CN105839635A - Construction device and construction method for deep or ultra-deep rock-embedded precast pile - Google Patents

Construction device and construction method for deep or ultra-deep rock-embedded precast pile Download PDF

Info

Publication number
CN105839635A
CN105839635A CN201610216556.3A CN201610216556A CN105839635A CN 105839635 A CN105839635 A CN 105839635A CN 201610216556 A CN201610216556 A CN 201610216556A CN 105839635 A CN105839635 A CN 105839635A
Authority
CN
China
Prior art keywords
casing
deep
drill bit
drilling rod
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610216556.3A
Other languages
Chinese (zh)
Inventor
陈越
廖琴超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610216556.3A priority Critical patent/CN105839635A/en
Publication of CN105839635A publication Critical patent/CN105839635A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a construction device and construction method for a deep or ultra-deep rock-embedded precast pile and relates to the technical field of precast pile construction. The construction device comprises a full cylinder drilling machine, a non-polished cylinder or a plum-blossom-shaped cylinder, a drill rod, a drill bit and a grout spraying nozzle. The full cylinder drilling machine is connected with the non-polished cylinder or the plum-blossom-shaped cylinder and the drill rod. The drill rod is connected with the drill bit. The drill bit is connected with the grout spraying nozzle. The construction technique used for the deep or ultra-deep precast pile in soft soil areas can also be used for construction of a deep or ultra-deep rock-embedded precast pile comprising a slightly-weathered, moderately-weathered or hard underlying stratum foundation, soil sampling is not needed in the construction process, the construction speed is high, hole collapse and hole shrinkage are avoided, slag in holes does not need to be removed, the side form resistance of a soil body and the end resistance of bed rocks can be brought into full play, the pile body strength of the precast pile is improved, and the bearing capacity of a single pile is improved substantially; meanwhile, the construction speed of a finished pile can be increased substantially, industrial production is facilitated, and the construction cost is reduced; and furthermore, deep, ultra-deep or rock-embedded cast-in-place piles in the soft soil areas can be replaced to a certain extent.

