CN107862105A - The method confided a technological secret based on BIM to component working procedure - Google Patents

The method confided a technological secret based on BIM to component working procedure Download PDF

Info

Publication number
CN107862105A
CN107862105A CN201710914526.4A CN201710914526A CN107862105A CN 107862105 A CN107862105 A CN 107862105A CN 201710914526 A CN201710914526 A CN 201710914526A CN 107862105 A CN107862105 A CN 107862105A
Authority
CN
China
Prior art keywords
construction
component
animation
confided
bim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710914526.4A
Other languages
Chinese (zh)
Inventor
齐建忠
鲁萌萌
陈庆鹏
杨清月
任壮
刘耀文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Engineering Construction Co Ltd
SHANDONG LIAOCHENG CONSTRUCTION GROUP CO Ltd
Original Assignee
Shandong Engineering Construction Co Ltd
SHANDONG LIAOCHENG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Engineering Construction Co Ltd, SHANDONG LIAOCHENG CONSTRUCTION GROUP CO Ltd filed Critical Shandong Engineering Construction Co Ltd
Priority to CN201710914526.4A priority Critical patent/CN107862105A/en
Publication of CN107862105A publication Critical patent/CN107862105A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T13/00Animation
    • G06T13/203D [Three Dimensional] animation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Civil Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Processing Or Creating Images (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses the method confided a technological secret based on BIM to component working procedure, comprise the following steps:S11, the threedimensional model of whole components required for establishing construction;S12, the component is placed to the position of setting, forms BUILDINGS MODELS;S13, simulation animation is worked out to arrangement and method for construction, contrasts the feasibility of different arrangement and method for construction, obtains optimal case;S14, using construction animation corresponding to the optimal case as confiding a technological secret, workmen is presented.The present invention is confided a technological secret by video or animation to arrangement and method for construction, and presentation mode is directly perceived, and disturbance of understanding and error is not present in workmen, ensures construction quality, and shortens the time that workmen understands arrangement and method for construction, improves operating efficiency.

Description

The method confided a technological secret based on BIM to component working procedure
Technical field
The present invention relates to technical field of building construction, specifically carries out technology friendship to component working procedure based on BIM The method at bottom.
Background technology
At this stage, green construction technology is carried out in China energetically, promotes housing industrialization.For traditional architecture, dress It is a technological difficulties for most enterprises with formula construction.Lifting requirements precision is high, but construction experience easily goes out less The problem of now working procedure is misorient, certain influence is produced to duration and construction.
Confiding a technological secret generally based on word description in traditional project management, construction manager is with oral instruction Mode is told somebody what one's real intentions are to worker, and worker to form understanding and the mode of operation of oneself according to personal experience to oral tell somebody what one's real intentions are.It is such There is larger drawback in the mode of telling somebody what one's real intentions are, misinterpretation easily occur in communication process.Especially complicated technology position of joints, to experience not Same workmen understands in technology and can have very big difference in concrete operations, influences construction quality.
The content of the invention
To overcome above-mentioned the shortcomings of the prior art, it is an object of the invention to provide based on BIM to component construct work The method that sequence is confided a technological secret, construction is confided a technological secret using the mode of animation or video, mode of telling somebody what one's real intentions are is directly perceived, does not deposit Understand deviation, ensure construction quality, and improve operating efficiency.
The technical solution adopted for the present invention to solve the technical problems is:Technology is carried out to component working procedure based on BIM The method told somebody what one's real intentions are, comprises the following steps:
S11, the threedimensional model of whole components required for establishing construction;
S12, the component is placed to the position of setting, forms BUILDINGS MODELS;
S13, simulation animation is worked out to arrangement and method for construction, contrasts the feasibility of different arrangement and method for construction, obtains optimal case;
S14, using construction animation corresponding to the optimal case as confiding a technological secret, workmen is presented.
Further, step S11 specific implementation process is:
By two-dimentional drawing, the pictorial information of component is obtained;
Establish boilerplate;
Using Revit instruments, in boilerplate, the threedimensional model of component is drawn.
Further, after the component being placed into the position of setting, in addition to:
Utilize the rich collision checked between reinforcing bar of speed;
The collision between component is checked using Revit.
Further, the specific implementation process to arrangement and method for construction establishment simulation animation is:
Using Navisworks to component establishment set in Revit;
By working procedure, to the set establishment time and action;
Activity time arrangement, generation construction animation simulation are carried out using Timeliner.
The method confided a technological secret based on BIM to component working procedure, is comprised the following steps:
S21, the threedimensional model of whole components required for establishing construction;
S22, the component is placed to the position of setting, forms BUILDINGS MODELS;
S23, simulation animation is worked out to arrangement and method for construction, contrasts the implementation result of different arrangement and method for construction, obtains optimal case;
S24, animation file corresponding to optimal case is changed into video file.
S25, using the video file as confiding a technological secret, workmen is presented.
Further, step S24 specific implementation process is:
The simulation animation of optimal case in Navisworks is exported, generates animation file;
Using video processing tools, explanatory note is added in relevant position, forms video file.
The effect provided in the content of the invention is only the effect of embodiment, rather than whole effects that invention is all, above-mentioned A technical scheme in technical scheme has the following advantages that or beneficial effect:
1st, using BIM technology, arrangement and method for construction is simulated, and by the form of animation or video, arrangement and method for construction entered Row is confided a technological secret, and presentation mode is directly perceived, and workmen can be appreciated that optimal construction plan by watching video or animation, be not present Disturbance of understanding and error, ensure construction quality, and shorten the time that workmen understands arrangement and method for construction, improve operating efficiency.
2nd, before component model is established, boilerplate is initially set up, makes each component that there are identical drafting standards, is improved The speed of components three-dimensional model is drawn, and is easy to the foundation of follow-up BUILDINGS MODELS.
3rd, after component has been laid, the collision detection of component is carried out, it is ensured that accurate, the reliability of the BUILDINGS MODELS of drafting.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of the inventive method one embodiment;
Fig. 2 is the schematic flow sheet of another embodiment of the inventive method.
Embodiment
For the technical characterstic for illustrating this programme can be understood, below by embodiment, and its accompanying drawing is combined, to this hair It is bright to be described in detail.Following disclosure provides many different embodiments or example is used for realizing the different knots of the present invention Structure.In order to simplify disclosure of the invention, hereinafter the part and setting of specific examples are described.In addition, the present invention can be with Repeat reference numerals and/or letter in different examples.This repetition is that for purposes of simplicity and clarity, itself is not indicated Relation between various embodiments are discussed and/or set.It should be noted that part illustrated in the accompanying drawings is not necessarily to scale Draw.Present invention omits the description to known assemblies and treatment technology and process to avoid being unnecessarily limiting the present invention.
As shown in figure 1, the present invention based on BIM (Building Information Modeling, BIM, Revit instruments, fuzor, Naviswork in embodiment are three sections of softwares of BIM technology) to component working procedure progress technology The one embodiment for method of telling somebody what one's real intentions are, comprises the following steps:
S11, the threedimensional model of whole components required for establishing construction;
S12, the component is placed to the position of setting, forms BUILDINGS MODELS;
S13, simulation animation is worked out to arrangement and method for construction, contrasts the feasibility of different arrangement and method for construction, obtains optimal case;
S14, using construction animation corresponding to the optimal case as confiding a technological secret, workmen is presented.
