CN109686102A CN201811634668.6A CN201811634668A CN109686102A CN 109686102 A CN109686102 A CN 109686102A CN 201811634668 A CN201811634668 A CN 201811634668A CN 109686102 A CN109686102 A CN 109686102A
Authority
CN
China
Prior art keywords
interim
expressway
cloud server
building
mobile terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811634668.6A
Other languages
Chinese (zh)
Inventor
黄向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Hua Min Tongda Information Technology Co Ltd
Original Assignee
Fujian Hua Min Tongda Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Hua Min Tongda Information Technology Co Ltd filed Critical Fujian Hua Min Tongda Information Technology Co Ltd
Priority to CN201811634668.6A priority Critical patent/CN109686102A/en
Publication of CN109686102A publication Critical patent/CN109686102A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/01Detecting movement of traffic to be counted or controlled
    • G08G1/017Detecting movement of traffic to be counted or controlled identifying vehicles
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/01Detecting movement of traffic to be counted or controlled
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/52Network services specially adapted for the location of the user terminal

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Traffic Control Systems (AREA)

Abstract

The present invention provides a kind of in the interim vehicles management method for building expressway, including step S10, will upload Cloud Server in the road information for building expressway;Step S20, enter sluice gate and out sluice gate set up link Cloud Server two dimensional code;Step S30, interim vehicle is prepared to enter into when building expressway, is established the link by two dimensional code and Cloud Server;Step S40, Cloud Server is managed interim vehicle;Step S50, interim vehicle is scanned the two-dimensional code in sluice gate out, and terminates process.It is effectively managed the present invention has the advantages that realizing in the interim vehicle for building expressway, improves safety.

Description

In the interim vehicles management method for building expressway
Technical field
The present invention relates to a kind of vehicles management methods, refer in particular to a kind of in the interim vehicles management method for building expressway.
Background technique
With the development of urbanization, a large amount of capital construction demand is produced, has thus built a large amount of road, especially high speed Thus highway generates the temporary road not being open to traffic formally very much.Since there is bituminous pavement surfacing, seamless, driving to relax Suitable, with small vibration, low noise, it is wear-resisting, not fugitive dust easy cleaning, construction time it is short, simple maintenance reproducible utilization, be suitable for repairing by stages The advantages that building becomes a kind of high class pavement being the most widely used in road construction.
During Expressway Asphalt Pavement Constructing, especially in pitch after surface construction, before highway is formally open to traffic, There is a situation where Construction traffic, management vehicle, check vehicle and make an inspection tour the vehicles such as vehicle and pass through on construction section, and is directed to The vehicle of these temporary traffics on construction section, traditional way are to be discrepancy lock, people in the beginning and end of construction section Work records vehicles passing in and out, is managed.
Traditional way exist have the disadvantage that one is: since construction section is not open to traffic formally, road information is not recorded Enter among each map software, driver is caused when driving, map software cannot to be used to navigate on construction section, believed road conditions Breath is not known about, and is easy to happen traffic accident;The second is the staff for entering and leaving lock registers when being only capable of to vehicles while passing, and vehicle The concrete condition travelled on construction section is not known about simultaneously, or even has been had a car accident and cannot all be understood in time.
Therefore, how problem to be solved is kowtowed as one in the interim vehicle progress effectively management for building expressway.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of in the interim vehicles management method for building expressway, realization It is effectively managed in the interim vehicle for building expressway, improves safety.
The present invention is implemented as follows: it is a kind of in the interim vehicles management method for building expressway, include the following steps:
Step S10, Cloud Server will be uploaded in the road information for building expressway;
Step S20, enter sluice gate and out sluice gate set up link Cloud Server two dimensional code;
Step S30, interim vehicle is prepared to enter into when building expressway, is established the link by two dimensional code and Cloud Server;
Step S40, Cloud Server is managed interim vehicle;
Step S50, interim vehicle is scanned the two-dimensional code in sluice gate out, and terminates process.
Further, in the step S10, the road information includes at least length, the shape of road, road of road Width, road allow loading capacity, the position in tunnel, the lane for allowing temporarily to be open to traffic, Large Construction equipment stand And high-risk section mark.
Further, the step S20 specifically: the two dimensional code of Cloud Server link is generated by two-dimension code generator, And it is shown in into sluice gate and sluice gate supplies interim vehicle scan out.
Further, the step S30 is specifically included:
Step S31, interim vehicle links to Cloud Server, Cloud Server by the two dimensional code that mobile scanning terminal enters sluice gate Pop up authentication window;
Step S32, identifying code is obtained in authentication window input handset number, and identifying code is inputted into authentication window Complete authentication;
Step S33, mobile terminal obtain on Cloud Server the road information that stores and on building expressway it is other interim The GPS information of the mobile terminal of vehicle, and show road information and all mobile terminals on mobile terminals in a manner of map GPS information;
Step S34, the GPS information of mobile terminal sharing itself is to Cloud Server.
Further, in the step S31, the mobile terminal is mobile phone or tablet computer.
Further, the step S40 is specifically included:
Step S41, Cloud Server is by the GPS information and road information of each mobile terminal sharing, between mobile terminal Distance and mobile terminal calculated in real time at a distance from object each on road information;
Step S42, it when thering is another interim vehicle head-on to sail, and being separated by less than set distance, issues meeting i.e. It notifies to mobile terminal and voice broadcast;
Step S43, when replace with front left and right width construction section be separated by need lane change less than set distance when, issuing will The notice of lane change is to mobile terminal and voice broadcast;
Step S44, it when interim vehicle drives towards tunnel, and interim vehicle and tunnel are separated by less than set distance, issues and faces The notice in nearly tunnel is to mobile terminal and voice broadcast;
Step S45, when the speed of interim vehicle driving is more than the First Speed of setting, the notice of hypervelocity is issued to movement Terminal and voice broadcast;
Step S46, when two interim vehicles be more than setting second speed go in the same direction, but intersection when it is quiet suddenly Only, Cloud Server issues the doubtful alarm for sending traffic accident to staff;
The step S42 to step S46 is regardless of tandem.
Further, the step S50 specifically: interim vehicle is scanned the two-dimensional code in sluice gate out, and Cloud Server judgement is faced When vehicle will be driven out to and build expressway, terminate the mobile terminal sharing GPS information, and terminate process.
The present invention has the advantages that
1, by the way that road information is uploaded to Cloud Server, and the GPS information of shared mobile terminal, by Cloud Server It calculates and notifies interim vehicle, realize and effectively managed in the interim vehicle for building expressway, improve interim vehicle Travel safety.
2, by two-dimensional code scanning technology, fast recording information of vehicles was manually registered relative to staff was passed through originally Greatly improve efficiency.
3, by mobile scanning terminal two dimensional code and shared GPS information, prevented certain vehicles itself causes without GPS GPS information is not shared, so that the case where management is less than the vehicle.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is flow chart of the present invention in the interim vehicles management method for building expressway.
Specific embodiment
Please refer to shown in Fig. 1, the present invention the interim vehicles management method for building expressway preferred embodiment, including it is as follows Step:
Step S10, Cloud Server will be uploaded in the road information for building expressway;
Step S20, enter sluice gate and out sluice gate set up link Cloud Server two dimensional code;
Step S30, interim vehicle is prepared to enter into when building expressway, is established the link by two dimensional code and Cloud Server;
Step S40, Cloud Server is managed interim vehicle;
Step S50, interim vehicle is scanned the two-dimensional code in sluice gate out, and terminates process.
In the step S10, the road information includes at least length, the shape of road, the width of road, road of road Loading capacity, the position in tunnel, the lane for allowing temporarily to be open to traffic, the stand of Large Construction equipment and the high-risk road that road allows Segment identification.It can be navigated to interim vehicle using these road informations, compensate for construction section and be not open to traffic formally, road letter Breath not each map software of typing the defects of.
The step S20 specifically: by two-dimension code generator generate Cloud Server link two dimensional code, and be shown in into Sluice gate and out sluice gate supply interim vehicle scan.Pass through two-dimensional code scanning technology, fast recording information of vehicles, relative to original logical It crosses staff and manually registers and greatly improve efficiency, facilitate interim vehicle fast passing.
The step S30 is specifically included:
Step S31, interim vehicle links to Cloud Server, Cloud Server by the two dimensional code that mobile scanning terminal enters sluice gate Pop up authentication window;Pass through mobile scanning terminal two dimensional code and shared GPS information, prevented certain vehicles itself without GPS and cause not sharing GPS information so that management less than the vehicle the case where;
Step S32, identifying code is obtained in authentication window input handset number, and identifying code is inputted into authentication window Complete authentication;
Step S33, mobile terminal obtain on Cloud Server the road information that stores and on building expressway it is other interim The GPS information of the mobile terminal of vehicle, and show road information and all mobile terminals on mobile terminals in a manner of map GPS information;
Step S34, the GPS information of mobile terminal sharing itself is used to Cloud Server for other interim vehicle.
In the step S31, the mobile terminal is mobile phone or tablet computer.
The step S40 is specifically included:
Step S41, Cloud Server is by the GPS information and road information of each mobile terminal sharing, between mobile terminal Distance and mobile terminal calculated in real time at a distance from object each on road information;
Step S42, it when thering is another interim vehicle head-on to sail, and being separated by less than set distance, issues meeting i.e. It notifies to mobile terminal and voice broadcast;
Step S43, when replace with front left and right width construction section be separated by need lane change less than set distance when, issuing will The notice of lane change is to mobile terminal and voice broadcast;
Step S44, it when interim vehicle drives towards tunnel, and interim vehicle and tunnel are separated by less than set distance, issues and faces The notice in nearly tunnel is to mobile terminal and voice broadcast;
Step S45, when the speed of interim vehicle driving is more than the First Speed of setting, the notice of hypervelocity is issued to movement Terminal and voice broadcast;
Step S46, when two interim vehicles be more than setting second speed go in the same direction, but intersection when it is quiet suddenly Only, Cloud Server issues the doubtful alarm for sending traffic accident to staff;Effectively prevent send traffic accident but nobody Know, has delayed best rescue opportunity;
The step S42 to step S46 is regardless of tandem.By the way that road information is uploaded to Cloud Server, and share The GPS information of the mobile terminal of interim vehicle, by Cloud Server calculating and notify interim vehicle, realize to building high speed The interim vehicle on road is effectively managed, and the travel safety of interim vehicle is improved.
The step S50 specifically: interim vehicle is scanned the two-dimensional code in sluice gate out, and Cloud Server judges that interim vehicle will be sailed Expressway is being built out, is terminating the mobile terminal sharing GPS information, and terminate process.Or Cloud Server passes through shared GPS letter Breath detects that interim vehicle has sailed out of and is building expressway, then deletes the GPS information of the interim vehicle.
In conclusion the present invention has the advantages that
1, by the way that road information is uploaded to Cloud Server, and the GPS information of shared mobile terminal, by Cloud Server It calculates and notifies interim vehicle, realize and effectively managed in the interim vehicle for building expressway, improve interim vehicle Travel safety.
2, by two-dimensional code scanning technology, fast recording information of vehicles was manually registered relative to staff was passed through originally Greatly improve efficiency.
3, by mobile scanning terminal two dimensional code and shared GPS information, prevented certain vehicles itself causes without GPS GPS information is not shared, so that the case where management is less than the vehicle.
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this The technical staff in field should be covered of the invention according to modification and variation equivalent made by spirit of the invention In scope of the claimed protection.

Claims (7)

1. a kind of in the interim vehicles management method for building expressway, characterized by the following steps:
Step S10, Cloud Server will be uploaded in the road information for building expressway;
Step S20, enter sluice gate and out sluice gate set up link Cloud Server two dimensional code;
Step S30, interim vehicle is prepared to enter into when building expressway, is established the link by two dimensional code and Cloud Server;
Step S40, Cloud Server is managed interim vehicle;
Step S50, interim vehicle is scanned the two-dimensional code in sluice gate out, and terminates process.
2. as described in claim 1 in the interim vehicles management method for building expressway, it is characterised in that: in the step S10, The road information includes at least loading capacity that the length of road, the shape of road, the width of road, road allow, tunnel Position, the lane for allowing temporarily to be open to traffic, the stand of Large Construction equipment and high-risk section mark.
3. as described in claim 1 in the interim vehicles management method for building expressway, it is characterised in that: the step S20 tool Body are as follows: the two dimensional code of Cloud Server link is generated by two-dimension code generator, and be shown in into sluice gate and out sluice gate for interim Vehicle scan.
4. as described in claim 1 in the interim vehicles management method for building expressway, it is characterised in that: the step S30 tool Body includes:
Step S31, interim vehicle links to Cloud Server, Cloud Server pop-up by the two dimensional code that mobile scanning terminal enters sluice gate Authentication window;
Step S32, identifying code is obtained in authentication window input handset number, and identifying code input authentication window is completed Authentication;
Step S33, mobile terminal obtains the road information stored on Cloud Server and other interim vehicles on building expressway Mobile terminal GPS information, and show in a manner of map the GPS of road information and all mobile terminals on mobile terminals Information;
Step S34, the GPS information of mobile terminal sharing itself is to Cloud Server.
5. as claimed in claim 4 in the interim vehicles management method for building expressway, it is characterised in that: in the step S31, The mobile terminal is mobile phone or tablet computer.
6. as claimed in claim 4 in the interim vehicles management method for building expressway, it is characterised in that: the step S40 tool Body includes:
Step S41, Cloud Server is by the GPS information and road information of each mobile terminal sharing, between mobile terminal away from From and mobile terminal calculated in real time at a distance from object each on road information;
Step S42, when having another interim vehicle head-on to sail, and being separated by less than set distance, the notice i.e. by meeting is issued To mobile terminal and voice broadcast;
Step S43, when replace with front left and right width construction section be separated by need lane change less than set distance when, issue lane change i.e. Notice to mobile terminal and voice broadcast;
Step S44, it when interim vehicle drives towards tunnel, and interim vehicle and tunnel are separated by less than set distance, issues and closes on tunnel The notice in road is to mobile terminal and voice broadcast;
Step S45, when the speed of interim vehicle driving is more than the First Speed of setting, the notice of hypervelocity is issued to mobile terminal And voice broadcast;
Step S46, when two interim vehicles be more than setting second speed go in the same direction, but intersection when static suddenly, cloud Server issues the doubtful alarm for sending traffic accident to staff;
The step S42 to step S46 is regardless of tandem.
7. as described in claim 1 in the interim vehicles management method for building expressway, it is characterised in that: the step S50 tool Body are as follows: interim vehicle is scanned the two-dimensional code in sluice gate out, and Cloud Server judges that interim vehicle will be driven out to and building expressway, terminates the shifting Dynamic terminal shares GPS information, and terminates process.
CN201811634668.6A 2018-12-29 2018-12-29 In the interim vehicles management method for building expressway Pending CN109686102A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811634668.6A CN109686102A (en) 2018-12-29 2018-12-29 In the interim vehicles management method for building expressway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811634668.6A CN109686102A (en) 2018-12-29 2018-12-29 In the interim vehicles management method for building expressway

Publications (1)

Publication Number Publication Date
CN109686102A true CN109686102A (en) 2019-04-26

Family

ID=66191203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811634668.6A Pending CN109686102A (en) 2018-12-29 2018-12-29 In the interim vehicles management method for building expressway

Country Status (1)

Country Link
CN (1) CN109686102A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111785061A (en) * 2020-07-14 2020-10-16 陈军 Traffic signal method and system based on two-dimensional code

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004152250A (en) * 2002-10-28 2004-05-27 Sin Etke Technology Co Ltd Vehicle management system
CN102737499A (en) * 2012-05-17 2012-10-17 西安亿力通微波科技有限公司 Expressway vehicle management and guidance command system and method based on mobile communication
CN103440767A (en) * 2013-09-04 2013-12-11 彭博 Highway-driving-information vehicle-mounted terminal, monitoring system and method
CN104121915A (en) * 2013-04-25 2014-10-29 ***通信集团安徽有限公司 Real-time road navigation method and system
CN105427638A (en) * 2015-12-18 2016-03-23 哈尔滨工业大学 Man-machine interactive vehicle-speed control and early-warning system for expressway construction operation area
CN105825335A (en) * 2016-03-15 2016-08-03 杭州睿兴栋宇工程咨询有限公司 BIM (Building Information Modeling) based construction onsite vehicle and device management system and method
CN205665900U (en) * 2016-06-06 2016-10-26 常熟理工学院 Highway car safety precaution and convenient payment system based on believe platform a little
CN107133764A (en) * 2017-04-25 2017-09-05 物载天下网络科技(苏州)有限公司 A kind of vehicle temporary scheduling system and method based on Beidou satellite navigation
CN107168212A (en) * 2017-06-30 2017-09-15 合肥贺财工程项目管理有限公司 A kind of civil engineering site road management system
CN107705564A (en) * 2017-08-16 2018-02-16 齐鲁交通信息有限公司 Express-road vehicle running track identification system and method based on mobile phone positioning

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004152250A (en) * 2002-10-28 2004-05-27 Sin Etke Technology Co Ltd Vehicle management system
CN102737499A (en) * 2012-05-17 2012-10-17 西安亿力通微波科技有限公司 Expressway vehicle management and guidance command system and method based on mobile communication
CN104121915A (en) * 2013-04-25 2014-10-29 ***通信集团安徽有限公司 Real-time road navigation method and system
CN103440767A (en) * 2013-09-04 2013-12-11 彭博 Highway-driving-information vehicle-mounted terminal, monitoring system and method
CN105427638A (en) * 2015-12-18 2016-03-23 哈尔滨工业大学 Man-machine interactive vehicle-speed control and early-warning system for expressway construction operation area
CN105825335A (en) * 2016-03-15 2016-08-03 杭州睿兴栋宇工程咨询有限公司 BIM (Building Information Modeling) based construction onsite vehicle and device management system and method
CN205665900U (en) * 2016-06-06 2016-10-26 常熟理工学院 Highway car safety precaution and convenient payment system based on believe platform a little
CN107133764A (en) * 2017-04-25 2017-09-05 物载天下网络科技(苏州)有限公司 A kind of vehicle temporary scheduling system and method based on Beidou satellite navigation
CN107168212A (en) * 2017-06-30 2017-09-15 合肥贺财工程项目管理有限公司 A kind of civil engineering site road management system
CN107705564A (en) * 2017-08-16 2018-02-16 齐鲁交通信息有限公司 Express-road vehicle running track identification system and method based on mobile phone positioning

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111785061A (en) * 2020-07-14 2020-10-16 陈军 Traffic signal method and system based on two-dimensional code

Similar Documents

Publication Publication Date Title
CN106960097B (en) Simulation method and system for constructing three-dimensional urban road network and microcosmic traffic flow
DE102015100812A1 (en) A method of using road level images to enhance a mode of automated driving for a vehicle
CN111611955B (en) Method, device, equipment and storage medium for identifying passable construction road
DE112018000477B4 (en) Event prediction system, event prediction method, program and recording medium on which it is recorded
CN108520635B (en) Mixed reality road display system
DE112018006997T5 (en) DEVICE FOR GENERATING IMAGE DATA FOR A VEHICLE, SYSTEM FOR GENERATING TRAJECTOR DATA, PROGRAM FOR GENERATING SEGMENT IMAGE DATA AND STORAGE MEDIUM
EP3959485B1 (en) Generation of surface maps to improve navigation
US20230386226A1 (en) Method and system for muck processing in smart city based on internet of things
CN114168457A (en) Method and system for generating test scene of automatic driving automobile
CN111753634A (en) Traffic incident detection method and device
CN109686102A (en) In the interim vehicles management method for building expressway
CN108665556B (en) Road indication display method based on mixed reality and storage medium
CN114387785A (en) Safety management and control method and system based on intelligent highway and storable medium
KR102190164B1 (en) Loaded vehicle inspection detour decision system and control method thereof
CN111460879B (en) Neural network operation method using grid generator and device using the same
CN115169890A (en) Intelligent networked vehicle hybrid traffic evaluation system based on microscopic traffic simulation
Sinha et al. Development of transportation engineering research, education, and practice in a changing civil engineering world
CN111291469A (en) Pedestrian crossing mixed traffic flow simulation method and system based on multiple intelligent agents
CN108711298B (en) Mixed reality road display method
CN113222407A (en) Highway project security evaluation system based on BIM
DE102019216747A1 (en) Method of providing an overlay map section
CN116853319A (en) Subway operation monitoring system and monitoring method thereof
Meocci et al. Black boxes data for road pavement conditions monitoring: A case study in Florence
US20180144260A1 (en) High-risk road location prediction
Garcia et al. A new traffic-calming device: Speed kidney

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190426