydraulic formwork climbing device for building construction is needed to solve the problems.
At present, the existing climbing device for the hydraulic template for building construction is inconvenient to use and is not beneficial to popularization and use.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a construction hydraulic template climbing device has solved current construction hydraulic template climbing device that is used for, uses inconveniently, is unfavorable for the problem of using widely.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a hydraulic formwork climbing device for building construction comprises a lifting platform, wherein a structural support is arranged inside the lifting platform, a guide rail is arranged on one side of the lifting platform, a fixing assembly and a wall-attached support are arranged on one side of the guide rail, which is far away from the lifting platform, a pouring wall body is arranged on one side of the fixing assembly and the wall-attached support, a supporting platform is arranged above the lifting platform, a supporting frame is arranged inside the supporting platform, a construction platform is arranged above the supporting platform, an electric slide rail is arranged on the surface of the construction platform, a moving platform is arranged above the electric slide rail, a baffle plate is arranged on one side of the moving platform, a fixing block is arranged on one side of the moving platform, which is far away from the baffle plate, a main back ridge inclined support is fixedly connected to one side of the fixing block, and the fixing block is fixedly connected with the main back ridge through the main back ridge, one side of the main back edge is provided with a fixing column, and the main back edge is fixedly connected with the template through the fixing column.
Optionally, hydraulic lifting equipment is arranged on one side of the lifting platform and one side of the supporting platform close to the guide rail.
Optionally, the fixing assembly comprises an embedded part hanging seat and a wall penetrating screw rod, and the embedded part hanging seat is fixedly connected with one side of the guide rail close to the pouring wall body.
optionally, a clamping groove is formed in one side, close to the construction platform, of the mobile platform, and the mobile platform is clamped inside the electric sliding rail.
Optionally, the number of the fixing columns is a plurality, one end of each fixing column is fixedly connected with the surface of the main back edge, and the main back edge is fixedly connected with the template through the fixing columns.
Optionally, the number of the templates is two, two the middle of the template is provided with a telescopic column, a beam is arranged above the template, a sliding groove is formed in the beam, and the templates are clamped in the sliding groove.
(III) advantageous effects
The utility model provides a construction hydraulic template climbing device possesses following beneficial effect:
(1) this construction hydraulic pressure template climbing device, hang the seat through setting up the embedded part, wear the wall lead screw and attach the wall support and fix the guide rail, when using, pour through the concrete, make fixed subassembly can be better fixed, then lift through the hoist and mount and hang the platform and assemble fixed climbing device, build construction platform, pour the thickness of wall body as required, change the distance between two templates through flexible post, then carry out pouring of wall body through tying up the reinforcing bar, demolish after pouring the completion and attach the wall support, go up and down to the platform through hydraulic lifting equipment, it supports to suitable position and pours next time to attach the wall fixedly.
(2) this construction hydraulic template climbing device, lift platform through setting up, when the construction, can conveniently hoist, be convenient for guide rail and protective equipment's installation, simultaneously through setting up supporting platform, when using, supporting platform can play better support, make things convenient for the hoist and mount of template, and simultaneously, through setting up moving platform, on the one hand can conveniently move the movable mould board and remove the regulation, on the other hand is when carrying out the platform removal, can be through the position of changing moving platform's position control focus, make the device weight distribution more reasonable, prevent accident's emergence, the security performance in the improvement work progress.
Drawings
FIG. 1 is a schematic view of the structure of the present invention;
Fig. 2 is a schematic diagram of the structure of the mobile platform of the present invention;
Fig. 3 is an enlarged schematic view of the structure a of the present invention.
in the figure: 1-lifting platform, 2-structural support, 3-guide rail, 4-fixing component, 401-embedded part hanging seat, 402-wall-penetrating screw rod, 5-wall-attached support, 6-pouring wall body, 7-supporting platform, 8-supporting frame, 9-construction platform, 10-electric slide rail, 11-moving platform, 12-baffle, 13-fixing block, 14-main back ridge inclined support, 15-main back ridge, 16-fixing column, 17-template, 18-hydraulic lifting equipment, 19-telescopic column and 20-crossbeam.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship indicated based on the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "disposed," "mounted," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection or a removable connection; may be a mechanical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature.
Referring to fig. 1-3, the present invention provides a technical solution: a hydraulic formwork climbing device for building construction comprises a lifting platform 1, a structural support 2 is arranged inside the lifting platform 1, a guide rail 3 is arranged on one side of the lifting platform 1, a fixing component 4 and a wall-attached support 5 are arranged on one side, far away from the lifting platform 1, of the guide rail 3, a pouring wall body 6 is arranged on one side of the fixing component 4 and the wall-attached support 5, a supporting platform 7 is arranged above the lifting platform 1, a supporting frame 8 is arranged inside the supporting platform 7, a construction platform 9 is arranged above the supporting platform 7, an electric sliding rail 10 is arranged on the surface of the construction platform 9, a moving platform 11 is arranged above the electric sliding rail 10, the moving platform 11 is arranged, on one hand, the moving formwork 17 can be conveniently moved and adjusted, on the other hand, when the platform is moved, the gravity center position can be adjusted by changing the position of the moving platform 11, so that the weight, the method is characterized in that a baffle plate 12 is arranged on one side of a moving platform 11, a fixing block 13 is arranged on one side of the moving platform 11, which is far away from the baffle plate 12, a main back ridge inclined strut 14 is fixedly connected to one side of the fixing block 13, the fixing block 13 is fixedly connected with a main back ridge 15 through the main back ridge inclined strut 14, a fixing column 16 is arranged on one side of the main back ridge 15, the main back ridge 15 is fixedly connected with a template 17 through the fixing column 16, when the method is used, the fixing component 4 can be well fixed by pouring concrete, then a fixed climbing device is assembled by lifting the lifting platform 1, a construction platform is built, the distance between the two templates 17 is changed through a telescopic column 19 according to the thickness of a wall body to be poured, then the pouring of the wall body is carried out by binding steel bars, an auxiliary wall support 5 is removed after the pouring is finished, the platform is lifted through a hydraulic lifting device 18, and fixing the wall attaching supports 5 to a proper position for the next pouring.
As an optional technical solution of the utility model:
And hydraulic lifting equipment 18 is arranged on one sides of the lifting platform 1 and the supporting platform 7 close to the guide rail 3.
As an optional technical solution of the utility model:
The fixing assembly 4 comprises an embedded part hanging seat 401 and a wall penetrating screw rod 402, the embedded part hanging seat 401 and one side of the guide rail 3 close to the pouring wall body 6 are fixedly connected, and the wall penetrating screw rod 402 is inserted in the pouring wall body 6.
as an optional technical solution of the utility model:
one side of the mobile platform 11 close to the construction platform 9 is provided with a clamping groove, and the mobile platform 11 is clamped inside the electric slide rail 10.
As an optional technical solution of the utility model:
The number of the fixed columns 16 is a plurality, and one ends of the fixed columns 16 are fixedly connected with the surface of the main back ridge 15.
As an optional technical solution of the utility model:
the quantity of template 17 is two, and two templates 17's centre is provided with flexible post 19, and the top of template 17 is provided with crossbeam 20, and the inside of crossbeam 20 is provided with the spout, and template 17 joint is in the inside of spout.
To sum up, the construction hydraulic template climbing device fixes a guide rail 3 by arranging an embedded part hanging seat 401, a wall penetrating screw rod 402 and a wall attaching support 5, when the device is used, pouring is carried out through concrete, so that a fixing component 4 can be well fixed, then the fixed climbing device is assembled and fixed by hoisting the hoisting platform 1, a construction platform is built, the thickness of a wall body is poured according to needs, the distance between two templates 17 is changed through a telescopic column 19, then the wall body is poured through binding steel bars, the wall attaching support 5 is detached after the pouring is finished, the platform is lifted through a hydraulic lifting device 18, the wall attaching support 5 is fixed to a proper position for next pouring, the hoisting platform 1 is arranged, the device can be conveniently hoisted during construction, the guide rail 3 and the protection device are convenient to install, meanwhile, by arranging the support platform 7, when the device is used, supporting platform 7 can play better support, makes things convenient for the hoist and mount of template 17, simultaneously, through setting up moving platform 11, can make things convenient for moving template 17 to remove the regulation on the one hand, and on the other hand can be through the position of changing moving platform 11 position control focus when carrying out the platform and removing, makes the device weight distribution more reasonable, prevents accident's emergence, improves the security performance in the work progress.
It is noted that in the present disclosure, unless otherwise explicitly specified or limited, a first feature "on" or "under" a second feature may be directly contacting the first and second features or indirectly contacting the first and second features through an intermediate. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. the utility model provides a construction hydraulic template climbing device, includes lift platform (1), its characterized in that:
A structural support (2) is arranged in the lifting platform (1), a guide rail (3) is arranged on one side of the lifting platform (1), a fixing component (4) and a wall-attached support (5) are arranged on one side, far away from the lifting platform (1), of the guide rail (3), a pouring wall body (6) is arranged on one side of the fixing component (4) and the wall-attached support (5), a supporting platform (7) is arranged above the lifting platform (1), a supporting frame (8) is arranged in the supporting platform (7), a construction platform (9) is arranged above the supporting platform (7), an electric sliding rail (10) is arranged on the surface of the construction platform (9), a moving platform (11) is arranged above the electric sliding rail (10), a baffle (12) is arranged on one side of the moving platform (11), and a fixing block (13) is arranged on one side, far away from the baffle (12), of the moving platform (11), stupefied bracing of one side fixedly connected with main back of the body (14) of fixed block (13), stupefied bracing of main back of the body (14) and the stupefied (15) fixed connection of main back of the body are passed through in fixed block (13), one side of the stupefied (15) of main back of the body sets up fixed column (16), stupefied (15) of main back of the body are through fixed column (16) and template (17) fixed connection.
2. The construction hydraulic template climbing device according to claim 1,
And hydraulic lifting equipment (18) is arranged on one sides of the lifting platform (1) and the supporting platform (7) close to the guide rail (3).
3. The construction hydraulic template climbing device according to claim 1,
The fixing assembly (4) comprises an embedded part hanging seat (401) and a wall penetrating screw rod (402), the embedded part hanging seat (401) is fixedly connected with one side, close to the pouring wall body (6), of the guide rail (3), and the wall penetrating screw rod (402) is inserted into the pouring wall body (6).
4. The construction hydraulic template climbing device according to claim 1,
One side of the mobile platform (11) close to the construction platform (9) is provided with a clamping groove, and the mobile platform (11) is clamped in the electric sliding rail (10).
5. the construction hydraulic template climbing device according to claim 1,
The number of the fixing columns (16) is a plurality, and one ends of the fixing columns (16) are fixedly connected with the surface of the main back ridge (15).
6. The construction hydraulic template climbing device according to claim 5,
The quantity of template (17) is two, two the centre of template (17) is provided with flexible post (19), the top of template (17) is provided with crossbeam (20), the inside of crossbeam (20) is provided with the spout, template (17) joint is in the inside of spout.
CN201920101642.9U 2019-01-19 2019-01-19 Construction hydraulic pressure template climbing device Expired - Fee Related CN209780230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920101642.9U CN209780230U (en) 2019-01-19 2019-01-19 Construction hydraulic pressure template climbing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920101642.9U CN209780230U (en) 2019-01-19 2019-01-19 Construction hydraulic pressure template climbing device

Publications (1)

Publication Number Publication Date
CN209780230U true CN209780230U (en) 2019-12-13

Family

ID=68793065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920101642.9U Expired - Fee Related CN209780230U (en) 2019-01-19 2019-01-19 Construction hydraulic pressure template climbing device

Country Status (1)

Country Link
CN (1) CN209780230U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984565A (en) * 2019-12-30 2020-04-10 吴权辉 Creeping formwork device for building construction
CN111119469A (en) * 2019-12-30 2020-05-08 吴权辉 Cast-in-place concrete construction method
CN111996918A (en) * 2020-08-27 2020-11-27 绍兴其顺桥梁设备有限公司 Template system of hollow high pier and installation and construction method thereof
CN112832511A (en) * 2020-12-31 2021-05-25 广东合迪科技有限公司 Climbing frame template system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984565A (en) * 2019-12-30 2020-04-10 吴权辉 Creeping formwork device for building construction
CN111119469A (en) * 2019-12-30 2020-05-08 吴权辉 Cast-in-place concrete construction method
CN110984565B (en) * 2019-12-30 2021-08-17 广东中泸建设集团有限公司 Creeping formwork device for building construction
CN111996918A (en) * 2020-08-27 2020-11-27 绍兴其顺桥梁设备有限公司 Template system of hollow high pier and installation and construction method thereof
CN111996918B (en) * 2020-08-27 2022-02-01 绍兴其顺桥梁设备有限公司 Template system of hollow high pier and installation and construction method thereof
CN112832511A (en) * 2020-12-31 2021-05-25 广东合迪科技有限公司 Climbing frame template system

Similar Documents

Publication Publication Date Title
CN209780230U (en) Construction hydraulic pressure template climbing device
CN105464216B (en) Construction method based on integral lifting formwork-strengthening system superelevation super-section batter post
CN105401679A (en) Large-gradient cast-in-place concrete inclined roof construction method
CN108589535A (en) A kind of reinforced concrete box girder construction method
CN105839543A (en) Construction process for self-lifting outer frame turnover formwork of bridge high pier
CN105839542A (en) Self-lifting outer frame turnover formwork device for high pier of bridge
CN109113335B (en) Parapet wall formwork support and construction method
CN106869479A (en) Bailey bracket sliding formwork system construction method
CN105951683A (en) Construction method for corbel steel reinforcements of gate pier
CN214557027U (en) Integrated jig frame for binding assembled cover plate culvert wall body reinforcing steel bars
CN1048066C (en) Method and apparatus for integrally self-lifting scaffold
CN215593730U (en) Hanging basket for parasitic support with beam plate on wide body of cable-stayed bridge with cantilever pouring double-side box
CN210530314U (en) Formwork frame is pour to steel concrete combination shear wall T type node
CN213014374U (en) Bottom plate post-cast strip structure
CN211368398U (en) Frame climbing structure
CN111501562A (en) Cable tower operation platform template separation lift system
CN209837479U (en) Upper supporting and positioning device for concrete beam reinforcing steel bar
CN214364916U (en) Construction hydraulic pressure template climbing device
CN219100670U (en) Low-level jacking climbing construction platform
CN212358013U (en) Cable tower operation platform template separation lift system
CN218596932U (en) From climbing formula turnover formwork reinforced structure
CN216515141U (en) Novel cantilever construction creeping formwork device
CN105569327B (en) Frame body for concrete filled steel tube high-throwing construction and using method thereof
CN214362935U (en) High mound rollover construction reinforcement ligature protection frame
CN211283556U (en) Precast concrete post jacking device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant