CN105571418B - Reinforced beam or post water coupling blasting demolishing method - Google Patents

Reinforced beam or post water coupling blasting demolishing method Download PDF

Info

Publication number
CN105571418B
CN105571418B CN201610116721.8A CN201610116721A CN105571418B CN 105571418 B CN105571418 B CN 105571418B CN 201610116721 A CN201610116721 A CN 201610116721A CN 105571418 B CN105571418 B CN 105571418B
Authority
CN
China
Prior art keywords
blasthole
hole
reinforced
water
explosive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610116721.8A
Other languages
Chinese (zh)
Other versions
CN105571418A (en
Inventor
程大春
叶建军
明军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610116721.8A priority Critical patent/CN105571418B/en
Publication of CN105571418A publication Critical patent/CN105571418A/en
Application granted granted Critical
Publication of CN105571418B publication Critical patent/CN105571418B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/02Particular applications of blasting techniques for demolition of tall structures, e.g. chimney stacks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

A kind of reinforced beam or post water coupling blasting demolishing method, it arranges blasthole and toward the technique poured water in blasthole using along reinforced beam or mast axis, reaches the resistance for reducing deep hole explosive and accurate powder charge, efficiently utilizes the intensity and quantity of hydraulic pressure demolition energy, effective controlled blasting vibrations, blasting flyrock, air-shock wave and quick-fried raw toxic gas, the purpose of reduction blasting dust.Present invention process is simple, easily operated, has wide range of applications, and is the preferable construction method that reinforced beam and post are removed.

Description

Reinforced beam or post water coupling blasting demolishing method
Technical field
The invention belongs to blasting engineering field, particularly on a kind of reinforced beam or post water coupling explosion The method of dismounting.
Background technology
Dismounting for reinforced beam or post, invention " reinforced beam axially pre-buried blasthole and demolition blasting side Method " (application number:201510376852.5), " reinforced column axially pre-buried blasthole and demolition blasting method " (application number: 201510383378.9) the BLASTING TECHNOLOGY FOR DEMOLITION scheme of axially pre-buried blasthole is proposed, the technical scheme has been evaded mixes in reinforcing bar The problem to be drilled in solidifying soil, also largely reduce explosive consumption.But the technical scheme is in blast hole projectile filling, no matter being mixed to reinforcing bar Solidifying Tu Liang or post, when hole depth is more than 3m, due to the deformation of the drag effect of the gravity of explosive, blasthole hole wall, in addition explosive, It is difficult to powder charge (particularly it is difficult to accomplishing precise intervals powder charge).This can influence demolition effect and safety.One of solution is just It is powder charge resistance to be reduced.Can preferably solve this problem using water coupling.Meanwhile using water coupling, it can subtract Endangered caused by few explosion.This is significant for urban demolition blasting.
The content of the invention
It is an object of the invention to provide a kind of method of reinforced beam or post water coupling demolition blasting, specifically Say it is that the Blasting Demolition Technology scheme of water coupling is being used along in the axial arranged blasthole of beam or post.
The object of the present invention is achieved like this:
A kind of method of reinforced beam water coupling demolition blasting, comprises the following steps:
1) both ends open blasthole is arranged in reinforced beam;
2) blasthole opening is found, and is cleaned out with pressure wind;
3) traction rope yarn is used as through an iron wire or rope in blasthole, makes its both ends outside hole;
4) toward filling water in blasthole, and water level is kept before powder charge terminates;
5) in the hole outer portion silk thread of traction rope yarn one end or adhesive tape colligation, continuously or discontinuously Explosive roll, dragging are led The messenger line other end, explosive is dragged in blasthole, and the detonator or detonator wire for making to draw from primer [cartridge] are extended to outside hole;
6) detonate.
In the method for described reinforced beam water coupling demolition blasting, both ends open blasthole is parallel in step 1) In reinforced beam axis, its both ends to surface to or oblique direction bend up, the termination for being opened on reinforced beam is horizontal On section or on the side of reinforced beam.
In the method for described reinforced beam water coupling demolition blasting, another way of step 5):Leading The hole outer portion silk thread or the discontinuous Explosive roll of adhesive tape colligation and primacord of messenger line one end, the rope yarn other end is dragged, will Explosive is dragged in blasthole, and primacord is extended to outside hole.
In the method for described reinforced beam water coupling demolition blasting, in step 1) both ends open blasthole along Reinforced beam axis step-by-step arrangement.Per section length 3-8m.
A kind of method of reinforced column water coupling demolition blasting, comprises the following steps:
1) upper end open blasthole is arranged in reinforced column;
2) blasthole opening is found, and is cleaned out with pressure wind;
3) toward filling water in blasthole, and water level is kept before powder charge terminates;
4) in one end silk thread or adhesive tape the colligation continuously or discontinuously Explosive roll of iron wire or rope, then explosive is put Enter in blasthole, in blasthole aperture, the root long degree of traverse one is more than the stub of blasthole diameter, by iron wire or rope yarn colligation on stub;Make Explosive is suspended in hole, and the detonator or detonator wire drawn from primer [cartridge] are extended to outside hole;
5) detonate.
In the method for described reinforced column water coupling demolition blasting, upper end open blasthole is parallel in step 1) In armored concrete mast axis, its upper end open is on the upper end cross section of reinforced column, or upper-end bent, is opened on steel On the side of reinforced concrete post.
In the method for described reinforced column water coupling demolition blasting, another way of step 4):In iron Explosive, is then put into blasthole by one end silk thread or the discontinuous Explosive roll of adhesive tape colligation and primacord of silk or rope, The root long degree of blasthole aperture traverse one is more than the stub of blasthole diameter, by iron wire or rope yarn colligation on stub, is suspended to explosive In hole;And primacord is extended to outside hole.
In the method for described reinforced column water coupling demolition blasting, in step 1) upper end open blasthole along Reinforced column axial segmentation is arranged.Per height of lift 4-10m.
In above-mentioned reinforced beam or the method for post water coupling demolition blasting, the water injected into blasthole is certainly Water.
In above-mentioned reinforced beam or the method for post water coupling demolition blasting, blasthole is blocked with sandstone before detonation End.
Advantages of the present invention:
1) present invention make use of the buoyancy of water and the lubrication of water well, reduces powder charge resistance, can realize more suitable Profit, more accurately powder charge.
2) present invention utilizes the principle of hydraulic pressure demolition, can more efficiently utilize blasting energy, crushing effect evenly, block Degree is smaller;Plus the mode for taking step-by-step arrangement blasthole, reduce dynamite quantity per hole, concussion of blasting, quick-fried can be efficiently controlled Broken slungshot, the intensity of air-shock wave and quick-fried raw toxic gas and quantity, reduce blasting dust.
3) when blasthole of the invention uses pre-buried pipeline, accomplished just to consider tearing open for armored concrete rod member at the beginning of design Remove, adverse effect is significantly reduced in demolition blasting.Particularly consider using these pre-buried pipelines as the logical of building When news, plumbing, power supply, steam line, building life cycle cost can be greatly reduced, improves building life-cycle benefit.Can With prediction, this will influence and change the design specification of existing reinforced beam, post.
4) present invention process is simple, easily operated, has wide range of applications.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1, it is one embodiment provided by the invention (this example is reinforced beam) steel for shot diagrammatic cross-section.
Fig. 2, it is the section of another embodiment (this example is reinforced beam) step-by-step arrangement blasthole provided by the invention Schematic diagram.
Fig. 3, it is one embodiment provided by the invention (this example is reinforced column) steel for shot diagrammatic cross-section.
Fig. 4, it is the section of another embodiment (this example is reinforced column) step-by-step arrangement blasthole provided by the invention Schematic diagram.
Fig. 5, it is the diagrammatic cross-section of one embodiment provided by the invention (this example is reinforced beam) charge constitution.
Fig. 6, it is the diagrammatic cross-section of one embodiment provided by the invention (this example is reinforced column) charge constitution.
In figure, 1- reinforced beams;2- straight holes;The curved holes of 3-;4- reinforced columns;5- draws rope yarn;6- explosives;7- Water;8- primacords, detonator or detonator wire;9- blocks sandstone;10- stubs;11- suspends silk thread in midair;12- colligation silk threads.
Embodiment
Shown in Fig. 1 is one embodiment provided by the invention (this example be reinforced beam, abbreviation beam) steel for shot Diagrammatic cross-section.The both ends of straight hole 2 in this example parallel to the axis of reinforced beam 1 arrangement are bent up upwards forms curved hole 3, curved hole 3 are opened in the end cross-sectional of beam upper surface and beam respectively.
Curved hole 3 can also be bent up obliquely upward, be opened on the side of reinforced beam.
Shown in Fig. 2 is another embodiment (this example is reinforced beam) step-by-step arrangement blasthole provided by the invention Diagrammatic cross-section.Step-by-step arrangement blasthole in this example, parallel to the end of straight hole 2 of the axis of reinforced beam 1 arrangement in being often segmented Bend up, form curved hole 3, the curved hole 3 of this example is bent up to surface, is opened on the upper surface of beam.In middle adjacent bend pipe one (or Two) slightly to beam both sides deflection, avoid point of intersection from colliding.
Curved hole 3 can also be opened on the end cross-sectional of reinforced beam or the side of beam.
The bending up a little apart from beam-ends cross section 0.3-1.0m on straight hole 2 of curved hole 3 near beam both ends.
It is 3-8m per section length.
Spacing (bending up a distance equal to adjacent straight tube) is 0.4-0.8m between adjacent two sections of straight tubes 2.
Shown in Fig. 3 is one embodiment provided by the invention (this example be reinforced column, abbreviation post) arrangement blasthole Diagrammatic cross-section, this straight hole 2 is opened on top surface on post parallel to mast axis.
The upper end of straight hole 2 can also be bent, and be opened on the side of post.
Shown in Fig. 4 is another embodiment (this example is reinforced column) axial segmentation arrangement big gun provided by the invention The diagrammatic cross-section in hole.This all straight hole 2 is opened on post side parallel to mast axis, curved hole 3.
Spacing is 0.5-1.0m between adjacent two sections of straight holes 2 in post.
Per height of lift 4-10m.
Shown in Fig. 5 is one embodiment provided by the invention (this example be reinforced beam, abbreviation beam) charge constitution Diagrammatic cross-section.In figure, a straight hole 2 is arranged along beam axis, the both ends of straight hole 2 bend up to form two sections of curved holes 3 upwards, draw Explosive 6 is banded with adhesive tape or silk thread on rope yarn 5, primacord, detonator or detonator wire 8 are extended to outside hole, be filled with hole Water 7.
Shown in Fig. 6 is that the section of one embodiment provided by the invention (this example is reinforced column) charge constitution shows It is intended to.In figure, a straight hole 2 is arranged on the axis of reinforced column 4, straight hole 2 is opened on post upper end face.Suspention Silk thread 11 lower end colligation silk thread colligation explosive 6 (can be continuously or discontinuously) and primacord, detonator or detonator wire 8;On End is suspended on stub 10;Primacord, detonator or the extension of detonator wire 8 are full of water 7, blasthole upper end has outside portalling in blasthole Block sandstone 9.
Described water uses running water.
Described explosive can be continuously or discontinuously pack, powder column, powder stick.
In the method for above-mentioned reinforced beam or post water coupling demolition blasting, blasthole can be in reinforced beam Pre-buried plastic tube is formed during construction., can also be when removing with drill hole of drilling machine shape when blasthole end is without bending (when being straight hole) Into.
Embodiment 1
Certain reinforced beam (abbreviation beam) needs demolition blasting.Its size is long 7.2m, wide × a height of 1.2m in section × 1.5m。
The beam demolition blasting step is:
1) PVC plastic pipe with an isometric diameter 38mm of beam is used as blasthole, plastic tube two along the pre-buried arrangement of beam axis Hold to surface and bend up, be opened on beam upper surface, bending radius 0.5m, 45 ° of transfer angle.
2) blasthole opening is found, and is cleaned out with pressure wind;
3) rope yarn is drawn through an iron wire in blasthole, makes its both ends outside hole;
4) toward filling water in blasthole, and water level is kept before powder charge terminates;
5) emulsification of the hole outer portion one end adhesive tape every 20cm colligations a diameter of 32mm, length 20cm of rope yarn is being drawn Explosive roll, altogether 15 powder sticks of colligation, while the root long degree of colligation one is 7.0m primacord;Used in the traction rope yarn other end Power, powder stick and primacord are dragged in pre-buried blasthole, are located at straight-tube portion;Primacord is extended to outside hole;
6) detonate.
Embodiment 2
Certain reinforced beam (abbreviation beam) needs demolition blasting.Its size is long 12m, wide × a height of 0.7m in section × 1.0m。
The beam demolition blasting step is:
1) two root long degree be 6m, diameter 38mm PVC plastic pipe along beam axis it is end to end segmentation it is pre-buried arrangement be used as big gun Hole, plastic tube both ends are bent up obliquely upward, are opened on beam both side surface, bending radius 0.5m, transfer angle respectively successively 60°。
2) all blasthole openings are found, and are cleaned out with pressure wind;
3) rope yarn is drawn through an iron wire in two blastholes, makes its both ends outside hole;
4) toward filling water in blasthole, and water level is kept before powder charge terminates;
5) hole outer portion one end a diameter of 32mm of adhesive tape colligation in traction rope yarn, length 20cm emulsion medicine Volume;Per blasthole 20 powder sticks of continuous colligation;Exerted oneself in the traction rope yarn other end, then powder stick is dragged in pre-buried blasthole, makes it Positioned at straight-tube portion;The detonator drawn from primer [cartridge] is extended to outside hole;Respectively 0.5m is blocked per blasthole both ends with sandstone.
6) detonate.
Embodiment 3
Certain reinforced column (abbreviation post) needs demolition blasting.Its size is high 6.5m, section length × a width of 0.6m × 0.6m。
The post demolition blasting step is:
1) length drilled out along post axis by the use of rig be 6.4m, a diameter of 36mm hole be opened on post as blasthole, blasthole Push up cross section.
2) blasthole opening is found, and is cleaned out with pressure wind;
3) toward filling water in blasthole, and water level is kept before powder charge terminates;
4) in piece primacord of rope made of hemp one end silk thread colligation and a diameter of 32mm, length 20cm breast that length is 7m Change Explosive roll;Powder stick, spacing 30cm, is then put into blasthole by the discontinuous colligation of powder stick, the traverse one in blasthole aperture Length is 60mm, a diameter of 50mm stub, by iron wire or rope yarn colligation on stub, explosive is suspended in hole;And it will lead Quick-fried rope is extended to outside hole.
5) detonate.
Embodiment 4
Certain reinforced column (abbreviation post) needs demolition blasting.Its size is high 20m, sectional dimension length × a width of 1.2m ×1.2m。
The post demolition blasting step is:
1) it is divided to two sections of arrangement blastholes, every section of 10m height;2 works of PVC plastic pipe that every section of arrangement overall length is 10m diameters 36mm For blasthole, pre-buried arrangement all parallel with post axis, two pipes are on a symmetry axis of post cross section and each into section The distance of the heart is 0.2m, plastic tube upper-end bent, bending radius 0.5m, 60 ° of angle of bend, the side being opened near capital On.
2) all blasthole openings are found, and are cleaned out with pressure wind;
3) toward filling water in blasthole, and water level is kept before powder charge terminates;
4) with piece primacord of silk thread colligation and a diameter of 32mm, length 20cm on rope made of hemp one end that length is 11m Emulsion explosive cartridge;Powder stick, spacing 20cm, is then put into blasthole by the discontinuous colligation of powder stick, in blasthole aperture traverse One root long degree is 60mm, a diameter of 60mm stub, by iron wire or rope yarn colligation on stub, explosive is suspended in hole;And Primacord is extended to outside hole;Then respectively 0.5m is blocked per blasthole upper end with sandstone;
5) detonate.

Claims (10)

  1. A kind of 1. method of reinforced beam water coupling demolition blasting, it is characterised in that comprise the following steps:
    1) both ends open blasthole is arranged in reinforced beam;Blasthole both ends to surface to or oblique direction bend up, be open In on the termination cross section of reinforced beam or on the side of reinforced beam;
    2) blasthole opening is found, and is cleaned out with pressure wind;
    3) traction rope yarn is used as through an iron wire or rope in blasthole, makes its both ends outside hole;
    4) toward filling water in blasthole, and water level is kept before powder charge terminates;
    5) the hole outer portion silk thread of rope yarn one end or adhesive tape colligation continuously or discontinuously Explosive roll are being drawn, is dragging pull rope The line other end, explosive is dragged in blasthole, and the detonator or detonator wire for making to draw from primer [cartridge] are extended to outside hole;
    6) detonate.
  2. 2. the method for reinforced beam water coupling demolition blasting according to claim 1, it is characterised in that:Step 5) another way:Drawing the hole outer portion silk thread of rope yarn one end or the discontinuous Explosive roll of adhesive tape colligation and leading quick-fried Rope, the dragging traction rope yarn other end, explosive is dragged in blasthole, and primacord is extended to outside hole.
  3. 3. the method for reinforced beam water coupling demolition blasting according to claim 1 or 2, it is characterised in that: Both ends open blasthole is along reinforced beam axis step-by-step arrangement in step 1).
  4. A kind of 4. method of reinforced column water coupling demolition blasting, it is characterised in that comprise the following steps:
    1) arrangement upper end open blasthole, blasthole upper-end bent in reinforced column, it is opened on the side of reinforced column On;
    2) blasthole opening is found, and is cleaned out with pressure wind;
    3) toward filling water in blasthole, and water level is kept before powder charge terminates;
    4) in one end silk thread or adhesive tape the colligation continuously or discontinuously Explosive roll of iron wire or rope, explosive is then put into big gun In hole, in blasthole aperture, the root long degree of traverse one is more than the stub of blasthole diameter, by iron wire or rope yarn colligation on stub, makes explosive It is suspended in hole;And the detonator or detonator wire drawn from primer [cartridge] are extended to outside hole;
    5) detonate.
  5. 5. the method for reinforced column water coupling demolition blasting according to claim 4, it is characterised in that:Step 4) another way:In iron wire or one end silk thread or the discontinuous Explosive roll of adhesive tape colligation and primacord of rope, then Explosive is put into blasthole, in blasthole aperture, the root long degree of traverse one is more than the stub of blasthole diameter, and iron wire or rope yarn colligation are existed On stub, explosive is set to be suspended in hole;And primacord is extended to outside hole.
  6. 6. the method for the reinforced column water coupling demolition blasting according to claim 4 or 5, it is characterised in that: Upper end open blasthole is arranged along reinforced column axial segmentation in step 1).
  7. 7. the method for reinforced beam water coupling demolition blasting according to claim 1, it is characterised in that:Toward big gun The water injected in hole is running water.
  8. 8. the method for reinforced column water coupling demolition blasting according to claim 4, it is characterised in that:Toward big gun The water injected in hole is running water.
  9. 9. the method for reinforced beam water coupling demolition blasting according to claim 1, it is characterised in that:Detonation It is preceding to block blasthole end with sandstone.
  10. 10. the method for reinforced column water coupling demolition blasting according to claim 4, it is characterised in that:Rise Before quick-fried blasthole end is blocked with sandstone.
CN201610116721.8A 2016-02-23 2016-02-23 Reinforced beam or post water coupling blasting demolishing method Active CN105571418B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610116721.8A CN105571418B (en) 2016-02-23 2016-02-23 Reinforced beam or post water coupling blasting demolishing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610116721.8A CN105571418B (en) 2016-02-23 2016-02-23 Reinforced beam or post water coupling blasting demolishing method

Publications (2)

Publication Number Publication Date
CN105571418A CN105571418A (en) 2016-05-11
CN105571418B true CN105571418B (en) 2018-01-16

Family

ID=55881827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610116721.8A Active CN105571418B (en) 2016-02-23 2016-02-23 Reinforced beam or post water coupling blasting demolishing method

Country Status (1)

Country Link
CN (1) CN105571418B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105823386B (en) * 2016-06-03 2017-06-09 武汉科技大学 The blasting demolishing method of reinforced concrete brace in a kind of foundation ditch
CN108952211A (en) * 2018-07-03 2018-12-07 中国人民解放军陆军工程大学 A kind of demolition blasting device of tubular steel column structure building
CN108915295A (en) * 2018-07-03 2018-11-30 中国人民解放军陆军工程大学 A kind of blasting demolishing method of tubular steel column structure building
CN108952212A (en) * 2018-07-04 2018-12-07 中国人民解放军陆军工程大学 A kind of device and blasting method for exempting to punch demolition blasting tubular steel column
CN110284674A (en) * 2019-06-11 2019-09-27 湖北工业大学 Reinforced concrete stairs embedded hole arrangement and the method for installing handrail and demolition blasting
CN112665474A (en) * 2020-12-22 2021-04-16 武汉***有限公司 Green construction process for horizontal concrete supporting structure
CN112857156B (en) * 2021-01-26 2022-05-17 宏大***工程集团有限责任公司 Environment-friendly dust suppression blasting method for surface mine and water hole charging blasting method
CN114184100B (en) * 2021-11-03 2023-07-18 湖北工业大学 Arrangement and use method of reinforced concrete floor slab embedded pipes under full-life design concept
CN114353609B (en) * 2021-12-21 2023-05-12 湖北工业大学 Structure and method for sectional charging in downward blast hole

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102706225A (en) * 2012-04-16 2012-10-03 广东宏大***股份有限公司 Loading method suitable for field mixed loading of explosive and tool used for method
CN102839610A (en) * 2012-09-17 2012-12-26 贵州新联***工程有限公司 Demolition blasting method for prestress concrete cantilever trussed arch bridge
CN103591860A (en) * 2013-11-29 2014-02-19 武汉大学 Water coupling gunpowder filling and ignition method for improving small-particle-size material content of rock-fill dam transition material
CN104790303A (en) * 2015-04-30 2015-07-22 青岛第一市政工程有限公司 Water-pressure blasting demolition technology for box bridge
CN104964623A (en) * 2015-07-01 2015-10-07 叶建军 Large-area or large-volume concrete pre-buried blast hole arrangement method and blasting demolition method
CN105091682A (en) * 2015-07-01 2015-11-25 叶建军 Axial pre-casting blast hole of reinforced concrete column and demolition blasting method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4201633B2 (en) * 2003-03-28 2008-12-24 三井住友建設株式会社 Blasting and dismantling method of reinforced concrete structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102706225A (en) * 2012-04-16 2012-10-03 广东宏大***股份有限公司 Loading method suitable for field mixed loading of explosive and tool used for method
CN102839610A (en) * 2012-09-17 2012-12-26 贵州新联***工程有限公司 Demolition blasting method for prestress concrete cantilever trussed arch bridge
CN103591860A (en) * 2013-11-29 2014-02-19 武汉大学 Water coupling gunpowder filling and ignition method for improving small-particle-size material content of rock-fill dam transition material
CN104790303A (en) * 2015-04-30 2015-07-22 青岛第一市政工程有限公司 Water-pressure blasting demolition technology for box bridge
CN104964623A (en) * 2015-07-01 2015-10-07 叶建军 Large-area or large-volume concrete pre-buried blast hole arrangement method and blasting demolition method
CN105091682A (en) * 2015-07-01 2015-11-25 叶建军 Axial pre-casting blast hole of reinforced concrete column and demolition blasting method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
水耦合钻孔***拆除钢筋混凝土薄壁水池;黎勇等;《***》;19991231;第16卷(第04期);107-108 *

Also Published As

Publication number Publication date
CN105571418A (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN105571418B (en) Reinforced beam or post water coupling blasting demolishing method
CN105823386B (en) The blasting demolishing method of reinforced concrete brace in a kind of foundation ditch
CN104964623B (en) Large-area or large-volume concrete pre-buried blast hole arrangement method and blasting demolition method
CN108759596B (en) Flexible energy-gathered blasting pipe cutting device and using method thereof
CN105091682B (en) The axial pre-buried big gun hole of reinforced column and demolition blasting method
CN110118084B (en) Ultra-deep shaft construction method
CN102927864A (en) Device and method for performing blasting processing for ore-pass high position blockage by balloon suspended explosive powders
CN105387777B (en) A kind of photoface exploision spaced loading joint-cutting pipe
RU2315223C1 (en) Flexible load-bearing polymeric pipe and method of its using
CN104929641A (en) Treatment method applied to disaster of steeply dipping seam roof
CN206111181U (en) Freeze novel steel sheet wall of a well structure of well
CN102817633A (en) Device for draining gas by deep hole crack control blasting and precracking method
CN102519323B (en) Pre-splitting blasting method for joint-cutting pipe
CN104234716B (en) The packed cofferdam method of mining by the way of filling
CN107724984A (en) A kind of method that the rate of oil and gas recovery is improved using pulsed shock wave
CN105423831A (en) Conical building superposition type in-situ control and detonating dismounting method
CN103776320B (en) Steel pipe for Pass blocks dredging imports blasting procedure
CN112729029A (en) Smooth blasting method for soft rock roadway
CN111521082A (en) One-time well completion method by matching high-pass shaft and medium-length hole sectional blasting in raise-boring construction
CN107270793B (en) It is a kind of for improving the beehive-shaped charge method of tunnel Smooth Blasting Effects
CN105240044B (en) A kind of method that utilization explosion prevents and treats coal and gas prominent
CN208456595U (en) A kind of toughness shaft wall structure under the high Explosive impact country rock of high pressure
CN102966376A (en) Vacuum negative pressure quick unwatering method for ore body
CN109139110B (en) Underground rock salt energy storage cavern is water-soluble to make chamber breakage-proof tubular column system
RU2375673C1 (en) Method of blasting foundations

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant