CN102839610A - Demolition blasting method for prestress concrete cantilever trussed arch bridge - Google Patents

Demolition blasting method for prestress concrete cantilever trussed arch bridge Download PDF

Info

Publication number
CN102839610A
CN102839610A CN2012103412269A CN201210341226A CN102839610A CN 102839610 A CN102839610 A CN 102839610A CN 2012103412269 A CN2012103412269 A CN 2012103412269A CN 201210341226 A CN201210341226 A CN 201210341226A CN 102839610 A CN102839610 A CN 102839610A
Authority
CN
China
Prior art keywords
bridge
blasting method
explosive
arch
stand columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103412269A
Other languages
Chinese (zh)
Inventor
池恩安
魏兴
赵明生
沈晓碧
刘庆
沈晓松
胡浩川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU XINLIAN EXPLOSIVE ENGINEERING Co Ltd
Guizhou Xinlian Blasting Engineering Group Co Ltd
Original Assignee
GUIZHOU XINLIAN EXPLOSIVE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU XINLIAN EXPLOSIVE ENGINEERING Co Ltd filed Critical GUIZHOU XINLIAN EXPLOSIVE ENGINEERING Co Ltd
Priority to CN2012103412269A priority Critical patent/CN102839610A/en
Publication of CN102839610A publication Critical patent/CN102839610A/en
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a demolition blasting method for a prestress concrete cantilever trussed arch bridge. The demolition blasting method comprises the following steps: an energy-gathering line cutting blasting method is adopted; firstly, all prestress anchor cable reinforcing steel bars and lower chord girder reinforcing steel bars in a main hole pin section on the main arch of the bridge are cut at the same time; the dose of the thread-loaded explosive of an energy-gathering explosive bag for cutting the pre-stress anchor cable reinforcing steel bars is 40g/cm; a multi-point water pressure blasting method is adopted for demolishing supporting stand columns and arch support stand columns on the piers of the bridge and a hollow body of an edge hole steel structure beam; water pressure explosive bag groups are arranged according to the required positions and heights of cutting openings based on the bridge collapse technology; and the arch top of the bridge and a solid body section between the two edge hole steel structure beams close to a bridge abutment are demolished by a drilling blasting method. By virtue of the above method, the steel structure beam, the arch support stand columns and the plier stand columns are completely demolished, the concrete is crashed and separated, and the bridge is collapsed in an unstable state.