Description

A kind of deep or ultra-deep embedding rock construction of prefabricated piles equipment and construction method
Technical field
The present invention relates to construction of prefabricated piles technical field, be specifically related to a kind of deep or the embedding rock of ultra-deep is pre- Pile driving construction equipment processed and construction method.
Background technology
In riverine, coastal area, widely distributed intensity is low, moisture content is high, compressibility is high, The weak soil that permeability is low, thickness is big, its physico-mechanical properties is poor, in high-rise or high-rise stake Basis is the most embedding relatively deep, uses prefabricated pile to be difficult to pile sinking, and to easily snap off, the highest Layer or high-rise pile foundation generally use bored concrete pile technology, during common filling pile construction To produce a large amount of mud, easy collapse hole, shrinkage cavity, sediment at the bottom of hole is difficult to clear up, is difficult in weak soil Ensure pile quality, and casing original state soil taking and filling pile work progress need to fetch earth, when the soil body becomes soft Moulding or be difficult to fetch earth successfully during liquid-plastic state, in casing, sediment is difficult to clear up, and speed of application is slow, When there is mild wind, mild wind, middle air slaking or hard subjacent bed, the embedding rock of common filling pile is relatively For difficulty, prefabricated pile is more difficult to.
By patent retrieval, there is following known technical scheme:
Patent 1:
Application number: 03124315.0, the applying date: 2003-04-30, authorized announcement date: 2003-11-26, A kind of combined rock-embedding pile, including the pile cutoff being positioned in soil layer and the pile cutoff being positioned in rock stratum, described Pile cutoff in soil layer and the pile cutoff in rock stratum link together, and described combined rock-embedding pile also comprises to be filled out Fill material.Wherein, the pile cutoff in the soil layer of the present invention can be by prefabricated (including prestressing force) steel Perfusion packing material in reinforced concrete sleeve pipe or steel pipe, and Section-steel Piles outsourcing packing material two kinds Component is selected one.Pile cutoff in the rock stratum of the present invention can be by steel reinforcement cage, steel beam column and pre- Reinforced concrete member these three component processed is selected a kind of or combination in any, formation pore is inoculated with Described packing material.Pile body in petrosal foramen expands load by the cohesive force of packing material and petrosal foramen wall It is scattered to depths, rock stratum, owing to its contact area with packing material is more than using the stake of normal configuration, Therefore anchor force can be fully provided.
Patent 2:
Application number: 02121959.1, the applying date: 2002-05-28, authorized announcement date: 2002-12-25, The invention discloses a kind of combined rock-embedding pile and construction method thereof, with prefabricated reinforced concrete pipe or other Stake adds additional bar as the bearing carrier in soil layer, adds additional bar or pre-with reinforcing bar or component Reinforced concrete member processed is inserted in deeper preboring petrosal foramen, then imposes the group that on-the-spot grouting material is formed Closing stake, one of which reinforcing bar is through and waters the inside being fixed in above-mentioned component to bear pressure or pulling force, And improve the seriality between pile cutoff, it is positioned at the pile body dependence of petrosal foramen and cohering of petrosal foramen sidewall Power is uniformly spread to depths, rock stratum the load transmitted above.Owing to the bearing area of stake is than existing The pure end having technology holds formula stake and is significantly increased, and its grouting material is the biggest with the adhesion of rock Frictional force between the pure friction pile and soil of prior art, thus substantially increase whole stake Bearing capacity.Due to all components of whole stake can industrial mass production, therefore can simplify design, side Just construct, reduce cost.
Patent 3:
Application number: 200510084145.5, the applying date: 2005-07-14, authorized announcement date: 2007-01-17, a kind of steel-pipe concrete assembled pile of predrilled hole rock-embedded, including the steel with high intensity Pipe shell and high compressive strength, the concrete of big rigidity or armored concrete inner core, described embedding rock The cementitious packing material of in-site pouring is gone back between concrete filled steel tube built pile and preboring stake holes.In advance Pile body in boring is diffused into rock stratum by the cohesive force of above-mentioned packing material and hole wall vertical load Depths, is delivered to horizontal loading in surrounding soil.Owing to the present invention utilizes existing steel tube concrete The excellent stress performance of earth pillar and embedded rock pile high-bearing capacity overcast by feature, make each of pile foundation Plant bearing capacity, horizontal force resistant rigidity, construction quality and cost performance and other existing concreting in site Concrete-pile is compared, and is all improved largely.
Being found by above retrieval, above technical scheme does not affect the novelty of the present invention; And above patent document be mutually combined the creativeness not destroying the present invention.
Summary of the invention
(1) solve the technical problem that
The technical problem to be solved there is provided one, and deeply or ultra-deep embedding rock prefabricated pile is executed Construction equipment and construction method, low to overcome in intensity, moisture content is high, compressibility is high, permeability The weak soil that low, thickness is big, uses prefabricated pile pile sinking mode, and pile driving process difficulty and prefabricated pile are easy Fracture, use common filling pile mode, work progress produces a large amount of mud, easy collapse hole, contracting Hole, sediment at the bottom of hole is difficult to clear up, and is difficult to ensure that pile quality, and casing original state takes in weak soil Soil filling pile construction process need to fetch earth, and moulds when the soil body becomes soft or is difficult to fetch earth successfully during liquid-plastic state, In casing, sediment is difficult to clear up, and the problem that speed of application is slow.
(2) technical scheme
For realizing object above, the present invention is achieved by the following technical programs: a kind of deep or Ultra-deep embedding rock construction of prefabricated piles equipment, including full casing rig, light circle casing (1) or Flos Mume are protected Cylinder (2), drilling rod (3), drill bit (4) and whitewashing mouth (5), described full casing rig is even Being connected to light circle casing (1) or Flos Mume casing (2) and drilling rod (3), described drilling rod (3) is even Being connected to drill bit (4), described drill bit (4) connects whitewashing mouth (5).
Further, described drilling rod (3) includes that drilling rod connects mouth (301), helical blade (302) With horizontal blade (303), described drilling rod (3) top is provided with drilling rod and connects mouth (301), described Full casing rig connects mouth (301) connection by drilling rod has drilling rod (3), on described drilling rod (3) It is provided with helical blade (302) and horizontal blade (303).
Further, described drill bit (4) includes drill bit interface (401), bit grooves (402), Inverted cone inclined-plane (403), inclined-plane bores tooth (404), and tooth (405) is bored in bottom surface, the most logical slurry hole (406) and whitewashing mouth install guard aperture (407), described drill bit (4) top is provided with bit adapter (401), described drilling rod (3) is connected by bit adapter (401) drill bit (4), institute Stating and be laid with four bit grooves (402) on drill bit (4), described drill bit (4) bottom sets There are inverted cone inclined-plane (403), described inverted cone inclined-plane (403) to be provided with inclined-plane and bore tooth (404), Described drill bit (4) bottom surface is provided with bottom surface and bores tooth (405), described four bit grooves (402) In be provided with the most logical slurry hole (406), institute in any one group of relative two bit grooves (402) In stating bit grooves (402), the most logical slurry hole (406) end coaxially sets with the most logical slurry hole (406) Having installation guard aperture (407), the most logical described slurry hole (406) connects whitewashing mouth (5).
Further, described light circle casing (1) includes that light circle casing wall (101) and light circle protect Cylinder V-type tooth (102), described light circle casing wall (101) lower end is provided with light circle casing V-type tooth (102)。
Further, described Flos Mume casing (2) includes plum blossom hole casing wall (201), casing Aperture (202) and casing V-type tooth (203), described plum blossom hole casing wall (201) lower end sets Having casing V-type tooth (203), the upper determining deviation of described plum blossom hole casing wall (201) is quincunx close It is laid with the diameter casing aperture (202) less than 2cm.
Further, the upper determining deviation of described drilling rod (3) is staggered is provided with at least two group helical blades (302) and horizontal blade (303), the diameter of described helical blade (302) protects less than light circle Cylinder (1) or the radius of Flos Mume casing (2), at two ends, radius is gradually reduced, described water The radius of flat blade (303) is slightly less than the maximum radius of helical blade (302).
Further, described drill bit (4) diameter is less than light circle casing (1) or Flos Mume casing (2) Inner diameter, more than the maximum gauge of helical blade (302), described inverted cone inclined-plane (403) Gradient and pile top are equal, and described drill bit (4) basal diameter is preferably greater than prefabricated pile diameter.
A kind of deep or ultra-deep embedding rock construction of prefabricated piles method, comprises the following steps:
1) light circle casing (1) or Flos Mume casing (2), drilling rod (3) are installed on full casing rig With drill bit (4), its China and foreign countries' unit head is connected with light circle casing (1) or Flos Mume casing (2), Internally-powered head is connected with drilling rod (3), and drilling rod (3) connects drill bit (4);
2) starting construction, outer unit head carries light circle casing (1) or Flos Mume casing (2) is carried out Cutting is crept into, and internally-powered is taken drilling rod (3) and stirred and take drill bit (4) follow-up, mouth of now whitewashing (5) whitewashing bench drill head (4) in parallel is broken ground and is crept into, and drilling rod (3) and drill bit (4) rotate forward, Helical blade (302), by the soil body upwards scarifying, reduces the resistance of stirring, Heshui flat blade in parallel (303) make serosity and soil body mix uniform;
3), after light circle casing (1) or Flos Mume casing (2) cutting drilling proceed to scar, stop outer dynamic The cutting of power head is crept into, and increases drilling rod (3) pressure, and whitewashing mouth (5) is persistently whitewashed, drill bit (4) Rotating chip and break rock, construct to designed elevation, reversion rollback drilling rod (3), reversion rollback turns During bar, soil cement is compacted by helical blade (302), and combines horizontal blade (303) Making serosity and Soil-cement uniform, the soil cement near drill bit (3) position is in extruding force effect Under by the bottom of drill bit (3) bit grooves (402) access aperture or light circle casing (1) or Flos Mume protect Cylinder (2) bottom, it is ensured that give out light after drill bit (3) round casing (1) or Flos Mume casing (2) The density of interior soil cement;
4) sinking prefabricated pile is to designed elevation, prefabricated pile pile driving process keep prefabricated pile vertical and with Light circle casing (1) or Flos Mume casing (2) are concentric, when being difficult to control to prefabricated pile center, Inverted cone pile crown is being connected at the bottom of prefabricated pile;
5) light circle casing (1) or Flos Mume casing (2) are promoted.
Further, step 3) in reversion rollback drilling rod (3) time select according to the intensity of soil cement Select and stop slurry reversion rollback drilling rod (3) or whitewashing reversion rollback drilling rod (3).
Further, step 4) described in pile top basal diameter less than prefabricated pile diameter, more than boring Head (3) diameter and light circle casing (1) or the difference of Flos Mume casing (2) diameter, pile top inclined-plane Inclined degree is equal with inverted cone inclined-plane (403) inclined degree of drill bit (3).
(3) beneficial effect
The invention provides a kind of be applicable to that soft clay area is deep or the construction equipment of ultra-deep prefabricated pile and Construction method is it can also be used to contain the deep of mild wind, middle air slaking or hard subjacent bed ground or ultra-deep Embedding rock construction of prefabricated piles, work progress is without fetching earth, and speed of application is fast, without collapse hole and shrinkage cavity, In hole, slagging is without removing, and can fully play soil body side form resistance and the end resistance of basement rock, carry The pile strength of high prefabricated pile, increases substantially bearing capacity of single pile, pile can be greatly improved simultaneously Speed of application, it is simple to industrialized production, reduce construction costs, and can be to a certain extent Replace deep, ultra-deep or the rock-socketed pile group of soft clay area.
Accompanying drawing explanation
Fig. 1 is the structural representation of light of the present invention circle casing;
Fig. 2 is the structural representation of Flos Mume casing of the present invention;
Fig. 3 is the structural representation of drilling rod of the present invention;
Fig. 4 is the structural representation of drill bit of the present invention;
Fig. 5 is the sectional structure schematic diagram of drill bit of the present invention;
Fig. 6 is that the present invention whitewashes the structural representation of mouth;
Fig. 7 is construction technology view of the present invention.
In figure:
1, light circle casing;101, light circle casing wall;102, light circle casing V-type tooth;
2, Flos Mume casing;201, plum blossom hole casing wall;202, casing aperture;203, casing V Type tooth;
3, drilling rod;301, drilling rod connects mouth;302, helical blade;303, horizontal blade;
4, drill bit;401, drill bit interface;402, bit grooves;403, inverted cone inclined-plane; 404, inclined-plane bores tooth;405, tooth is bored in bottom surface;406, the most logical slurry hole;407, whitewashing mouth is installed Guard aperture;
5, whitewashing mouth;
601, banket;602, weak soil;603, basement rock;
701, casing cutting is crept into, drill bit is whitewashed and state is crept in drilling rod stirring follow-up;702、 Casing cutting drilling proceeds to bedrock surface to be stopped creeping into state;703, drilling rod vertical pressure, drill bit are increased State is crept in whitewashing;704, bit cutting creeps into designed elevation state;705, drill bit whitewashing, Back-drilling rollback drilling rod state;706, sinking prefabricated pile state;707, prefabricated pile sinks down into design Absolute altitude state;708, casing, pile done state are extracted.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below will knot Close the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely retouched State, it is clear that described embodiment is a part of embodiment of the present invention rather than whole realities Execute example.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creation The every other embodiment obtained under property work premise, broadly falls into the scope of protection of the invention.
Shown in Fig. 1~7, including full casing rig, light circle casing 1 or Flos Mume casing 2, bore Bar 3, drill bit 4 and whitewashing mouth 5, described full casing rig connects has light circle casing 1 or Flos Mume to protect Cylinder 2 and drilling rod 3, described drilling rod 3 connects drill bit 4, and described drill bit 4 connects whitewashing mouth 5.
