CN109578033A - Coal mine roadway anchor and its implementation method - Google Patents

Coal mine roadway anchor and its implementation method Download PDF

Info

Publication number
CN109578033A
CN109578033A CN201811295395.7A CN201811295395A CN109578033A CN 109578033 A CN109578033 A CN 109578033A CN 201811295395 A CN201811295395 A CN 201811295395A CN 109578033 A CN109578033 A CN 109578033A
Authority
CN
China
Prior art keywords
anchor
hole
rubber plug
pole
coal mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811295395.7A
Other languages
Chinese (zh)
Inventor
李文洲
吴拥政
汪占领
范明建
孟宪志
王志超
石蒙
石垚
武龙云
郝登云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA COAL SCIENCE AND TECHNOLOGY GROUP Co Ltd
Tiandi Science and Technology Co Ltd
China Coal Technology and Engineering Group Corp
Original Assignee
CHINA COAL SCIENCE AND TECHNOLOGY GROUP Co Ltd
Tiandi Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA COAL SCIENCE AND TECHNOLOGY GROUP Co Ltd, Tiandi Science and Technology Co Ltd filed Critical CHINA COAL SCIENCE AND TECHNOLOGY GROUP Co Ltd
Priority to CN201811295395.7A priority Critical patent/CN109578033A/en
Publication of CN109578033A publication Critical patent/CN109578033A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/008Anchoring or tensioning means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The present invention relates to colliery tunnel support technical fields, provide a kind of coal mine roadway anchor and its implementation method, coal mine roadway anchor includes Anchor Agent and anchor pole, anchor pole is arranged rubber plug, rubber plug is mounted at the port of the anchor hole, and rubber plug is equipped with injected hole, is equipped with Grouting Pipe in injected hole, Grouting Pipe is set between anchor pole and anchor hole, the end connection anchor rod pallet board and anchor nut of anchor pole;The implementation method of coal mine roadway anchor includes the following steps: to be drilled with anchor hole in roadway surrounding rock, Anchor Agent is placed anchor hole bottom, anchor pole is installed and stirs;Rubber plug is set on anchor pole and is fastened at anchor hole port, injected hole of the Grouting Pipe on rubber plug is simultaneously placed on anchor pole and anchor hole;Anchor rod pallet board is installed in the end of anchor pole and anchor nut is anchored, Grouting Pipe is connect with grouting pump, the slip casting into anchor hole.The supporting effect that ensure that country rock, substantially increases construction efficiency, reduces construction cost.

Description

Coal mine roadway anchor and its implementation method
Technical field
The present invention relates to colliery tunnel support technical fields, more particularly to a kind of coal mine roadway anchor and its implementation Method.
Background technique
Bolting with wire mesh obtains large range of application in colliery tunnel support, coal mine roadway country rock be mainly sedimentary rock or Situations such as coal seam, rock crusher, soft rock is developed, cause during suspension roof support that anchor force is insufficient, cause supporting effect of roadway compared with Situations such as difference, it is severely deformed to often result in tunnel, roof fall, causes to seriously affect to tunnelling, Safety of Coal Mine Production.For enclosing Rock is broken, soft rock develops the situation for causing supporting effect poor, scene often using grouted anchor bar or anchor cable to roadway surrounding rock into Row supporting guarantees supporting effect of roadway.
Current grouted anchor bar primary structure is that anchor pole external surface uses overall length standard steep-pitch thread structure, and the body of rod is adopted It is designed with hollow structure, carries out grouting design as Grouting Pipe using hollow lever during slip casting, which is applied to After colliery tunnel support construction, have the following problems:
(1) hollow grouting anchor diameter is big, needs to be crept into using major diameter drill bit in boring procedure, with existing lane Road supporting construction equipment mismatches, and needs independent matching operation drilling tool, and the bar tail of hollow grouting anchor uses Plastic cap pair Body of rod end is blocked, and anchor bolt construction is caused to need to be drilled with the drilling of larger diameter.
(2) during coal mine roadway suspension roof support, carry out supporting timely and effective to roadway surrounding rock is needed, and provide higher Prestressing force, after guaranteeing that supporting effect, hollow grouting anchor are set up, although foring full length fastening, nut is pre- next, can not be formed Effective prestressing force causes supporting effect of roadway poor.
(3) with the increase of Coal Exploitation depth, crustal stress is increasing.The structure of full thread designs, and causes nut that cannot have Effect pre-tightens, and causes supporting effect poor.
Summary of the invention
(1) technical problems to be solved
The object of the present invention is to provide a kind of coal mine roadway anchor and its implementation methods, to solve existing anchor Prestressing force can not be applied, the problem of supporting effect is poor, constructional difficulties.
(2) technical solution
In order to solve the above technical problem, the present invention provides a kind of coal mine roadway anchor, including Anchor Agent and anchor pole, For the Anchor Agent the anchor pole to be connect with anchor hole gluing, the anchor pole is arranged rubber plug, and the rubber plug is mounted on the anchor At the port in hole, the rubber plug is equipped with injected hole, the axis parallel of the central axes of the injected hole and the anchor pole, the note It starches and is equipped with Grouting Pipe in hole, the Grouting Pipe is set between the anchor pole and the anchor hole, and the end of the anchor pole connects anchor pole Pallet and anchor nut.
Wherein, the grout outlet of the Grouting Pipe is set between the anchor pole and the anchor hole, the stock inlet of the Grouting Pipe It is connect with grouting pump.
Wherein, the stock inlet of the Grouting Pipe is equipped with slip casting pipe fitting.
Wherein, the anchor rod pallet board, which is equipped with, installs the perforation being adapted to the Grouting Pipe.
Wherein, the rubber plug is in the form of a column structure, and the first end of the rubber plug is mounted in the anchor hole, and the of the rubber plug Two ends are fastened on the outside of the anchor hole.
Wherein, the diameter of the rubber plug becomes larger along first end to the direction of second end, the first end of the rubber plug Diameter is identical as the internal diameter of the anchor hole.
Wherein, anchor pole washer is equipped between the anchor nut and the anchor rod pallet board.
The implementation method for the coal mine roadway anchor that the present invention also provides a kind of as described in any of the above item, including it is as follows Step:
It is drilled with anchor hole in roadway surrounding rock, Anchor Agent is placed into anchor hole bottom, anchor pole is installed and is stirred;
Rubber plug is set on anchor pole and is fastened at anchor hole port, Grouting Pipe passes through the injected hole on rubber plug and is placed on Between anchor pole and anchor hole;
Anchor rod pallet board is installed in the end of anchor pole and anchor nut is anchored, Grouting Pipe is connect with grouting pump, to anchor hole Interior slip casting.
Wherein, the Anchor Agent is resin explosive roll, to make end and the institute of the anchor pole being mounted in the anchor hole State the connection of anchor hole gluing.
Wherein, Grouting Pipe slip casting into anchor hole fills in wall-rock crack and anchor hole to slurries forms injecting cement paste.
(3) beneficial effect
A kind of coal mine roadway anchor provided by the invention and its implementation method, to coal mine fractured coal and rock tunnel Or soft-rock tunnel suspension roof support, it can effectively avoid and need bigger drilling using common hollow grouting anchor, need replacing brill The problems such as head, drilling tool, efficiently solves hollow grouting anchor using overall length standard steep-pitch thread structure, during site operation Pretightning force cannot effectively be applied, and during nut preload, be easy to cause and loosen, the effect of suspension roof support cannot be given full play to Fruit, the problems such as causing supporting effect of roadway poor;Structure is simple, does not need to change the drilling tool of live roadway construction, glue Plug is poured using rubber, is adjusted according to the coefficient of stiffiness of the technology characteristics of anchor bolt construction to rubber plug, is preferably adapted to The case where anchor pole, carries out slip casting to country rock after rubber plug sealing of hole, which reduces the influence to tunnelling, infuses After slurry, by secondary preload, it ensure that the supporting effect of country rock, substantially increase construction efficiency, reduce construction cost, guarantee The supporting effect in fractured coal and rock tunnel or soft-rock tunnel.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the structural schematic diagram of rubber plug of the embodiment of the present invention;
Fig. 3 is the structural schematic diagram of anchor rod pallet board of the embodiment of the present invention.
In figure, 1: roadway surrounding rock;2: Anchor Agent;3: anchor pole;4: injecting cement paste;5: wall-rock crack;6: rubber plug;7: Grouting Pipe; 8: slip casting pipe fitting;9: anchor rod pallet board;10: anchor nut;11: injected hole;12: sets of holes;13: perforation.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people Member's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
In addition, in the description of the present invention, unless otherwise indicated, " multiple ", " more ", " multiple groups " be meant that two or Two or more, " several ", " several ", " several groups " are meant that one or more.
As shown in Figure 1-3, the embodiment of the present invention provides a kind of coal mine roadway anchor, including Anchor Agent 2 and anchor pole 3, For Anchor Agent 2 anchor pole 3 to be connect with anchor hole gluing, anchor pole 3 is arranged rubber plug 6, and rubber plug 6 is mounted at the port of anchor hole, rubber plug 6 Equipped with injected hole 11, the central axes of injected hole 11 and the axis parallel of anchor pole 3, injected hole 11 is interior to be equipped with Grouting Pipe 7, Grouting Pipe 7 are set between anchor pole 3 and anchor hole, the end connection anchor rod pallet board 9 and anchor nut 10 of anchor pole 3.
Further, tunnel rock stratum 1 is the side wall of coal mine fractured coal and rock tunnel or soft-rock tunnel, and tunnel rock stratum 1 is interior certainly So there are wall-rock cracks 5.Anchor hole is arranged in tunnel rock stratum 1, to install anchor pole 3.The setting of Anchor Agent 2 is used in anchor hole bottom So that the end for the anchor pole 3 being mounted in anchor hole is connect with anchor hole gluing, Anchor Agent 2 is sticked on the outer wall of anchor pole 3, and then is produced Raw pretightning force, as shown in Figure 1, the part for the anchor pole 3 being inserted into anchor hole is only connect by Anchor Agent 2 with anchor hole gluing.In an example In son, Anchor Agent 2 selects resin explosive roll.
Wherein, rubber plug 6 is arranged on anchor pole 3, rubber plug 6 is in the form of a column structure, and center is equipped with sets of holes 12, facilitates rubber plug 6 are sleeved on 3 end of anchor pole, and the diameter of sets of holes 12 is identical as the outer diameter of anchor pole 3, guarantee sealing cooperation.The first end of rubber plug 6 is installed In anchor hole, second end is fastened on the outside of anchor hole, and the diameter of rubber plug 6 becomes larger to the direction of second end along first end, plays Seal the effect of anchor hole.
Further, injected hole 11 is equipped in the rubber plug 6 of 12 side of sets of holes, the number of injected hole 11 can be according to anchor hole Depth and roadway surrounding rock 1 in wall-rock crack 5 concrete condition setting.The central axes of injected hole 11 and the central axes of anchor pole 3 are flat Row, flows slurries into anchor hole unobstructed.
Wherein, be equipped with Grouting Pipe 7 in injected hole 11, the grout outlet of Grouting Pipe 7 it is exposed 11 outside of injected hole or according to Need to protrude into one end length in anchor hole.The grout outlet of Grouting Pipe 7 is set between anchor pole 3 and anchor hole, to wall-rock crack 5 and anchor Slip casting in hole improves the overall structural strength of roadway surrounding rock 1, prevents from loosening in anchoring procedure to form injecting cement paste 4, improves branch Protect effect.The stock inlet of Grouting Pipe 7 is equipped with slip casting pipe fitting 8, and connect with grouting pump, guarantees bonding strength.
Further, the exposed end on the outside of anchor hole of anchor pole 3 is equipped with screw thread, and connects anchor rod pallet board 9 and anchor nut 10, it realizes and pretightning force is generated to anchor pole 3 and is anchored, anchor pole washer is equipped between anchor nut 10 and anchor rod pallet board 9, and raising is tightened Power prevents from loosening.Specifically, only the exposed end on the outside of anchor hole is equipped with screw thread to anchor pole 3, anchor rod pallet board 9 and roadway surrounding rock 1 are pasted It closing, anchor nut 10 and the screw thread of 3 end of anchor pole are spirally connected, and under the action of the connection of 2 gluing of Anchor Agent, anchor nut 10 is tightened, Realize that secondary preload, the effect of injecting cement paste 4 improve anchoring effect.
Wherein, anchor rod pallet board 9, which is equipped with, installs the perforation 13 being adapted to Grouting Pipe 7, prevents the compressing to Grouting Pipe 7, shadow Ring slip casting effect.
The embodiment of the present invention also provides a kind of implementation method of coal mine roadway anchor as described above, including as follows Step:
It is drilled with anchor hole in roadway surrounding rock, Anchor Agent is placed into anchor hole bottom, anchor pole is installed and is stirred, insert Anchor Agent will The part for entering the anchor pole in anchor hole is connect with anchor hole gluing, generates certain pretightning force;
Rubber plug is set on anchor pole, the sets of holes of anchor pole and rubber plug are tightly connected, prevents slurries during slip casting from omitting;
The first end of rubber plug is mounted in anchor hole, second end is exposed on the outside of anchor hole, guarantees that rubber plug sealing is fastened on anchor At the port of hole, seal anchor hole;
