CN105484782A - Anchor rod for achieving high-prestress total-length anchoring through double-fluid grouting cartridges and use method of anchor rod - Google Patents

Anchor rod for achieving high-prestress total-length anchoring through double-fluid grouting cartridges and use method of anchor rod Download PDF

Info

Publication number
CN105484782A
CN105484782A CN201610015031.3A CN201610015031A CN105484782A CN 105484782 A CN105484782 A CN 105484782A CN 201610015031 A CN201610015031 A CN 201610015031A CN 105484782 A CN105484782 A CN 105484782A
Authority
CN
China
Prior art keywords
powder stick
slip casting
casting powder
grouting
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610015031.3A
Other languages
Chinese (zh)
Other versions
CN105484782B (en
Inventor
王文
程志斌
王伸
杨洁
顾合龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201610015031.3A priority Critical patent/CN105484782B/en
Publication of CN105484782A publication Critical patent/CN105484782A/en
Application granted granted Critical
Publication of CN105484782B publication Critical patent/CN105484782B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/021Grouting with inorganic components, e.g. cement
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/025Grouting with organic components, e.g. resin

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Chemical & Material Sciences (AREA)
  • Inorganic Chemistry (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides an anchor rod for achieving high-prestress total-length anchoring through double-fluid grouting cartridges and a use method of the anchor rod. The grouting cartridge A and the grouting cartridge B are both in a hollow barrel shape and penetrate through the middle of a rod body. The end, close to the grouting cartridge B, of the rod body smashes a resin cartridge at the bottom of a drill hole for end anchoring, the end, away from the grouting cartridge A, of the grouting cartridge B is provided with a fixed blocking piece, the end, away from the grouting cartridge B, of the grouting cartridge A is provided with a movable blocking piece, the end, close to the grouting cartridge A, of the rod body is provided with a nut, a supporting plate is arranged on the side face of the nut, a rubber tapered wedge is arranged on the portion, close to the supporting plate, of the rod body, and through fine rebars are arranged on the supporting plate and connected to the movable blocking piece in a pushed and pressed mode. High-prestress total-length anchoring is achieved through the double-fluid grouting cartridges, the use method is simple, cost is low, the workload is low, and the change of the construction technology is small.

