CN106485411A CN201610878065.5A CN201610878065A CN106485411A CN 106485411 A CN106485411 A CN 106485411A CN 201610878065 A CN201610878065 A CN 201610878065A CN 106485411 A CN106485411 A CN 106485411A
Authority
CN
China
Prior art keywords
prefabricated
prefabricated components
essential information
data base
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610878065.5A
Other languages
Chinese (zh)
Inventor
李琰
潘峰
邱迪
沈浅灏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201610878065.5A priority Critical patent/CN106485411A/en
Publication of CN106485411A publication Critical patent/CN106485411A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a kind of prefabricated concrete structure based on BIM technology builds management method and system, data base sets up essential information, specifying information and the drawing of each prefabricated component, essential information is write in RFID chip;Obtain essential information by scanning RFID chip, the progress msg of each construction phase corresponding with essential information is updated in data base, the information mutual communication of supply chain can be strengthened, realize integration information, construction assembly bag and the entry integrated management of factory for prefabrication, strengthen the information mutual communication of supply chain, construction over contract can carry out remote visualization monitor in real time to prefabricated components construction speed, construction over contract and factory for prefabrication realize the with no paper real-time management to prefabricated components quality, in addition, the progress msg of each construction phase can be reflected on the pel of component corresponding processed of BIM model, consequently facilitating user image ground can check the progress msg of each construction phase of each prefabricated component on BIM model.

Description

Prefabricated concrete structure based on BIM technology builds management method and system
Technical field
The present invention relates to a kind of prefabricated concrete structure based on BIM technology builds management method and system.
Background technology
With prefabricated concrete structure large-area applications, in prefabrication building course, to the production of component, Transport, stack, that lifting carries out the efficient management of systematization is most important.In prefabricated concrete structure construction, construction is total Contract timely with prefabricated components inter-plant, effective communication influence and construction quality and efficiency of construction.In prefabricated concrete structure Under the background of construction rapid growth, there is job site component and stack that place is limited, the multiple acceptance information of component is heterogeneous, component peace Dress needs in a certain order, the problem that the communication of component supply chain need to be strengthened with cooperation.
Content of the invention
It is an object of the invention to provide a kind of prefabricated concrete structure based on BIM technology is built management method and is System, can strengthen the information mutual communication of supply chain, it is real that construction over contract can carry out remote visualization to prefabricated components construction speed When monitoring.
For solving the above problems, the present invention provides a kind of prefabricated concrete structure based on BIM technology to build manager Method, including:
Set up essential information, specifying information and the drawing of each prefabricated component in data base, by each prefabricated component Essential information writes in the RFID chip on respective prefabricated components;
Obtain the essential information of each prefabricated component by scanning RFID chip, each prefabricated component are basic with described The progress msg of information corresponding each construction phase updates in data base.
Further, in the above-mentioned methods, set up in data base the essential information of each prefabricated component, specifying information and Drawing, before the essential information of each prefabricated component is write the step in the RFID chip on respective prefabricated components, also includes:
Set up the BIM model of prefabricated concrete structure, described BIM model includes the prefabricated structure of prefabricated concrete structure The pel of part;
The progress msg of corresponding with described essential information for each prefabricated component each construction phase is updated into data base In step after, also include:
By the entering of the essential information of each prefabricated component, specifying information, drawing and corresponding each construction phase in data base Degree information updating enters on the pel of corresponding prefabricated components in BIM model.
Further, in the above-mentioned methods, a kind of color of pel of prefabricated components corresponds to a kind of progress of construction phase Information.
Further, in the above-mentioned methods, set up in data base the essential information of each prefabricated component, specifying information and Drawing, the essential information of each prefabricated component is write in the RFID chip on respective prefabricated components, including:
Construction over contract sets up essential information, specifying information and the figure of each prefabricated component in data base by terminal Paper, and submit to the making distribution of prefabricated components single to described data base;
Factory for prefabrication selects the essential information of prefabricated components and corresponding making to divide by terminal from described data base Join list, generate production schedule list, and when producing each prefabricated component, inquire about corresponding specifying information and drawing, by RFID core Piece is embedded in prefabricated components, and the essential information of each prefabricated component is write in the RFID chip on respective prefabricated components.