Grouting Pipe passes through the injected hole on rubber plug, guarantees that the grout outlet of Grouting Pipe is exposed at the outside of injected hole, and be placed on Between anchor pole and anchor hole, to the slip casting into wall-rock crack and anchor hole;
Anchor rod pallet board is installed in the end of anchor pole and anchor nut is tentatively anchored, the stock inlet of Grouting Pipe passes through anchor pole Perforation on pallet, then connect by slip casting pipe fitting with grouting pump, guarantee the bonding strength of Grouting Pipe and grouting pump;
Grouting pump slip casting into anchor hole is opened, according to country rock situation, after slurries initial set, slurries are in wall-rock crack and anchor hole Interior filling forms injecting cement paste, and roadway surrounding rock forms entirety, and structural strength enhancing closes grouting pump and stops slip casting, carries out to anchor pole Anchor nut is tightened in secondary preload, applies high pretightening force, is achieved the effect that high pretightening force slip casting anchors, is guaranteed the supporting of anchor pole Effect.
A kind of coal mine roadway anchor provided by the invention and its implementation method are not limited only in coal mine roadway Application in construction is applied in the Other Engineerings such as tunnel also within the scope of protection of this application.
A kind of coal mine roadway anchor provided by the invention and its implementation method, to coal mine fractured coal and rock tunnel Or soft-rock tunnel suspension roof support, it can effectively avoid and need bigger drilling using common hollow grouting anchor, need replacing brill The problems such as head, drilling tool, efficiently solves hollow grouting anchor using overall length standard steep-pitch thread structure, during site operation Pretightning force cannot effectively be applied, and during nut preload, be easy to cause and loosen, the effect of suspension roof support cannot be given full play to Fruit, the problems such as causing supporting effect of roadway poor;Structure is simple, does not need to change the drilling tool of live roadway construction, glue Plug is poured using rubber, is adjusted according to the coefficient of stiffiness of the technology characteristics of anchor bolt construction to rubber plug, is preferably adapted to The case where anchor pole, carries out slip casting to country rock after rubber plug sealing of hole, which reduces the influence to tunnelling, infuses After slurry, by secondary preload, it ensure that the supporting effect of country rock, substantially increase construction efficiency, reduce construction cost, guarantee The supporting effect in fractured coal and rock tunnel or soft-rock tunnel.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of coal mine roadway anchor, which is characterized in that including Anchor Agent and anchor pole, the Anchor Agent is to by the anchor Bar is connect with anchor hole gluing, and the anchor pole is arranged rubber plug, and the rubber plug is mounted at the port of the anchor hole, and the rubber plug is equipped with Injected hole, the axis parallel of the central axes of the injected hole and the anchor pole, the injected hole is interior to be equipped with Grouting Pipe, the note Slurry pipe is set between the anchor pole and the anchor hole, the end connection anchor rod pallet board and anchor nut of the anchor pole.
2. coal mine roadway anchor as described in claim 1, which is characterized in that the grout outlet of the Grouting Pipe is set to described Between anchor pole and the anchor hole, the stock inlet of the Grouting Pipe is connect with grouting pump.
3. coal mine roadway anchor as claimed in claim 2, which is characterized in that the stock inlet of the Grouting Pipe is equipped with slip casting Pipe fitting.
4. coal mine roadway anchor as described in claim 1, which is characterized in that the anchor rod pallet board is equipped with and the slip casting The perforation of pipe installation adaptation.
5. coal mine roadway anchor as described in claim 1, which is characterized in that the rubber plug is in the form of a column structure, the glue The first end of plug is mounted in the anchor hole, and the second end of the rubber plug is fastened on the outside of the anchor hole.
6. coal mine roadway anchor as claimed in claim 5, which is characterized in that the diameter of the rubber plug is along first end to The direction at two ends becomes larger, and the diameter of the first end of the rubber plug is identical as the internal diameter of the anchor hole.
7. coal mine roadway anchor as described in claim 1, which is characterized in that the anchor nut and the anchor rod pallet board Between be equipped with anchor pole washer.
8. a kind of implementation method of coal mine roadway anchor as described in any one of claims 1 to 7, which is characterized in that packet Include following steps:
It is drilled with anchor hole in roadway surrounding rock, Anchor Agent is placed into anchor hole bottom, anchor pole is installed and is stirred;
Rubber plug is set on anchor pole and is fastened at anchor hole port, Grouting Pipe passes through the injected hole on rubber plug and is placed on anchor pole Between anchor hole;
Anchor rod pallet board is installed in the end of anchor pole and anchor nut is anchored, Grouting Pipe is connect with grouting pump, is infused into anchor hole Slurry.
9. the implementation method of coal mine roadway anchor as claimed in claim 8, which is characterized in that the Anchor Agent is resin Powder stick, connect the end for the anchor pole being mounted in the anchor hole with the anchor hole gluing.
10. the implementation method of coal mine roadway anchor as claimed in claim 8, which is characterized in that the Grouting Pipe is to anchor Slip casting fills in wall-rock crack and anchor hole to slurries and forms injecting cement paste in hole.
CN201811295395.7A 2018-11-01 2018-11-01 Coal mine roadway anchor and its implementation method Pending CN109578033A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811295395.7A CN109578033A (en) 2018-11-01 2018-11-01 Coal mine roadway anchor and its implementation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811295395.7A CN109578033A (en) 2018-11-01 2018-11-01 Coal mine roadway anchor and its implementation method

Publications (1)

Publication Number Publication Date
CN109578033A true CN109578033A (en) 2019-04-05

Family

ID=65921145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811295395.7A Pending CN109578033A (en) 2018-11-01 2018-11-01 Coal mine roadway anchor and its implementation method

Country Status (1)

Country Link
CN (1) CN109578033A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111156944A (en) * 2019-12-25 2020-05-15 天地科技股份有限公司 Real-time monitoring system and method for surrounding rock of roadway
CN111810207A (en) * 2020-06-17 2020-10-23 山东大学 Drilling and anchoring integrated anchoring device and method
CN111927514A (en) * 2020-08-03 2020-11-13 中国矿业大学 Prestress full-length anchoring system and method based on steel grit adding in post-grouting method
CN112360501A (en) * 2020-09-28 2021-02-12 中煤科工开采研究院有限公司 Temporary support and drilling and grouting integrated anchor rod composite support system and construction method
CN112482406A (en) * 2020-11-30 2021-03-12 王杰 Anchor rod supporting device for slope support
CN112814717A (en) * 2021-03-08 2021-05-18 长江勘测规划设计研究有限责任公司 Using method suitable for underwater shield tunnel anchor support device
CN114215531A (en) * 2021-12-02 2022-03-22 中煤科工开采研究院有限公司 Coal mine tunnel ultra-soft surrounding rock modification method and structure
WO2022227402A1 (en) * 2021-04-30 2022-11-03 中煤科工开采研究院有限公司 Anchor rod construction assembly

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202132060U (en) * 2011-02-27 2012-02-01 山东科技大学 Anchoring structure for liquid-filled corrosion resistant anchor rod or anchor rope
US20120282039A1 (en) * 2011-05-05 2012-11-08 Earth Support Services, Inc. Mine roof support apparatus and system
CN202866840U (en) * 2012-09-05 2013-04-10 淮南市顺辉锚固有限公司 Full-thread glass fiber composite hollow grouting anchor rod
CN203189049U (en) * 2013-02-28 2013-09-11 新汶矿业集团有限责任公司 Anchorage top-pouring pre-stressed anchor cable strengthening device of mine roadway bottom plate
CN104653206A (en) * 2014-12-15 2015-05-27 魏兴民 Prestress full-length anchoring anchor rope construction method based on common anchor rope construction
CN107905827A (en) * 2017-11-23 2018-04-13 西南石油大学 A kind of self-advancing type hollow grouting anchor and application method with force measuring function

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202132060U (en) * 2011-02-27 2012-02-01 山东科技大学 Anchoring structure for liquid-filled corrosion resistant anchor rod or anchor rope
US20120282039A1 (en) * 2011-05-05 2012-11-08 Earth Support Services, Inc. Mine roof support apparatus and system
CN202866840U (en) * 2012-09-05 2013-04-10 淮南市顺辉锚固有限公司 Full-thread glass fiber composite hollow grouting anchor rod
CN203189049U (en) * 2013-02-28 2013-09-11 新汶矿业集团有限责任公司 Anchorage top-pouring pre-stressed anchor cable strengthening device of mine roadway bottom plate
CN104653206A (en) * 2014-12-15 2015-05-27 魏兴民 Prestress full-length anchoring anchor rope construction method based on common anchor rope construction
CN107905827A (en) * 2017-11-23 2018-04-13 西南石油大学 A kind of self-advancing type hollow grouting anchor and application method with force measuring function

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111156944A (en) * 2019-12-25 2020-05-15 天地科技股份有限公司 Real-time monitoring system and method for surrounding rock of roadway
CN111810207A (en) * 2020-06-17 2020-10-23 山东大学 Drilling and anchoring integrated anchoring device and method
CN111927514A (en) * 2020-08-03 2020-11-13 中国矿业大学 Prestress full-length anchoring system and method based on steel grit adding in post-grouting method
CN112360501A (en) * 2020-09-28 2021-02-12 中煤科工开采研究院有限公司 Temporary support and drilling and grouting integrated anchor rod composite support system and construction method
CN112482406A (en) * 2020-11-30 2021-03-12 王杰 Anchor rod supporting device for slope support
CN112814717A (en) * 2021-03-08 2021-05-18 长江勘测规划设计研究有限责任公司 Using method suitable for underwater shield tunnel anchor support device
CN112814717B (en) * 2021-03-08 2022-12-20 长江勘测规划设计研究有限责任公司 Using method suitable for underwater shield tunnel anchor support device
WO2022227402A1 (en) * 2021-04-30 2022-11-03 中煤科工开采研究院有限公司 Anchor rod construction assembly
CN114215531A (en) * 2021-12-02 2022-03-22 中煤科工开采研究院有限公司 Coal mine tunnel ultra-soft surrounding rock modification method and structure

Similar Documents

Publication Publication Date Title
CN109578033A (en) Coal mine roadway anchor and its implementation method
CN106337692B (en) It is a kind of be suitable for weak coal petrography from boring from anchor extensible anchor pole and its anchoring process
CN104405423A (en) Mining grouting anchor rope
CN105257328B (en) A kind of the segmentation archoring slip casting archoring-balt device and its anchoring process of energy automatic clamping
CN205532664U (en) Novel flexible stock
CN103277122B (en) Method for drilling anchor rod hole and anchoring anchor rod in broken roof
CN204716272U (en) Mining Assembled slip-casting roofbolt
CN107288671A (en) Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note and its construction method
CN103016034A (en) Mining hollow grouting anchor cable
RU105941U1 (en) ROPE FLEXIBLE ANCHOR
CN104405424A (en) Full-length-anchoring anchor rod and anchoring method
CN104500115A (en) Pre-stress full-length anchoring rock bolt retaining and protecting method
CN205370613U (en) Utilize biliquid slip casting medicated roll to realize high prestressing force total length anchored stock
CN103174444A (en) Support method and support structure for soft coal/ rock stratum alley
CN104533486A (en) Bolting-grouting reinforcement method for remained roadway along goaf by use of self-drilling hollow grouting anchor cable
CN103147777B (en) Pumping paste prestress full bolting anchor rod/cable supporting method
CN205189918U (en) Intumescent cavity slip casting stock
CN102748048A (en) Hole wall grouting anchor cable
CN214836457U (en) Novel downthehole yielding full-anchor cable
CN105626109B (en) It is a kind of that there is the method for repeating to apply prestressed cable bolting
CN103206222B (en) Method for constructing reinforced surrounding rock inside precast-segment tunnels
CN204475323U (en) The telescopic Inner bolt head of a kind of modified
CN208982078U (en) A kind of mining anchor dispensing device
CN109252881A (en) Steel pipe cement mortar prestress anchorage cable and its method for protecting support
CN105484782B (en) A kind of anchor pole and its application method for realizing high pre-stress full length fastening

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405