Preferably, described drilling rod 3 includes that drilling rod connects mouth 301, helical blade 302 and horizontal blade 303, described drilling rod 3 top is provided with drilling rod and connects mouth 301, and described full casing rig is by drilling rod even Mouth 301 connects has drilling rod 3, described drilling rod 3 to be provided with helical blade 302 and horizontal blade 303.
Preferably, described drill bit 4 includes drill bit interface 401, and bit grooves 402, inverted cone is oblique Face 403, inclined-plane bores tooth 404, and tooth 405 is bored in bottom surface, and the most logical slurry hole 406 and whitewashing mouth are installed and protected Hole 407, described drill bit 4 top is provided with bit adapter 401, and described drilling rod 3 passes through bit adapter 401 connections have drill bit 4, and described drill bit 4 is laid with four bit grooves 402, are conducive to Drilling rod 3 inverts rollback water of compaction earth and enters at the bottom of stake and form closely knit cement earth pile;Described brill Being provided with inverted cone inclined-plane 403 bottom 4, described inverted cone inclined-plane 403 is provided with inclined-plane and bores tooth 404, described drill bit 4 bottom surface is provided with bottom surface and bores tooth 405, appoints in described four bit grooves 402 The most logical slurry hole 406, described bit grooves it is provided with in one group of relative two bit grooves 402 of anticipating In 402, the most logical slurry hole 406 end is coaxially provided with installation guard aperture 407 with the most logical slurry hole 406, described The most logical slurry hole 406 connects whitewashing mouth 5.
Preferably, described light circle casing 1 includes light circle casing wall 101 and light circle casing V-type tooth 102, described light circle casing wall 101 lower end is provided with light circle casing V-type tooth 102;Light circle casing 1 The most smooth friction reduced between light circle casing 1 and the soil body of stack shell, reduces and creeps into resistance, Favourable light circle casing 1 cutting is crept into and is terminated rear light circle casing 1 with prefabricated pile pile sinking and promote.
Preferably, described Flos Mume casing 2 includes plum blossom hole casing wall 201, casing aperture 202 With casing V-type tooth 203, described plum blossom hole casing wall 201 lower end is provided with casing V-type tooth 203, The quincunx casing being provided with diameter less than 2cm that gathers of determining deviation on described plum blossom hole casing wall 201 Aperture 202;There is quincunx casing aperture 202, beneficially soil cement in Flos Mume casing 2 surface Extrusion, improves soil body density, improves whitewashing condition, simultaneously can in prefabricated pile sinking watching So that soil cement clamp-ons the periphery soil body, improve side friction.
Preferably, on described drilling rod 3, determining deviation is staggered is provided with at least two group helical blade 302 Hes Horizontal blade 303, the diameter of described helical blade 302 is than light circle casing 1 or Flos Mume casing 2 Diameter little, reduce the friction between helical blade 302 and casing wall, reduce resistance, extend Casing service life;Radius is gradually reduced at the two ends, beneficially the creeping into and drilling rod of drilling rod Lifting, and vertically creeping into of drilling rod can be kept;The radius of described horizontal blade 303 is slightly less than The maximum radius of helical blade 302, prevents horizontal blade from rubbing with casing contact internal walls.
Preferably, described drill bit 4 diameter is than light circle casing 1 or the inner diameter of Flos Mume casing 2 Little, prevent drill bit 4 and light circle casing 1 or Flos Mume casing 2 wall friction, whitewashing and drill bit 4 energy In ensureing light circle casing 1 or Flos Mume casing 2, the soil body is the most broken, and beneficially drilling rod 3 stirs; Described inverted cone inclined-plane 403 gradient and pile top are equal, and described drill bit 4 basal diameter ratio is prefabricated Stake diameter is big, makes prefabricated pile pile top be fully contacted with basement rock.
Time specifically used, its construction method comprises the following steps:
1) light circle casing 1 or Flos Mume casing 2, drilling rod 3 and drill bit are installed on full casing rig 4, its China and foreign countries' unit head is connected with light circle casing 1 or Flos Mume casing 2, internally-powered head and drilling rod 3 Connecting, drilling rod 3 connects drill bit 4;
2) starting construction, outer unit head carries light circle casing (1) or Flos Mume casing (2) is carried out Cutting is crept into, and internally-powered is taken drilling rod (3) and stirred and take drill bit (4) follow-up, mouth of now whitewashing (5) whitewashing bench drill head (4) in parallel is broken ground and is crept into, and drilling rod (3) and drill bit (4) rotate forward, Helical blade (302), by the soil body upwards scarifying, reduces the resistance of stirring, Heshui flat blade in parallel (303) make serosity and soil body mix uniform;
3), after light circle casing (1) or Flos Mume casing (2) cutting drilling proceed to scar, stop outer dynamic The cutting of power head is crept into, and increases drilling rod (3) pressure, and whitewashing mouth (5) is persistently whitewashed, drill bit (4) Rotating chip and break rock, construct to designed elevation, reversion rollback drilling rod (3), reversion rollback turns During bar, soil cement is compacted by helical blade (302), and combines horizontal blade (303) Making serosity and Soil-cement uniform, the soil cement near drill bit (3) position is in extruding force effect Under by the bottom of drill bit (3) bit grooves (402) access aperture or light circle casing (1) or Flos Mume protect Cylinder (2) bottom, it is ensured that give out light after drill bit (3) round casing (1) or Flos Mume casing (2) The density of interior soil cement;
4) sinking prefabricated pile is to designed elevation, prefabricated pile pile driving process keep prefabricated pile vertical and with Light circle casing 1 or Flos Mume casing 2 are concentric, when being difficult to control to prefabricated pile center, in advance Inverted cone pile crown is connected at the bottom of stake processed;
5) light circle casing 1 or Flos Mume casing 2 are promoted.
Preferably, select to stop slurry according to the intensity of soil cement when step 3 inverts rollback drilling rod 3 Reversion rollback drilling rod 3 or whitewashing reversion rollback drilling rod 3.
Preferably, pile top basal diameter described in step 4 is less than prefabricated pile diameter, more than drill bit 3 Diameter and light circle casing 1 or the difference of Flos Mume casing 2 diameter, pile top inclined-plane inclined degree and brill Inverted cone inclined-plane 403 inclined degree of 3 is equal, it is simple to prefabricated pile sinks down into designed elevation, Be conducive to improving the stress of soil cement between prefabricated pile and basement rock, improve the end resistance of prefabricated pile.
Ultimately form the compound embedded rock pile structure being wrapped up embedding rock prefabricated pile by embedding rock solidified earth stake, and Realize deep or ultra-deep embedding rock construction of prefabricated piles.
The stirring carrying out serosity and the original position soil body in casing can improve the uniformity of solidified earth, Solidified earth intensity can be effectively improved simultaneously.
Certainly can be with cement mortar or other soft soil curing agents at above-mentioned serosity, serosity and soil body mix Formed solidified earth can be soil cement can also be other solidified earth, these are all this areas General knowledge, seldom describes at this.
This construction method can be used for soft clay area, and deeply or ultra-deep construction of prefabricated piles is it can also be used to contain micro- Deep or the ultra-deep embedding rock construction of prefabricated piles of air slaking, middle air slaking or hard subjacent bed ground.At soil layer In utilize drill bit whitewashing and drill bit chip jointly crush the soil body, when such as rock, utilize bit cutting rock Body, serosity cooling drill bit.
To sum up, the embodiment of the present invention has the advantages that providing one is applicable to weak soil Area is deep or the construction equipment of ultra-deep prefabricated pile and construction method it can also be used to containing mild wind, in Air slaking or the deep or ultra-deep embedding rock construction of prefabricated piles of hard subjacent bed ground, work progress is without taking Soil, speed of application is fast, and without collapse hole and shrinkage cavity, in hole, slagging is without removing, and can fully play Soil body side form resistance and the end resistance of basement rock, improve the pile strength of prefabricated pile, increase substantially Bearing capacity of single pile, can be greatly improved the speed of application of pile, it is simple to industrialized production simultaneously, fall Low construction costs, and deep, ultra-deep or the embedding rock brill of soft clay area can be replaced to a certain extent Hole pouring pile.
It should be noted that in this article, the relational terms of such as first and second or the like is only Only it is used for separating an entity or operation with another entity or operating space, and not necessarily Require or imply and there is the relation of any this reality or suitable between these entities or operation Sequence.And, term " includes ", " comprising " or its any other variant are intended to nonexcludability Comprise, so that include the process of a series of key element, method, article or equipment not only Including those key elements, but also include other key elements being not expressly set out, or also include The key element intrinsic for this process, method, article or equipment.There is no more restriction In the case of, statement " including ... " key element limited, it is not excluded that including described wanting Process, method, article or the equipment of element there is also other identical element.
Above example only in order to technical scheme to be described, is not intended to limit;Although reference The present invention has been described in detail by previous embodiment, and those of ordinary skill in the art should Understand: the technical scheme described in foregoing embodiments still can be modified by it, or Wherein portion of techniques feature is carried out equivalent;And these amendments or replacement, do not make phase The essence answering technical scheme departs from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (10)

1. a deep or ultra-deep embedding rock construction of prefabricated piles equipment, including full casing rig, its feature It is: also include light circle casing (1) or Flos Mume casing (2), drilling rod (3), drill bit (4) With whitewashing mouth (5), described full casing rig connects light circle casing (1) or Flos Mume casing (2) With drilling rod (3), described drilling rod (3) connects drill bit (4), and described drill bit (4) connects to be had Whitewashing mouth (5).
One the most according to claim 1 is deep or ultra-deep embedding rock construction of prefabricated piles equipment, its Be characterised by: described drilling rod (3) includes that drilling rod connects mouth (301), helical blade (302) and Horizontal blade (303), described drilling rod (3) top is provided with drilling rod and connects mouth (301), described entirely protects Cylinder rig connects mouth (301) connection by drilling rod has drilling rod (3), described drilling rod (3) to be provided with Helical blade (302) and horizontal blade (303).
One the most according to claim 2 is deep or ultra-deep embedding rock construction of prefabricated piles equipment, its It is characterised by: described drill bit (4) includes drill bit interface (401), bit grooves (402), falls Tapered slope (403), inclined-plane bores tooth (404), and tooth (405) is bored in bottom surface, the most logical slurry hole (406) Installing guard aperture (407) with whitewashing mouth, described drill bit (4) top is provided with bit adapter (401), Described drilling rod (3) is connected by bit adapter (401) drill bit (4), described drill bit (4) On be laid with four bit grooves (402), described drill bit (4) bottom is provided with inverted cone inclined-plane (403), described inverted cone inclined-plane (403) is provided with inclined-plane and bores tooth (404), described drill bit (4) Bottom surface be provided with bottom surface bore tooth (405), in described four bit grooves (402) any one group relative Two bit grooves (402) in be provided with tiltedly logical slurry hole (406), described bit grooves (402) The most logical interior slurry hole (406) end is coaxially provided with installation guard aperture (407) with oblique logical slurry hole (406), The most logical described slurry hole (406) connects whitewashing mouth (5).
One the most according to claim 3 is deep or ultra-deep embedding rock construction of prefabricated piles equipment, its It is characterised by: described light circle casing (1) includes light circle casing wall (101) and light circle casing V Type tooth (102), described light circle casing wall (101) lower end is provided with light circle casing V-type tooth (102).
One the most according to claim 3 is deep or ultra-deep embedding rock construction of prefabricated piles equipment, its It is characterised by: described Flos Mume casing (2) includes plum blossom hole casing wall (201), casing aperture (202) With casing V-type tooth (203), described plum blossom hole casing wall (201) lower end is provided with casing V-type Tooth (203), the upper determining deviation of described plum blossom hole casing wall (201) is quincunx gathers that to be provided with diameter little Casing aperture (202) in 2cm.
6. according to a kind of deep or ultra-deep embedding rock prefabricated pile described in any one in Claims 1 to 5 Construction equipment, it is characterised in that: the upper determining deviation of described drilling rod (3) is staggered is provided with at least two group spiral shells Vane sheet (302) and horizontal blade (303), the diameter of described helical blade (302) is less than Light circle casing (1) or the radius of Flos Mume casing (2), at two ends, radius is gradually reduced, The radius of described horizontal blade (303) is slightly less than the maximum radius of helical blade (302).
7. according to a kind of deep or ultra-deep embedding rock prefabricated pile described in any one in Claims 1 to 5 Construction equipment, it is characterised in that: described drill bit (4) diameter is less than light circle casing (1) or prunus mume (sieb.) sieb.et zucc. The inner diameter of flower casing (2), more than the maximum gauge of helical blade (302), described fall Tapered slope (403) gradient and pile top are equal, and described drill bit (4) basal diameter is preferably greater than Prefabricated pile diameter.
8. a deep or ultra-deep embedding rock construction of prefabricated piles method, it is characterised in that include following step Rapid:
1) light circle casing (1) or Flos Mume casing (2), drilling rod (3) are installed on full casing rig With drill bit (4), its China and foreign countries' unit head is connected with light circle casing (1) or Flos Mume casing (2), Internally-powered head is connected with drilling rod (3), and drilling rod (3) connects drill bit (4);
2) starting construction, outer unit head carries light circle casing (1) or Flos Mume casing (2) is carried out Cutting is crept into, and internally-powered is taken drilling rod (3) and stirred and take drill bit (4) follow-up, now whitewashes Mouth (5) whitewashing bench drill head (4) in parallel is broken ground and is crept into, and drilling rod (3) and drill bit (4) are just Turning, helical blade (302), by the soil body upwards scarifying, reduces the resistance of stirring, and combines Horizontal blade (303) makes serosity and soil body mix uniform;
3), after light circle casing (1) or Flos Mume casing (2) cutting drilling proceed to scar, stop outer dynamic The cutting of power head is crept into, and increases drilling rod (3) pressure, and whitewashing mouth (5) is persistently whitewashed, drill bit (4) rotate chip and break rock, construct to designed elevation, reversion rollback drilling rod (3), instead During going back to move back bull stick, soil cement is compacted by helical blade (302), and combines level Blade (303) makes serosity and Soil-cement uniform, near the cement at drill bit (3) position Soil passes through at the bottom of drill bit (3) bit grooves (402) access aperture or light circle under extruding force effect Casing (1) or Flos Mume casing (2) bottom, it is ensured that round casing of giving out light after drill bit (3) Or the density of Flos Mume casing (2) interior soil cement (1);
4) sinking prefabricated pile is to designed elevation, prefabricated pile pile driving process keep prefabricated pile vertical and with Light circle casing (1) or Flos Mume casing (2) are concentric, when being difficult to control to prefabricated pile center Time, connecting inverted cone pile crown at the bottom of prefabricated pile;
5) light circle casing (1) or Flos Mume casing (2) are promoted.
One the most according to claim 8 is deep or ultra-deep embedding rock construction of prefabricated piles method, its Be characterised by: step 3) in reversion rollback drilling rod (3) time select to stop according to the intensity of soil cement Slurry reversion rollback drilling rod (3) or whitewashing reversion rollback drilling rod (3).
One the most according to claim 8 is deep or ultra-deep embedding rock construction of prefabricated piles method, It is characterized in that: step 4) described in pile top basal diameter less than prefabricated pile diameter, more than drill bit (3) diameter and light circle casing (1) or the difference of Flos Mume casing (2) diameter, pile top inclined-plane inclines Tiltedly degree is equal with inverted cone inclined-plane (403) inclined degree of drill bit (3).
CN201610216556.3A 2016-04-08 2016-04-08 Construction device and construction method for deep or ultra-deep rock-embedded precast pile Pending CN105839635A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610216556.3A CN105839635A (en) 2016-04-08 2016-04-08 Construction device and construction method for deep or ultra-deep rock-embedded precast pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610216556.3A CN105839635A (en) 2016-04-08 2016-04-08 Construction device and construction method for deep or ultra-deep rock-embedded precast pile

Publications (1)

Publication Number Publication Date
CN105839635A true CN105839635A (en) 2016-08-10

Family

ID=56597177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610216556.3A Pending CN105839635A (en) 2016-04-08 2016-04-08 Construction device and construction method for deep or ultra-deep rock-embedded precast pile

Country Status (1)

Country Link
CN (1) CN105839635A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411896A (en) * 2018-03-06 2018-08-17 中建五局华东建设有限公司 The foundation-reinforcing device of building
CN110107223A (en) * 2019-05-20 2019-08-09 中国铁建重工集团股份有限公司 Drilling apparatus
CN110899766A (en) * 2019-12-11 2020-03-24 朱梅香 Drilling equipment for steel parts for civil engineering building

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1458346A (en) * 2003-04-30 2003-11-26 立基工程有限公司 Rock engaged combined pile and its construction method
CN1609346A (en) * 2003-10-20 2005-04-27 胡柏英 Superposed pile structure and construction method
CN201212147Y (en) * 2008-06-23 2009-03-25 何世鸣 Combination drill tool for long screwy jet grouting and stirring pile
CN101798810A (en) * 2009-02-20 2010-08-11 上海强劲基础工程有限公司 Cement-soil composite pile inserted into reinforced concrete core materials
KR20120068200A (en) * 2010-12-17 2012-06-27 (주)하경엔지니어링 Connection method for cast-in-place concrete pile and drilled pile
CN103015413A (en) * 2012-12-26 2013-04-03 杭州南联土木工程科技有限公司 Construction method of composite pile with implanting-in rigid-body embedded into hard bearing stratum
CN104329020A (en) * 2014-10-14 2015-02-04 北京中岩大地工程技术有限公司 Reinforced long-screw rock-socketed construction equipment and process thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1458346A (en) * 2003-04-30 2003-11-26 立基工程有限公司 Rock engaged combined pile and its construction method
CN1609346A (en) * 2003-10-20 2005-04-27 胡柏英 Superposed pile structure and construction method
CN201212147Y (en) * 2008-06-23 2009-03-25 何世鸣 Combination drill tool for long screwy jet grouting and stirring pile
CN101798810A (en) * 2009-02-20 2010-08-11 上海强劲基础工程有限公司 Cement-soil composite pile inserted into reinforced concrete core materials
KR20120068200A (en) * 2010-12-17 2012-06-27 (주)하경엔지니어링 Connection method for cast-in-place concrete pile and drilled pile
CN103015413A (en) * 2012-12-26 2013-04-03 杭州南联土木工程科技有限公司 Construction method of composite pile with implanting-in rigid-body embedded into hard bearing stratum
CN104329020A (en) * 2014-10-14 2015-02-04 北京中岩大地工程技术有限公司 Reinforced long-screw rock-socketed construction equipment and process thereof

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
北京工程管理科学学会: "《重点建设工程施工技术与管理创新 5》", 30 November 2011, 中国建筑工业出版社 *
卿三惠等编著: "《隧道及地铁工程 第2版》", 31 October 2013, 中国铁道出版社 *
周全兴: "《钻采工具手册 上》", 31 January 2007, 科学出版社 *
唐继平等: "《塔西南地区深井、超深井钻井技术》", 31 December 2008, 石油工业出版社 *
赵祥等: "《2010年辽宁工程勘察与岩土工程学术会议论文集 岩土工程创新与实践》", 30 September 2014 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411896A (en) * 2018-03-06 2018-08-17 中建五局华东建设有限公司 The foundation-reinforcing device of building
CN110107223A (en) * 2019-05-20 2019-08-09 中国铁建重工集团股份有限公司 Drilling apparatus
CN110899766A (en) * 2019-12-11 2020-03-24 朱梅香 Drilling equipment for steel parts for civil engineering building

Similar Documents

Publication Publication Date Title
CN102425159B (en) Pile cutting construction method of bored concrete pile
CN102587358B (en) Construction technology of high polymer material post-grouting squeezed cast-in-place pile
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
CN102011399B (en) PHC pile-based multiple high jet pedestal pile construction method
CN110318394B (en) Construction method of composite pile
JP5932124B1 (en) Steel pipe pile construction method
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN102900079A (en) High-frequency hydraulic vibratory construction method for cement-soil core-inserted combined pile
CN105672307A (en) Expanded-base combination end pile bearing foundation
CN106192999A (en) The construction method of uplift pile
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN105839635A (en) Construction device and construction method for deep or ultra-deep rock-embedded precast pile
CN107012861A (en) A kind of discrete material core expansive concrete stake and its construction method
CN102626946A (en) Manufacture method for concrete irregular fender post
CN1490467A (en) Composite friction pile structure and constructing method thereof
CN112081157A (en) Construction process for forming reinforced composite pile foundation by high-rise building retreating type grouting
CN106480878A (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN205776216U (en) A kind of implantation equipment of rigid pile
CN111005359A (en) Anti-collapse hole foundation reinforcing structure for building engineering construction and reinforcing method thereof
CN212336070U (en) Karst foundation variable-rigidity primary-secondary pile
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN102605775B (en) Combination pile of flexible pile and rigid pile concentrically arranged at upper end and lower end and pile forming method
CN104532832A (en) Steel retaining cylinder and application method thereof
CN110939161B (en) Construction method of large-diameter socketed anti-floating anchor rod and drilling tool used in method
CN105019449B (en) Prestressed concrete pipe pile and its construction method with degassing function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160810

RJ01 Rejection of invention patent application after publication