Further, in the above-mentioned methods, the essential information of each prefabricated component is obtained by scanning RFID chip, will be every The progress msg of each construction phase corresponding with described essential information of individual prefabricated components updates in data base, including:
Factory for prefabrication passes through the RFID chip that scanning produces on the prefabricated components finishing, and obtains the base of each prefabricated component This information, by terminal by corresponding with described essential information for each prefabricated component production examination table, produce picture update into In data base, checked and accepted with the production completing prefabricated components;
Factory for prefabrication passes through the RFID chip that scanning produces on the prefabricated components finishing, and obtains the base of each prefabricated component This information, by terminal and according to described essential information, from data base, correspondence checks the specifying information of prefabricated components, drawing, life Produce and check and accept table and produce picture, delivery examination table is updated in data base, and carry out ordering of prefabricated components to construction assembly bag Single-shot goods, to complete the factory inspection and acceptance of prefabricated components;
When prefabricated components are marched into the arena, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains every The essential information of individual prefabricated components, by terminal and according to described essential information, from data base, correspondence checks the tool of prefabricated components Table is checked and accepted in body information, drawing, delivery, and examination table of receiving updates in data base;
During prefabricated part hanging, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains every The essential information of individual prefabricated components, checks the concrete letter of prefabricated components from data base by terminal and according to described essential information Breath, drawing, determine corresponding building number, floor, component number, are lifted;
After prefabricated components installation, construction assembly bag passes through the RFI D chip on the prefabricated components after scanning is dispatched from the factory, and obtains Take the essential information of each prefabricated component, check the tool of prefabricated components by terminal and according to described essential information from data base Body information, drawing, deliver and examination table of receiving, update installing examination table in data base.
According to the another side of the present invention, a kind of prefabricated concrete structure based on BIM technology is provided to build management system, Including:
Initialization module, for setting up essential information, specifying information and the drawing of each prefabricated component in data base, will The essential information of each prefabricated component writes in the RFID chip on respective prefabricated components;
Update module, for obtaining the essential information of each prefabricated component by scanning RFID chip, by each prefabricated structure The progress msg of each construction phase corresponding with described essential information of part updates in data base.
Further, in said system, also include BIM model module, for setting up the BIM of prefabricated concrete structure Model, described BIM model includes the pel of the prefabricated components of prefabricated concrete structure, and by each prefabricated component in data base Essential information, the progress msg of specifying information, drawing and corresponding each construction phase update corresponding prefabricated in BIM model On the pel of component.
Further, in said system, a kind of color of pel of prefabricated components corresponds to a kind of progress of construction phase Information.
Further, in said system, initialization module, for being built by terminal for construction over contract in data base Found essential information, specifying information and the drawing of each prefabricated component, and submit the making distribution of prefabricated components to described data base to Single;And select essential information and the corresponding making distribution of prefabricated components from described data base by terminal for factory for prefabrication Single, generate production schedule list, and when producing each prefabricated component, inquire about corresponding specifying information and drawing, by RFID chip It is embedded in prefabricated components, the essential information of each prefabricated component is write in the RFID chip on respective prefabricated components.
Further, in said system, described update module, it is used for
Pass through the RFID chip on the prefabricated components that scanning production finishes for factory for prefabrication, obtain each prefabricated component Corresponding with described essential information for each prefabricated component production is checked and accepted table, produces picture renewal by terminal by essential information Enter in data base, checked and accepted with the production completing prefabricated components;
Pass through the RFID chip on the prefabricated components that scanning production finishes for factory for prefabrication, obtain each prefabricated component Essential information, by terminal and according to described essential information from data base correspondence check the specifying information of prefabricated components, drawing, Produce and check and accept table and produce picture, delivery examination table is updated in data base, and carry out prefabricated components to construction assembly bag Order is delivered, to complete the factory inspection and acceptance of prefabricated components;
When marching into the arena for prefabricated components, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains The essential information of each prefabricated component, by terminal and according to described essential information, from data base, correspondence checks prefabricated components Table is checked and accepted in specifying information, drawing, delivery, and examination table of receiving updates in data base;
During for prefabricated part hanging, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains The essential information of each prefabricated component, checks the concrete of prefabricated components by terminal and according to described essential information from data base Information, drawing, determine corresponding building number, floor, component number, are lifted;
After prefabricated components installation, pass through the RF ID chip on the prefabricated components after scanning is dispatched from the factory for construction assembly bag, Obtain the essential information of each prefabricated component, check prefabricated components from data base by terminal and according to described essential information Specifying information, drawing, deliver and examination table of receiving, update installing examination table in data base.
Compared with prior art, the present invention passes through to set up the essential information of each prefabricated component, concrete letter in data base Breath and drawing, the essential information of each prefabricated component are write in the RFID chip on respective prefabricated components, by scanning RFID Chip obtains the essential information of each prefabricated component, by corresponding with described essential information for each prefabricated component each construction phase Progress msg update in data base, the information mutual communication of supply chain can be strengthened, reach remote monitoring component quality and construction The effect of progress, realizes integration information, the entry integrated management of construction assembly bag and factory for prefabrication, strengthens supply chain Information mutual communication, construction over contract can carry out remote visualization monitor in real time to prefabricated components construction speed, construction over contract and Factory for prefabrication realizes the with no paper real-time management to prefabricated components quality.In addition, can will be anti-for the progress msg of each construction phase Reflect on the pel of component corresponding processed of BIM model, consequently facilitating user image ground can check that on BIM model each is prefabricated The progress msg of each construction phase of component.
Brief description
Fig. 1 is the flow process of the prefabricated concrete structure construction management method based on BIM technology of one embodiment of the invention Figure;
Fig. 2 is that management method built by the prefabricated concrete structure based on BIM technology of one embodiment of the present invention Schematic diagram.
Specific embodiment
Understandable for enabling the above objects, features and advantages of the present invention to become apparent from, below in conjunction with the accompanying drawings and specifically real The present invention is further detailed explanation to apply mode.
Embodiment one
As shown in figure 1, the present invention provides a kind of prefabricated concrete structure based on BIM technology to build management method, bag Include:
Step S2, sets up essential information, specifying information and the drawing of each prefabricated component in data base, and each is prefabricated The essential information of component writes in the RFID chip on respective prefabricated components;
Step S3, obtains the essential information of each prefabricated component by scanning RFID chip, by each prefabricated component with The progress msg of described essential information corresponding each construction phase updates in data base.Specifically, prefabricated concrete structure In construction, construction over contract and prefabricated components inter-plant is timely, effective communication influence construction quality and efficiency of construction.? Under the background of prefabricated concrete structure construction rapid growth it is contemplated that job site component stacking place is limited, component is multiple Acceptance information is heterogeneous, component is installed needs in a certain order, and the communication of reinforcement members supply chain and cooperation ensure prefabricated components Produce the construction progress msg chain integrity installed, set up systematic management system, carry out with no paper real-time Data Transmission, become The main object of the present invention.The present invention is directed to that job site in esse component management is difficult, examination data is heterogeneous, be difficult to and When hold the problem of component progress msg, have developed prefabricated concrete structure and build progress chasing scheme, strengthen supply chain Information mutual communication, reaches the effect of remote monitoring component quality and construction speed, realizes integration information, construction assembly bag and prefabricated structure The entry integrated management of part factory, strengthens the information mutual communication of supply chain, construction over contract can be to prefabricated components construction speed Carry out remote visualization monitor in real time, construction over contract and factory for prefabrication realize managing in real time with no paper at all to prefabricated components quality Reason.Detailed, component production phase, association prefabricated components pel and RFID chip, pre-buried RFID chip in prefabricated components, it The essential information of each prefabricated component in RFID chip in construction process afterwards, is scanned by scanning device, will be corresponding to each The real-time status of the progress msg of each construction phase of the essential information of prefabricated components feeds back in data base, each terminal (as PC, Panel computer, mobile phone) connect network after, can from data base obtain prefabricated components each construction phase progress msg,
Preferably, as illustrated in fig. 1 and 2, step S2, sets up the essential information of each prefabricated component, concrete in data base Information and drawing, before the essential information of each prefabricated component is write the step in the R FID chip on respective prefabricated components, Also include:
Step S1, sets up the BIM model of prefabricated concrete structure, and described BIM model includes prefabricated concrete structure Prefabricated components pel;
Step S3, obtains the essential information of each prefabricated component by scanning RFID chip, by each prefabricated component with After the progress msg of described essential information corresponding each construction phase updates the step in data base, also include:
Step S4, by the essential information of each prefabricated component, specifying information, drawing and corresponding each construction rank in data base The progress msg of section updates on the pel of corresponding prefabricated components in BIM model.Specifically, BIM (building Information modeling) it is basis using every relevant information data of construction-engineering project as model, carry out mould The foundation of type.BIM technology is to realize integrated management to provide reliable technical support.And the progress of each construction phase can be believed Breath reflection is on the pel of the component corresponding processed of BIM model, consequently facilitating each can be checked on BIM model in user image ground The progress msg of each construction phase of prefabricated components is it is preferred that a kind of pel color of prefabricated components corresponds to a kind of construction phase Progress msg, so as to the progress msg of different construction phases is substantially distinguished in BIM model.Meanwhile, prefabricated components Electronics receipt, examination picture can be uploaded to data base in the acceptance phase dispatched from the factory, march into the arena, lift by factory, construction over contract In, after connecting network, the data synchronization updating of the prefabricated components of each terminal.In overall process, BIM model information real-time update, can Check essential information, the progress msg of specifying information, drawing and corresponding each construction phase of a prefabricated component, simultaneously a kind of pre- Component pel color processed corresponds to a kind of prefabricated components state.
Preferably, the essential information of each prefabricated component includes project, Lou Hao, level number, component number such that it is able to according to base This information exact correlation other information in data base.
Preferably, as shown in Fig. 2 step S2, data base sets up essential information, the specifying information of each prefabricated component And drawing, the essential information of each prefabricated component is write in the RFID chip on respective prefabricated components, including:
Construction over contract sets up essential information, specifying information and the figure of each prefabricated component in data base by terminal Paper, and submit to the making distribution of prefabricated components single to described data base;
Factory for prefabrication selects the essential information of prefabricated components and corresponding system by terminal (PC) from described data base Make distribution single, generate production schedule list, and when producing each prefabricated component, inquire about corresponding specifying information and drawing, will RFID chip is embedded in prefabricated components, and the essential information of each prefabricated component is write the RFID chip on respective prefabricated components In.
Preferably, as shown in Fig. 2 step S3, obtain the essential information of each prefabricated component by scanning RFID chip, will The progress msg of each construction phase corresponding with described essential information of each prefabricated component updates in data base, including:
Factory for prefabrication passes through the RFID chip that scanning produces on the prefabricated components finishing, and obtains the base of each prefabricated component Corresponding with described essential information for each prefabricated component production is checked and accepted table, produces picture by (flat board) terminal by this information Update in data base, checked and accepted with the production completing prefabricated components;
Factory for prefabrication passes through the RFID chip that scanning produces on the prefabricated components finishing, and obtains the base of each prefabricated component This information, by (flat board) terminal and according to described essential information from data base correspondence check prefabricated components specifying information, Drawing, production are checked and accepted table and are produced picture, and delivery examination table is updated in data base, and carry out prefabricated structure to construction assembly bag The order delivery of part, to complete the factory inspection and acceptance of prefabricated components;
When prefabricated components are marched into the arena, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains every The essential information of individual prefabricated components, by (flat board) terminal and according to described essential information, from data base, correspondence checks prefabricated structure Table is checked and accepted in the specifying information of part, drawing, delivery, and examination table of receiving updates in data base;
During prefabricated part hanging, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains every The essential information of individual prefabricated components, checks prefabricated components by (flat board) terminal and according to described essential information from data base Specifying information, drawing, determine corresponding building number, floor, component number, are lifted;
After prefabricated components installation, construction assembly bag passes through the RFI D chip on the prefabricated components after scanning is dispatched from the factory, and obtains Take the essential information of each prefabricated component, check prefabricated structure from data base by (flat board) terminal and according to described essential information The specifying information of part, drawing, deliver and examination table of receiving, update installing examination table in data base.
Embodiment two
The present invention also provides another kind of prefabricated concrete structure based on BIM technology to build management system, including:
Initialization module, for setting up essential information, specifying information and the drawing of each prefabricated component in data base, will The essential information of each prefabricated component writes in the RFID chip on respective prefabricated components;
Update module, for obtaining the essential information of each prefabricated component by scanning RFID chip, by each prefabricated structure The progress msg of each construction phase corresponding with described essential information of part updates in data base.
Preferably, also include BIM model module, for setting up the BIM model of prefabricated concrete structure, described BIM mould Type includes the pel of the prefabricated components of prefabricated concrete structure, and by the essential information of each prefabricated component, tool in data base The progress msg of body information, drawing and corresponding each construction phase updates on the pel of corresponding prefabricated components in BIM model.
Preferably, a kind of color of pel of prefabricated components corresponds to a kind of progress msg of construction phase.
Preferably, initialization module, for setting up each prefabricated component for construction over contract by terminal in data base Essential information, specifying information and drawing, and submit to the making distribution of prefabricated components single to described data base;And supply prefabricated components Factory selects the essential information of prefabricated components and corresponding making distribution single by terminal from described data base, generates the production schedule Single, and when producing each prefabricated component, inquire about corresponding specifying information and drawing, RFID chip is embedded in prefabricated components In, the essential information of each prefabricated component is write in the RFID chip on respective prefabricated components.
Preferably, described update module, is used for
Pass through the RFID chip on the prefabricated components that scanning production finishes for factory for prefabrication, obtain each prefabricated component Corresponding with described essential information for each prefabricated component production is checked and accepted table, produces picture renewal by terminal by essential information Enter in data base, checked and accepted with the production completing prefabricated components;
Pass through the RFID chip on the prefabricated components that scanning production finishes for factory for prefabrication, obtain each prefabricated component Essential information, by terminal and according to described essential information from data base correspondence check the specifying information of prefabricated components, drawing, Produce and check and accept table and produce picture, delivery examination table is updated in data base, and carry out prefabricated components to construction assembly bag Order is delivered, to complete the factory inspection and acceptance of prefabricated components;
When marching into the arena for prefabricated components, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains The essential information of each prefabricated component, by terminal and according to described essential information, from data base, correspondence checks prefabricated components Table is checked and accepted in specifying information, drawing, delivery, and examination table of receiving updates in data base;
During for prefabricated part hanging, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains The essential information of each prefabricated component, checks the concrete of prefabricated components by terminal and according to described essential information from data base Information, drawing, determine corresponding building number, floor, component number, are lifted;
After prefabricated components installation, pass through the RF ID chip on the prefabricated components after scanning is dispatched from the factory for construction assembly bag, Obtain the essential information of each prefabricated component, check prefabricated components from data base by terminal and according to described essential information Specifying information, drawing, deliver and examination table of receiving, update installing examination table in data base.
Other detailed contents of embodiment two, specifically can be found in the corresponding part of embodiment one, will not be described here.
In sum, the present invention passes through to set up essential information, specifying information and the figure of each prefabricated component in data base Paper, the essential information of each prefabricated component is write in the RFID chip on respective prefabricated components, is obtained by scanning RFID chip Take the essential information of each prefabricated component, by the progress of corresponding with described essential information for each prefabricated component each construction phase Information updating enters in data base, can strengthen the information mutual communication of supply chain, reaches remote monitoring component quality and construction speed Effect, realizes integration information, the entry integrated management of construction assembly bag and factory for prefabrication, the information strengthening supply chain is mutual Logical, construction over contract can carry out remote visualization monitor in real time, construction over contract and prefabricated structure to prefabricated components construction speed Part factory realizes the with no paper real-time management to prefabricated components quality.In addition, the progress msg of each construction phase can be reflected BIM On the pel of component corresponding processed of model, consequently facilitating user image ground can check each prefabricated component on BIM model The progress msg of each construction phase.
In this specification, each embodiment is described by the way of going forward one by one, and what each embodiment stressed is and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.
Professional further appreciates that, in conjunction with the unit of each example of the embodiments described herein description And algorithm steps, can with electronic hardware, computer software or the two be implemented in combination in, in order to clearly demonstrate hardware and The interchangeability of software, generally describes composition and the step of each example in the above description according to function.These Function to be executed with hardware or software mode actually, the application-specific depending on technical scheme and design constraint.Specialty Technical staff can use different methods to each specific application realize described function, but this realization should Think beyond the scope of this invention.
Obviously, those skilled in the art can carry out the various changes and modification spirit without deviating from the present invention to invention And scope.So, if these modifications of the present invention and modification belong to the claims in the present invention and its equivalent technologies scope it Interior, then the present invention is also intended to including these changes and modification.

Claims (10)

1. a kind of prefabricated concrete structure based on BIM technology builds management method it is characterised in that including:
Set up the BIM model of prefabricated concrete structure, described BIM model includes the prefabricated components of prefabricated concrete structure Pel;
Essential information, specifying information and the drawing of each prefabricated component is set up in data base, each prefabricated component are basic Information writes in the RFID chip on respective prefabricated components;
Obtain the essential information of each prefabricated component by scanning RFID chip, by each prefabricated component and described essential information The progress msg of corresponding each construction phase updates in data base.
2. the prefabricated concrete structure based on BIM technology as claimed in claim 1 build management method it is characterised in that
The progress msg of corresponding with described essential information for each prefabricated component each construction phase is updated in data base After step, also include:
Progress letter by the essential information of each prefabricated component, specifying information, drawing and corresponding each construction phase in data base Breath updates on the pel of corresponding prefabricated components in BIM model.
3. the prefabricated concrete structure based on BIM technology as claimed in claim 2 build management method it is characterised in that A kind of color of pel of prefabricated components corresponds to a kind of progress msg of construction phase.
4. the prefabricated concrete structure based on BIM technology as claimed in claim 2 build management method it is characterised in that Set up essential information, specifying information and the drawing of each prefabricated component in data base, by the essential information of each prefabricated component Write in the RFID chip on respective prefabricated components, including:
Construction over contract sets up essential information, specifying information and the drawing of each prefabricated component in data base by terminal, and Submit to the making distribution of prefabricated components single to described data base;
Factory for prefabrication selects the essential information of prefabricated components and corresponding making distribution single by terminal from described data base, Generate production schedule list, and when producing each prefabricated component, inquire about corresponding specifying information and drawing, RFID chip is pre-buried In prefabricated components, the essential information of each prefabricated component is write in the RFID chip on respective prefabricated components.
5. the prefabricated concrete structure based on BIM technology as claimed in claim 4 build management method it is characterised in that Obtain the essential information of each prefabricated component by scanning RFID chip, each prefabricated component are corresponding with described essential information The progress msg of each construction phase update in data base, including:
Factory for prefabrication passes through the RFID chip that scanning produces on the prefabricated components finishing, and obtains the basic letter of each prefabricated component Breath, is updated corresponding with described essential information for each prefabricated component production examination table, production picture into data by terminal In storehouse, checked and accepted with the production completing prefabricated components;
Factory for prefabrication passes through the RFID chip that scanning produces on the prefabricated components finishing, and obtains the basic letter of each prefabricated component Breath, by terminal and according to described essential information, from data base, the corresponding specifying information checking prefabricated components, drawing, production are tested Receive table and produce picture, delivery examination table is updated in data base, and the order carrying out prefabricated components to construction assembly bag is sent out Goods, to complete the factory inspection and acceptance of prefabricated components;
When prefabricated components are marched into the arena, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains each pre- The essential information of component processed, by terminal and according to described essential information, from data base, correspondence checks the concrete letter of prefabricated components Table is checked and accepted in breath, drawing, delivery, and examination table of receiving updates in data base;
During prefabricated part hanging, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains each pre- The essential information of component processed, by terminal and according to described essential information check from data base prefabricated components specifying information, Drawing, determines corresponding building number, floor, component number, is lifted;
After prefabricated components installation, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains every The essential information of individual prefabricated components, checks the concrete letter of prefabricated components from data base by terminal and according to described essential information Breath, drawing, deliver and examination table of receiving, update installing examination table in data base.
6. a kind of prefabricated concrete structure based on BIM technology builds management system it is characterised in that including:
BIM model module, for setting up the BIM model of prefabricated concrete structure, described BIM model includes assembly concrete The pel of the prefabricated components of structure;
Initialization module, for setting up essential information, specifying information and the drawing of each prefabricated component in data base, by each The essential information of prefabricated components writes in the RFID chip on respective prefabricated components;
Update module, for obtaining the essential information of each prefabricated component by scanning RFID chip, by each prefabricated component The progress msg of each construction phase corresponding with described essential information updates in data base.
7. the prefabricated concrete structure based on BIM technology as claimed in claim 6 build management system it is characterised in that Described BIM model module, is additionally operable to the essential information of each prefabricated component in data base, specifying information, drawing and corresponding The progress msg of each construction phase updates on the pel of corresponding prefabricated components in BIM model.
8. the prefabricated concrete structure based on BIM technology as claimed in claim 7 build management system it is characterised in that A kind of color of pel of prefabricated components corresponds to a kind of progress msg of construction phase.
9. the prefabricated concrete structure based on BIM technology as claimed in claim 7 build management system it is characterised in that Initialization module, for passing through, for construction over contract, the essential information, specifically that terminal sets up each prefabricated component in data base Information and drawing, and submit to the making distribution of prefabricated components single to described data base;And pass through terminal from institute for factory for prefabrication State the essential information selecting prefabricated components in data base and corresponding making distribution is single, generate production schedule list, and every producing During individual prefabricated components, inquire about corresponding specifying information and drawing, RFID chip is embedded in prefabricated components, by each prefabricated structure The essential information of part writes in the RFID chip on respective prefabricated components.
10. the prefabricated concrete structure based on BIM technology as claimed in claim 9 build management system it is characterised in that Described update module, is used for
Pass through the RFID chip on the prefabricated components that scanning production finishes for factory for prefabrication, obtain the basic of each prefabricated component Information, is updated corresponding with described essential information for each prefabricated component production examination table, production picture into number by terminal According in storehouse, checked and accepted with the production completing prefabricated components;
Pass through the RFID chip on the prefabricated components that scanning production finishes for factory for prefabrication, obtain the basic of each prefabricated component Information, by terminal and according to described essential information, from data base, correspondence checks the specifying information of prefabricated components, drawing, production Check and accept table and produce picture, delivery examination table is updated in data base, and carry out the order of prefabricated components to construction assembly bag Delivery, to complete the factory inspection and acceptance of prefabricated components;
When marching into the arena for prefabricated components, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains each The essential information of prefabricated components, by terminal and according to described essential information, from data base, correspondence checks the concrete of prefabricated components Table is checked and accepted in information, drawing, delivery, and examination table of receiving updates in data base;
During for prefabricated part hanging, construction assembly bag passes through the RFID chip on the prefabricated components after scanning is dispatched from the factory, and obtains each The essential information of prefabricated components, checks the concrete letter of prefabricated components from data base by terminal and according to described essential information Breath, drawing, determine corresponding building number, floor, component number, are lifted;
After prefabricated components installation, pass through the RFID chip on the prefabricated components after scanning is dispatched from the factory for construction assembly bag, obtain The essential information of each prefabricated component, checks the concrete of prefabricated components by terminal and according to described essential information from data base Information, drawing, deliver and examination table of receiving, update installing examination table in data base.
CN201610878065.5A 2016-10-08 2016-10-08 Prefabricated concrete structure based on BIM technology builds management method and system Pending CN106485411A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610878065.5A CN106485411A (en) 2016-10-08 2016-10-08 Prefabricated concrete structure based on BIM technology builds management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610878065.5A CN106485411A (en) 2016-10-08 2016-10-08 Prefabricated concrete structure based on BIM technology builds management method and system

Publications (1)

Publication Number Publication Date
CN106485411A true CN106485411A (en) 2017-03-08

Family

ID=58268619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610878065.5A Pending CN106485411A (en) 2016-10-08 2016-10-08 Prefabricated concrete structure based on BIM technology builds management method and system

Country Status (1)

Country Link
CN (1) CN106485411A (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107092764A (en) * 2017-06-14 2017-08-25 成都智建新业建筑设计咨询有限公司 A kind of concrete assembled construction method based on BIM
CN107386660A (en) * 2017-08-02 2017-11-24 中国十七冶集团有限公司 Tower crane system in prefabricated concrete structure construction based on BIM technology
CN107679297A (en) * 2017-09-20 2018-02-09 中国十七冶集团有限公司 A kind of prefabricated assembled apron slope construction method based on BIM
CN107705351A (en) * 2017-10-19 2018-02-16 毕埃慕(上海)建筑数据技术股份有限公司 A kind of state color method and device based on BIM
CN107832951A (en) * 2017-11-10 2018-03-23 上海建工五建集团有限公司 Application processes and system of the BIM in precast concrete supply chain
CN108133158A (en) * 2017-11-21 2018-06-08 上海建工五建集团有限公司 Transport of materials method and system
CN108133242A (en) * 2017-11-21 2018-06-08 上海建工五建集团有限公司 Construction material vertical transporting method and system
CN108228967A (en) * 2017-12-06 2018-06-29 海门市设备安装工程有限公司 A kind of production of assembled pipeline based on BIM and mounting process
CN108427803A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of external coordination mold management method and system
CN108616815A (en) * 2018-05-06 2018-10-02 北京工业大学 A kind of prefabricated component positioning Lift-on/Lift-off System based on LoRa technologies
CN109025319A (en) * 2018-07-10 2018-12-18 上海建工集团股份有限公司 A kind of prefabricated components butt joint interface quality testing and method of disposal
CN109214015A (en) * 2017-06-30 2019-01-15 中建科技有限公司深圳分公司 A kind of building element management method, device, terminal device and readable storage medium storing program for executing
CN109203222A (en) * 2018-10-10 2019-01-15 苏州建设(集团)有限责任公司 Building assembly beam slab intelligence production method
CN109472091A (en) * 2018-11-13 2019-03-15 四川华芯项目管理有限公司 A kind of assembled architecture construction and stage monitoring system and method for being on active service
CN109492876A (en) * 2018-10-15 2019-03-19 鼎宸建设管理有限公司 A kind of assembled architecture production and construction management module information system
CN109558412A (en) * 2018-09-20 2019-04-02 中建科技有限公司深圳分公司 The data growing method and device of assembled architecture construct platform
CN109784674A (en) * 2018-12-20 2019-05-21 上海建工集团股份有限公司 Quality tracing system and method based on BIM model
CN110348546A (en) * 2019-05-31 2019-10-18 云南齐星杭萧钢构股份有限公司 A kind of air navigation aid of assembled architecture prefabricated components installation
CN112376919A (en) * 2020-11-02 2021-02-19 上海建工一建集团有限公司 Digital automatic hoisting method for fabricated building
CN112434123A (en) * 2020-11-25 2021-03-02 马鞍山学院 Rail transit life-cycle management data storage method based on BIM and RFID
CN112685821A (en) * 2020-12-30 2021-04-20 武汉合创炬盛科技有限公司 Prefabricated component hoist and mount auxiliary system
CN112734184A (en) * 2020-12-30 2021-04-30 南通汉腾建筑科技有限公司 Acceptance method and system for assembly type building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103559525A (en) * 2013-10-21 2014-02-05 沈阳建筑大学 Precast concrete member provided with implanted radio frequency chip
CN104636873A (en) * 2015-02-11 2015-05-20 上海公路投资建设发展有限公司 Bridge precast concrete member monitoring system based on two-dimensional code and control method thereof
CN105003028A (en) * 2015-07-23 2015-10-28 深圳海龙建筑制品有限公司 Prefabricated component capable of being monitored, monitoring method of prefabricated component and monitoring system of prefabricated component
CN105160462A (en) * 2015-08-17 2015-12-16 上海建工四建集团有限公司 Reinforcement raw material information automatic integration apparatus and method for prefabricated concrete member
CN105888248A (en) * 2016-04-27 2016-08-24 河北建筑工程学院 Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103559525A (en) * 2013-10-21 2014-02-05 沈阳建筑大学 Precast concrete member provided with implanted radio frequency chip
CN104636873A (en) * 2015-02-11 2015-05-20 上海公路投资建设发展有限公司 Bridge precast concrete member monitoring system based on two-dimensional code and control method thereof
CN105003028A (en) * 2015-07-23 2015-10-28 深圳海龙建筑制品有限公司 Prefabricated component capable of being monitored, monitoring method of prefabricated component and monitoring system of prefabricated component
CN105160462A (en) * 2015-08-17 2015-12-16 上海建工四建集团有限公司 Reinforcement raw material information automatic integration apparatus and method for prefabricated concrete member
CN105888248A (en) * 2016-04-27 2016-08-24 河北建筑工程学院 Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107092764A (en) * 2017-06-14 2017-08-25 成都智建新业建筑设计咨询有限公司 A kind of concrete assembled construction method based on BIM
CN109214015B (en) * 2017-06-30 2023-08-11 中建科技集团有限公司深圳分公司 Building element management method, device, terminal equipment and readable storage medium
CN109214015A (en) * 2017-06-30 2019-01-15 中建科技有限公司深圳分公司 A kind of building element management method, device, terminal device and readable storage medium storing program for executing
CN107386660A (en) * 2017-08-02 2017-11-24 中国十七冶集团有限公司 Tower crane system in prefabricated concrete structure construction based on BIM technology
CN108427803A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of external coordination mold management method and system
CN107679297A (en) * 2017-09-20 2018-02-09 中国十七冶集团有限公司 A kind of prefabricated assembled apron slope construction method based on BIM
CN107705351A (en) * 2017-10-19 2018-02-16 毕埃慕(上海)建筑数据技术股份有限公司 A kind of state color method and device based on BIM
CN107832951A (en) * 2017-11-10 2018-03-23 上海建工五建集团有限公司 Application processes and system of the BIM in precast concrete supply chain
CN108133242A (en) * 2017-11-21 2018-06-08 上海建工五建集团有限公司 Construction material vertical transporting method and system
CN108133158A (en) * 2017-11-21 2018-06-08 上海建工五建集团有限公司 Transport of materials method and system
CN108228967A (en) * 2017-12-06 2018-06-29 海门市设备安装工程有限公司 A kind of production of assembled pipeline based on BIM and mounting process
CN108616815A (en) * 2018-05-06 2018-10-02 北京工业大学 A kind of prefabricated component positioning Lift-on/Lift-off System based on LoRa technologies
CN109025319A (en) * 2018-07-10 2018-12-18 上海建工集团股份有限公司 A kind of prefabricated components butt joint interface quality testing and method of disposal
CN109558412A (en) * 2018-09-20 2019-04-02 中建科技有限公司深圳分公司 The data growing method and device of assembled architecture construct platform
CN109203222A (en) * 2018-10-10 2019-01-15 苏州建设(集团)有限责任公司 Building assembly beam slab intelligence production method
CN109492876A (en) * 2018-10-15 2019-03-19 鼎宸建设管理有限公司 A kind of assembled architecture production and construction management module information system
CN109472091A (en) * 2018-11-13 2019-03-15 四川华芯项目管理有限公司 A kind of assembled architecture construction and stage monitoring system and method for being on active service
CN109784674A (en) * 2018-12-20 2019-05-21 上海建工集团股份有限公司 Quality tracing system and method based on BIM model
CN110348546A (en) * 2019-05-31 2019-10-18 云南齐星杭萧钢构股份有限公司 A kind of air navigation aid of assembled architecture prefabricated components installation
CN112376919A (en) * 2020-11-02 2021-02-19 上海建工一建集团有限公司 Digital automatic hoisting method for fabricated building
CN112434123A (en) * 2020-11-25 2021-03-02 马鞍山学院 Rail transit life-cycle management data storage method based on BIM and RFID
CN112685821A (en) * 2020-12-30 2021-04-20 武汉合创炬盛科技有限公司 Prefabricated component hoist and mount auxiliary system
CN112734184A (en) * 2020-12-30 2021-04-30 南通汉腾建筑科技有限公司 Acceptance method and system for assembly type building
CN112734184B (en) * 2020-12-30 2022-06-03 南通汉腾建筑科技有限公司 Acceptance method and system for assembly type building

Similar Documents

Publication Publication Date Title
CN106485411A (en) Prefabricated concrete structure based on BIM technology builds management method and system
CN105023201B (en) Assembled architecture Deepen Design and construction method based on BIM and big data
CN109785436B (en) BIM technology-based reinforcing steel bar information full life cycle management method
CN105825335A (en) BIM (Building Information Modeling) based construction onsite vehicle and device management system and method
CN107386660A (en) Tower crane system in prefabricated concrete structure construction based on BIM technology
CN106951966A (en) Device management method and system
CN106530405A (en) Automobile production line real-time roaming system based on virtual reality technology
US20080109330A1 (en) Method and system for constructing buildings
CN109558412A (en) The data growing method and device of assembled architecture construct platform
KR102353408B1 (en) Management system and method for constructing precast concrete
CN106903786A (en) Prefabricated components make quality control method and system
CN109360123B (en) Multi-professional construction management method and system based on room
CN110216788A (en) A kind of Intelligentized control method of bridge subsection precasting yard
CN110717685A (en) Building material management system and method
CN109242269A (en) Job instruction generation method, device, system, electronic equipment and storage medium
JP2009139996A (en) Construction management system
CN109377195A (en) Project development management method and device
CN110503323A (en) The monitoring method and device and equipment of a kind of pull type SC task
CN109784693B (en) Three-dimensional dynamic production management system for prefabricated part field
CN111242498A (en) Construction progress management system and management method based on building information model
Peiris et al. Digitalising modular construction: Enhancement of off-site manufacturing productivity via a manufacturing execution & control (MEC) system
US11868325B2 (en) Data management system, management method, and storage medium
CN110782523A (en) BIM-based building model checking method and system
KR20200142229A (en) Method for relaying delivery service
CN106682865A (en) Prefabricated part transport monitoring method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170308

RJ01 Rejection of invention patent application after publication