Description

A kind of utilize two fluid grouting powder stick to realize high pre-stress full length fastening anchor pole and using method
Technical field
The present invention relates to mine roadway support technical field, particularly relate to and utilize two fluid grouting powder stick to realize high pre-stress full length fastening anchor field.
Background technology
Colliery tunnel support technology is the key technology in coal mining.Keep adjoining rock stability, controlling roadway deformation and destroying is the necessary condition realizing mine safety, High-efficient Production.Along with mine develops both in depth and in breadth, roadway support issues shows more and more outstanding.BOLTING TECHNOLOGY TO COAL ROADWAY development in recent years rapidly, has become the supporting technology that mine realizes high-yield and high-efficiency indispensability.
The current anchorage style of bolt support has the anchorage styles such as end anchor, the extensible bolting and full length fastening, and in order to improve supporting effect, reduce the tunnel absciss layer at initial stage, distortion, great majority end anchor and the extensible bolting anchor pole all apply pretightning force.Bolt, due to complicated construction technique, applies pretightning force difficulty large, does not generally add pretightning force, can not realize full-length prestress anchoring.
The prestressing force full length fastening of current common bolt generally adopts two kinds of forms.One adopts fast slow hardening resin explosive roll to realize, but in actual applications, when aperture than time constant due to the spherical conglomeration of easy formation under anchor pole pushing tow rotates of powder stick skin, direct obstruction anchor pole advances, cause rockbolt installation not in place, therefore often adopt increase bore diameter mode to solve, but there is again the problems such as aperture is mated than not, and bond effect is undesirable.Another is that anchor pole uses resin explosive roll to fix, and non-strength of holing knot section adopts large drill sleeve hole, and along anchor rod body arranging exhaust air pipe, rockbolt installation grouting plug, after rockbolt installation completes, slip casting completes prestressing force full length fastening.
Large based on current prestressing force full length fastening technology difficulty of construction, the problems such as construction technology is complicated, the invention provides provides that a kind of method is simple, cost is low, workload is little and construction technology changes little prestressing force Bolt and supporting method.
Summary of the invention
The object of the invention is to overcome above-mentioned deficiency of the prior art, provide a kind of utilize two fluid grouting powder stick to realize high pre-stress full length fastening anchor pole and using method, the following technical scheme of concrete employing: a kind of anchor pole realizing high pre-stress full length fastening, it comprises the body of rod, supporting plate, rubber slanting wedge, slip casting powder stick A, slip casting powder stick B, resin explosive roll, fine steel rib, nut, active blade and fixing catch, it is characterized in that, described slip casting powder stick A, slip casting powder stick B is hollow tubular, described slip casting powder stick A and slip casting powder stick B is located in the middle part of the body of rod, end anchorage is carried out with the resin explosive roll smashing up foot of hole in one end of the close described slip casting powder stick B of the described body of rod, one end away from described slip casting powder stick A of described slip casting powder stick B is provided with fixing catch, one end away from described slip casting powder stick B of described slip casting powder stick A is provided with active blade, one end of the close described slip casting powder stick A of the described body of rod is provided with nut, described nut side is provided with supporting plate, rubber slanting wedge is provided with on the body of rod of described supporting plate, described supporting plate is provided with the fine steel rib run through, described fine steel rib pushing is connected on described active blade.
Further, as preferably, the structure of described fine steel rib must guarantee pushes on movable catch thus crush slip casting powder stick A and B, until active blade to be pushed into fixing catch place.
Further, as preferably, the diameter of the described body of rod is less than the diameter of described boring.
Further, as preferably, the diameter 30mm of described boring, hole depth is 1700mm.
Further, as preferably, the termination of described fine steel rib is provided with primary nut, described primary nut is provided with grouting elastic tape.
In addition, present invention also offers the using method that a kind of anchor pole realizing high pre-stress full length fastening carries out anchoring, it is characterized in that, it comprises the following steps:
A. utilize jumbolter to hole, after boring, hole is clearly carried out to it;
B. resin explosive roll is mounted to foot of hole;
C. insert and be equipped with the anchor rod body of hollow tubular slip casting powder stick A and slip casting powder stick B, and smash up resin explosive roll and carry out end anchorage, and apply comparatively high pretightening force;
