CN205776216U - A kind of implantation equipment of rigid pile - Google Patents
A kind of implantation equipment of rigid pile Download PDFInfo
- Publication number
- CN205776216U CN205776216U CN201620577267.1U CN201620577267U CN205776216U CN 205776216 U CN205776216 U CN 205776216U CN 201620577267 U CN201620577267 U CN 201620577267U CN 205776216 U CN205776216 U CN 205776216U
- Authority
- CN
- China
- Prior art keywords
- pile
- drilling rod
- pore
- equipment
- forming
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
This utility model provides the implantation equipment of a kind of rigid pile, and pore-forming is implanted with rigid pile and shared pile frame;Pore-forming equipment is provided with drilling rod;The drilling tool of pore-forming in rock stratum and hard stratum is installed bottom drilling rod;Equipped with variable speed drives equipment on drilling rod;Equipped with axial stepping pressue device on pile frame.Steel pile casting is imbedded at top, during can effectively preventing from fetching earth, hole wall caves in, up big and down small type drilling tool top spiral fetches earth, bottom action of forced stirring soil cement, plant the cement grout discharged during stake to be stored in casing in headspace, the discharge of the mud avoided, the composite pile of formation has higher bearing capacity.
Description
Technical field
This utility model relates to technical field of civil engineering, specifically relates to a kind of implantation rigid pile, imitates without soil compaction
Should, and with the cementitious composite in stake holes, formed stiffness stake.
Background technology
In field of civil engineering, traditional rigid pile includes the construction of prefabricated pile and piling bar, mainly has hammering method and quiet
Platen press, all there is the problems such as penetrating resistance is big, speed is slow, soil compaction is serious in both modes, to week during rigid pile construction
The building on limit, pipeline and structures produce harm.Although taking some Stress Release measures can alleviate the harm of soil compaction, but
Facts have proved that the harm of this soil compaction is difficult to eliminate.Additionally, formation resistance is the biggest, the pressure needing pile sinking is the biggest, causes pile sinking
Process is the biggest to the infringement of pile body.In order to protect pile body to be without prejudice at work progress, it is necessary to use relatively high-bearing capacity
Piling so that the cost of pile foundation increases a lot.Another kind of method is to draw hole drag reduction, this not only adds construction cost, Er Qieyin
Although hole drag reduction, but also reduce the side-friction force of foundation soil, cause the reduction of bearing capacity of pile foundation, thus add engineering and make
Valency.
In mud class soft layer, owing to the frictional resistance of the soil body is relatively low, the side bearing capacity causing pile body is less so that
The intensity of pile shaft material does not plays effect, it is impossible to fully apply, and produces bigger waste.
Rigid pile enters decomposed rock and is currently through dense sand stratum impossible, thus limits the range of application of prefabricated pile.
For the region that surrounding enviroment are complicated, can only use cast-in-situ bored pile, cast-in-situ bored pile will produce in work progress
Raw substantial amounts of slurry coat method and pore-forming pulping, pollute generation environment.Simultaneously as the difficult quality of concrete placed under water
Ensure and the mud skin of drill-pouring pile body periphery causes pile body bearing capacity to decline so that the cost of cast-in-situ bored pile is than prefabricated pile
Cost is high by more than 40%.
Holing in sandy gravel stratum, clear hole is the most difficult, makes the engineering time of cast-in-situ bored pile and cost increase more.
The problem existed based on prefabricated pile basis and bored pile foundation and respective advantage, engineering circles is highly desirable will
The advantage of these two kinds of pile foundations is developed, and overcomes the shortcoming that it exists, and needs a kind of pile foundation construction equipment of innovation.
Utility model content
Technical problem to be solved in the utility model is, overcomes problems of the prior art, it is provided that Yi Zhonggang
The implantation equipment of property stake.
The implantation equipment of a kind of rigid pile, including pile frame, is characterized in that: be provided with pore-forming equipment on same pile frame with just
Property stake implant equipment so that pore-forming and rigid pile are implanted and are shared pile frame;Pore-forming equipment is provided with drilling rod;Rock is installed bottom drilling rod
The drilling tool of pore-forming in layer and hard stratum;Equipped with variable speed drives equipment on drilling rod;Equipped with axial stepping pressue device on pile frame.
It is provided with the long spire fetched earth on the drilling rod of described pore-forming equipment to fetch earth blade, bottom drilling rod, is provided with gunniting hole.
The spherical drill bit of hard alloy is installed on described drilling tool
Described drilling tool, for toothed spiral drilling tool.
Described axial stepping pressue device is fluid pressure type or towed device.
Described drilling rod is for continuing drilling rod, by drilling rod connection device, by drilling rod spreading, it is achieved stirring drilling depth reaches
More than 40m, controls pile frame height within 30m.
Plant pile construction method for one kind, it is characterised in that comprise the steps:
1) high frequency vibrating inserts steel pile casting, i.e. utilizes high-frequency vibratory hammer to vibrate insertion steel pile casting in the soil body, and the length of casing is pressed
The volume calculating implanting rigid pile determines;
2) original state fetches earth, and is to utilize helical blade, takes out undisturbed soil, form stake holes in steel pile casting;
3) stirring pore-forming, utilizes cement grout induction system, and at drill bit, whitewashing stirring are crept into, and drilling rod top is stirring
Blade, bottom is helical blade;
4) spiral pore-forming, is to utilize elongated helical blade, takes out undisturbed soil from stake holes, is pressed into the incorporation solidification reinvented simultaneously
The fluidised form composite soil of agent;
5) carry on shaft and transfer, in stirring makes hole repeatedly, forming superfluidity soil cement;
6) rotation is dug or drill pore-forming, is to utilize Spiral digging machine or punching (boring) machine pore-forming, mud off, injects after implanting rigid pile
Mud between stake holes is replaced by concrete stake, and between stake and stratum, filling is cement mortar and consolidates simultaneously;
7) when run of steel does not reaches projected depth, at work progress continued access drilling rod;
8) when pile foundation embeds rock stratum and penetratinghardpan, drilling rod lower end is installed the spherical drill bit of hard alloy, is utilized mud cold
But creep into lubrication;
9) after stirring pore-forming, utilize this pile frame, hang rigid pile, superfluidity soil-cement body inserts rigid pile, uses
Stepping axial pressurizing device and dither are implanted, resistance when overcoming rigid pile to sink rigid pile pressurization;Rigidity was sunk
The soil cement of displacement is flowed in the headspace of steel pile casting by journey;The sidewall of rigid pile and inner chamber are full of soil cement;?
The position, stake top implanted forms the cement soil pile of a major diameter, protects rigid body pile body, to avoid lateral displacement;
10) steel pile casting is extracted in vibration.
Described pore-forming is to use the long spire blade that fetches earth to be taken out from stake holes by bury, is sent to stake with high-pressure pump simultaneously
Hole displaces the original soft clay in stake holes;Bury in described hole is forced mixing to be reinvented and solidifies enhancing, is to take
The bury gone out adds aggregate firming agent and is mixed to form fluidised form through action of forced stirring.
Described stirring pore-forming, is to whitewash at drill bit, utilizes the stirring vane on drilling rod and screw blade, by boring
Broken ground mixes with cement grout stirring, forms superfluidity soil cement.
When described drilling tool creeps into, in rock stratum and hard stratum, install the spherical drill bit of hard alloy, use cement mortar make cooling and
Lubricating fluid, utilizes speed-changing driving device, increases and creeps into moment of torsion, embeds the hard stratum such as rock stratum and dense sand stratum.
When described drilling tool creeps into, use toothed spiral drilling tool, utilize speed-changing driving device, increase and creep into moment of torsion through gravel
Stratum.
By the axial stepping pressue device arranged, during stirring pore-forming, drilling rod is pressurizeed;When implanting rigid pile,
The resistance providing axle power to overcome rigid pile to sink carries out planting stake.
Beneficial effect: described in the utility model plant an equipment and construction method, imbeds steel pile casting at top, can be effective
The caving in of hole wall during preventing from fetching earth, up big and down small type drilling tool top spiral fetches earth, and bottom action of forced stirring soil cement plants a mistake
The cement grout discharged in journey is stored in casing in headspace, it is to avoid the discharge of mud, the composite pile of formation has
Higher bearing capacity.
Meanwhile, the tip position in rigid pile forms a larger-diameter reinforcing body, and reinforcing body is usually soil-cement body,
Rigid pile can be protected destroyed, such as the lateral displacement of stake top or fracture etc. during foundation excavation.
Accompanying drawing explanation
This utility model is described in detail below in conjunction with the accompanying drawings with detailed description of the invention;
Fig. 1 is the implantation device structure schematic diagram of rigid pile described in the utility model.
Fig. 2 is that the implantation equipment of rigid pile described in the utility model overlooks direction structure schematic diagram.
Fig. 3 is insertion steel pile casting schematic diagram in work progress.
Fig. 4 is formation cement mixing method schematic diagram in work progress.
Fig. 5 construct pile body implant schematic diagram.
Detailed description of the invention
For the technological means making this utility model realize, creation characteristic, reach purpose and be easy to understand with effect, under
Face combines and is specifically illustrating, and this utility model is expanded on further.
Referring to Fig. 1 and Fig. 2, the implantation equipment of a kind of rigid pile, including pile frame 1, same pile frame is provided with pore-forming and sets
Equipment 3 is implanted so that pore-forming is implanted with rigid pile and shared pile frame for 2 and rigid pile;Pore-forming equipment is provided with drilling rod 4;At the bottom of drilling rod
Portion is provided with the drilling tool 5 of pore-forming in rock stratum and hard stratum;Equipped with variable speed drives equipment 6 on drilling rod;Set equipped with to pore-forming on pile frame
Standby and plant an axial stepping pressue device for equipment pressurization.
It is provided with the long spire fetched earth on the drilling rod of described pore-forming equipment to fetch earth blade 7, bottom drilling rod, is provided with gunniting hole.
The spherical drill bit of hard alloy is installed on described drilling tool
Described drilling tool, for toothed spiral drilling tool.
Described axial stepping pressue device is fluid pressure type or towed device.
Described drilling rod 4 is for continuing drilling rod, by drilling rod connection device, by drilling rod spreading, it is achieved stirring drilling depth reaches
To more than 40m, control pile frame height within 30m.
Plant a pile construction method, comprise the steps: referring to Fig. 3, Fig. 4, Fig. 5;
1) high frequency vibrating inserts steel pile casting, i.e. utilizes high-frequency vibratory hammer to vibrate insertion steel pile casting 10, the length of casing in the soil body
Calculate by the volume implanting rigid pile and determine;
2) original state fetches earth, and is to utilize helical blade 7, takes out undisturbed soil, form stake holes in steel pile casting;
3) stirring pore-forming, utilizes cement grout induction system, and at drill bit, whitewashing stirring are crept into, and drilling rod top is stirring
Blade, bottom is helical blade;
4) spiral pore-forming, is to utilize elongated helical blade, takes out undisturbed soil from stake holes, is pressed into the incorporation solidification reinvented simultaneously
The fluidised form composite soil of agent;
5) carry on shaft and transfer, in stirring makes hole repeatedly, forming superfluidity soil cement;
6) rotation is dug or drill pore-forming, is to utilize Spiral digging machine or punching (boring) machine pore-forming, mud off, injects after implanting rigid pile
Mud between stake holes is replaced by concrete stake, and between stake and stratum, filling is cement mortar and consolidates simultaneously;
7) when run of steel does not reaches projected depth, at work progress continued access drilling rod 4;
8) when pile foundation embeds rock stratum and penetratinghardpan, drilling rod lower end is installed the spherical drill bit of hard alloy, is utilized mud cold
But creep into lubrication;
9) after stirring pore-forming, utilize this pile frame, hang rigid pile 11, superfluidity soil-cement body inserts rigid pile, adopts
Implant with stepping axial pressurizing device and dither, resistance when overcoming rigid pile to sink rigid pile pressurization;Rigidity is sunk
During the soil cement of displacement is flowed in the headspace of steel pile casting;The sidewall of rigid pile and inner chamber are full of soil cement;
Form the cement soil pile of a major diameter in the position, stake top implanted, protect rigid body pile body, to avoid lateral displacement;
10) steel pile casting 10 is extracted in vibration.
