CN105603880A - 一种预留压浆孔的节段箱梁拼装方法 - Google Patents
一种预留压浆孔的节段箱梁拼装方法 Download PDFInfo
- Publication number
- CN105603880A CN105603880A CN201610047958.5A CN201610047958A CN105603880A CN 105603880 A CN105603880 A CN 105603880A CN 201610047958 A CN201610047958 A CN 201610047958A CN 105603880 A CN105603880 A CN 105603880A
- Authority
- CN
- China
- Prior art keywords
- section box
- box girder
- assembled
- reserved
- mud jacking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种提供的预留压浆孔节段箱梁拼装方法,通过在节段箱梁拼装前就预留压浆孔,前方先进行拼装的节段箱梁,其不稳定因素较多的压浆工序可以在后方拼装节段箱梁时同步进行,达到减少施工周期,提高施工进度的目的。
Description
技术领域
本发明涉及海上桥梁施工技术领域,具体地指一种预留压浆孔的节段箱梁拼装方法。
背景技术
在桥梁工程中,以往的节段梁拼装工序都是底部喂梁→起吊→初对位(标高调整)→移开→涂环氧树脂→精对位→临时预应力张拉→永久悬拼预应力钢束张拉→预应力钢束封锚压浆→重复上述步骤直至中跨T构最后一对箱梁拼装完毕。在专利号为“200810043795.9”、专利名称为“一种节段箱梁的拼装方法”的中国专利即公开了此种拼装方式,即在所有节段梁拼装完毕后再进行封锚压浆工序,由于正常的张拉封锚压浆工序耗时较多,各种不稳定因素较多,特别是压浆工序,容易出现各种突发状况,陆地上施工也可能会影响施工进度,在海上施工时会被海上特殊环境所影响,例如,节段箱梁拼装通常需利用潮汐作业,在压浆工序很可能会因潮汐水位时未能及时进行节段箱梁拼装装作业,影响施工进度。
发明内容
本发明的目的就是要解决上述背景技术的不足,提供一种提供施工进度的预留压浆孔的节段箱梁拼装方法。
本发明的技术方案为:一种预留压浆孔的节段箱梁拼装方法,其特征在于,包括以下步骤:
1)待拼装节段箱梁预制时,在待拼装节段箱梁的非拼接面预留压浆孔;
2)运输待拼装节段箱梁至施工现场;
3)依次起吊并初定位各个节段箱梁,相邻节段箱梁之间预留抹胶空间;
4)相邻节段箱梁试拼后分离;
5)从前向后依次完成节段箱梁的拼装;
6)在拼装后方节段箱梁时,利用预留压浆孔,同步施工前方拼装完成的节段箱梁的压浆工序;
7)所有节段箱梁拼装、压浆完成后,进行节段箱梁的湿接缝混凝土浇筑。
进一步地,所述节段箱梁的拼装包括依次进行的拼接面抹环氧剂、精确定位、张拉临时预应力以及永久预应力钢束张拉各个工序。
本发明的一种提供的预留压浆孔节段箱梁拼装方法,通过在节段箱梁拼装前就预留压浆孔,前方先进行拼装的节段箱梁,其不稳定因素较多的压浆工序可以在后方拼装节段箱梁时同步进行,达到减少施工周期,提高施工进度的目的。
附图说明
图1为本发明的流程示意图。
具体实施方式
下面结合附图和具体实施例对本发明作进一步的详细说明。
参考图1,本实施例的一种预留压浆孔的节段箱梁拼装方法,主要包括节段箱梁的拼装工序和压浆工序,其中拼装工序包括拼接面抹环氧剂、精确定位、张拉临时预应力以及永久预应力钢束张拉等施工工序。
本实施例的一种预留压浆孔的节段箱梁拼装方法,包括以下步骤:
1)待拼装节段箱梁在工厂预制时,在待拼装节段箱梁预留压浆孔,由于节段箱梁需进行端面拼接,因此,压浆孔只能预留在拼装节段箱梁的非拼接面;
2)运输待拼装节段箱梁至施工现场,并在节段箱梁上进行编号1、2……;
3)起吊并初定位各个节段箱梁,相邻节段箱梁之间预留抹胶空间;
4)相邻节段箱梁试拼后分离;
5)在编号为1和2的节段箱梁的拼接面抹环氧剂,编号为1和2的节段箱梁精确定位后进行张拉临时预应力及永久预应力钢束张拉,完成编号为1和2的节段箱梁拼装;按照上述步骤,完成编号为2和3的节段箱梁拼装;
6)在编号为2和3的节段箱梁拼装时,利用预留压浆孔,同步施工以完成拼装的编号为1和2的节段箱梁的压浆工序;
7)按照步骤6)所示的施工方法,完成剩余节段箱梁的拼装及压浆工序;
8)所有节段箱梁拼装、压浆完成后,进行节段箱梁的湿接缝混凝土浇筑,即完成了一跨桥梁的拼装施工。
采用上述施工方法,前方先进行拼装的节段箱梁,其不稳定因素较多的压浆工序可以在后方拼装节段箱梁时同步进行,达到减少施工周期,提高施工进度的目的。
需要说明的是,前方先进行拼装的节段箱梁的压浆工序,并不一定是与其相邻节段箱梁拼装时进行,也可以在具有一定间隔节段箱梁拼装时进行,这就需要根据实际情况,选择合适时机进行前方节段箱梁的压浆工序。
以上所述,仅是本发明的较佳实施例而已,并非对本发明的结构做任何形式上的限制。凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明的技术方案的范围内。
Claims (2)
1.一种预留压浆孔的节段箱梁拼装方法,其特征在于,包括以下步骤:
1)待拼装节段箱梁预制时,在待拼装节段箱梁的非拼接面预留压浆孔;
2)运输待拼装节段箱梁至施工现场;
3)依次起吊并初定位各个节段箱梁,相邻节段箱梁之间预留抹胶空间;
4)相邻节段箱梁试拼后分离;
5)从前向后依次完成节段箱梁的拼装;
6)在拼装后方节段箱梁时,利用预留压浆孔,同步施工前方拼装完成的节段箱梁的压浆工序;
7)所有节段箱梁拼装、压浆完成后,进行节段箱梁的湿接缝混凝土浇筑。
2.根据权利要求1所述的一种预留压浆孔的节段箱梁拼装方法,其特征在于:所述节段箱梁的拼装包括依次进行的拼接面抹环氧剂、精确定位、张拉临时预应力以及永久预应力钢束张拉各个工序。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610047958.5A CN105603880A (zh) | 2016-01-25 | 2016-01-25 | 一种预留压浆孔的节段箱梁拼装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610047958.5A CN105603880A (zh) | 2016-01-25 | 2016-01-25 | 一种预留压浆孔的节段箱梁拼装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105603880A true CN105603880A (zh) | 2016-05-25 |
Family
ID=55984190
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610047958.5A Pending CN105603880A (zh) | 2016-01-25 | 2016-01-25 | 一种预留压浆孔的节段箱梁拼装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105603880A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106149541A (zh) * | 2016-05-30 | 2016-11-23 | 中国冶集团有限公司 | 一种预应力张拉的预制箱型桥梁及施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1485498A (zh) * | 2002-09-26 | 2004-03-31 | 上海市隧道工程轨道交通设计研究院 | 槽形梁预制节段纵向拼装的施工方法 |
JP2008274586A (ja) * | 2007-04-26 | 2008-11-13 | Kajima Corp | 柱頭部の施工方法 |
CN101476291A (zh) * | 2009-01-21 | 2009-07-08 | 中铁一局集团有限公司 | 一种节段拼装简支箱梁移动膺架施工方法 |
CN101684638A (zh) * | 2008-09-23 | 2010-03-31 | 中交第三航务工程局有限公司 | 一种节段箱梁的拼装方法 |
CN104594200A (zh) * | 2014-12-15 | 2015-05-06 | 中铁建大桥工程局集团第五工程有限公司 | 一种高原高寒地区桥梁简支梁节段拼装施工方法 |
-
2016
- 2016-01-25 CN CN201610047958.5A patent/CN105603880A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1485498A (zh) * | 2002-09-26 | 2004-03-31 | 上海市隧道工程轨道交通设计研究院 | 槽形梁预制节段纵向拼装的施工方法 |
JP2008274586A (ja) * | 2007-04-26 | 2008-11-13 | Kajima Corp | 柱頭部の施工方法 |
CN101684638A (zh) * | 2008-09-23 | 2010-03-31 | 中交第三航务工程局有限公司 | 一种节段箱梁的拼装方法 |
CN101476291A (zh) * | 2009-01-21 | 2009-07-08 | 中铁一局集团有限公司 | 一种节段拼装简支箱梁移动膺架施工方法 |
CN104594200A (zh) * | 2014-12-15 | 2015-05-06 | 中铁建大桥工程局集团第五工程有限公司 | 一种高原高寒地区桥梁简支梁节段拼装施工方法 |
Non-Patent Citations (1)
Title |
---|
冷加金: ""大跨度连续刚构桥箱梁预制悬拼施工浅析"", 《广东科技》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106149541A (zh) * | 2016-05-30 | 2016-11-23 | 中国冶集团有限公司 | 一种预应力张拉的预制箱型桥梁及施工方法 |
CN106149541B (zh) * | 2016-05-30 | 2020-05-01 | 中国一冶集团有限公司 | 一种预应力张拉的预制箱型桥梁及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104153287B (zh) | 具有自复位能力的节段拼装混凝土框架桥墩***及方法 | |
CN106988346A (zh) | 沉管隧道最终接头及预制方法、安装方法 | |
CN104195950A (zh) | 一种钢混组合梁斜拉桥胶接缝连接方法 | |
ITBO20060414A1 (it) | Metodo per sollevare un manufatto edilizio. | |
CN102011597B (zh) | 隧道软弱围岩支护方法及支护结构 | |
CN105756369B (zh) | 一种结构内置保温装饰集成一体化装配式房屋及其施工方法 | |
CN106869166A (zh) | 一种用于综合管廊的装配式的施工方法 | |
CN204163108U (zh) | 一种可体内张拉的拼装综合管廊 | |
CN109555535B (zh) | 下路桁形式预应力管幕结构及施工方法 | |
CN104389315A (zh) | 固结灌浆钻孔桩墙及其施工方法 | |
CN203559904U (zh) | 一种倒挂井壁竖井侧墙开马头门的加强支护结构 | |
CN108999281A (zh) | 一种新型预制混凝土梁柱节点及其施工方法 | |
CN106930768B (zh) | 隧洞施工方法及应用 | |
CN105603880A (zh) | 一种预留压浆孔的节段箱梁拼装方法 | |
CN104314105B (zh) | 地下室外墙板与现浇扶壁柱的连接竖向拼缝结构及施工方法 | |
CN104712343A (zh) | 一种大盾构先过站后再建造风道结构的盾构过站方法 | |
CN205875193U (zh) | 一种装配式桩柱一体化结构 | |
CN111411650A (zh) | 建筑物顶升纠偏方法 | |
CN110173075A (zh) | 一种装配式钢结构柱与柱连接灌浆锚固节点 | |
CN104278635B (zh) | 地锚式悬索桥猫道承重索的转向方法 | |
CN108193667A (zh) | 一种防水型全拼装单箱三室薄壁式地下连续墙结构及施工方法 | |
CN104329098A (zh) | 一种软弱围岩辅助坑道小导洞横穿正洞挑顶施工方法 | |
CN101592006B (zh) | 一种防止窗户在施工中受损的方法 | |
CN106285028A (zh) | 基于bim技术的大跨度重型吊车梁拆除中厂房加固施工方法 | |
CN204899937U (zh) | 一种地下盾构隧道衬砌管片的接缝拼接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160525 |
|