CN105888248B - A kind of construction method based on BIM technology tutorial message prefabricated components - Google Patents
A kind of construction method based on BIM technology tutorial message prefabricated components Download PDFInfo
- Publication number
- CN105888248B CN105888248B CN201610269027.XA CN201610269027A CN105888248B CN 105888248 B CN105888248 B CN 105888248B CN 201610269027 A CN201610269027 A CN 201610269027A CN 105888248 B CN105888248 B CN 105888248B
- Authority
- CN
- China
- Prior art keywords
- prefabricated components
- simulation
- construction
- information
- bim technology
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 79
- 238000005516 engineering process Methods 0.000 title claims abstract description 44
- 238000004088 simulation Methods 0.000 claims abstract description 80
- 238000004519 manufacturing process Methods 0.000 claims abstract description 41
- 238000001514 detection method Methods 0.000 claims abstract description 15
- 239000000463 material Substances 0.000 claims abstract description 12
- 230000004044 response Effects 0.000 claims abstract description 9
- 238000002372 labelling Methods 0.000 claims abstract description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 24
- 238000000034 method Methods 0.000 claims description 21
- 230000008569 process Effects 0.000 claims description 18
- 239000004567 concrete Substances 0.000 claims description 17
- 238000007689 inspection Methods 0.000 claims description 15
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 4
- 238000007726 management method Methods 0.000 claims description 4
- 230000002787 reinforcement Effects 0.000 claims description 4
- 238000011065 in-situ storage Methods 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims description 3
- 239000011178 precast concrete Substances 0.000 claims description 3
- 230000008676 import Effects 0.000 claims description 2
- 238000007728 cost analysis Methods 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 3
- 238000004458 analytical method Methods 0.000 description 2
- 239000004927 clay Substances 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 230000014509 gene expression Effects 0.000 description 2
- 206010054949 Metaplasia Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000003116 impacting effect Effects 0.000 description 1
- 230000015689 metaplastic ossification Effects 0.000 description 1
- 230000007115 recruitment Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Processing Or Creating Images (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610269027.XA CN105888248B (en) | 2016-04-27 | 2016-04-27 | A kind of construction method based on BIM technology tutorial message prefabricated components |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610269027.XA CN105888248B (en) | 2016-04-27 | 2016-04-27 | A kind of construction method based on BIM technology tutorial message prefabricated components |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105888248A CN105888248A (en) | 2016-08-24 |
CN105888248B true CN105888248B (en) | 2018-01-26 |
Family
ID=56704733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610269027.XA Expired - Fee Related CN105888248B (en) | 2016-04-27 | 2016-04-27 | A kind of construction method based on BIM technology tutorial message prefabricated components |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105888248B (en) |
Families Citing this family (46)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106485411A (en) * | 2016-10-08 | 2017-03-08 | 上海建工五建集团有限公司 | Prefabricated concrete structure based on BIM technology builds management method and system |
CN106639207A (en) * | 2016-11-01 | 2017-05-10 | 苏州美瑞德建筑装饰有限公司 | Complex shared space assembling building decoration construction method based on BIM (building information modeling) |
CN108629057A (en) * | 2017-03-20 | 2018-10-09 | 崔波 | A method of generating BIM models |
CN106934855B (en) * | 2017-03-20 | 2021-05-07 | 王凯 | Building 3D model construction method and device |
CN107092739A (en) * | 2017-04-12 | 2017-08-25 | 四川云图瑞科技有限公司 | Execution management method therefor during using model to prefabricated components on-site consolidation |
CN107194831A (en) * | 2017-06-01 | 2017-09-22 | 上海宝冶集团有限公司 | BIM and application process of the Quick Response Code in construction management |
CN107012860A (en) * | 2017-06-02 | 2017-08-04 | 中国十七冶集团有限公司 | A kind of construction method of the post Single Pile joint bar positioner based on BIM technology |
CN107169231B (en) * | 2017-06-09 | 2020-08-14 | 东风设计研究院有限公司 | BIM-based deep design method for building metal enclosure system |
CN107220466A (en) * | 2017-07-05 | 2017-09-29 | 马学娟 | A kind of assembled architecture design method and device |
CN107287991A (en) * | 2017-07-17 | 2017-10-24 | 上海宝冶集团南京建筑有限公司 | Utilize the component installation method and unmanned plane and cradle of BIM combination Quick Response Codes |
CN107299762B (en) * | 2017-07-28 | 2020-05-22 | 成都智建新业建筑设计咨询有限公司 | Concrete pouring method based on BIM |
CN107386660A (en) * | 2017-08-02 | 2017-11-24 | 中国十七冶集团有限公司 | Tower crane system in prefabricated concrete structure construction based on BIM technology |
CN107862105A (en) * | 2017-09-30 | 2018-03-30 | 山东聊建集团有限公司 | The method confided a technological secret based on BIM to component working procedure |
CN108108510A (en) * | 2017-10-27 | 2018-06-01 | 广东星层建筑科技股份有限公司 | A kind of assembled architecture design method and equipment based on BIM |
CN109753672A (en) * | 2017-11-08 | 2019-05-14 | 上海宝冶集团有限公司 | Prefabricated concrete structure engineering optimization method based on BIM technology |
CN110046363B (en) * | 2018-01-16 | 2022-10-25 | 中国建筑第八工程局有限公司 | Construction method for accurately embedding pipeline group in concrete structure |
CN108388719A (en) * | 2018-02-08 | 2018-08-10 | 墨点狗智能科技(东莞)有限公司 | Assembled architecture Celerity process planning method based on BIM |
CN110273539A (en) * | 2018-03-13 | 2019-09-24 | 新疆苏中建设工程有限公司 | A kind of combination set shaped steel formwork and its modeling method |
CN108536933A (en) * | 2018-03-26 | 2018-09-14 | 何登富 | A kind of system and method for automatic arrangement reinforcing bar |
CN108457504A (en) * | 2018-03-27 | 2018-08-28 | 湘能楚天电力有限公司 | A kind of building method of BIM assembly integrated intelligents substation |
CN108595882B (en) * | 2018-05-09 | 2020-09-29 | 上海营邑城市规划设计股份有限公司 | Yinyi planning pipeline BIM design pipeline cost generation system |
CN108589725A (en) * | 2018-05-15 | 2018-09-28 | 中国十七冶集团有限公司 | A kind of built-in fitting construction method based on BIM technology |
CN108532953B (en) * | 2018-05-18 | 2020-03-31 | 宝业湖北建工集团有限公司 | BIM-based cantilever plate construction method and building construction method |
CN108665245B (en) * | 2018-05-23 | 2022-01-25 | 华北水利水电大学 | Assembled prefabricated part information fusion management system and method based on DT-BIM |
CN108842782A (en) * | 2018-07-17 | 2018-11-20 | 中铁九局集团第七工程有限公司 | Based on BIM technology deep pit digging and construction method for supporting |
CN108941990A (en) * | 2018-07-28 | 2018-12-07 | 上海二十冶建设有限公司 | A kind of cooling-bed hydraulic pipeline modular installation method |
CN109087048A (en) * | 2018-08-17 | 2018-12-25 | 青岛理工大学 | Two-dimensional code-based assembled building component tracking method |
CN109162407B (en) * | 2018-09-25 | 2020-08-04 | 重庆大学产业技术研究院 | Automatic obstacle avoidance method for reinforcing steel bars in crossed area of reinforced concrete member based on artificial potential field method |
CN109344506B (en) * | 2018-09-30 | 2022-03-04 | 深圳市华阳国际建筑产业化有限公司 | Method and equipment for automatically generating deepened drawing of BIM three-dimensional model and storage medium |
CN109191577B (en) * | 2018-10-22 | 2023-04-14 | 杭州睿兴栋宇建筑科技有限公司 | Distributed BIM cooperative platform |
CN109508493A (en) * | 2018-11-12 | 2019-03-22 | 中国十七冶集团有限公司 | A kind of application method based on BIM+ planar bar code technology in distribution debugging and maintenance |
CN109766605A (en) * | 2018-12-28 | 2019-05-17 | 国网浙江省电力有限公司经济技术研究院 | Method for building up in kind with the power distribution network full information mathematical model of value linkage |
CN109583145A (en) * | 2019-01-17 | 2019-04-05 | 唐山铭嘉建筑设计咨询有限公司 | A kind of assembled architecture design method |
CN110528881A (en) * | 2019-08-12 | 2019-12-03 | 成都市新宏建筑工程有限公司 | A kind of quick turnover method of assembled architecture support system based on BIM |
CN111350377A (en) * | 2020-01-06 | 2020-06-30 | 陈文斌 | Construction method (reverse-order construction method) of equipment and related electromechanical pipelines in equipment room |
CN111231101A (en) * | 2020-01-13 | 2020-06-05 | 中铁八局集团桥梁工程有限责任公司 | Automatic intelligent construction method |
CN111475900A (en) * | 2020-03-25 | 2020-07-31 | 中国五冶集团有限公司 | Rapid arrangement method of indoor electric pipelines |
CN113515834A (en) * | 2020-04-10 | 2021-10-19 | 任逸切科技(上海)有限公司 | Steel bar structure manufacturing system and method |
CN111457157A (en) * | 2020-04-20 | 2020-07-28 | 中国十七冶集团有限公司 | Production and installation method of outdoor multi-professional prefabricated pressure pipeline set |
CN111931270A (en) * | 2020-07-16 | 2020-11-13 | 中建一局集团第二建筑有限公司 | Construction method of subway vehicle section contact net embedded part based on BIM technology |
CN111663783B (en) * | 2020-07-16 | 2021-09-07 | 广州城建职业学院 | Assembly type building concrete pouring device based on BIM |
CN112380600B (en) * | 2020-11-11 | 2023-12-26 | 中国有色金属工业第六冶金建设有限公司 | Cantilever plate construction method based on BIM technology |
CN113032872B (en) * | 2021-03-12 | 2023-12-15 | 北京六建集团有限责任公司 | BIM technology-based fabricated building progress plan comprehensive resource management and control method |
CN114457693A (en) * | 2022-02-25 | 2022-05-10 | 中交二航局第四工程有限公司 | Construction method for prefabricating and assembling anchor rod support of suspension bridge anchoring system |
CN115319911B (en) * | 2022-08-16 | 2024-07-23 | 上海建工建材科技集团股份有限公司 | Digital production process of concrete prefabricated part with complex shape |
CN116145959A (en) * | 2023-03-08 | 2023-05-23 | 中国建筑第二工程局有限公司 | Construction method of curved surface concrete roof based on BIM |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102654888A (en) * | 2012-04-10 | 2012-09-05 | 江苏环亚建设工程有限公司 | Informatization green construction method of indoor decoration engineering of building |
CN202422171U (en) * | 2011-12-31 | 2012-09-05 | 上海大学 | RFID (Radio Frequency Identification Devices) ultrahigh frequency electronic tag for PC (Personal Computer) member management |
CN103218492A (en) * | 2013-04-16 | 2013-07-24 | 上海上安机电设计事务所有限公司 | BIM (Building Information Model)-based pipe prefabrication method |
CN105046359A (en) * | 2015-07-19 | 2015-11-11 | 南宁市政工程集团有限公司 | BIM (Building Information Modelling) technology based municipal pipeline factory prefabrication and installation method |
CN105046432A (en) * | 2015-07-20 | 2015-11-11 | 重庆建工第十一建筑工程有限责任公司 | Building dimensional guide construction method |
-
2016
- 2016-04-27 CN CN201610269027.XA patent/CN105888248B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202422171U (en) * | 2011-12-31 | 2012-09-05 | 上海大学 | RFID (Radio Frequency Identification Devices) ultrahigh frequency electronic tag for PC (Personal Computer) member management |
CN102654888A (en) * | 2012-04-10 | 2012-09-05 | 江苏环亚建设工程有限公司 | Informatization green construction method of indoor decoration engineering of building |
CN103218492A (en) * | 2013-04-16 | 2013-07-24 | 上海上安机电设计事务所有限公司 | BIM (Building Information Model)-based pipe prefabrication method |
CN105046359A (en) * | 2015-07-19 | 2015-11-11 | 南宁市政工程集团有限公司 | BIM (Building Information Modelling) technology based municipal pipeline factory prefabrication and installation method |
CN105046432A (en) * | 2015-07-20 | 2015-11-11 | 重庆建工第十一建筑工程有限责任公司 | Building dimensional guide construction method |
Non-Patent Citations (2)
Title |
---|
基于BIM的机电工程数字化预制加工;张晓剑等;《安装》;20150815(第8期);第57-60页 * |
装配式建筑设计的BIM方法;樊则森等;《建筑技艺》;20140620(第6期);第68-76页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105888248A (en) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888248B (en) | A kind of construction method based on BIM technology tutorial message prefabricated components | |
CN110008648B (en) | Intelligent building site integration implementation method based on BIM model | |
CN111062081A (en) | Underground continuous wall construction method based on BIM technology | |
CN110929328A (en) | Concrete assembly type building construction method based on BIM | |
CN107958101A (en) | A kind of assembled architecture Information Management System and method based on BIM | |
CN107220462A (en) | The production method and system of a kind of parametrization reinforcing bar applied to prefabricated components | |
CN110543674B (en) | Automatic splitting method of assembled floor based on BIM | |
CN110080114A (en) | A kind of visualization prefabricated stand column construction method based on BIM technology | |
CN104407576A (en) | Realization method for general type production and manufacturing unit and control system thereof | |
CN110287513A (en) | A kind of built-in fitting construction method based on BIM technology | |
CN106639207A (en) | Complex shared space assembling building decoration construction method based on BIM (building information modeling) | |
CN108427782A (en) | A kind of three-dimensional building model treatment method and device based on BIM | |
CN107299762B (en) | Concrete pouring method based on BIM | |
CN107012860A (en) | A kind of construction method of the post Single Pile joint bar positioner based on BIM technology | |
CN107292065A (en) | A kind of quick composing system of floor tile based on BIM technology and method | |
CN112182718B (en) | Component design method and device based on BIM and 3D technology and storage medium | |
CN110359550A (en) | Assembled architecture PC component method for arranging based on BIM technology | |
CN108428036A (en) | A kind of collaborative management method of assembled plant, apparatus and system | |
CN106448779A (en) | Method and device for gang controlling screen of master control room of nuclear electrical power plant | |
CN108416076A (en) | A kind of assembled architecture design method based on BIM technology | |
CN113392463A (en) | Modular building design method based on BIM technology | |
CN110930044A (en) | Construction organization resource rapid configuration method and system | |
CN106446448A (en) | Formwork system parametrization design method based on BIM technology | |
CN111914325A (en) | BIM technology-based blast furnace body frame structure model information interaction method | |
CN114077765B (en) | Dynamo project data management method and device based on Dynamo project data management method and device, and computer equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Ma Jiansuo Inventor after: Ma Haidong Inventor after: Yang Dehui Inventor after: Liu Yongwei Inventor after: Li Ruifeng Inventor after: Cai Huanqin Inventor after: Huang Xiaoyun Inventor after: Zhou Miaomiao Inventor after: Guo Teng Inventor after: Cheng Lan Inventor after: Qi Meng Inventor after: Ma Xiangnan Inventor before: Ma Jiansuo Inventor before: Li Ruifeng Inventor before: Zhou Miaomiao Inventor before: Ma Haidong Inventor before: Yang Dehui Inventor before: Liu Yongwei |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201117 Address after: No.79, Section 1, Tanghu North Road, Dongsheng Street, Shuangliu District, Chengdu, Sichuan 610000 Patentee after: Sichuan lanben Digital Construction Technology Co.,Ltd. Address before: 075000 No. 13 West Main Street, Chaoyang, Hebei, Zhangjiakou Patentee before: HEBEI University OF ARCHITECTURE |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180126 |
|
CF01 | Termination of patent right due to non-payment of annual fee |