In step S11, by the two-dintension CAD drawing of component, the corresponding information of component is extracted, by BIM technology, The threedimensional model of structure is established in Revit instruments.Wherein component includes reinforcing bar, steel pipe, fastener and template etc., and corresponding information is such as Attribute information of reinforcing bar etc..Before the threedimensional model of structure is drawn, boilerplate is drawn first, when carrying out three-dimensional modeling, Model is often bigger to link together, it is necessary to establish multiple models, in order that each file accurately links together, there is one The attributes such as axis, absolute altitude and the basic point of cause, improve plotting speed and subsequently establish the facility of BUILDINGS MODELS.
, it is necessary to be carried out by the setting to parameters and the foundation of race when establishing threedimensional model using Revit instruments. Wherein, the setting of parameter includes the length of component, width, height, material etc..All pels in Autodesk revit are all It is based on race.Each race pel can define polytype in it, and according to the design of race founder, each type can have There are different sizes, shape, material is set or other specification variable.
In step S12, rational opening position is placed into using the mode for inserting race, the component is placed to the position of setting Put.The component of project is arranged according to construction technology, such as the configuration of full hall scaffold standpipe spacing, bar spacing, template Etc..Checked using the rich collision detection function with revit itself bands of speed, the rich collision checked between reinforcing bar of speed, revit Check the collision between component.So as to realize the rational deployment to component.It is a revit plug-in unit that its middling speed is rich, can be fast The arrangement reinforcing bar of speed, has reinforcing bar collision detection function.
In step S13, the specific implementation process for working out arrangement and method for construction simulation animation is:(also may be used using Navisworks To utilize fuzor) to component establishment set in Revit;By working procedure, to the set establishment time and action;Utilize Timeliner carries out activity time arrangement, generation construction animation simulation.For specific work progress, there are a variety of construction works Sequence and method, such as casting of concrete in mass will have much in construction method and process, be poured since which position, at which Individual position indwelling construction joint just has kinds of schemes, can work out different schemes, carries out the contrast between different schemes.Reviewing party Whether sequence of construction is reasonable in case, chooses the best alternatives.And export animation file corresponding to optimal case.
In step S14, above-mentioned animation file is confided a technological secret, workmen is presented, wherein presentation mode Can on mobile terminals, such as mobile phone, convenient construction personnel's real time inspection are confided a technological secret.
As shown in Fig. 2 another embodiment of the method that to component working procedure confide a technological secret based on BIM of the present invention, Comprise the following steps:
S21, the threedimensional model of whole components required for establishing construction;
S22, the component is placed to the position of setting, forms BUILDINGS MODELS;
S23, simulation animation is worked out to arrangement and method for construction, contrasts the implementation result of different arrangement and method for construction, obtains optimal case;
S24, animation file corresponding to optimal case is changed into video file.
S25, using the video file as confiding a technological secret, workmen is presented.
In step S21, by the two-dintension CAD drawing of component, the corresponding information of component is extracted, by BIM technology, The threedimensional model of structure is established in Revit instruments.Wherein component includes reinforcing bar, steel pipe, fastener and template etc., and corresponding information is such as Attribute information of reinforcing bar etc..Before the threedimensional model of structure is drawn, boilerplate is drawn first, when carrying out three-dimensional modeling, Model is often bigger to link together, it is necessary to establish multiple models, in order that each file accurately links together, there is one The attributes such as axis, absolute altitude and the basic point of cause, improve plotting speed and subsequently establish the facility of BUILDINGS MODELS.
, it is necessary to be carried out by the setting to parameters and the foundation of race when establishing threedimensional model using Revit instruments. Wherein, the setting of parameter includes the length of component, width, height, material etc..All pels in Autodesk revit are all It is based on race.Each race pel can define polytype in it, and according to the design of race founder, each type can have There are different sizes, shape, material is set or other specification variable.
In step S22, rational opening position is placed into using the mode for inserting race, the component is placed to the position of setting Put.The component of project is arranged according to construction technology, such as the configuration of full hall scaffold standpipe spacing, bar spacing, template Etc..Checked using the rich collision detection function with revit itself bands of speed, the rich collision checked between reinforcing bar of speed, revit Check the collision between component.So as to realize the rational deployment to component.It is a revit plug-in unit that its middling speed is rich, can be fast The arrangement reinforcing bar of speed, has reinforcing bar collision detection function.
In step S23, the specific implementation process for working out arrangement and method for construction simulation animation is:Utilize Navisworks pairs Component establishment set in Revit;By working procedure, to the set establishment time and action;Work is carried out using Timeliner Sequence Time alignment, generation construction animation simulation.For specific work progress, there are a variety of working procedures and method, such as greatly Volume concrete, which pours, to be had much in construction method and process, poured since which position, in which position indwelling construction Seam just has kinds of schemes, can work out different schemes, carries out the contrast between different schemes.Sequence of construction is in inspection scheme It is no reasonable, choose the best alternatives.And export animation file corresponding to optimal case.
In step S24, the simulation animation of optimal case in Navisworks is exported, generates animation file;At video Science and engineering has, and adds explanatory note in relevant position, forms video file.Wherein AE (Adobe can be selected in video processing tools A graphics video processing software that After Effects, Adobe companies release)
In step S25, above-mentioned video file is confided a technological secret, workmen is presented, wherein presentation mode Can on mobile terminals, such as mobile phone, convenient construction personnel's real time inspection are confided a technological secret.
Simply the preferred embodiment of the present invention described above, for those skilled in the art, Without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications are also regarded as this hair Bright protection domain.

Claims (6)

1. the method confided a technological secret based on BIM to component working procedure, it is characterized in that:Comprise the following steps:
S11, the threedimensional model of whole components required for establishing construction;
S12, the component is placed to the position of setting, forms BUILDINGS MODELS;
S13, simulation animation is worked out to arrangement and method for construction, contrasts the feasibility of different arrangement and method for construction, obtains optimal case;
S14, using construction animation corresponding to the optimal case as confiding a technological secret, workmen is presented.
2. the method according to claim 1 confided a technological secret based on BIM to component working procedure, it is characterized in that:Step Suddenly S11 specific implementation process is:
By two-dimentional drawing, the pictorial information of component is obtained;
Establish boilerplate;
Using Revit instruments, in boilerplate, the threedimensional model of component is drawn.
3. the method according to claim 1 confided a technological secret based on BIM to component working procedure, it is characterized in that:Will After the component is placed to the position of setting, in addition to:
Utilize the rich collision checked between reinforcing bar of speed;
The collision between component is checked using Revit.
4. the method according to claim 1 confided a technological secret based on BIM to component working procedure, it is characterized in that:Institute State and be to the specific implementation process of arrangement and method for construction establishment simulation animation:
Using Navisworks to component establishment set in Revit;
By working procedure, to the set establishment time and action;
Activity time arrangement, generation construction animation simulation are carried out using Timeliner.
5. the method confided a technological secret based on BIM to component working procedure, it is characterized in that:Comprise the following steps:
S21, the threedimensional model of whole components required for establishing construction;
S22, the component is placed to the position of setting, forms BUILDINGS MODELS;
S23, simulation animation is worked out to arrangement and method for construction, contrasts the implementation result of different arrangement and method for construction, obtains optimal case;
S24, animation file corresponding to optimal case is changed into video file.
S25, using the video file as confiding a technological secret, workmen is presented.
6. the method according to claim 5 confided a technological secret based on BIM to component working procedure, it is characterized in that:Step Suddenly S24 specific implementation process is:
The simulation animation of optimal case in Navisworks is exported, generates animation file;
Using video processing tools, explanatory note is added in relevant position, forms video file.
CN201710914526.4A 2017-09-30 2017-09-30 The method confided a technological secret based on BIM to component working procedure Pending CN107862105A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710914526.4A CN107862105A (en) 2017-09-30 2017-09-30 The method confided a technological secret based on BIM to component working procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710914526.4A CN107862105A (en) 2017-09-30 2017-09-30 The method confided a technological secret based on BIM to component working procedure

Publications (1)

Publication Number Publication Date
CN107862105A true CN107862105A (en) 2018-03-30

Family

ID=61698664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710914526.4A Pending CN107862105A (en) 2017-09-30 2017-09-30 The method confided a technological secret based on BIM to component working procedure

Country Status (1)

Country Link
CN (1) CN107862105A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108711773A (en) * 2018-06-07 2018-10-26 武汉鑫科信科技有限公司 A kind of design method of buildings integrative wire laying equipment room
CN108734443A (en) * 2018-05-17 2018-11-02 上海宝冶集团有限公司 A kind of project installation and assembly method, device, system and technological process method
CN109117521A (en) * 2018-07-21 2019-01-01 中铁十八局集团有限公司 A kind of steel truss rod piece splice plate bolt auxiliary assembly system
CN109614666A (en) * 2018-11-22 2019-04-12 中铁二局第四工程有限公司 A method of based on the arrangement and method for construction of BIM technology than choosing
CN109614685A (en) * 2018-12-04 2019-04-12 上海宝冶集团有限公司 Construction based on BIM model is told somebody what one's real intentions are method, apparatus, equipment and mobile terminal
CN109657366A (en) * 2018-12-24 2019-04-19 中铁十六局集团第四工程有限公司 A kind of pier top swivel bridges rotating device method for analog construction based on BIM
CN110322534A (en) * 2019-04-08 2019-10-11 中铁十六局集团第四工程有限公司 A kind of steel truss girder Support Method assembling construction analogy method based on BIM technology
CN110532676A (en) * 2019-08-27 2019-12-03 中建七局安装工程有限公司 A kind of BIM technology auxiliary more packing list rooms reinforcing bar and bellows positioning construction method
CN111663783A (en) * 2020-07-16 2020-09-15 广州城建职业学院 Assembly type building concrete pouring device based on BIM
CN111859558A (en) * 2020-06-30 2020-10-30 中建八局轨道交通建设有限公司 Subway station engineering steel bar straight thread connection bottom crossing method based on BIM technology

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888248A (en) * 2016-04-27 2016-08-24 河北建筑工程学院 Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology
CN106845039A (en) * 2017-03-21 2017-06-13 中建三局第建设工程有限责任公司 Bracing demolition construction method based on BIM
CN107065801A (en) * 2017-04-27 2017-08-18 中铁六局集团有限公司 Simulative construction method is automatically assembled using the section of track production line of BIM technology

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888248A (en) * 2016-04-27 2016-08-24 河北建筑工程学院 Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology
CN106845039A (en) * 2017-03-21 2017-06-13 中建三局第建设工程有限责任公司 Bracing demolition construction method based on BIM
CN107065801A (en) * 2017-04-27 2017-08-18 中铁六局集团有限公司 Simulative construction method is automatically assembled using the section of track production line of BIM technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
KAM C 等: "The product model and fourth dimension project", 《SPECIAL ISSUE IFC-PRODUCT MODELS FOR THE AEC ARENA》 *
李俊: "基于BIM技术的施工应用研究", 《工程建设与设计》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108734443A (en) * 2018-05-17 2018-11-02 上海宝冶集团有限公司 A kind of project installation and assembly method, device, system and technological process method
CN108711773A (en) * 2018-06-07 2018-10-26 武汉鑫科信科技有限公司 A kind of design method of buildings integrative wire laying equipment room
CN109117521A (en) * 2018-07-21 2019-01-01 中铁十八局集团有限公司 A kind of steel truss rod piece splice plate bolt auxiliary assembly system
CN109614666A (en) * 2018-11-22 2019-04-12 中铁二局第四工程有限公司 A method of based on the arrangement and method for construction of BIM technology than choosing
CN109614685A (en) * 2018-12-04 2019-04-12 上海宝冶集团有限公司 Construction based on BIM model is told somebody what one's real intentions are method, apparatus, equipment and mobile terminal
CN109657366A (en) * 2018-12-24 2019-04-19 中铁十六局集团第四工程有限公司 A kind of pier top swivel bridges rotating device method for analog construction based on BIM
CN110322534A (en) * 2019-04-08 2019-10-11 中铁十六局集团第四工程有限公司 A kind of steel truss girder Support Method assembling construction analogy method based on BIM technology
CN110322534B (en) * 2019-04-08 2022-08-09 中铁十六局集团第四工程有限公司 BIM technology-based steel truss girder support method assembly construction simulation method
CN110532676A (en) * 2019-08-27 2019-12-03 中建七局安装工程有限公司 A kind of BIM technology auxiliary more packing list rooms reinforcing bar and bellows positioning construction method
CN111859558A (en) * 2020-06-30 2020-10-30 中建八局轨道交通建设有限公司 Subway station engineering steel bar straight thread connection bottom crossing method based on BIM technology
CN111663783A (en) * 2020-07-16 2020-09-15 广州城建职业学院 Assembly type building concrete pouring device based on BIM

Similar Documents

Publication Publication Date Title
CN107862105A (en) The method confided a technological secret based on BIM to component working procedure
WO2021128675A1 (en) Bim technology-based method for constructing underground continuous wall
CN104252558B (en) A kind of non-standard construction fender member digital control processing preprocess method based on BIM platform
CN107832498A (en) A kind of complicated construction technology based on BIM is told somebody what one's real intentions are method
CN106652049A (en) Full-professional design delivery method for building based on augmented reality technology of mobile terminal
CN105888248A (en) Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology
CN104573254A (en) Pre-construction technical disclosure method based on BIM
CN107818198A (en) A kind of science of bridge building management platform based on BIM technology
CN107844677B (en) Method for editing and updating three-dimensional steel bar
CN107220462A (en) The production method and system of a kind of parametrization reinforcing bar applied to prefabricated components
CN107862117A (en) A kind of 3D solid reinforcing bar generation method and equipment based on BIM
CN110162856B (en) Intelligent beam stirrup generation method based on dynamo
CN104156544A (en) Automatic beam and column steel bar joint arranging and constructing simulation method based on BIM technology
CN108427814A (en) A kind of assembled wall steel bar data processing method and device
CN107885918A (en) A kind of Architectural Structure Design method and apparatus based on BIM technology
CN106845039A (en) Bracing demolition construction method based on BIM
CN112069562B (en) Zero-collision rapid arrangement method for three-way hoop reinforcement cage structure in rectangular component
CN108875167A (en) A kind of construction site three dimensional arrangement optimization method based on BIM technology
CN112116713B (en) High-precision steel bar arrangement method for linear bearing platform type components
CN103914589A (en) Power tower single-line model fast generating method
CN106844840B (en) Method for realizing rapid modeling of subway station based on BIM
CN110309624A (en) A kind of laminated floor slab production method
CN108318010A (en) A kind of pit retaining monitoring measuring point fast selecting method based on BIM
CN110119552A (en) Indulge the BIM method that muscle and side surface configurations reinforcing bar automatically generate in beam lower part
CN110750823A (en) BIM visual display method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination