CN105363767A - Extracting and injecting combined three-dimensional prevention and control method used for emergency treatment after soil pollution - Google Patents

Extracting and injecting combined three-dimensional prevention and control method used for emergency treatment after soil pollution Download PDF

Info

Publication number
CN105363767A
CN105363767A CN201510794531.7A CN201510794531A CN105363767A CN 105363767 A CN105363767 A CN 105363767A CN 201510794531 A CN201510794531 A CN 201510794531A CN 105363767 A CN105363767 A CN 105363767A
Authority
CN
China
Prior art keywords
contaminated soil
soil body
control method
water
dimensional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510794531.7A
Other languages
Chinese (zh)
Inventor
杨坪
姜涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201510794531.7A priority Critical patent/CN105363767A/en
Publication of CN105363767A publication Critical patent/CN105363767A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09CRECLAMATION OF CONTAMINATED SOIL
    • B09C1/00Reclamation of contaminated soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/002Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09CRECLAMATION OF CONTAMINATED SOIL
    • B09C2101/00In situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Soil Sciences (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention relates to an extracting and injecting combined three-dimensional prevention and control method used for emergency treatment after soil pollution. The method includes the following steps that (1) the following sub-steps of (101) extracting contaminants in polluted soil, (102) constructing a waterproof curtain around the polluted soil, and (103) constructing a bottom rotary spraying surface at the bottom of the polluted soil are executed at the same time; and (2) the waterproof curtain and the bottom rotary spraying surface are connected to form a three-dimensional surrounding structure. Compared with the prior art, the method has the advantages that the method is simple, the construction cost is low, the isolation effect is good, and the like.

Description

A kind ofly take out note in conjunction with three-dimensional preventing control method for emergency processing after soil pollution
Technical field
The present invention relates to a kind of method for emergency processing after soil pollution, especially relate to and a kind ofly take out note in conjunction with three-dimensional preventing control method for emergency processing after soil pollution.
Background technology
In recent years, China's process of industrialization moves forward steadily, the construction of a large amount of factory and modern port has made tremendous contribution for realizing socialist modernization, but chemicals is revealed in recent years, heavy metals emission exceeds standard frequent appearance, paroxysmal soil pollution causes great harm to environment and the people's lives and property, the PORT OF TIANJIN explosion accident on August 12nd, 2015 demonstrates the mishandling surprising consequence of chemicals, the wherein particularly interestingly surface water that causes of 700 tons of Cymags and soil contamination problem, and diameter 100 meters, the hollow place of long-pending full water, wherein 8 points exceeding standard maximum a little exceed standard 277 times, the importance of sudden soil pollution emergency processing highlights again.
For the situation of sudden soil pollution, existing some scholars developed preventing control method, current domestic adopt in-situ solidifying or change the method for filling out contaminated soil is processed, these two kinds of methods take time and effort, and deal with improperly and also may cause secondary pollution.
Summary of the invention
Object of the present invention is exactly provide a kind of after there is soil body burst Pollution to overcome defect that above-mentioned prior art exists, and that effectively can isolate the contaminated soil body takes out note in conjunction with three-dimensional preventing control method.
Object of the present invention can be achieved through the following technical solutions:
Take out note in conjunction with a three-dimensional preventing control method for emergency processing after soil pollution, the method comprises the following steps:
(1) perform following steps: (101) extract contaminated soil body internal contamination thing simultaneously; (102) around the contaminated soil body, construction forms water-stop curtain; (103) bottom the contaminated soil body, construction forms bottom rotary jet face;
(2) water-stop curtain and bottom rotary jet face are connected to form three-dimensional encirclement structure.
Extraction contaminated soil body internal contamination thing described in step (1) is specially employing and takes out dirty treating apparatus and extract contaminated soil body bottom contaminant water and fine grained Polluted Soil, and carry out encapsulation process, pollutant in the contaminated soil body is extracted out and isolation processing by this step in time, avoids it to continue to pollute the soil body and underground water.
Construction around the contaminated soil body described in step (1) forms water-stop curtain and is specially the sealing post adopting high compression set to be sprayed on multiple setting sizes that construction formation connects successively around the contaminated soil body, and each sealing post is connected to form water-stop curtain.
The sealing post that described high compression set is sprayed on multiple setting sizes that construction formation connects successively around the contaminated soil body specifically comprises following sub-step:
(201) around the contaminated soil body, determine the position, multiple hole of high compression set spray work;
(202) hole in position, each hole;
(203) playpipe that high compression set sprays stretches into boring and carries out jet groutinl, forms sealing post.
Described water-stop curtain is the rule or erose water-stop curtain that are formed according to contaminated soil body size.
It is the churning body adopting high-pressure rotary-spray churning below the contaminated soil body to form multiple setting thickness that construction bottom the contaminated soil body described in step (1) forms bottom rotary jet mask body, and each churning body mutually overlaps and forms bottom rotary jet face.
The churning below the contaminated soil body of described high-pressure rotary-spray forms the churning body of multiple setting thickness, specifically comprises following sub-step:
(301) high-pressure rotary-spray is holed at setting station;
(302) shotcrete pipe of high-pressure rotary-spray rises up into boring and carries out rotation whitewashing, simultaneously constantly promotes shotcrete pipe and controls shotcrete pipe hoisting depth, thus forming the churning body of setting thickness.
Compared with prior art, tool of the present invention has the following advantages:
(1) work by taking out dirty treating apparatus, the spray of high compression set and high-pressure rotary-spray three simultaneously, in time the pollutant in the contaminated soil body extracted and isolate, form the solid be made up of water-stop curtain and bottom rotary jet face simultaneously and surround structure, the contaminated soil body of effective isolation, avoid the diffusion of polluting, for carrying out of subsequent treatment work is raced against time.
(2) the method is simple, cost is low, isolation effect is good.
Accompanying drawing explanation
Fig. 1 is that the present invention takes out note in conjunction with the design sketch after three-dimensional preventing control method enforcement;
Fig. 2 is for forming water-stop curtain construction procedure flow chart;
Fig. 3 is for forming bottom rotary jet surface construction flow chart of steps.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
Embodiment
Take out note in conjunction with a three-dimensional preventing control method for emergency processing after soil pollution, the method comprises the following steps: (1) performs following steps simultaneously: (101) extract contaminated soil body internal contamination thing; (102) around the contaminated soil body, construction forms water-stop curtain; (103) bottom the contaminated soil body, construction forms bottom rotary jet face; (2) water-stop curtain and bottom rotary jet face are connected to form three-dimensional encirclement structure, surround effect structure figure as shown in Figure 1 according to the solid that above-mentioned steps completes.
Extraction contaminated soil body internal contamination thing described in described step (1) is specially and extracts contaminated soil body bottom contaminant water and fine grained Polluted Soil with taking out dirty treating apparatus, stretch into contaminated soil body bottom by tubulose or rod like device, the contaminant water within the scope of certain depth and fine grained Polluted Soil are extracted in an obturator and carry out processing or transporting.Pollutant in the contaminated soil body is extracted out and isolation processing by this step in time, avoids it to continue to pollute the soil body and underground water.
As shown in Figure 2, construction around the contaminated soil body described in described step (1) forms water-stop curtain and is specially the sealing post adopting high compression set to be sprayed on multiple setting sizes that construction formation connects successively around the contaminated soil body, each sealing post surrounds water-stop curtain, wherein water-stop curtain is the rule or erose water-stop curtain that are formed according to contaminated soil body size, as circle, square, rectangle etc.The sealing post that described high compression set is sprayed on multiple setting sizes that construction formation connects successively around the contaminated soil body is specially: perform step 201, around the contaminated soil body, the preventing seepage with high-pressure sprayed concrete axis of root Ju design determines the position, multiple hole of high compression set spray work, and carry out mark and protected, position, hole make after by place for the equipment such as rig, high spray booth car, connect water power and also carry out plant equipment debugging; Perform slurrying in step 202, wherein mud materials selects high-quality bentonite or clay; Perform in step 203 simultaneously and hole in individual room: boring adopts mud off, alloy bit convolution is crept into, and bore diameter is 130 ~ 150mm; Perform and in step 204, the playpipe that high compression set sprays is seated in locating hole, close inspection slurry, the unimpeded situation of tracheae before laying playpipe, simultaneously interview is sprayed and injection direction of harmonizing, playpipe should extend set depth downwards on request, its degree of depth sets according to contaminated soil body concrete condition, if playpipe fails down set depth, pipe telephone-moving cleaning bottom of hole again should be played, until the degree of depth of laying of playpipe reaches setting requirement; Perform step 205 and carry out jet groutinl in boring, jet groutinl divides two sequence constructions, when playpipe is after set depth, water, gas, slurry is sent to spray by setup parameter, after every construction parameter reaches regulation and boring has cement mortar to emerge, playpipe can be promoted and carry out normal injection grouting, form sealing post, jet groutinl from bottom to top, complete opening works continuously, if interrupt construction in lifting playpipe process, continue to execute man-hour requirement playpipe is inserted former interruption position under 20cm place restart jet groutinl; Performing in step 205 process the cleaning facility performed in step 206, when holing dark and also can clear water being adopted to rinse flushing well once by playpipe with each construction equipment after 2 ~ 3 borings when working continuously, playpipe proposes aperture and should check nozzle simultaneously, underproof nozzle is changed in time, guarantees normally carrying out of follow-up work; Finally perform step 307, after drilling hole, spraying slip casting being terminated, utilize overfall or cement grout in drilling orifice to recharge, till drilling orifice Starch Level no longer sinks, to ensure water-stop curtain wall height, thus surround the whole contaminated soil body.
As shown in Figure 3, it is the churning body adopting high-pressure rotary-spray churning below the contaminated soil body to form multiple setting thickness that construction bottom the contaminated soil body described in described step (1) forms bottom rotary jet mask body, and each churning body mutually overlaps and forms bottom rotary jet face.Wherein said churning below the contaminated soil body forms the churning body of multiple setting thickness, specifically comprises following sub-step: perform step 301 determines high-pressure rotary-spray work position, multiple hole at contaminated soil body position; Perform slurrying in step 302, by designing the match ratio mixing cement mortar determined, mud materials selects high-quality bentonite or clay; Perform step 303 simultaneously and carry out drill hole of drilling machine, carry out holing to set depth in the position, hole determined in step 301, this degree of depth sets according to the actual conditions of the contaminated soil body; Perform step 304, by the shotcrete pipe of high-pressure rotary-spray; Perform step 305, carry out rotation whitewashing, after shotcrete pipe being sunk to the set depth described in step 303, whitewash in limit, and limit rotates, and constantly promotes shotcrete pipe simultaneously and control shotcrete pipe hoisting depth, thus forming the churning body of setting thickness.

Claims (7)

1. take out note in conjunction with a three-dimensional preventing control method for emergency processing after soil pollution, it is characterized in that, the method comprises the following steps:
(1) perform following steps: (101) extract contaminated soil body internal contamination thing simultaneously; (102) around the contaminated soil body, construction forms water-stop curtain; (103) bottom the contaminated soil body, construction forms bottom rotary jet face;
(2) water-stop curtain and bottom rotary jet face are connected to form three-dimensional encirclement structure.
2. according to claim 1ly a kind ofly take out note in conjunction with three-dimensional preventing control method for emergency processing after soil pollution, it is characterized in that, extraction contaminated soil body internal contamination thing described in step (1) is specially employing and takes out dirty treating apparatus and extract contaminated soil body bottom contaminant water and fine grained Polluted Soil, and carries out encapsulation process.
3. according to claim 1ly a kind ofly take out note in conjunction with three-dimensional preventing control method for emergency processing after soil pollution, it is characterized in that, construction around the contaminated soil body described in step (1) forms water-stop curtain and is specially the sealing post adopting high compression set to be sprayed on multiple setting sizes that construction formation connects successively around the contaminated soil body, and each sealing post is connected to form water-stop curtain.
4. according to claim 3ly a kind ofly take out note in conjunction with three-dimensional preventing control method for emergency processing after soil pollution, it is characterized in that, the sealing post that described high compression set is sprayed on multiple setting sizes that construction formation connects successively around the contaminated soil body specifically comprises following sub-step:
(201) around the contaminated soil body, determine the position, multiple hole of high compression set spray work;
(202) hole in position, each hole;
(203) playpipe that high compression set sprays stretches into boring and carries out jet groutinl, forms sealing post.
5. according to claim 1ly a kind ofly take out note in conjunction with three-dimensional preventing control method for emergency processing after soil pollution, it is characterized in that, described water-stop curtain is the rule or erose water-stop curtain that are formed according to contaminated soil body size.
6. according to claim 1ly a kind ofly take out note in conjunction with three-dimensional preventing control method for emergency processing after soil pollution, it is characterized in that, it is the churning body adopting high-pressure rotary-spray churning below the contaminated soil body to form multiple setting thickness that construction bottom the contaminated soil body described in step (1) forms bottom rotary jet mask body, and each churning body mutually overlaps and forms bottom rotary jet face.
7. according to claim 6ly a kind ofly take out note in conjunction with three-dimensional preventing control method for emergency processing after soil pollution, it is characterized in that, the churning below the contaminated soil body of described high-pressure rotary-spray forms the churning body of multiple setting thickness, specifically comprises following sub-step:
(301) high-pressure rotary-spray is holed at setting station;
(302) shotcrete pipe of high-pressure rotary-spray rises up into boring and carries out rotation whitewashing, simultaneously constantly promotes shotcrete pipe and controls shotcrete pipe hoisting depth, thus forming the churning body of setting thickness.
CN201510794531.7A 2015-11-18 2015-11-18 Extracting and injecting combined three-dimensional prevention and control method used for emergency treatment after soil pollution Pending CN105363767A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510794531.7A CN105363767A (en) 2015-11-18 2015-11-18 Extracting and injecting combined three-dimensional prevention and control method used for emergency treatment after soil pollution

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510794531.7A CN105363767A (en) 2015-11-18 2015-11-18 Extracting and injecting combined three-dimensional prevention and control method used for emergency treatment after soil pollution

Publications (1)

Publication Number Publication Date
CN105363767A true CN105363767A (en) 2016-03-02

Family

ID=55366678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510794531.7A Pending CN105363767A (en) 2015-11-18 2015-11-18 Extracting and injecting combined three-dimensional prevention and control method used for emergency treatment after soil pollution

Country Status (1)

Country Link
CN (1) CN105363767A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108372201A (en) * 2018-03-27 2018-08-07 中交天航环保工程有限公司 A kind of high-pressure rotary-spray dosing of organic contamination place original position aoxidizes restorative procedure
CN108480373A (en) * 2018-03-27 2018-09-04 中交天航环保工程有限公司 A kind of contaminated sites source blocking method
CN109322699A (en) * 2018-09-29 2019-02-12 山东省地质矿产勘查开发局八0水文地质工程地质大队 Pollution isolation blocking technology under a kind of mine

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1657718A (en) * 2004-02-17 2005-08-24 上海市普陀区市政工程管理署 Method for repairing sewer using water-proof film lining
CN2782246Y (en) * 2004-12-17 2006-05-24 杨杰 Infiltration-proof garbage treatment site
CN101205721A (en) * 2007-12-03 2008-06-25 中铁大桥局集团第四工程有限公司 Method for surrounding water by combination of steel cofferdam and heavy-pressure rotary-spraying pile in deep-water low-pile cap construction
CN101250879A (en) * 2008-04-01 2008-08-27 中国第一冶金建设有限责任公司 Method for processing bottom solum trickleing water of deep building pit
CN101775810A (en) * 2010-02-04 2010-07-14 天津大学 Underground water control construction method in foundation pit dewatering project
CN102797266A (en) * 2012-08-31 2012-11-28 天津住宅集团建设工程总承包有限公司 Well sealing waterproof construction method for dewatering well
CN104353665A (en) * 2014-10-31 2015-02-18 上海岩土工程勘察设计研究院有限公司 Facet sealed well-point dewatering structure for integrated in-situ polluted water-soil remediation
CN104399740A (en) * 2014-11-18 2015-03-11 青岛新天地环境保护有限责任公司 Horizontal water stopping layer structure and method thereof for contaminated soil remediation
CN204320796U (en) * 2014-11-18 2015-05-13 青岛新天地环境保护有限责任公司 A kind of horizontal sealing Rotating fields for contaminated soil remediation
CN104929114A (en) * 2015-06-24 2015-09-23 江苏省建筑科学研究院有限公司 High pressure jet grouting pile waterproof curtain construction device and method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1657718A (en) * 2004-02-17 2005-08-24 上海市普陀区市政工程管理署 Method for repairing sewer using water-proof film lining
CN2782246Y (en) * 2004-12-17 2006-05-24 杨杰 Infiltration-proof garbage treatment site
CN101205721A (en) * 2007-12-03 2008-06-25 中铁大桥局集团第四工程有限公司 Method for surrounding water by combination of steel cofferdam and heavy-pressure rotary-spraying pile in deep-water low-pile cap construction
CN101250879A (en) * 2008-04-01 2008-08-27 中国第一冶金建设有限责任公司 Method for processing bottom solum trickleing water of deep building pit
CN101775810A (en) * 2010-02-04 2010-07-14 天津大学 Underground water control construction method in foundation pit dewatering project
CN102797266A (en) * 2012-08-31 2012-11-28 天津住宅集团建设工程总承包有限公司 Well sealing waterproof construction method for dewatering well
CN104353665A (en) * 2014-10-31 2015-02-18 上海岩土工程勘察设计研究院有限公司 Facet sealed well-point dewatering structure for integrated in-situ polluted water-soil remediation
CN104399740A (en) * 2014-11-18 2015-03-11 青岛新天地环境保护有限责任公司 Horizontal water stopping layer structure and method thereof for contaminated soil remediation
CN204320796U (en) * 2014-11-18 2015-05-13 青岛新天地环境保护有限责任公司 A kind of horizontal sealing Rotating fields for contaminated soil remediation
CN104929114A (en) * 2015-06-24 2015-09-23 江苏省建筑科学研究院有限公司 High pressure jet grouting pile waterproof curtain construction device and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
廉新颖 等: "突发性重金属污染地下水应急处理技术研究进展", 《水处理技术》 *
李相然 等: "《高压喷射注浆技术与应用》", 31 August 2007, 中国建材工业出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108372201A (en) * 2018-03-27 2018-08-07 中交天航环保工程有限公司 A kind of high-pressure rotary-spray dosing of organic contamination place original position aoxidizes restorative procedure
CN108480373A (en) * 2018-03-27 2018-09-04 中交天航环保工程有限公司 A kind of contaminated sites source blocking method
CN109322699A (en) * 2018-09-29 2019-02-12 山东省地质矿产勘查开发局八0水文地质工程地质大队 Pollution isolation blocking technology under a kind of mine

Similar Documents

Publication Publication Date Title
CN108086296B (en) Dynamic and static combined grouting foundation reinforcing construction method
CN105363767A (en) Extracting and injecting combined three-dimensional prevention and control method used for emergency treatment after soil pollution
CN101260669A (en) Drilling, spraying, injection integral enlarging anchor rod construction method
CN104141314B (en) The method of complete seepage proof curtain is formed in rock, native two media
CN106836214A (en) Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect treatment
CN101864778A (en) Method for leaking stoppage of external wall of underground structure
CN101070701A (en) Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method
CN110424892B (en) Water inrush treatment method for nearly horizontal directional drilling of mine
CN104563099A (en) Porous pipe method large-diameter high-pressure jet grouting pile construction method
CN104929135A (en) Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof
EP2914781B1 (en) Soil grouting
CN108372201A (en) A kind of high-pressure rotary-spray dosing of organic contamination place original position aoxidizes restorative procedure
CN103061349A (en) Processing method for foundation pit piping
CN102926409A (en) Construction method for preventing water and soil loss
CN203702071U (en) Water inrush preventing drill ejecting device for water exploration and grouting construction of vertical shaft
CN106088092B (en) Pile pile piling process occurs refusing the solution of hammer situation
CN204703180U (en) A kind of foundation pit dewatering well-sealing device
CN102535518A (en) Plugging method of large seam of underground diaphragm wall
CN107354939A (en) A kind of minor diameter static mini steel-pipe pile grouting behind shaft or drift lining construction method
CN102758443B (en) Novel enclosing structure applicable to connection change between new pipes and old pipes and construction method thereof
CN201486523U (en) High-pressure water return preventing safety control device in borehole rod below high-pressure water head
CN106677190A (en) Grouting construction method for underwater pebble bed foundation pit curtain
CN110700790B (en) Complete hole sealing method for coal mine underground Ordovician limestone aquifer large-flow water-gushing and sand-gushing drill hole
CN103938613A (en) Freezing pipe injected grout non-return device
CN106930294A (en) A kind of bedrock fracture artesian area grouting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160302