CN105825335A - BIM (Building Information Modeling) based construction onsite vehicle and device management system and method - Google Patents

BIM (Building Information Modeling) based construction onsite vehicle and device management system and method Download PDF

Info

Publication number
CN105825335A
CN105825335A CN201610148225.0A CN201610148225A CN105825335A CN 105825335 A CN105825335 A CN 105825335A CN 201610148225 A CN201610148225 A CN 201610148225A CN 105825335 A CN105825335 A CN 105825335A
Authority
CN
China
Prior art keywords
vehicle
information
model
bim
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610148225.0A
Other languages
Chinese (zh)
Inventor
包胜
顾益斌
来云罡
郑育辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Ruixing Dongyu Engineering Consulting Co Ltd
Original Assignee
Hangzhou Ruixing Dongyu Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Ruixing Dongyu Engineering Consulting Co Ltd filed Critical Hangzhou Ruixing Dongyu Engineering Consulting Co Ltd
Priority to CN201610148225.0A priority Critical patent/CN105825335A/en
Publication of CN105825335A publication Critical patent/CN105825335A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a BIM based construction onsite vehicle and device management system and method. The system comprises a handheld-end intelligent device, a vehicle and device identification end, a GPS end, a network service end and a database end, wherein the handheld-end intelligent device sends user instructions and device information to the network service end; the vehicle and device identification end stores vehicle and device information; the GPS end sends real-time geographical information of vehicles and devices to the network service end; the network service end is used for data interaction between the handheld-end intelligent device and the database end and data transmission between the GPS end and the database end; and the database end is used to convert, update, store and control BIM models and project drawings, and further to manage and schedule the vehicles and devices in the construction site in real time. Thus, operation conditions of all the vehicles and devices are clear, and related management and scheduling are carried out conveniently; interfaces are provided for statistics software of the related construction site, and it is ensured that the statistical data is instant and accurate; and all data information is updated in real time and is high in response speed.

Description

A kind of job site based on BIM vehicle and equipment management system and method
Technical field
The present invention relates to construction site vehicle and facilities management field, in particular it relates to a kind of job site based on BIM vehicle and equipment management system and method.
Background technology
BIM (BuildingInformationModeling), i.e. BIM, briefly refer to based on identical standard, it is possible to the integrated information model relevant to construction-engineering project up to the lifecycle process of operation and maintenance stage from building design stage.BIM model is the basis using every relevant information data of construction-engineering project as model, carries out the foundation of BUILDINGS MODELS, and then realizes the new ant algorithms of effectively management.It refers to the real information being had by digital information analogue simulation building, here, the intension of information is not only the visual information that geometry describes, and also comprises substantial amounts of non-geometry information, such as the fire resistance rating of material, the heat transfer coefficient of material, the cost of component, procurement information etc..It practice, BIM is through digitizing technique, set up a Virtual Building in a computer, it is provided that an architecture information storehouse single, the most consistent, that have logic.
Along with China's expanding economy, construction scope is the biggest, and construction vehicle gets more and more, and engineering ground situation also becomes increasingly complex, and the drawback of traditional construction site way to manage is more and more obvious;
(1) along with the development of building industry, project is organized and coordinated requirement more and more higher, the complexity of project surrounding enviroment often brings that narrow field, foundation depth are big, surrounding building distance is near, green construction and safety construction require the problems such as height, and it is big plus the job site scope of operation sometimes, there is difference of height in the construction of each subregion, on-the-spot complicated and changeable, easily causes spot plane layout and is continually changing, and the frequency of change is more and more higher, brings difficulty to project scene reasonable Arrangement.
(2) construction site management is random, acts by rule of thumb in operation.With the biggest randomness, show as job site chaotic, without road in unified field, placing of material is chaotic, and facility are parked unordered etc., and its consequence is that material is repeatedly transported, and channel block, vehicle run smooth, affects construction and is smoothed out.
(3) during working procedure movable mass controls, the large in number and widely distributed of material is put into, the factor comprehensive control relatively difficult to achieve to material.In practical work, supervising engineer often feels like industrialized equipment and bulk article quality discreteness is little, i.e. can be passed judgment on and control often through the written inspection of product and experimental test product quality.But local material used by majority operation type operation, the quality discreteness such as sand, stone, brick etc. is relatively big, and material is marched into the arena when tending to vary with, and how to realize also being a difficult problem for the control real-time, comprehensive, effective of material in addition.(4) all kinds of construction projects are various, amount is big, the duration is tight, construction enterprises' overall qualities gap of taking part in building is bigger, indivedual units in charge of construction shortage is suited one's training and metastable construction team and site construction management personnel, and the technical quality of construction operation personnel is the lowest, site construction management strength is not enough, can not well carry out training before construction, thus cause work progress to lack strong monitoring.In addition job site there is also information delay and management, the backward problem of scheduling, the most significantly delays construction progress.
Summary of the invention
Defect for existing construction site management technique, the present invention provides following technical scheme: a kind of job site based on BIM vehicle and equipment management system, this system includes handheld terminal smart machine, vehicle and equipment identification end, GPS end, network service end and database side;
Handheld terminal smart machine, for reception and the control of BIM model data, vehicle and the identification of equipment and the reading of relevant information, and the reception of work order and transmission;
Vehicle and equipment identification end, including RFID and Quick Response Code, be used for storing vehicle and facility information;
GPS end, for sending the real-time geographical locations of vehicle and equipment;
Network service end, for handheld terminal smart machine, data interaction between GPS end and database side, including: the model data between handheld terminal smart machine and database side synchronizes, the vehicle and the facility information that receive to handheld terminal smart machine are sent to database side, the mutual transmission of user instruction, GPS end vehicle and the transmission of equipment geography information;
Database side, is used for storing, changes, updates, controls relevant BIM model, be managed job site real-time vehicle and equipment and regulate and control;
Development of Mobile Internet technology is used to provide real-time uploading and downloading between handheld terminal smart machine, network service end, database side.
Further, handheld terminal smart machine includes: BIM model cootrol module, vehicle and equipment identification module, model and reality interactive module and job request module;Concrete:
(1) described BIM model cootrol module, including following submodule:
Model display module, for control BIM model amplification, reduce, rotate, roam, height-width measurement;
2D drawing is shown and locating module, for showing all of relevant drawing and the 2D drawing location to 3D model;
Vehicle and equipment display module, for showing vehicle and the real-time geographic information of equipment and association attributes;
(2) described vehicle and equipment identification module, including following submodule:
Quick Response Code identification module, by photographic head and embedded software identification 2 D code information;
Electronic label identification module, by the relevant information of built-in radio frequency receiving device identification RFID;
(3) function of described model and reality interactive module is: when foundation ditch, building, outdoor pipeline, road, vehicle and the facility of engineering change, by the way of picture, image, word, voice, respective change is fed back to database side;
(4) described job request module, including following submodule:
Management and dispatching request module, by data base by the way of picture, image, word, voice to handheld terminal smart machine release management dispatch request;
Reality feedback request module, is sent work request to database side by handheld terminal smart machine by the way of picture, image, word, voice.
Further, described RFID is attached to enter on the vehicle of job site, contains the contained material information of vehicle;Described Quick Response Code is attached to enter on vehicle and the equipment of job site, comprises the id information of vehicle and equipment.
Further, relevant BIM model is changed, is updated and comprise the steps of by database side;
(1) Revit software is utilized to complete the modeling of BIM architectural design model;
(2) the building race of BIM architectural design model is simplified, add foundation ditch, road and relevant place race;
(3) prefabricated associated vehicle and facility race;
(4) pertinent model information is added;
(5) Integrated Models generates BIM Ground arrangement model, specifically includes following sub-step:
(5.1) derive the IFC normative document of BIM architectural design model, use the resolver of official to resolve IFC normative document.Extracting the geological information in IFC normative document, geological information includes geometry information and geometric operation information, utilizes the 3-D view engine of AutoCAD to regenerate physical model.
(5.2) the Acbr function utilizing Autocad carries out triangular grids for the physical model rebuild in AutoCAD 3-D view engine, derives vertex of a triangle coordinate information, utilizes triangular coordinate information to regenerate surface model.
(5.3) attribute information in IFC normative document is processed, only retain the material relevant to surface model, color, attribute data, attribute information is loaded onto surface model.
(5.4) refining the construction site information of the component of surface model, add foundation ditch, road and relevant place information, prefabricated associated vehicle and facilities information, Integrated Models generates BIM Ground arrangement model.
A kind of job site based on BIM vehicle and device management method, the method comprises the steps:
(1) revitarchitecture, revitstructure, revitMEP, Tekla Software on Drawing BIM architectural design model is utilized according to the existing cad building of building, structure, MEP drawing;
(2) vehicle and equipment to job site are added up and collection of data, put up Quick Response Code and electronic tag on equipment;
(3) GPS chip and sensor are installed on equipment;
(4) size in computational engineering place builds mobile network, it is ensured that start all standing of network;
(5) it is BIM Ground arrangement model according to following steps by BIM architectural design model conversation in database side;
(5.1) derive the IFC normative document of BIM architectural design model, use the resolver of official to resolve IFC normative document.Extracting the geological information in IFC normative document, geological information includes geometry information and geometric operation information, utilizes the 3-D view engine of AutoCAD to regenerate physical model.
(5.2) the Acbr function utilizing Autocad carries out triangular grids for the physical model rebuild in AutoCAD 3-D view engine, derives vertex of a triangle coordinate information, utilizes triangular coordinate information to regenerate surface model.
(5.3) attribute information in IFC normative document is processed, only retain the material relevant to surface model, color, attribute data, attribute information is loaded onto surface model.
(5.4) refining the construction site information of the component of surface model, add foundation ditch, road and relevant place information, prefabricated associated vehicle and facilities information, Integrated Models generates BIM Ground arrangement model;
(6) on vehicle, GPS chip and Quick Response Code corresponding to the contained goods of vehicle and electronic tag are loaded when vehicle enters building site;
(7) initial construction site model is stored to handheld terminal smart machine, and store the information of relevant device, material above;
(8) dispatch request is processed by database side, and described dispatch request is two-way, database side mail to handheld terminal smart machine and can also be mail to database side by handheld terminal smart machine;Specific as follows:
(8.1) sent work request when being necessary equipment and material are shifted by handheld terminal smart machine, described work request include equipment and the real-time position of material, mobile after positional information;
(8.2) dispatch request is audited and processes by database side, the mobile route of equipment and material is simulated by database side in a model, select optimal mobile route, and mobile route is audited, become traffic order by the dispatch request of examination & verification, database side send to related personnel's handheld terminal smart machine and mobile phone;
(8.3) each dispatch request is fed back and updates BIM Ground arrangement model by database side;
(9) database side carries out model and reality is mutual:
(9.1) by the way of picture, image, word, voice, respective change is fed back to database side when foundation ditch, building, outdoor pipeline, road, vehicle and the facility of engineering change;
(9.2) foundation ditch, building, outdoor pipeline, road, vehicle and facility are processed by database side, update BIM Ground arrangement model accordingly;
(10) handheld terminal smart machine is utilized to carry out regular maintenance and make an inspection tour work, specific as follows:
(10.1) carry out regular maintenance and make an inspection tour time utilize handheld terminal smart machine to carry BIM Ground arrangement model to around need maintenance equipment and vehicle scan for, complete to safeguard and make an inspection tour the Quick Response Code in scanning device and vehicle and electronic tag after work, generate and safeguard and make an inspection tour record;
(10.2) for needing the equipment of periodic maintenance to carry out safeguarding prompting, user is reminded to carry out safeguarding until safeguarding and terminating when the date arrives the specified life of distance last maintenance;
(11) monitor vehicle and the positional information of equipment of job site in database side in real time, control the working condition of job site, possible danger is given warning in advance.
The invention has the beneficial effects as follows: it is the management to job site equipment and vehicle greatly that the construction management in construction stage has, along with construction becomes increasingly complex, job site vehicle and equipment get more and more, and the ratio that relevant cost accounts in construction management is increasing.By BIM technology is applied in construction management system, system is made to comprise job site vehicle and all of essential information of equipment, observation vehicle and the equipment real-time status of Three-Dimensional Dynamic can also be realized, so that construction site management personnel understand the behaviour in service of equipment, solution equipment and the present situation of vehicle management confusion, save management cost.
Accompanying drawing explanation
Fig. 1 is present invention job site based on BIM vehicle and equipment management system structured flowchart.
Detailed description of the invention
With specific embodiment, the present invention is described in further detail below in conjunction with the accompanying drawings.
As it is shown in figure 1, a kind of based on BIM Property Management System that the present invention provides, this system includes handheld terminal smart machine, vehicle and equipment identification end, GPS end, network service end and database side;Development of Mobile Internet technology is used to provide real-time uploading and downloading between handheld terminal smart machine, network service end, database side.
One, handheld terminal smart machine, for reception and the control of BIM model data, vehicle and the identification of equipment and the reading of relevant information, and the reception of work order and transmission;Handheld terminal smart machine includes: BIM model cootrol module, vehicle and equipment identification module, model and reality interactive module and job request module;Concrete:
(1) described BIM model cootrol module, including following submodule:
Model display module, for control BIM model amplification, reduce, rotate, roam, height-width measurement;
2D drawing is shown and locating module, for showing all of relevant drawing and the 2D drawing location to 3D model;
Vehicle and equipment display module, for showing vehicle and the real-time geographic information of equipment and association attributes;
(2) described vehicle and equipment identification module, including following submodule:
Quick Response Code identification module, by photographic head and embedded software identification 2 D code information;
Electronic label identification module, by the relevant information of built-in radio frequency receiving device identification RFID;
(3) function of described model and reality interactive module is: when foundation ditch, building, outdoor pipeline, road, vehicle and the facility of engineering change, by the way of picture, image, word, voice, respective change is fed back to database side;
(4) described job request module, including following submodule:
Management and dispatching request module, by data base by the way of picture, image, word, voice to handheld terminal smart machine release management dispatch request;
Reality feedback request module, is sent work request to database side by handheld terminal smart machine by the way of picture, image, word, voice.
Two, vehicle and equipment identification end, including RFID and Quick Response Code, is used for storing vehicle and facility information;Described RFID is attached to enter on the vehicle of job site, contains the contained material information of vehicle;Described Quick Response Code is attached to enter on vehicle and the equipment of job site, comprises the id information of vehicle and equipment.
Three, GPS end, for sending the real-time geographical locations of vehicle and equipment;
Four, network service end, for handheld terminal smart machine, data interaction between GPS end and database side, including: the model data between handheld terminal smart machine and database side synchronizes, the vehicle and the facility information that receive to handheld terminal smart machine are sent to database side, the mutual transmission of user instruction, GPS end vehicle and the transmission of equipment geography information;
Five, database side, is used for storing, changes, updates, controls relevant BIM model, be managed job site real-time vehicle and equipment and regulate and control.Relevant BIM model changed by database side, update and comprise the steps of;
(1) Revit software is utilized to complete the modeling of BIM architectural design model;
(2) the building race of BIM architectural design model is simplified, add foundation ditch, road and relevant place race;
(3) prefabricated associated vehicle and facility race;
(4) pertinent model information is added;
(5) Integrated Models generates BIM Ground arrangement model, specifically includes following sub-step:
(5.1) derive the IFC normative document of BIM architectural design model, use the resolver of official to resolve IFC normative document.Extracting the geological information in IFC normative document, geological information includes geometry information and geometric operation information, utilizes the 3-D view engine of AutoCAD to regenerate physical model.
(5.2) the Acbr function utilizing Autocad carries out triangular grids for the physical model rebuild in AutoCAD 3-D view engine, derives vertex of a triangle coordinate information, utilizes triangular coordinate information to regenerate surface model.
(5.3) attribute information in IFC normative document is processed, only retain the material relevant to surface model, color, attribute data, attribute information is loaded onto surface model.
(5.4) refining the construction site information of the component of surface model, add foundation ditch, road and relevant place information, prefabricated associated vehicle and facilities information, Integrated Models generates BIM Ground arrangement model.
A kind of based on BIM job site vehicle of present invention offer and device management method, the method comprises the steps:
(1) revitarchitecture, revitstructure, revitMEP, Tekla Software on Drawing BIM architectural design model is utilized according to the existing cad building of building, structure, MEP drawing;
(2) vehicle and equipment to job site are added up and collection of data, put up Quick Response Code and electronic tag on equipment;
(3) GPS chip and sensor are installed on equipment;
(4) size in computational engineering place builds mobile network, it is ensured that start all standing of network;
(5) it is BIM Ground arrangement model according to following steps by BIM architectural design model conversation in database side;
(5.1) derive the IFC normative document of BIM architectural design model, use the resolver of official to resolve IFC normative document.Extracting the geological information in IFC normative document, geological information includes geometry information and geometric operation information, utilizes the 3-D view engine of AutoCAD to regenerate physical model.
(5.2) the Acbr function utilizing Autocad carries out triangular grids for the physical model rebuild in AutoCAD 3-D view engine, derives vertex of a triangle coordinate information, utilizes triangular coordinate information to regenerate surface model.
(5.3) attribute information in IFC normative document is processed, only retain the material relevant to surface model, color, attribute data, attribute information is loaded onto surface model.
(5.4) refining the construction site information of the component of surface model, add foundation ditch, road and relevant place information, prefabricated associated vehicle and facilities information, Integrated Models generates BIM Ground arrangement model;
(6) on vehicle, GPS chip and Quick Response Code corresponding to the contained goods of vehicle and electronic tag are loaded when vehicle enters building site;
(7) initial construction site model is stored to handheld terminal smart machine, and store the information of relevant device, material above;
(8) dispatch request is processed by database side, and described dispatch request is two-way, database side mail to handheld terminal smart machine and can also be mail to database side by handheld terminal smart machine;Specific as follows:
(8.1) sent work request when being necessary equipment and material are shifted by handheld terminal smart machine, described work request include equipment and the real-time position of material, mobile after positional information;
(8.2) dispatch request is audited and processes by database side, the mobile route of equipment and material is simulated by database side in a model, select optimal mobile route, and mobile route is audited, become traffic order by the dispatch request of examination & verification, database side send to related personnel's handheld terminal smart machine and mobile phone;
(8.3) each dispatch request is fed back and updates BIM Ground arrangement model by database side;
(9) database side carries out model and reality is mutual:
(9.1) by the way of picture, image, word, voice, respective change is fed back to database side when foundation ditch, building, outdoor pipeline, road, vehicle and the facility of engineering change;
(9.2) foundation ditch, building, outdoor pipeline, road, vehicle and facility are processed by database side, update BIM Ground arrangement model accordingly;
(10) handheld terminal smart machine is utilized to carry out regular maintenance and make an inspection tour work, specific as follows:
(10.1) carry out regular maintenance and make an inspection tour time utilize handheld terminal smart machine to carry BIM Ground arrangement model to around need maintenance equipment and vehicle scan for, complete to safeguard and make an inspection tour the Quick Response Code in scanning device and vehicle and electronic tag after work, generate and safeguard and make an inspection tour record;
(10.2) for needing the equipment of periodic maintenance to carry out safeguarding prompting, user is reminded to carry out safeguarding until safeguarding and terminating when the date arrives the specified life of distance last maintenance;
(11) monitor vehicle and the positional information of equipment of job site in database side in real time, control the working condition of job site, possible danger is given warning in advance.

Claims (5)

1. job site based on a BIM vehicle and equipment management system, it is characterised in that this system includes handheld terminal smart machine, vehicle and equipment identification end, GPS end, network service end and database side;
Handheld terminal smart machine, for reception and the control of BIM model data, vehicle and the identification of equipment and the reading of relevant information, and the reception of work order and transmission;
Vehicle and equipment identification end, including RFID and Quick Response Code, be used for storing vehicle and facility information;
GPS end, for sending the real-time geographical locations of vehicle and equipment;
Network service end, for handheld terminal smart machine, data interaction between GPS end and database side, including: the model data between handheld terminal smart machine and database side synchronizes, the vehicle and the facility information that receive to handheld terminal smart machine are sent to database side, the mutual transmission of user instruction, GPS end vehicle and the transmission of equipment geography information;
Database side, is used for storing, changes, updates, controls relevant BIM model, be managed job site real-time vehicle and equipment and regulate and control;
Development of Mobile Internet technology is used to provide real-time uploading and downloading between handheld terminal smart machine, network service end, database side.
Job site based on BIM vehicle and equipment management system the most according to claim 1, it is characterised in that handheld terminal smart machine includes: BIM model cootrol module, vehicle and equipment identification module, model and reality interactive module and job request module;Concrete:
(1) described BIM model cootrol module, including following submodule:
Model display module, for control BIM model amplification, reduce, rotate, roam, height-width measurement;
2D drawing is shown and locating module, for showing all of relevant drawing and the 2D drawing location to 3D model;
Vehicle and equipment display module, for showing vehicle and the real-time geographic information of equipment and association attributes;
(2) described vehicle and equipment identification module, including following submodule:
Quick Response Code identification module, by photographic head and embedded software identification 2 D code information;
Electronic label identification module, by the relevant information of built-in radio frequency receiving device identification RFID;
(3) function of described model and reality interactive module is: when foundation ditch, building, outdoor pipeline, road, vehicle and the facility of engineering change, by the way of picture, image, word, voice, respective change is fed back to database side;
(4) described job request module, including following submodule:
Management and dispatching request module, by data base by the way of picture, image, word, voice to handheld terminal smart machine release management dispatch request;
Reality feedback request module, is sent work request to database side by handheld terminal smart machine by the way of picture, image, word, voice.
Job site based on BIM vehicle and equipment management system the most according to claim 1, it is characterised in that described RFID is attached to enter on the vehicle of job site, contains the contained material information of vehicle;Described Quick Response Code is attached to enter on vehicle and the equipment of job site, comprises the id information of vehicle and equipment.
Job site based on BIM vehicle and equipment management system the most according to claim 1, it is characterised in that relevant BIM model changed by database side, update and comprise the steps of;
(1) Revit software is utilized to complete the modeling of BIM architectural design model;
(2) the building race of BIM architectural design model is simplified, add foundation ditch, road and relevant place race;
(3) prefabricated associated vehicle and facility race;
(4) pertinent model information is added;
(5) Integrated Models generates BIM Ground arrangement model, specifically includes following sub-step:
(5.1) derive the IFC normative document of BIM architectural design model, use the resolver of official to resolve IFC normative document.Extracting the geological information in IFC normative document, geological information includes geometry information and geometric operation information, utilizes the 3-D view engine of AutoCAD to regenerate physical model.
(5.2) the Acbr function utilizing Autocad carries out triangular grids for the physical model rebuild in AutoCAD 3-D view engine, derives vertex of a triangle coordinate information, utilizes triangular coordinate information to regenerate surface model.
(5.3) attribute information in IFC normative document is processed, only retain the material relevant to surface model, color, attribute data, attribute information is loaded onto surface model.
(5.4) refining the construction site information of the component of surface model, add foundation ditch, road and relevant place information, prefabricated associated vehicle and facilities information, Integrated Models generates BIM Ground arrangement model.
5. job site based on a BIM vehicle and device management method, it is characterised in that the method comprises the steps:
(1) revitarchitecture, revitstructure, revitMEP, Tekla Software on Drawing BIM architectural design model is utilized according to the existing cad building of building, structure, MEP drawing;
(2) vehicle and equipment to job site are added up and collection of data, put up Quick Response Code and electronic tag on equipment;
(3) GPS chip and sensor are installed on equipment;
(4) size in computational engineering place builds mobile network, it is ensured that start all standing of network;
(5) it is BIM Ground arrangement model according to following steps by BIM architectural design model conversation in database side;
(5.1) derive the IFC normative document of BIM architectural design model, use the resolver of official to resolve IFC normative document.Extracting the geological information in IFC normative document, geological information includes geometry information and geometric operation information, utilizes the 3-D view engine of AutoCAD to regenerate physical model.
(5.2) the Acbr function utilizing Autocad carries out triangular grids for the physical model rebuild in AutoCAD 3-D view engine, derives vertex of a triangle coordinate information, utilizes triangular coordinate information to regenerate surface model.
(5.3) attribute information in IFC normative document is processed, only retain the material relevant to surface model, color, attribute data, attribute information is loaded onto surface model.
(5.4) refining the construction site information of the component of surface model, add foundation ditch, road and relevant place information, prefabricated associated vehicle and facilities information, Integrated Models generates BIM Ground arrangement model;
(6) on vehicle, GPS chip and Quick Response Code corresponding to the contained goods of vehicle and electronic tag are loaded when vehicle enters building site;
(7) initial construction site model is stored to handheld terminal smart machine, and store the information of relevant device, material above;
(8) dispatch request is processed by database side, and described dispatch request is two-way, database side mail to handheld terminal smart machine and can also be mail to database side by handheld terminal smart machine;Specific as follows:
(8.1) sent work request when being necessary equipment and material are shifted by handheld terminal smart machine, described work request include equipment and the real-time position of material, mobile after positional information;
(8.2) dispatch request is audited and processes by database side, the mobile route of equipment and material is simulated by database side in a model, select optimal mobile route, and mobile route is audited, become traffic order by the dispatch request of examination & verification, database side send to related personnel's handheld terminal smart machine and mobile phone;
(8.3) each dispatch request is fed back and updates BIM Ground arrangement model by database side;
(9) database side carries out model and reality is mutual:
(9.1) by the way of picture, image, word, voice, respective change is fed back to database side when foundation ditch, building, outdoor pipeline, road, vehicle and the facility of engineering change;
(9.2) foundation ditch, building, outdoor pipeline, road, vehicle and facility are processed by database side, update BIM Ground arrangement model accordingly;
(10) handheld terminal smart machine is utilized to carry out regular maintenance and make an inspection tour work, specific as follows:
(10.1) carry out regular maintenance and make an inspection tour time utilize handheld terminal smart machine to carry BIM Ground arrangement model to around need maintenance equipment and vehicle scan for, complete to safeguard and make an inspection tour the Quick Response Code in scanning device and vehicle and electronic tag after work, generate and safeguard and make an inspection tour record;
(10.2) for needing the equipment of periodic maintenance to carry out safeguarding prompting, user is reminded to carry out safeguarding until safeguarding and terminating when the date arrives the specified life of distance last maintenance;
(11) monitor vehicle and the positional information of equipment of job site in database side in real time, control the working condition of job site, possible danger is given warning in advance.
CN201610148225.0A 2016-03-15 2016-03-15 BIM (Building Information Modeling) based construction onsite vehicle and device management system and method Pending CN105825335A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610148225.0A CN105825335A (en) 2016-03-15 2016-03-15 BIM (Building Information Modeling) based construction onsite vehicle and device management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610148225.0A CN105825335A (en) 2016-03-15 2016-03-15 BIM (Building Information Modeling) based construction onsite vehicle and device management system and method

Publications (1)

Publication Number Publication Date
CN105825335A true CN105825335A (en) 2016-08-03

Family

ID=56987780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610148225.0A Pending CN105825335A (en) 2016-03-15 2016-03-15 BIM (Building Information Modeling) based construction onsite vehicle and device management system and method

Country Status (1)

Country Link
CN (1) CN105825335A (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106528760A (en) * 2016-11-04 2017-03-22 成都希盟泰克科技发展有限公司 IFC-standard-based analysis model working method applied to engineering project
CN107016502A (en) * 2017-03-30 2017-08-04 中建地下空间有限公司 A kind of pipe gallery intelligent management system
CN107229790A (en) * 2017-05-26 2017-10-03 上海市城市建设设计研究总院(集团)有限公司 Generation is three-dimensional, the bridge structure information model system and application method of X-Y scheme
CN107464284A (en) * 2017-08-26 2017-12-12 济南万维数字传媒有限公司 Three-dimensional visualization property information management system based on mobile terminal
CN107527143A (en) * 2017-08-10 2017-12-29 嘉兴恒创电力设计研究院有限公司 Job site data-pushing, management method and management system based on BIM models
CN107909171A (en) * 2017-11-06 2018-04-13 中交第二航务工程勘察设计院有限公司 A kind of intelligent passenger-cargo rolling dress system based on BIM technology
CN107977524A (en) * 2017-12-14 2018-05-01 机械工业第六设计研究院有限公司 The method, apparatus and equipment of a kind of route survey
CN107992778A (en) * 2017-12-15 2018-05-04 北海思博网络科技有限公司 A kind of Field Device Management System and method
CN108364123A (en) * 2018-01-24 2018-08-03 浙江大学 A kind of construction machinery managing device based on BIM technology
CN108427817A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 Method and device is determined based on the entrucking sequence of BIM assembled architecture components
CN108427787A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of assembled stockyard layout management method and system based on BIM
CN108427790A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 The component logistics management emulation mode and device of erecting yard based on BIM
CN108874340A (en) * 2018-06-13 2018-11-23 深圳市智汇幕墙科技有限公司 A kind of visualization building curtain wall management method and device
CN108897969A (en) * 2018-07-12 2018-11-27 椭圆方程(深圳)信息技术有限公司 A method of the facility maintenance Automatic dispatching based on BIM
CN109118753A (en) * 2018-07-21 2019-01-01 中铁十八局集团有限公司 One kind being based on BIM vehicle scheduling safety management system
CN109583149A (en) * 2019-01-25 2019-04-05 中铁三局集团广东建设工程有限公司 Super large lid rolling stock section in-depth modernization system and its construction method based on BIM management
CN109686102A (en) * 2018-12-29 2019-04-26 福建华闽通达信息技术有限公司 In the interim vehicles management method for building expressway
CN109978388A (en) * 2019-03-28 2019-07-05 上海荷福人工智能科技(集团)有限公司 A kind of building management system and method based on artificial intelligence
CN109993449A (en) * 2019-04-08 2019-07-09 中交一公局海威工程建设有限公司 Laboratory equipment management method, BIM Visualization Platform, equipment and medium
CN110717685A (en) * 2019-10-15 2020-01-21 广东博智林机器人有限公司 Building material management system and method
CN111881198A (en) * 2020-07-10 2020-11-03 中铁第四勘察设计院集团有限公司 Contact net building site management system towards intelligence is built
CN111932049A (en) * 2020-05-26 2020-11-13 中建八局天津建设工程有限公司 Building assembly type component transportation simulation method based on BIM
CN112257889A (en) * 2019-07-21 2021-01-22 长沙智能驾驶研究院有限公司 Route planning method and device for ground moving object in intelligent construction site
CN112434912A (en) * 2020-11-02 2021-03-02 中建三局第二建设工程有限责任公司 Desert area field sand stabilizing method based on mechanical automation
CN112765125A (en) * 2020-12-30 2021-05-07 中国人民解放军32181部队 Database configuration for glasses-handle continuous ammunition identification system
CN113189621A (en) * 2021-05-10 2021-07-30 中建三局集团华南有限公司 Construction plane transportation management tool based on BIM and big dipper
CN114118703A (en) * 2021-10-27 2022-03-01 中建三局集团有限公司 Intelligent scheduling management system and method for construction engineering

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN104808610A (en) * 2015-02-13 2015-07-29 上海同筑信息科技有限公司 Machinery control system and machinery control method based on a BIM (building information model)
CN104978696A (en) * 2015-06-09 2015-10-14 广州市水电设备安装有限公司 Electronic acceptance and handover method based on BIM technology

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN104808610A (en) * 2015-02-13 2015-07-29 上海同筑信息科技有限公司 Machinery control system and machinery control method based on a BIM (building information model)
CN104978696A (en) * 2015-06-09 2015-10-14 广州市水电设备安装有限公司 Electronic acceptance and handover method based on BIM technology

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
仲青 等: "基于RFID与BIM的集成施工现场安全监控关键技术研究", 《建筑科学》 *
曾凝霜 等: "基于BIM的智慧工地管理体系框架研究-控制层进行调度", 《施工技术》 *
王廷魁 等: "基于BIM与RFID的建筑设备运行维护管理***研究", 《建筑经济》 *

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106528760A (en) * 2016-11-04 2017-03-22 成都希盟泰克科技发展有限公司 IFC-standard-based analysis model working method applied to engineering project
CN107016502A (en) * 2017-03-30 2017-08-04 中建地下空间有限公司 A kind of pipe gallery intelligent management system
CN107229790A (en) * 2017-05-26 2017-10-03 上海市城市建设设计研究总院(集团)有限公司 Generation is three-dimensional, the bridge structure information model system and application method of X-Y scheme
CN107527143A (en) * 2017-08-10 2017-12-29 嘉兴恒创电力设计研究院有限公司 Job site data-pushing, management method and management system based on BIM models
CN108427817A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 Method and device is determined based on the entrucking sequence of BIM assembled architecture components
CN108427790A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 The component logistics management emulation mode and device of erecting yard based on BIM
CN108427787A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of assembled stockyard layout management method and system based on BIM
CN107464284A (en) * 2017-08-26 2017-12-12 济南万维数字传媒有限公司 Three-dimensional visualization property information management system based on mobile terminal
CN107909171A (en) * 2017-11-06 2018-04-13 中交第二航务工程勘察设计院有限公司 A kind of intelligent passenger-cargo rolling dress system based on BIM technology
CN107977524A (en) * 2017-12-14 2018-05-01 机械工业第六设计研究院有限公司 The method, apparatus and equipment of a kind of route survey
CN107977524B (en) * 2017-12-14 2021-04-16 机械工业第六设计研究院有限公司 Line measurement method, device and system
CN107992778A (en) * 2017-12-15 2018-05-04 北海思博网络科技有限公司 A kind of Field Device Management System and method
CN108364123A (en) * 2018-01-24 2018-08-03 浙江大学 A kind of construction machinery managing device based on BIM technology
CN108874340A (en) * 2018-06-13 2018-11-23 深圳市智汇幕墙科技有限公司 A kind of visualization building curtain wall management method and device
CN108897969A (en) * 2018-07-12 2018-11-27 椭圆方程(深圳)信息技术有限公司 A method of the facility maintenance Automatic dispatching based on BIM
CN109118753A (en) * 2018-07-21 2019-01-01 中铁十八局集团有限公司 One kind being based on BIM vehicle scheduling safety management system
CN109686102A (en) * 2018-12-29 2019-04-26 福建华闽通达信息技术有限公司 In the interim vehicles management method for building expressway
CN109583149A (en) * 2019-01-25 2019-04-05 中铁三局集团广东建设工程有限公司 Super large lid rolling stock section in-depth modernization system and its construction method based on BIM management
CN109978388A (en) * 2019-03-28 2019-07-05 上海荷福人工智能科技(集团)有限公司 A kind of building management system and method based on artificial intelligence
CN109993449A (en) * 2019-04-08 2019-07-09 中交一公局海威工程建设有限公司 Laboratory equipment management method, BIM Visualization Platform, equipment and medium
CN112257889A (en) * 2019-07-21 2021-01-22 长沙智能驾驶研究院有限公司 Route planning method and device for ground moving object in intelligent construction site
CN110717685A (en) * 2019-10-15 2020-01-21 广东博智林机器人有限公司 Building material management system and method
CN111932049A (en) * 2020-05-26 2020-11-13 中建八局天津建设工程有限公司 Building assembly type component transportation simulation method based on BIM
CN111881198A (en) * 2020-07-10 2020-11-03 中铁第四勘察设计院集团有限公司 Contact net building site management system towards intelligence is built
CN111881198B (en) * 2020-07-10 2022-08-05 中铁第四勘察设计院集团有限公司 Contact net building site management system towards intelligence is built
CN112434912A (en) * 2020-11-02 2021-03-02 中建三局第二建设工程有限责任公司 Desert area field sand stabilizing method based on mechanical automation
CN112765125A (en) * 2020-12-30 2021-05-07 中国人民解放军32181部队 Database configuration for glasses-handle continuous ammunition identification system
CN113189621A (en) * 2021-05-10 2021-07-30 中建三局集团华南有限公司 Construction plane transportation management tool based on BIM and big dipper
CN114118703A (en) * 2021-10-27 2022-03-01 中建三局集团有限公司 Intelligent scheduling management system and method for construction engineering

Similar Documents

Publication Publication Date Title
CN105825335A (en) BIM (Building Information Modeling) based construction onsite vehicle and device management system and method
CN105938613B (en) Intelligent city pipe network comprehensive platform based on BIM and VR and management method and construction method thereof
CN110363852B (en) Three-dimensional digital beam field, construction method, computer equipment and storage medium
CN109472483A (en) A kind of building-site modeling method and system based on BIM model and technology of taking photo by plane
CN104866952B (en) Three-dimensional digital management implementation method for hydropower station engineering project
CN104808610B (en) Machinery Control System and method based on BIM BIMs
CN105844336A (en) BIM-based property management system and method
CN106595565A (en) BIM-based intelligent monitoring system
CN109191577A (en) A kind of distribution BIM collaborative platform
CN103778566A (en) Heat-engine plant monitoring and measuring method based on three-dimensional visualization demonstration
CN104317855A (en) Metering producing real-time monitoring method based on real-time database
CN104680321A (en) BIM technology-based visual material control system and method
CN106228476A (en) Property work order dispatch system based on BIM and send method
CN109460834A (en) Build operation management system and its management method
CN102509330A (en) Application of virtual three-dimensional system of transformer substation on the basis of electric power geographic information system (GIS)
CN104778742A (en) Method for establishing 3D digital maintenance platform of aircraft based on 3D laser scanning technology
CN107992643A (en) It is a kind of to be produced and installation accuracy control technique with the construction industry structure component calculated based on 3-D scanning cloud data and artificial intelligence identification
CN111199066A (en) Construction site virtual construction restoration method based on BIM + GIS
CN104063529A (en) Simulation method of layout planning of digital automobile plant
CN106503896A (en) Construction equipment management method based on BIM technology
CN113869680A (en) Intelligent pile foundation construction management and control method and system
CN112712300A (en) BIM + GIS construction project management system based on B/S information system
CN110717685A (en) Building material management system and method
CN105279797B (en) A kind of three-dimensional warehouse component method for establishing model
CN114036622A (en) BIM-based fabricated concrete building design and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160803

RJ01 Rejection of invention patent application after publication