Description

A kind of prestressed concrete cantilever truss arch bridge blasting demolishing method
Technical field
The present invention relates to the demolition blasting method of highway bridge, the particularly blasting demolishing method of prestressed concrete cantilever truss arch bridge.
Background technology
Prestressed concrete cantilever truss arch bridge is the new structure bridge that grows up the eighties in 20th century; The force-bearing situation of the full structure of this class formation bridge is superior to encircleing the purlin bridge; Have the big characteristics of span; Be one of main developing direction of Longspan Bridge, in recent years, needs such as widen and exist in a large number these type of structural bridges to remove owing to build water conservancy projects, highway.Traditional bridge demolition blasting is general to adopt single shallow blasting, hydraulic pressure demolition or cumulative cutting explosion to remove; But prestressed reinforced concrete cantilever truss arch bridge is a combining structure; Member is box structure mostly; Wall is thin, adopts simple boring or multiple spot hydraulic pressure demolition scheme can not realize design idea fully, adopts cumulative line cutting blasting scheme cost higher fully.
Summary of the invention
In order to improve defective and the deficiency in the above-mentioned prestressed concrete cantilever truss arch bridge demolition blasting process, passed through a large amount of engineering practices, the present invention proposes a kind of practical approach reasonable in design, easy and simple to handle.
The technical scheme that the present invention adopts: a kind of prestressed concrete cantilever truss arch bridge blasting demolishing method comprises following operating procedure:
(1) adopt cumulative line cutting blasting method, at first all prestress anchorage cable reinforcing bars on the bridge main arch and main aperture pin section lower edge purlin sheet reinforcing bar are cut off simultaneously, its wire-bound dose of cumulative cartridge bag that cuts off the prestress anchorage cable reinforcing bar is 40g/cm, selects the hexogen explosive for use;
(2) to the support post on the bridge pier of bridge and abut column and the lateral opening beam body employing multiple spot hydraulic pressure demolition method on an empty stomach of just having purchased; Control water coupling cartridge bag damage envelope by water filling height or length, required incision site, the height placement hydraulic pressure cartridge bag crowd of technical requirements of caving in by pontic; Multiple spot hydraulic pressure demolition dose can be by momentum criterion formulas Q=K δ 1.6R 1.4Calculate, select emulsion for use;
(3) adopt destroy a bridge vault and close on the real abdomen section between two lateral opening firm structure beams of abutment of drilling and blasting method, drilling depth is got 2/3 of the position thickness δ that bores; Adjacent two explosion distance between borehole a are: 30-40cm between adjacent two explosive holes apart from b is: 20-30cm, and the explosive consumption q of every cube of steel concrete gets 1.5kg/m3, and the explosive payload in every hole can be calculated by Q=qab δ, selects emulsion for use.
Adopt said method; Prestressed concrete cantilever truss arch bridge is under the comprehensive blast action that the explosion of cumulative linear incision, multiple spot hydraulic pressure demolition and drilling and blasting combine, and lateral opening firm structure beam, abut and pier column disintegrate fully, and cage is taken off in the concrete fragmentation; Pontic slump under instability status; Relying on deadweight to fall, secondly is to disintegrate to want fully to be beneficial to follow-up clear quarrel work.
The specific embodiment
It is domestic that Bijie naturalization bridge is positioned at naturalization village, Bijie City, Guizhou Province, is the important highway bridge on the expensive complete high-grade highway, was open to the traffic in 1994; Because unsound at bridge construction stage supervision mechanism, quality is not effectively guaranteed, has buried serious hidden danger of quality; And it is rapid when design, not expect economic development; Vehicle flowrate is very big, and overload, overrun vehicle is a lot, causes this bridge just to need demolition blasting less than the length of service.
(1) adopts cumulative line cutting blasting method; At first all prestress anchorage cable reinforcing bars on the bridge main arch and main aperture pin section lower edge purlin sheet reinforcing bar are cut off simultaneously; Its wire-bound dose of flexible linear-shaped charge bag that cuts off the prestress anchorage cable reinforcing bar is 40g/cm; Select the hexogen explosive for use, the huge tension basis that produces when avoiding main arch to cave in like this;
(2) to the support post on the bridge pier of bridge and abut column and the lateral opening beam body employing multiple spot hydraulic pressure demolition method on an empty stomach of just having purchased; Control water coupling cartridge bag damage envelope by water filling height or length, required incision site, the height placement hydraulic pressure cartridge bag crowd of technical requirements of caving in by pontic; Multiple spot hydraulic pressure demolition dose can be by momentum criterion formulas Q=K δ 1.6R 1.4Calculate, δ is the wall thickness of works in the formula; R is the internal diameter of works, is the half the of minor face for rectangular configuration; K is that coefficient gets 10, arranges that the number of plies of cartridge bag is arranged according to the height of required destruction, and the distance between every layer of blasting charge is 0.5m, selects emulsion for use;
(3) adopt destroy a bridge vault and close on the real abdomen section between two lateral opening firm structure beams of abutment of drilling and blasting method, drilling depth is got 2/3 of the position thickness δ that bores; Adjacent two explosion distance between borehole a are: 30-40cm between adjacent two explosive holes apart from b is: 20-30cm, and the explosive consumption q of every cube of steel concrete gets 1.5kg/m3, and the explosive payload in every hole can be calculated by Q=qab δ, selects emulsion for use.

Claims (1)

1. prestressed concrete cantilever truss arch bridge blasting demolishing method is characterized in that comprising following operating procedure:
(1) adopt cumulative line cutting blasting method, at first all prestress anchorage cable reinforcing bars on the bridge main arch and main aperture pin section lower edge purlin sheet reinforcing bar are cut off simultaneously, its wire-bound dose of cumulative cartridge bag that cuts off the prestress anchorage cable reinforcing bar is 40g/cm, selects the hexogen explosive for use;
(2) to the support post on the bridge pier of bridge and abut column and the lateral opening beam body employing multiple spot hydraulic pressure demolition method on an empty stomach of just having purchased; Control water coupling cartridge bag damage envelope by water filling height or length, required incision site, the height placement hydraulic pressure cartridge bag crowd of technical requirements of caving in by pontic; Multiple spot hydraulic pressure demolition dose can be by momentum criterion formulas Q=K δ 1.6R 1.4Calculate, select emulsion for use;
(3) adopt destroy a bridge vault and close on the real abdomen section between two lateral opening firm structure beams of abutment of drilling and blasting method, drilling depth is got 2/3 of the position thickness δ that bores; Adjacent two explosion distance between borehole a are: 30-40cm between adjacent two explosive holes apart from b is: 20-30cm, and the explosive consumption q of every cube of steel concrete gets 1.5kg/m3, and the explosive payload in every hole can be calculated by Q=qab δ, selects emulsion for use.
CN2012103412269A 2012-09-17 2012-09-17 Demolition blasting method for prestress concrete cantilever trussed arch bridge Pending CN102839610A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103412269A CN102839610A (en) 2012-09-17 2012-09-17 Demolition blasting method for prestress concrete cantilever trussed arch bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103412269A CN102839610A (en) 2012-09-17 2012-09-17 Demolition blasting method for prestress concrete cantilever trussed arch bridge

Publications (1)

Publication Number Publication Date
CN102839610A true CN102839610A (en) 2012-12-26

Family

ID=47367312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103412269A Pending CN102839610A (en) 2012-09-17 2012-09-17 Demolition blasting method for prestress concrete cantilever trussed arch bridge

Country Status (1)

Country Link
CN (1) CN102839610A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790303A (en) * 2015-04-30 2015-07-22 青岛第一市政工程有限公司 Water-pressure blasting demolition technology for box bridge
CN104930936A (en) * 2015-06-24 2015-09-23 中交一公局第五工程有限公司 Rapid controlled blasting demolition method for arch-shaped highway over-line bridge
CN105088979A (en) * 2015-09-04 2015-11-25 贵州新联***工程集团有限公司 Demolition blasting method for large bridge
CN105571418A (en) * 2016-02-23 2016-05-11 程大春 Water-coupled charging blasting demolition method for reinforced concrete beam or column
CN105648931A (en) * 2015-12-31 2016-06-08 中铁二局集团有限公司 Blasting method of separated type overpass
CN108583815A (en) * 2018-04-24 2018-09-28 西京学院 A kind of seabed vacuum pipe and lifesaving escaping method considering lifesaving escaping
CN108613602A (en) * 2018-04-25 2018-10-02 中铁四院集团岩土工程有限责任公司 A kind of blasting demolishing method of Structure in Complex Structure prestressed girder
CN109269367A (en) * 2018-10-19 2019-01-25 洛阳理工学院 It is a kind of to exempt from punching construction method for reinforced concrete frame structure demolition blasting
CN110984002A (en) * 2020-01-17 2020-04-10 广东冠粤路桥有限公司 Bridge deck auxiliary structure and method for dismantling cantilever box girder of main bridge T-shaped structure
CN111485569A (en) * 2020-04-24 2020-08-04 中交路桥建设有限公司 Method for removing temporary bearing platform in water by blasting method
CN111551088A (en) * 2020-05-12 2020-08-18 中钢集团武汉安全环保研究院有限公司 Accurate blasting demolition method for single-tower single-cable-plane prestressed cable-stayed bridge

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6279477B1 (en) * 1997-05-30 2001-08-28 Hitachi Zosen Corporation Destroying apparatus and method, and holding member for use in that method
JP2004293260A (en) * 2003-03-28 2004-10-21 Sumitomo Mitsui Construction Co Ltd Explosive demolition method for reinforced concrete structure
JP2005179924A (en) * 2003-12-16 2005-07-07 Sumitomo Mitsui Construction Co Ltd Method for blowing up and demolishing reinforced concrete structure
CN101265690A (en) * 2007-10-08 2008-09-17 中铁四局集团有限公司 Method for dismantling arch bridge for protection
CN101289835A (en) * 2008-06-16 2008-10-22 江西中煤建设工程有限公司 Process for rebuilding double arch bridge by replacing arch style construction on arch with continuous slabs
CN102644385A (en) * 2012-04-10 2012-08-22 中南大学 Device for blasting reinforced concrete structure by electromagnetic induction heating

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6279477B1 (en) * 1997-05-30 2001-08-28 Hitachi Zosen Corporation Destroying apparatus and method, and holding member for use in that method
JP2004293260A (en) * 2003-03-28 2004-10-21 Sumitomo Mitsui Construction Co Ltd Explosive demolition method for reinforced concrete structure
JP2005179924A (en) * 2003-12-16 2005-07-07 Sumitomo Mitsui Construction Co Ltd Method for blowing up and demolishing reinforced concrete structure
CN101265690A (en) * 2007-10-08 2008-09-17 中铁四局集团有限公司 Method for dismantling arch bridge for protection
CN101289835A (en) * 2008-06-16 2008-10-22 江西中煤建设工程有限公司 Process for rebuilding double arch bridge by replacing arch style construction on arch with continuous slabs
CN102644385A (en) * 2012-04-10 2012-08-22 中南大学 Device for blasting reinforced concrete structure by electromagnetic induction heating

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
池恩安: ""公路桥梁组合拆除***及数值模拟"", 《中国博士学位论文全文数据库•工程科技II辑》, no. 12, 15 December 2011 (2011-12-15) *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790303A (en) * 2015-04-30 2015-07-22 青岛第一市政工程有限公司 Water-pressure blasting demolition technology for box bridge
CN104930936B (en) * 2015-06-24 2016-05-04 中交一公局第五工程有限公司 Highway arch form line bridge controlled blasting fast dismantling eliminating method
CN104930936A (en) * 2015-06-24 2015-09-23 中交一公局第五工程有限公司 Rapid controlled blasting demolition method for arch-shaped highway over-line bridge
CN105088979B (en) * 2015-09-04 2017-03-22 贵州新联***工程集团有限公司 Demolition blasting method for large bridge
CN105088979A (en) * 2015-09-04 2015-11-25 贵州新联***工程集团有限公司 Demolition blasting method for large bridge
CN105648931A (en) * 2015-12-31 2016-06-08 中铁二局集团有限公司 Blasting method of separated type overpass
CN105571418A (en) * 2016-02-23 2016-05-11 程大春 Water-coupled charging blasting demolition method for reinforced concrete beam or column
CN105571418B (en) * 2016-02-23 2018-01-16 程大春 Reinforced beam or post water coupling blasting demolishing method
CN108583815A (en) * 2018-04-24 2018-09-28 西京学院 A kind of seabed vacuum pipe and lifesaving escaping method considering lifesaving escaping
CN108613602A (en) * 2018-04-25 2018-10-02 中铁四院集团岩土工程有限责任公司 A kind of blasting demolishing method of Structure in Complex Structure prestressed girder
CN109269367A (en) * 2018-10-19 2019-01-25 洛阳理工学院 It is a kind of to exempt from punching construction method for reinforced concrete frame structure demolition blasting
CN109269367B (en) * 2018-10-19 2020-06-05 洛阳理工学院 Punching-free construction method for blasting demolition of reinforced concrete frame structure
CN110984002A (en) * 2020-01-17 2020-04-10 广东冠粤路桥有限公司 Bridge deck auxiliary structure and method for dismantling cantilever box girder of main bridge T-shaped structure
CN111485569A (en) * 2020-04-24 2020-08-04 中交路桥建设有限公司 Method for removing temporary bearing platform in water by blasting method
CN111551088A (en) * 2020-05-12 2020-08-18 中钢集团武汉安全环保研究院有限公司 Accurate blasting demolition method for single-tower single-cable-plane prestressed cable-stayed bridge

Similar Documents

Publication Publication Date Title
CN102839610A (en) Demolition blasting method for prestress concrete cantilever trussed arch bridge
CN100465386C (en) Pile-anchor foundation ditch supporting construction method
CN1333144C (en) Directioning falling and detaching method for chimney-like building
CN109115064B (en) Large-aperture efficient static blasting auxiliary orientation device and static blasting construction method thereof
CN103233476B (en) Deep foundation pit supporting structure as well as construction method and demolishing method thereof
CN110258315A (en) Antidetonation bridge and its method of construction across active breaking belt
CN102031782A (en) Layered inclined hole blast construction method for multilayer complex quicksand foundation
CN110566236B (en) Combined supporting device and supporting method for pipe shed and steel support
Loizeaux et al. Progressive collapse—an implosion contractor’s stock in trade
CN107328322A (en) Cable-stayed type truss bridge blasting method is held under one kind
CN103485348B (en) Anti-side pier body combined type building enclosure in a wide range of excavation of foundation pit
CN108798720B (en) Anchor grid integrated arch foot reinforcement system for underground engineering arch cover method and construction method thereof
CN203429640U (en) Enclosure structure for large-range underground engineering foundation pit excavation project
Tobriner A history of reinforced masonry construction designed to resist earthquakes: 1755-1907
CN111854549B (en) Blasting excavation system for large-scale rock foundation pit and construction method
CN109236294B (en) Environment-friendly anti-collapse mining method
RU2693210C2 (en) Method of arrangement of enclosures from secant bored piles
San Bartolomé et al. Seismic behaviour of masonry constructions in 2007 Pisco, Peru earthquake
CN111733813A (en) One-column one-pile manual and mechanical dry operation combined hole forming construction method
Medlock et al. Innovative prefabrication in Texas bridges
YUASA The Transition of Demolition Techniques for Reinforced Concrete Structure in Japan
CN213867778U (en) Novel underground pile foundation
CN111551088B (en) Accurate blasting demolition method for single-tower single-cable-plane prestressed cable-stayed bridge
Fabian Study on the performances of composite steel concrete structural shear walls under lateral loads
CN108731564B (en) Method for blasting demolishing angle steel structure of precast concrete split module

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121226