CN105350556A CN201510763183.7A CN201510763183A CN105350556A CN 105350556 A CN105350556 A CN 105350556A CN 201510763183 A CN201510763183 A CN 201510763183A CN 105350556 A CN105350556 A CN 105350556A
Authority
CN
China
Prior art keywords
grouting
underground structure
new material
slurries
leak
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510763183.7A
Other languages
Chinese (zh)
Inventor
单勤
赵东升
杨建峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201510763183.7A priority Critical patent/CN105350556A/en
Publication of CN105350556A publication Critical patent/CN105350556A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/16Restraining of underground water by damming or interrupting the passage of underground water by placing or applying sealing substances
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/0021Mortar
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0025Adhesives, i.e. glues

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

A new material underground structure leakage stoppage construction technology includes the following steps that firstly, cleaning is performed; secondly, drilling and drainage are performed; thirdly, a grouting guide pipe is installed; fourthly, cracks are sealed; fifthly, grouting is performed, wherein ultra-fine cement slurry materials are adopted for grouting, water leakage is reduced or disappears, then permeable crystallization grouting materials are injected to plug a tiny water seepage channel, and finally epoxy resin grout is injected for reinforcement; sixthly, a nozzle is detached; and seventhly, sealing is performed. Through a traditional leakage stoppage method, only obvious cracks can be plugged. According to the new material underground structure leakage stoppage construction technology, ultra-fine cement slurry is adopted for plugging the tiny cracks, the phenomenon that only the temporary problem is solved and the fundamental problem is not solved is effectively avoided, and the effect of fundamentally suppressing structural crack water leakage is achieved. By means of the method, repeated construction of leakage stoppage operation can be avoided, the effects of saving cost of labor, machines, materials and the like are effectively achieved, and good economic benefits are achieved.

Description

A kind of new material underground structure blocking constructing process
Technical field
The invention belongs to the blocking technology field of subway station or other underground structure shutoff micro-cracks, be specifically related to a kind of new material underground structure blocking constructing process.
Background technology
Current Tianjin Underground station owner body structure completion, there is Seepage in various degree in part-structure; And in ensuing accessory structure work progress, also may run into structural leakage problem.If do not take reliable plugging watertight method in the middle of work progress, may have an impact to the internal construction at station, shortening structure application life, seepage seriously even there will be the phenomenon such as quicksand and piping.Further, in station, percolating water also can bring a series of impact to follow-up operation repeatedly, affects the using function at station, therefore selects rational construction material, carries out plugging watertight construction to subway station, effectively can ensure the construction quality of subway station.
Summary of the invention
The present invention is directed to above-mentioned weak point and a kind of leak-blocking construction method for micro-cracks is provided, utilize the construction technology of micro-cracks in new material shutoff underground structure.
The technical solution used in the present invention is:
A kind of new material underground structure blocking constructing process, comprises the following steps:
(1) clear up: detailed inspection, analysis leakage scenarios, clean out the region needing construction, cut concrete surface precipitate, guarantee surface clean;
(2) trepanation and drainage: use electric drill to hole along the place of leaking, bit diameter is 25mm, bore angle≤45 °, drilling depth, through crack, makes current discharge from boring;
(3) grouting pipe is installed: in the hole of having bored, conduit is installed, installs firmly;
(4) joint seal: the space water between surrounding catheter and boring does not leak shutoff, make to leak along conduit and flow out, surrounding catheter is water-tight;
(5) slip casting: grouting sequence is from one end, and single hole carries out one by one continuously; Grouting pressure is 0.5 ~ 1.0MPa, first adopts the slip casting of superfine cement pulp material, and making to leak reduces or disappear, and then injects the trickle penetrating passage of penetrant crystalline injecting paste material slurries shutoff, the reinforcement of last injection ring epoxy resins slurries;
(6) tear mouth open: slip casting is complete, confirm not leak the grouting nozzle that can remove or knock out and expose; Clean out the slurries that the spill and leakage that solidified goes out;
(7) seal: repairing, the sealing process of carrying out grouting port with leak stopping spirit.
Described superfine cement slurry for raw material, is that 0.8:1 ~ 1:1 batching make slurries according to water/binder ratio with middle rock superfine cement.
Described penetrant crystalline slip casting, with CCCW type penetrant crystalline cement, makes slurries according to water/binder ratio 0.6:1 ~ 1:1 batching.
Described epoxy resin slurries are with epoxy resin, 731 epoxy resin and 501 epoxide resin reactive diluents for batching, and proportional quantity is respectively 100; 25 ~ 35; 10 ~ 20.
Beneficial effect of the present invention: traditional blocking method can only the obvious crack of shutoff, the present invention is with superfine cement slurries shutoff micro-cracks, effectively avoid traditional method for blocking " to cure the symptoms, not the disease ", the effect fundamentally suppressing structural cracks percolating water can be played.This method can avoid plugging operations to repeat construction, effectively serves the expenses such as saving is artificial, machinery, material, has good economic benefit.
Detailed description of the invention
Tianjin Underground No. 6 line northern stations utilize new material to underground structure blocking constructing process, comprise the following steps:
(1) clear up: detailed inspection, analysis leakage scenarios, clean out the region needing construction, cut concrete surface precipitate, guarantee surface clean;
(2) trepanation and drainage: use electric drill to hole along the place of leaking, bit diameter is 25mm, bore angle≤45 °, drilling depth, through crack, makes current discharge from boring;
(3) grouting pipe is installed: in the hole of having bored, conduit is installed, installs firmly.
(4) joint seal: the space water between surrounding catheter and boring does not leak shutoff, make to leak along conduit and flow out, surrounding catheter is water-tight.
(5) slip casting: grouting sequence is from one end, and single hole carries out one by one continuously; Grouting pressure is 0.5 ~ 1.0MPa, first employing water/binder ratio is the superfine cement pulp material slip casting of 1:1, make to leak and reduce or disappear, then inject the trickle penetrating passage of penetrant crystalline injecting paste material slurries shutoff that water/binder ratio is 1:1, the reinforcement of last injection ring epoxy resins slurries.
(6) tear mouth open: slip casting is complete, confirm not leak the grouting nozzle that can remove or knock out and expose; Clean out the slurries that the spill and leakage that solidified goes out.
(7) seal: repairing, the sealing process of carrying out grouting port with leak stopping spirit.
Epoxy resin slurries press 100:35:20 preparation with epoxy resin, 731 epoxy resin and 501 epoxide resin reactive diluents.