D. promote fine steel rib make its pushes on movable catch thus crush slip casting powder stick A and slip casting powder stick B, until active blade to be pushed into fixing catch place, and play the effect to slurry agitation in slip casting powder stick A and slip casting powder stick B, make its quick solidification;
E. screw the primary nut of fine steel rib end with grouting elastic tape, and complete the installation of anchor pole.
Further, as preferably, in described step (a), the diameter of described boring is 30mm, and hole depth is 1700mm.
Beneficial effect of the present invention is:
The present invention utilizes two fluid grouting powder stick to achieve high pre-stress full length fastening, and it uses, and method is simple, cost is low, workload is little and construction technology change is little.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of anchor pole before anchoring realizing high pre-stress full length fastening of the present invention;
Fig. 2 is a kind of structural representation of anchor pole after smashing up resin explosive roll realizing high pre-stress full length fastening of the present invention;
Fig. 3 is a kind of structural representation of anchor pole after anchoring completes realizing high pre-stress full length fastening of the present invention;
Fig. 4 is a kind of structure for amplifying schematic diagram realizing the end of the anchor pole of high pre-stress full length fastening of the present invention; .
Wherein, 1-supporting plate 2-rubber slanting wedge 3-slip casting powder stick A4-slip casting powder stick B5-body of rod 6-boring 7-resin explosive roll 8-fine steel rib 9-nut 10-active blade 11-fixes catch 12-mixing rear slurry.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
As Figure 1-4, the invention provides a kind of anchor pole realizing high pre-stress full length fastening, it comprises the body of rod 5, supporting plate 1, rubber slanting wedge 2, slip casting powder stick A3, slip casting powder stick B4, resin explosive roll 7, fine steel rib 8, nut 9, active blade 10 and fixing catch 11, it is characterized in that, described slip casting powder stick A3, slip casting powder stick B4 is hollow tubular, described slip casting powder stick A3 and slip casting powder stick B4 is located in the middle part of the body of rod 5, end anchorage is carried out with the resin explosive roll 7 smashed up bottom boring 6 in one end of the close described slip casting powder stick B4 of the described body of rod 5, one end away from described slip casting powder stick A3 of described slip casting powder stick B7 is provided with fixing catch 11, one end away from described slip casting powder stick B4 of described slip casting powder stick A3 is provided with active blade 10, one end of the close described slip casting powder stick A of the described body of rod 5 is provided with nut 9, described nut 9 side is provided with supporting plate 1, rubber slanting wedge 2 is provided with on the body of rod 5 of described supporting plate 1, described supporting plate 1 is provided with the fine steel rib 8 run through, described fine steel rib 8 pushing is connected on described active blade 10.
In the present embodiment, the structure of described fine steel rib 8 must guarantee pushes on movable catch 10 thus crush slip casting powder stick A and slip casting powder stick B, until active blade 10 to be pushed into fixing catch 11 place.The diameter of the described body of rod is less than the diameter of described boring.The diameter 30mm of described boring, hole depth is 1700mm.
In addition, the termination of described fine steel rib 8 is provided with primary nut, described primary nut is provided with grouting elastic tape.
In addition, present invention also offers the using method that a kind of anchor pole realizing high pre-stress full length fastening carries out anchoring, it is characterized in that, it comprises the following steps:
A. utilize jumbolter to carry out boring 6, after boring, hole is clearly carried out to it;
B. resin explosive roll 7 is mounted to bottom boring 6;
C. insert and be equipped with the anchor rod body 5 of hollow tubular slip casting powder stick A3 and slip casting powder stick B4, and smash up resin explosive roll 7 and carry out end anchorage, and apply comparatively high pretightening force;
D. promote fine steel rib 8 make its pushes on movable catch thus crush slip casting powder stick A3 and slip casting powder stick B4, until active blade 10 to be pushed into fixing catch 11 place, and play the effect to slurry agitation in slip casting powder stick A3 and slip casting powder stick B4, make its quick solidification;
E. screw the primary nut of fine steel rib 8 end with grouting elastic tape, and complete the installation of anchor pole.
Further, as preferably, in described step (a), the diameter of described boring is 30mm, and hole depth is 1700mm.
The present invention utilizes two fluid grouting powder stick to achieve high pre-stress full length fastening, and it uses, and method is simple, cost is low, workload is little and construction technology change is little.
Although illustrate and describe embodiments of the invention, for the ordinary skill in the art, be appreciated that and can carry out multiple change, amendment, replacement and modification to these embodiments without departing from the principles and spirit of the present invention, scope of the present invention is by claims and equivalents thereof.

Claims (7)

1. one kind realizes the anchor pole of high pre-stress full length fastening, it comprises the body of rod, supporting plate, rubber slanting wedge, slip casting powder stick A, slip casting powder stick B, resin explosive roll, fine steel rib, nut, active blade and fixing catch, it is characterized in that, described slip casting powder stick A, slip casting powder stick B is hollow tubular, described slip casting powder stick A and slip casting powder stick B is located in the middle part of the body of rod, end anchorage is carried out with the resin explosive roll smashing up foot of hole in one end of the close described slip casting powder stick B of the described body of rod, one end away from described slip casting powder stick A of described slip casting powder stick B is provided with fixing catch, one end away from described slip casting powder stick B of described slip casting powder stick A is provided with active blade, one end of the close described slip casting powder stick A of the described body of rod is provided with nut, described nut side is provided with supporting plate, rubber slanting wedge is provided with on the body of rod of described supporting plate, described supporting plate is provided with the fine steel rib run through, described fine steel rib pushing is connected on described active blade.
2. a kind of anchor pole realizing high pre-stress full length fastening according to claim 1, it is characterized in that, the structure of described fine steel rib must guarantee pushes on movable catch thus crush slip casting powder stick A and slip casting powder stick B, until active blade to be pushed into fixing catch place.
3. according to claim 1 a kind of utilize two fluid grouting powder stick to realize high pre-stress full length fastening anchor pole and using method, it is characterized in that, the diameter of the described body of rod is less than the diameter of described boring.
4. according to claim 1 a kind of utilize two fluid grouting powder stick to realize high pre-stress full length fastening anchor pole and using method, it is characterized in that, the diameter 30mm of described boring, hole depth is 1700mm.
5. according to claim 1 a kind of utilize two fluid grouting powder stick to realize high pre-stress full length fastening anchor pole and using method, it is characterized in that, the termination of described fine steel rib is provided with primary nut, described primary nut is provided with grouting elastic tape.
6. utilize a kind of anchor pole realizing high pre-stress full length fastening described in claim 1-5 any one to carry out the using method of anchoring, it is characterized in that, it comprises the following steps:
A. utilize jumbolter to hole, after boring, hole is clearly carried out to it;
B. resin explosive roll is mounted to foot of hole;
C. insert and be equipped with the anchor rod body of hollow tubular slip casting powder stick A and slip casting powder stick B, and smash up resin explosive roll and carry out end anchorage, and apply comparatively high pretightening force;
D. promote fine steel rib make its pushes on movable catch thus crush slip casting powder stick A and slip casting powder stick B, until active blade to be pushed into fixing catch place, and play the effect to slurry agitation in slip casting powder stick A and slip casting powder stick B, make its quick solidification;
E. screw the primary nut of fine steel rib end with grouting elastic tape, and complete the installation of anchor pole.
7. a kind of anchor pole realizing high pre-stress full length fastening according to claim 6 carries out the using method of anchoring, it is characterized in that, in described step (a), the diameter of described boring is 30mm, and hole depth is 1700mm.
CN201610015031.3A 2016-01-08 2016-01-08 A kind of anchor pole and its application method for realizing high pre-stress full length fastening Expired - Fee Related CN105484782B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610015031.3A CN105484782B (en) 2016-01-08 2016-01-08 A kind of anchor pole and its application method for realizing high pre-stress full length fastening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610015031.3A CN105484782B (en) 2016-01-08 2016-01-08 A kind of anchor pole and its application method for realizing high pre-stress full length fastening

Publications (2)

Publication Number Publication Date
CN105484782A true CN105484782A (en) 2016-04-13
CN105484782B CN105484782B (en) 2018-01-30

Family

ID=55672027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610015031.3A Expired - Fee Related CN105484782B (en) 2016-01-08 2016-01-08 A kind of anchor pole and its application method for realizing high pre-stress full length fastening

Country Status (1)

Country Link
CN (1) CN105484782B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640160A (en) * 2016-10-24 2017-05-10 河南理工大学 Left-handed longitudinal-bar-free full-length high-prestress anchor rod and construction technique thereof
CN112095664A (en) * 2020-09-18 2020-12-18 中铁隧道集团一处有限公司 Prestressed full-length anchoring mortar anchor rod for underground cave depot and rapid anchoring tensioning method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4764055A (en) * 1986-10-02 1988-08-16 Birmingham Bolt Company, Inc. Resin reinforced expansion anchor system
CN2195569Y (en) * 1994-05-20 1995-04-26 中国矿业大学 Easy-to-recover quick-setting cement anchor rod
CN2208617Y (en) * 1994-05-25 1995-09-27 中国矿业大学 Double-end anchoring type anchor rod
CN201650320U (en) * 2010-03-27 2010-11-24 中国矿业大学 Hollow rapid hardening resin capsule used for grouted anchor bar sealing
CN102644470A (en) * 2012-04-18 2012-08-22 李治中 General energy-saving quick anchoring method and general energy-saving quick anchor rod
CN203925545U (en) * 2014-05-20 2014-11-05 霍州煤电集团技术研究院 A kind of hollow powder stick for shutoff anchor pole bar tail hell
CN104278998A (en) * 2014-09-22 2015-01-14 山东科技大学 Double-end anchoring type anchor bolt for roadway surrounding rock
CN205370613U (en) * 2016-01-08 2016-07-06 河南理工大学 Utilize biliquid slip casting medicated roll to realize high prestressing force total length anchored stock

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4764055A (en) * 1986-10-02 1988-08-16 Birmingham Bolt Company, Inc. Resin reinforced expansion anchor system
CN2195569Y (en) * 1994-05-20 1995-04-26 中国矿业大学 Easy-to-recover quick-setting cement anchor rod
CN2208617Y (en) * 1994-05-25 1995-09-27 中国矿业大学 Double-end anchoring type anchor rod
CN201650320U (en) * 2010-03-27 2010-11-24 中国矿业大学 Hollow rapid hardening resin capsule used for grouted anchor bar sealing
CN102644470A (en) * 2012-04-18 2012-08-22 李治中 General energy-saving quick anchoring method and general energy-saving quick anchor rod
CN203925545U (en) * 2014-05-20 2014-11-05 霍州煤电集团技术研究院 A kind of hollow powder stick for shutoff anchor pole bar tail hell
CN104278998A (en) * 2014-09-22 2015-01-14 山东科技大学 Double-end anchoring type anchor bolt for roadway surrounding rock
CN205370613U (en) * 2016-01-08 2016-07-06 河南理工大学 Utilize biliquid slip casting medicated roll to realize high prestressing force total length anchored stock

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640160A (en) * 2016-10-24 2017-05-10 河南理工大学 Left-handed longitudinal-bar-free full-length high-prestress anchor rod and construction technique thereof
CN106640160B (en) * 2016-10-24 2019-03-29 河南理工大学 A kind of left-handed nothing indulges muscle overall length high pre-stress anchor pole and its construction technology
CN112095664A (en) * 2020-09-18 2020-12-18 中铁隧道集团一处有限公司 Prestressed full-length anchoring mortar anchor rod for underground cave depot and rapid anchoring tensioning method

Also Published As

Publication number Publication date
CN105484782B (en) 2018-01-30

Similar Documents

Publication Publication Date Title
CN205370613U (en) Utilize biliquid slip casting medicated roll to realize high prestressing force total length anchored stock
CN105257328B (en) A kind of the segmentation archoring slip casting archoring-balt device and its anchoring process of energy automatic clamping
CN201103397Y (en) Yielding deformed steel bar slip-casting anchor bar
CN104500115B (en) A kind of prestressing force Bolt method for protecting support
CN103758552A (en) Hole-expanding anchor rod and construction process thereof
CN105840221B (en) It rotatably can quick anchoring installation binding type hollow bolt
CN203742612U (en) Rapid construction supporting system for deep coal mine roadway with weak and broken surrounding rock
CN109578033A (en) Coal mine roadway anchor and its implementation method
CN107288671A (en) Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note and its construction method
US6457909B1 (en) Multi-purpose anchor bolt assembly
CN105715287A (en) Combined self feeding type grouting anchor rod
CN104533486A (en) Bolting-grouting reinforcement method for remained roadway along goaf by use of self-drilling hollow grouting anchor cable
CN105484782A (en) Anchor rod for achieving high-prestress total-length anchoring through double-fluid grouting cartridges and use method of anchor rod
CN105840222B (en) Push-press type can quick anchoring installation binding type hollow bolt
CN103147777B (en) Pumping paste prestress full bolting anchor rod/cable supporting method
CN206539359U (en) A kind of umbrella-type grouted anchor bar
CN106703850A (en) Novel hydraulic expanded recyclable anchor rod
CN206889003U (en) A kind of roadway support anti-loosening anchor rod
CN206397531U (en) A kind of novel slurry filling anchor pole
CN107044295B (en) Novel slip casting stock
CN205977253U (en) Expansion sleeve bolt
CN206071626U (en) It is rotary can quick anchoring install binding type hollow bolt
CN205260061U (en) Flexible intumescent cavity slip casting stock
CN205089343U (en) Mining high -pressure slip casting stock
CN214091927U (en) Improved hollow grouting anchor rod

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

CF01 Termination of patent right due to non-payment of annual fee