Described pore-forming is to use the long spire blade that fetches earth to be taken out from stake holes by bury, is sent to stake with high-pressure pump simultaneously
Hole displaces the original soft clay in stake holes;Bury in described hole is forced mixing to be reinvented and solidifies enhancing, is to take
The bury gone out adds aggregate firming agent and is mixed to form fluidised form through action of forced stirring.
Described stirring pore-forming, is to whitewash at drill bit, utilizes the stirring vane on drilling rod and screw blade, by boring
Broken ground mixes with cement grout stirring, forms superfluidity soil cement.
When described drilling tool creeps into, in rock stratum and hard stratum, install the spherical drill bit of hard alloy, use cement mortar make cooling and
Lubricating fluid, utilizes speed-changing driving device, increases and creeps into moment of torsion, embeds the hard stratum such as rock stratum and dense sand stratum.
When described drilling tool creeps into, use toothed spiral drilling tool, utilize speed-changing driving device, increase and creep into moment of torsion through gravel
Stratum.
By the axial stepping pressue device arranged, during stirring pore-forming, drilling rod is pressurizeed;When implanting rigid pile,
The resistance providing axle power to overcome rigid pile to sink carries out planting stake.
Beneficial effect: described in the utility model plant an equipment and construction method, imbeds steel pile casting at top, can be effective
The caving in of hole wall during preventing from fetching earth, up big and down small type drilling tool top spiral fetches earth, and bottom action of forced stirring soil cement plants a mistake
The cement grout discharged in journey is stored in casing in headspace, it is to avoid the discharge of mud, the composite pile of formation has
Higher bearing capacity.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have more than been shown and described.One's own profession
Skilled person will appreciate that of industry, this utility model is not limited by examples detailed above, described in examples detailed above and description only
Being that principle of the present utility model is described, on the premise of without departing from this utility model spirit and scope, this utility model also has respectively
Plant changes and improvements, in the range of these changes and improvements both fall within claimed this utility model.This utility model requires to protect
Scope of protecting is defined by appending claims and equivalent thereof.
Claims (5)
1. an implantation equipment for rigid pile, including pile frame, is characterized in that: be provided with pore-forming equipment and rigidity on same pile frame
Equipment is implanted in stake;Pore-forming equipment is provided with drilling rod;The drilling tool of pore-forming in rock stratum and hard stratum is installed bottom drilling rod;Fill on drilling rod
There is variable speed drives equipment;Equipped with axial stepping pressue device on pile frame.
The implantation equipment of a kind of rigid pile the most according to claim 1, is characterized in that, the drilling rod of described pore-forming equipment sets
It is equipped with the long spire fetched earth to fetch earth blade, bottom drilling rod, is provided with gunniting hole.
The implantation equipment of a kind of rigid pile the most according to claim 1, is characterized in that, described drilling tool is installed hard alloy ball
Shape drill bit or toothed spiral drilling tool.
The implantation equipment of a kind of rigid pile the most according to claim 1, is characterized in that, described axial stepping pressue device
For fluid pressure type or towed device.
The implantation equipment of a kind of rigid pile the most according to claim 1, is characterized in that, described drilling rod is the drilling rod that can continue,
By drilling rod connection device, by drilling rod spreading, it is achieved stirring drilling depth reaches more than 40m, control pile frame height 30m with
In.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620577267.1U CN205776216U (en) | 2016-06-13 | 2016-06-13 | A kind of implantation equipment of rigid pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620577267.1U CN205776216U (en) | 2016-06-13 | 2016-06-13 | A kind of implantation equipment of rigid pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205776216U true CN205776216U (en) | 2016-12-07 |
Family
ID=58133064
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620577267.1U Active CN205776216U (en) | 2016-06-13 | 2016-06-13 | A kind of implantation equipment of rigid pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205776216U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862861A (en) * | 2016-06-13 | 2016-08-17 | 上海强劲地基工程股份有限公司 | Rigid-pile embedding device and construction method |
CN106930273A (en) * | 2017-03-17 | 2017-07-07 | 济南轨道交通集团有限公司 | Stake technique and prefabricated pile are planted in one kind drilling high pressure draught vibration |
CN110344414A (en) * | 2019-07-12 | 2019-10-18 | 刘建军 | A kind of pilot hole plant stake piling all-in-one machine |
-
2016
- 2016-06-13 CN CN201620577267.1U patent/CN205776216U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862861A (en) * | 2016-06-13 | 2016-08-17 | 上海强劲地基工程股份有限公司 | Rigid-pile embedding device and construction method |
CN105862861B (en) * | 2016-06-13 | 2018-03-23 | 上海强劲地基工程股份有限公司 | A plant pile construction method |
CN106930273A (en) * | 2017-03-17 | 2017-07-07 | 济南轨道交通集团有限公司 | Stake technique and prefabricated pile are planted in one kind drilling high pressure draught vibration |
CN110344414A (en) * | 2019-07-12 | 2019-10-18 | 刘建军 | A kind of pilot hole plant stake piling all-in-one machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105862861B (en) | A plant pile construction method | |
WO2018210019A1 (en) | Pile formation method for down-the-hole impact rotary jet composite piles | |
CN110318393B (en) | Construction method of composite pile | |
CN101812976B (en) | Adjustable multiple coil extruding and expanding drilling tool | |
CN104074186B (en) | The casing device of pore-forming and construction method thereof in a kind of building lot | |
CN100501011C (en) | Hole drilling mudjack pile construction method | |
CN105350525A (en) | Construction method for piles | |
CN106638547B (en) | The pile making method of bored concrete pile in a kind of coral sand ground | |
KR100762991B1 (en) | Precast piling method injected with high-strength mortar | |
CN111058443B (en) | Precast pile composite foundation construction method for eliminating loess collapsibility | |
CN205776216U (en) | A kind of implantation equipment of rigid pile | |
CN107489158A (en) | A kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile | |
CN203403404U (en) | High-efficiency cast-in-place pile device | |
CN202227336U (en) | Rigid flexible composite foundation pile | |
CN1995689B (en) | Pile forming method of pile forming mechanism with gyro bit | |
CN101899827B (en) | Broken soil vibration and compaction treatment method by utilizing impact hammer in immersed tube in riprap filled foundation | |
CN107700508A (en) | A kind of shaped steel stirs the construction method of water spray soil curtain support pile | |
JP5075090B2 (en) | Cast-in-place pile construction method and cast-in-place pile | |
CN108316288A (en) | Half casing guncreting pile construction equipment and construction method | |
CN206495202U (en) | A kind of top expansion type cement-soil composite pile | |
CN208088287U (en) | Half casing guncreting pile construction equipment | |
CN209162815U (en) | A kind of Screw Pile and its construction tool | |
CN107687168A (en) | Inside hit and plant stake method and its application | |
CN112323836A (en) | Construction method of combined assembly type deep foundation pile | |
CN1162590C (en) | Process for drilling hole and soil taking and transplanting pile for steel reinforced concrete prefabricated pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |