CN105544405A - 一种桥梁墩顶块采用浮吊架设安装的施工方法 - Google Patents

一种桥梁墩顶块采用浮吊架设安装的施工方法 Download PDF

Info

Publication number
CN105544405A
CN105544405A CN201610047622.9A CN201610047622A CN105544405A CN 105544405 A CN105544405 A CN 105544405A CN 201610047622 A CN201610047622 A CN 201610047622A CN 105544405 A CN105544405 A CN 105544405A
Authority
CN
China
Prior art keywords
pier
jacking block
erection
top block
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610047622.9A
Other languages
English (en)
Inventor
毛奎
文德安
朱晓明
吴凯军
莫先琳
赵军科
田新平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB First Engineering Co Ltd
Original Assignee
CCCC SHB First Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB First Engineering Co Ltd filed Critical CCCC SHB First Engineering Co Ltd
Priority to CN201610047622.9A priority Critical patent/CN105544405A/zh
Publication of CN105544405A publication Critical patent/CN105544405A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种桥梁墩顶块采用浮吊架设安装的施工方法,先在墩身顶部安装永久支座,墩身侧部架设临时支座,临时支座顶面设置有三向调整千斤顶;再采用浮吊起吊墩顶块至墩身顶部上方,操纵三向调整千斤顶,完成墩顶块定位;在临时支座上设置螺旋式千斤顶,并拆除浮吊用具;最后在墩顶块底部与永久支座之间的调平层进行灌注填实;强度达到要求后,拆除三向调整千斤顶和螺旋式千斤顶即可。本发明采用浮吊方式先架设墩顶块,施工完后在墩顶块上锚固分配梁,架桥机再过孔,既减少了安装牛腿预留支栈桥的麻烦,减少了成本投入,又保证了墩顶块架设的安全,还加快了桥机的架设速度,以提高墩顶块架设的安全性和稳定性。

Description

一种桥梁墩顶块采用浮吊架设安装的施工方法
技术领域
本发明涉及桥梁架设施工技术领域,具体地指一种桥梁墩顶块采用浮吊架设安装的施工方法。
背景技术
目前,节段拼装步履式架桥机的架梁作业方式是,将需要架设的箱形混凝土梁块预先在制梁场分节段预制好,然后用运梁车运到已在桥孔位置上支立好的架桥机后端喂梁,架桥机上的吊梁天车将先后依次运来的预制梁节段逐一有序地悬挂排列在架桥机已与桥孔对好位的主梁下方,最后把各梁段拼装成整体梁片。
而架桥机的横梁支腿通常由墩身顶部的墩顶块进行支撑,因此,墩顶块的施工是影响后续梁段施工进度的关键因素,在桥梁工程中,传统的墩顶块架设方式为:采用架桥机吊装墩顶块,架桥机前支腿作用在搭设在墩身上的三角桁架上。这种架设方式的优点是:采用架桥机架设墩顶块,节约了成本,缺点是:需预留支栈桥安装三角桁架,后期修补墩身,墩顶块架设安装完后,再进行墩顶块混凝土的浇筑,模板拆除,墩顶临时预应力施工等,时间紧张,强度未能达到100%就受到架桥机前支腿的作用,质量和速度得不到保证,且架桥安装施工时风险较大。
发明内容
本发明的目的就是要解决上述背景技术的不足,提供一种桥梁墩顶块采用浮吊架设安装的施工方法,它既可保证墩顶块架设安全,又可达到加快架桥机架设速度的目的。
本发明的技术方案为:一种桥梁墩顶块采用浮吊架设安装的施工方法,其特征在于,包括以下步骤:
1)在墩身顶部安装永久支座,在墩身侧部架设临时支座,在临时支座顶面设置有若干个三向调整千斤顶;
2)采用浮吊起吊墩顶块至墩身顶部上方,此时,墩顶块底部由三向调整千斤顶支撑,墩顶块底部与永久支座之间为调平层;
3)操纵三向调整千斤顶,完成墩顶块定位;
4)在临时支座上设置若干个螺旋式千斤顶,使墩顶块由三向调整千斤顶和螺旋式千斤顶进行支撑,同时,拆除浮吊用具;
5)对墩顶块底部与永久支座之间的调平层进行灌注填实;
6)调平层强度达到要求后,拆除三向调整千斤顶和螺旋式千斤顶。
进一步地,所述永久支座为呈凹字形并由混凝土浇筑而成的凸起,所述凸起朝向临时支座的侧部设置有止口。
进一步地,所述临时支座呈门型,包括两侧支撑柱和将所述支撑柱顶部连接的撑板,所述撑板的顶面与所述墩身顶部齐平。
本发明改进了传统墩顶块的架设方式,采用浮吊方式先架设墩顶块,施工完后在墩顶块上锚固分配梁,架桥机再过孔,这样既减少了安装牛腿预留支栈桥的麻烦,减少了成本投入,又保证了墩顶块架设的安全,还加快了桥机的架设速度,以提高墩顶块架设的安全性和稳定性。
附图说明
图1为本发明中墩顶块采用浮吊时的吊装示意图;
图2为本发明中墩顶块在墩身顶部调位时的示意图。
具体实施方式
下面结合附图和具体实施例对本发明作进一步的详细说明。
本实施例公开的一种桥梁墩顶块采用浮吊架设安装的施工方法,是针对背景技术中采用架桥机吊装墩顶块的不足进行改进的,它包括以下步骤:
1)在墩身1顶部安装永久支座2,在墩身1侧部架设临时支座3,在临时支座3顶面设置有若干个三向调整千斤顶4;
2)参考图1,先采用浮吊起吊墩顶块5至墩身1顶部上方,此时,墩顶块5的纵、横轴线与墩顶上的纵、横轴线目视大致对齐,墩顶块5底部由三向调整千斤顶4支撑,墩顶块5底部与永久支座2之间为调平层;墩顶块5主要由浮吊承重,三向调整千斤顶4辅助受力;
3)操纵三向调整千斤顶4,通过目视,使墩顶块5轴线与墩顶1安装控制线对齐与否进行梁段粗调就位;随后,测量墩顶块5顶面坐标控制点,计算出墩顶块5调整数据;再根据测量数据启动三向调整千斤顶,完成墩顶块5精确定位;
4)在临时支座3上设置若干个螺旋式千斤顶,使墩顶块5由三向调整千斤顶4和螺旋式千斤顶进行共同支撑,此时,墩顶块5由螺旋式千斤顶主要承重,三向调整千斤顶4辅助受力;与此同时,将浮吊用具拆除;
5)在墩顶块5底部与永久支座2之间的调平层进行灌注填实,使二者固定为一体;
6)调平层强度达到要求后,拆除三向调整千斤顶4和螺旋式千斤顶6即可。
本实施例的永久支座2为呈凹字形并由混凝土浇筑而成的凸起,该凸起朝向临时支座的侧部设置有止口2.1,当墩顶块5底部与永久支座2之间的调平层被灌注填实后,可以对墩顶块5进行限位。
本实施例的临时支座3呈门型,包括两侧支撑柱3.1和将支撑柱3.1顶部连接的撑板3.2,撑板3.2的顶面与墩身1顶部齐平。
本发明改进了传统墩顶块的架设方式,采用浮吊方式先架设墩顶块5,施工完成后在墩顶块5上锚固分配梁,架桥机再过孔,这样既减少了安装牛腿预留支栈桥的麻烦,减少了成本投入,又保证了墩顶块架设的安全,还加快了桥机的架设速度,以提高墩顶块架设的安全性和稳定性。
以上所述,仅是本发明的较佳实施例而已,并非对本发明的结构做任何形式上的限制。凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明的技术方案的范围内。

Claims (3)

1.一种桥梁墩顶块采用浮吊架设安装的施工方法,其特征在于,包括以下步骤:
1)在墩身顶部安装永久支座,在墩身侧部架设临时支座,在临时支座顶面设置有若干个三向调整千斤顶;
2)采用浮吊起吊墩顶块至墩身顶部上方,此时,墩顶块底部由三向调整千斤顶支撑,墩顶块底部与永久支座之间为调平层;
3)操纵三向调整千斤顶,完成墩顶块定位;
4)在临时支座上设置若干个螺旋式千斤顶,使墩顶块由三向调整千斤顶和螺旋式千斤顶进行支撑,同时,拆除浮吊用具;
5)对墩顶块底部与永久支座之间的调平层进行灌注填实;
6)调平层强度达到要求后,拆除三向调整千斤顶和螺旋式千斤顶。
2.根据权利要求1所述的一种桥梁墩顶块采用浮吊架设安装的施工方法,其特征在于:所述永久支座为呈凹字形并由混凝土浇筑而成的凸起,所述凸起朝向临时支座的侧部设置有止口。
3.根据权利要求1或2所述的一种桥梁墩顶块采用浮吊架设安装的施工方法,其特征在于:所述临时支座呈门型,包括两侧支撑柱和将所述支撑柱顶部连接的撑板,所述撑板的顶面与所述墩身顶部齐平。
CN201610047622.9A 2016-01-25 2016-01-25 一种桥梁墩顶块采用浮吊架设安装的施工方法 Pending CN105544405A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610047622.9A CN105544405A (zh) 2016-01-25 2016-01-25 一种桥梁墩顶块采用浮吊架设安装的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610047622.9A CN105544405A (zh) 2016-01-25 2016-01-25 一种桥梁墩顶块采用浮吊架设安装的施工方法

Publications (1)

Publication Number Publication Date
CN105544405A true CN105544405A (zh) 2016-05-04

Family

ID=55823936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610047622.9A Pending CN105544405A (zh) 2016-01-25 2016-01-25 一种桥梁墩顶块采用浮吊架设安装的施工方法

Country Status (1)

Country Link
CN (1) CN105544405A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476191A (zh) * 2017-07-17 2017-12-15 中交二航局第二工程有限公司 短线匹配法安装墩顶箱梁的临时锚固方法
CN113073555A (zh) * 2021-03-19 2021-07-06 中铁大桥局集团第四工程有限公司 一种墩顶块定位***及其施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134832A (zh) * 2011-01-18 2011-07-27 中铁大桥局集团第五工程有限公司 活动支架辅助不变幅架梁吊机架设钢箱梁方法及活动支架
CN102535343A (zh) * 2012-02-02 2012-07-04 中铁大桥局股份有限公司 钢桁梁斜拉桥主塔墩顶钢梁架设方法
CN103194981A (zh) * 2013-04-02 2013-07-10 中铁大桥局股份有限公司 桥梁钢塔海上竖转施工***及方法
US8522381B1 (en) * 2010-09-07 2013-09-03 OCCI, Inc. System and method for bridge pier replacement
WO2014200443A1 (en) * 2013-06-11 2014-12-18 Nrs Consulting Co., Ltd. Self-launching movable scaffolding system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8522381B1 (en) * 2010-09-07 2013-09-03 OCCI, Inc. System and method for bridge pier replacement
CN102134832A (zh) * 2011-01-18 2011-07-27 中铁大桥局集团第五工程有限公司 活动支架辅助不变幅架梁吊机架设钢箱梁方法及活动支架
CN102535343A (zh) * 2012-02-02 2012-07-04 中铁大桥局股份有限公司 钢桁梁斜拉桥主塔墩顶钢梁架设方法
CN103194981A (zh) * 2013-04-02 2013-07-10 中铁大桥局股份有限公司 桥梁钢塔海上竖转施工***及方法
WO2014200443A1 (en) * 2013-06-11 2014-12-18 Nrs Consulting Co., Ltd. Self-launching movable scaffolding system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
林金华,夏祺: "墩顶梁段安装施工技术", 《福建建筑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476191A (zh) * 2017-07-17 2017-12-15 中交二航局第二工程有限公司 短线匹配法安装墩顶箱梁的临时锚固方法
CN107476191B (zh) * 2017-07-17 2018-10-23 中交二航局第二工程有限公司 短线匹配法安装墩顶箱梁的临时锚固方法
CN113073555A (zh) * 2021-03-19 2021-07-06 中铁大桥局集团第四工程有限公司 一种墩顶块定位***及其施工方法

Similar Documents

Publication Publication Date Title
CN103741604B (zh) 全预制装配式钢筋混凝土桥梁拼装结构及其连接方法
CN103912010A (zh) 明挖预制装配式地下结构施工方法
CN102587659A (zh) 一种以混凝土柱支顶后浇带两侧结构的施工方法
JP2008274586A (ja) 柱頭部の施工方法
CN103470272A (zh) 一种用于矿山法多种断面混凝土施工的台车及其施工方法
KR20150051503A (ko) 프리캐스트 교각의 조정단 구조 및 이를 이용한 프리캐스트 교각의 시공방법
CN111119071A (zh) 混凝土预制节段箱梁拼装施工方法
CN107237350A (zh) 预制装配式地下通道结构的顶推纠偏换撑***及方法
CN106939553A (zh) 一种钢桥面和钢箱拱肋安装方法
CN102535353A (zh) 轨道交通跨高速公路、铁路箱梁转体施工方法
CN110042863A (zh) 全复合装配式地铁车站地下墙与预制中板节点及施工方法
CN111236089A (zh) 现有桥梁上部结构不均匀顶升***及不均匀顶升施工方法
CN203499697U (zh) 一种用于矿山法多种断面混凝土施工的台车
CN105544405A (zh) 一种桥梁墩顶块采用浮吊架设安装的施工方法
CN104989422B (zh) 一种隧道用半预制速成中隔墙施工工艺
CN110158951A (zh) 一种框架结构全木质模板施工方法
CN104110002A (zh) 一种更换钢桁梁桥桥面板的方法
CN212656260U (zh) 一种地下车站装配式轨顶风道结构
CN205604075U (zh) 一种桥梁墩顶块采用浮吊架设的安装结构
CN107988913A (zh) 一种桥梁双层箱梁上层模板拆除方法
CN104948202B (zh) 一种隧道中隔墙速成拼装预制构件
CN114482607B (zh) 钢筋砼筒仓内壁加装钢板层的施工方法
CN113294175B (zh) 一种隧道二衬结构的施工方法及隧道二衬结构
CN103132494A (zh) 预埋锚锥精确定位方法
CN211872669U (zh) 现有桥梁上部结构不均匀顶升***

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160504

RJ01 Rejection of invention patent application after publication