CN105603880A - Assembly method of segmental box beam with reserved pressure grouting hole - Google Patents

Assembly method of segmental box beam with reserved pressure grouting hole Download PDF

Info

Publication number
CN105603880A
CN105603880A CN201610047958.5A CN201610047958A CN105603880A CN 105603880 A CN105603880 A CN 105603880A CN 201610047958 A CN201610047958 A CN 201610047958A CN 105603880 A CN105603880 A CN 105603880A
Authority
CN
China
Prior art keywords
section box
box girder
assembled
reserved
mud jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610047958.5A
Other languages
Chinese (zh)
Inventor
毛奎
文德安
朱晓明
吴凯军
莫先琳
赵军科
田新平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB First Engineering Co Ltd
Original Assignee
CCCC SHB First Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB First Engineering Co Ltd filed Critical CCCC SHB First Engineering Co Ltd
Priority to CN201610047958.5A priority Critical patent/CN105603880A/en
Publication of CN105603880A publication Critical patent/CN105603880A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses and provides an assembly method of a segmental box beam with a reserved pressure grouting hole. Through reserving the pressure grouting hole before the assembly of the segmental box beam, the pressure grouting procedure, which is more in labile factors, of the segmental box beam which is first subjected to the assembly in front can be carried out synchronously when the segmental box beam is subjected to the assembly at back; the purposes of shortening a construction period and improving construction progress are achieved.

Description

The section box girder assembling method in a kind of reserved mud jacking hole
Technical field
The present invention relates to Offshore Bridges technical field of construction, refer to particularly the joint in a kind of reserved mud jacking holeSection box girder assembling method.
Background technology
In science of bridge building, segment installation operation is in the past all bottom feeding beam → lifting → first rightPosition (absolute altitude adjustment) → remove → is coated with epoxy resin → smart contraposition → interim prestressed stretch-draw → foreverCantilever prestressed strand stretch-draw → prestressed strand sealing off and covering anchorage mud jacking → repetition above-mentioned steps until in acrossLast is complete to box girder assembling for T structure. Be " 200810043795.9 ", proprietary term in the patent No.The Chinese patent that is called " a kind of assembling method of section box girder " discloses this kind of erection method,After all segment installations, carry out again sealing off and covering anchorage mud jacking operation, due to normal tensioning anchor sealMud jacking operation is consuming time more, and various destabilizing factors are more, and particularly mud jacking operation easily occursVarious emergency situations, land construction also may affect construction speed, can quilt while at sea constructionMarine particular surroundings affects, and for example, the assembled common need of section box girder utilize morning and evening tides operation, is pressingSlurry process fails to carry out in time the assembled industry of pretending of section box girder during possibly because of tidal level, impactConstruction speed.
Summary of the invention
Object of the present invention is exactly the deficiency that will solve above-mentioned background technology, provides one that construction is providedThe section box girder assembling method in the reserved mud jacking hole of progress.
Technical scheme of the present invention is: the section box girder assembling method in a kind of reserved mud jacking hole, its spyLevy and be, comprise the following steps:
1) when section box girder to be assembled is prefabricated, reserved pressure of non-Mosaic face of section box girder to be assembledSlurry hole;
2) transport section box girder to be assembled to job site;
3) lifting just each section box girder of location successively, reserved daub between adjacent segment case beamSpace;
4) examination of adjacent segment case beam separates after spelling;
5) complete successively from front to back the assembled of section box girder;
6) in the time of the section box girder of assembled rear, utilize reserved mud jacking hole, synchronous construction front is assembledThe mud jacking operation of the section box girder completing;
7), after assembled, the mud jacking of all section box girders completes, carry out the wet seam coagulation of section box girderSoil is built.
Further, described section box girder assembled comprise the Mosaic face carrying out successively smear epoxy agent,Accurately location, the interim prestressing force of stretch-draw and permanent each operation of prestressed strand stretch-draw.
A kind of reserved mud jacking hole section box girder assembling method providing of the present invention, by sections caseJust reserved mud jacking hole before beam is assembled, assembled section box girder is first carried out in front, and its destabilizing factor isMany mud jacking operations are synchronously carried out when assembled section box girder in the wings, reach and reduce construction weekPhase, the object of raising construction speed.
Brief description of the drawings
Fig. 1 is schematic flow sheet of the present invention.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
With reference to figure 1, the section box girder assembling method in a kind of reserved mud jacking hole of the present embodiment, mainComprise assembled operation and the mud jacking operation of section box girder, wherein assembled operation comprises that Mosaic face smears epoxyThe working procedures such as agent, accurate location, the interim prestressing force of stretch-draw and permanent prestressed strand stretch-draw.
The section box girder assembling method in a kind of reserved mud jacking hole of the present embodiment, comprises the following steps:
1) when section box girder to be assembled is prefabricated in the factory, in the reserved mud jacking of section box girder to be assembled hole,Because section box girder need carry out end face splicing, therefore, mud jacking hole can only be reserved in assembled section box girderNon-Mosaic face;
2) transport section box girder to be assembled to job site, and on section box girder, be numbered 1,2……;
3) lifting just each section box girder of location, reserved daub space between adjacent segment case beam;
4) examination of adjacent segment case beam separates after spelling;
5) smear epoxy agent at the Mosaic face that is numbered 1 and 2 section box girder, be numbered 1 and 2Section box girder accurately behind location, carry out the interim prestressing force of stretch-draw and permanent prestressed strand stretch-draw, completeBecome to be numbered 1 and 2 section box girder assembled; According to above-mentioned steps, complete and be numbered 2 and 3Section box girder assembled;
6) in the time that the section box girder that is numbered 2 and 3 is assembled, utilize reserved mud jacking hole, synchronously executeWork is to complete the mud jacking operation of the assembled section box girder that is numbered 1 and 2;
7) according to step 6) shown in construction method, complete residue section box girder assembled and pressSlurry process;
8), after assembled, the mud jacking of all section box girders completes, carry out the wet seam coagulation of section box girderSoil is built, and has completed the assembling construction of a bridge beam.
Adopt above-mentioned construction method, assembled section box girder is first carried out in front, and its destabilizing factorMany mud jacking operations are synchronously carried out when assembled section box girder in the wings, reach and reduce construction weekPhase, the object of raising construction speed.
It should be noted that, the mud jacking operation of assembled section box girder is first carried out in front, might notTo be adjacent section box girder to carry out when assembled, also can be to have certain intervals section box girder assembledShi Jinhang, these just need to be according to actual conditions, select to carry out suitable opportunity the pressure of front section box girderSlurry process.
The above, be only preferred embodiment of the present invention, not structure of the present invention doneAny pro forma restriction. What every foundation technical spirit of the present invention was done above embodiment appointsWhat simple modification, equivalent variations and modification, all still belong in the scope of technical scheme of the present invention.

Claims (2)

1. the section box girder assembling method in reserved mud jacking hole, is characterized in that, comprises followingStep:
1) when section box girder to be assembled is prefabricated, reserved pressure of non-Mosaic face of section box girder to be assembledSlurry hole;
2) transport section box girder to be assembled to job site;
3) lifting just each section box girder of location successively, reserved daub between adjacent segment case beamSpace;
4) examination of adjacent segment case beam separates after spelling;
5) complete successively from front to back the assembled of section box girder;
6) in the time of the section box girder of assembled rear, utilize reserved mud jacking hole, synchronous construction front is assembledThe mud jacking operation of the section box girder completing;
7), after assembled, the mud jacking of all section box girders completes, carry out the wet seam coagulation of section box girderSoil is built.
2. the section box girder assembling method in a kind of reserved mud jacking according to claim 1 hole,It is characterized in that: described section box girder assembled comprises that the Mosaic face carrying out successively smears epoxy agent, essenceDetermine position, the interim prestressing force of stretch-draw and permanent each operation of prestressed strand stretch-draw.
CN201610047958.5A 2016-01-25 2016-01-25 Assembly method of segmental box beam with reserved pressure grouting hole Pending CN105603880A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610047958.5A CN105603880A (en) 2016-01-25 2016-01-25 Assembly method of segmental box beam with reserved pressure grouting hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610047958.5A CN105603880A (en) 2016-01-25 2016-01-25 Assembly method of segmental box beam with reserved pressure grouting hole

Publications (1)

Publication Number Publication Date
CN105603880A true CN105603880A (en) 2016-05-25

Family

ID=55984190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610047958.5A Pending CN105603880A (en) 2016-01-25 2016-01-25 Assembly method of segmental box beam with reserved pressure grouting hole

Country Status (1)

Country Link
CN (1) CN105603880A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149541A (en) * 2016-05-30 2016-11-23 中国冶集团有限公司 The prefabricated box bridge of a kind of prestressed stretch-draw and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1485498A (en) * 2002-09-26 2004-03-31 上海市隧道工程轨道交通设计研究院 Construction method for longitudinally assembling prefabricated subsection of channel beam
JP2008274586A (en) * 2007-04-26 2008-11-13 Kajima Corp Pillar head construction method
CN101476291A (en) * 2009-01-21 2009-07-08 中铁一局集团有限公司 Segment-assembling simply supported box girder movable falsework construction method
CN101684638A (en) * 2008-09-23 2010-03-31 中交第三航务工程局有限公司 Assembly method of section box girder
CN104594200A (en) * 2014-12-15 2015-05-06 中铁建大桥工程局集团第五工程有限公司 Bridge simply supported beam segment assembling construction method for frigid plateau region

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1485498A (en) * 2002-09-26 2004-03-31 上海市隧道工程轨道交通设计研究院 Construction method for longitudinally assembling prefabricated subsection of channel beam
JP2008274586A (en) * 2007-04-26 2008-11-13 Kajima Corp Pillar head construction method
CN101684638A (en) * 2008-09-23 2010-03-31 中交第三航务工程局有限公司 Assembly method of section box girder
CN101476291A (en) * 2009-01-21 2009-07-08 中铁一局集团有限公司 Segment-assembling simply supported box girder movable falsework construction method
CN104594200A (en) * 2014-12-15 2015-05-06 中铁建大桥工程局集团第五工程有限公司 Bridge simply supported beam segment assembling construction method for frigid plateau region

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冷加金: ""大跨度连续刚构桥箱梁预制悬拼施工浅析"", 《广东科技》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149541A (en) * 2016-05-30 2016-11-23 中国冶集团有限公司 The prefabricated box bridge of a kind of prestressed stretch-draw and construction method
CN106149541B (en) * 2016-05-30 2020-05-01 中国一冶集团有限公司 Prestressed tensioning prefabricated box type bridge and construction method

Similar Documents

Publication Publication Date Title
CN104153287B (en) There is the section assembling concrete frame bridge pier system and method for self-resetting capability
CN106013218B (en) A kind of method of construction of underground garage open caisson
CN106988346A (en) Immersed tube tunnel final joint and method for prefabricating, installation method
CN104195950A (en) Steel-concrete composite beam cable-stayed bridge glued joint connecting method
ITBO20060414A1 (en) METHOD FOR LIFTING A BUILDING AFT.
CN102011597B (en) Method and structure for supporting weak surrounding rocks of tunnel
CN105756369B (en) A kind of structure built-in heat insulation decorates integrated prefabricated buildings and its construction method
CN106869166A (en) A kind of fabricated construction method for pipe gallery
CN204163108U (en) A kind of can the assembled pipe gallery of stretch-draw in body
CN109555535B (en) Lower-way truss type prestressed pipe curtain structure and construction method
CN104389315A (en) Consolidation grouting drilled pile wall and construction method thereof
CN203559904U (en) Reinforced supporting structure for creating horsehead on reversal borehole wall shaft well side wall
CN108999281A (en) A kind of novel precast concrete bean column node and its construction method
CN106930768B (en) Tunnel Construction and application
CN105603880A (en) Assembly method of segmental box beam with reserved pressure grouting hole
CN104314105B (en) The connection vertical piece structure of the basement wall and cast-in-place buttress and construction method
CN104712343A (en) Shield station passing method of first passing large shield through station and then building air flue structure
CN205875193U (en) Assembled stake integral structure
CN110173075A (en) A kind of assembling type steel structure column connect grouting anchorage node with column
CN104278635B (en) The forward method of earth anchored suspension bridge cat road track cable
CN104329098A (en) Weak surrounding rock auxiliary gallery small pilot tunnel crossing main tunnel roof brushing construction method
CN106285028A (en) Reinforcement of factory building construction method in long-span heavy type crane girder based on BIM technology dismounting
CN101592006B (en) Method for preventing window being damaged in construction
CN204899937U (en) Seam mosaic structure of underground shield tunnel lining segment
CN207470195U (en) Xia Lu purlins form prestressed pipe curtain system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160525

RJ01 Rejection of invention patent application after publication