Claims (4)

1. a new material underground structure blocking constructing process, is characterized in that, comprises the following steps:
(1) clear up: detailed inspection, analysis leakage scenarios, clean out the region needing construction, cut concrete surface precipitate, guarantee surface clean;
(2) trepanation and drainage: use electric drill to hole along the place of leaking, bit diameter is 25mm, bore angle≤45 °, drilling depth, through crack, makes current discharge from boring;
(3) grouting pipe is installed: in the hole of having bored, conduit is installed, installs firmly;
(4) joint seal: the space water between surrounding catheter and boring does not leak shutoff, make to leak along conduit and flow out, surrounding catheter is water-tight;
(5) slip casting: grouting sequence is from one end, and single hole carries out one by one continuously; Grouting pressure is 0.5 ~ 1.0MPa, first adopts the slip casting of superfine cement pulp material, and making to leak reduces or disappear, and then injects the trickle penetrating passage of penetrant crystalline injecting paste material slurries shutoff, the reinforcement of last injection ring epoxy resins slurries;
(6) tear mouth open: slip casting is complete, confirm not leak the grouting nozzle that can remove or knock out and expose; Clean out the slurries that the spill and leakage that solidified goes out;
(7) seal: repairing, the sealing process of carrying out grouting port with leak stopping spirit.
2. new material underground structure blocking constructing process according to claim 1, is characterized in that, described superfine cement slurry for raw material, is that 0.8:1 ~ 1:1 batching make slurries according to water/binder ratio with middle rock superfine cement.
3. new material underground structure blocking constructing process according to claim 1, is characterized in that, described penetrant crystalline slip casting, with CCCW type penetrant crystalline cement, makes slurries according to water/binder ratio 0.6:1 ~ 1:1 batching.
4. new material underground structure blocking constructing process according to claim 1, is characterized in that, described epoxy resin slurries are with epoxy resin, 731 epoxy resin and 501 epoxide resin reactive diluents for batching, and proportional quantity is respectively 100; 25 ~ 35; 10 ~ 20.
CN201510763183.7A 2015-11-10 2015-11-10 New material underground structure leakage stoppage construction technology Pending CN105350556A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510763183.7A CN105350556A (en) 2015-11-10 2015-11-10 New material underground structure leakage stoppage construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510763183.7A CN105350556A (en) 2015-11-10 2015-11-10 New material underground structure leakage stoppage construction technology

Publications (1)

Publication Number Publication Date
CN105350556A true CN105350556A (en) 2016-02-24

Family

ID=55326608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510763183.7A Pending CN105350556A (en) 2015-11-10 2015-11-10 New material underground structure leakage stoppage construction technology

Country Status (1)

Country Link
CN (1) CN105350556A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882076A (en) * 2017-11-13 2018-04-06 中铁二十四局集团南昌铁路工程有限公司 Underground engineering agent structure and accessory structure interface Seepage water method
CN108118724A (en) * 2016-11-29 2018-06-05 中国二十冶集团有限公司 T-bolt anchor box leak blocking method
CN108316241A (en) * 2018-04-13 2018-07-24 上海公路桥梁(集团)有限公司 Blocking method is stitched in waterwall concrete wall structure and its serious leakage water crack
CN108774040A (en) * 2018-06-20 2018-11-09 河南阳光防水科技有限公司 The inorganic grout material of penetrant crystalline
CN110195444A (en) * 2019-04-23 2019-09-03 浙江绿城房屋服务***有限公司 Basement leakage back side processing method
CN110344448A (en) * 2019-07-14 2019-10-18 广东庆余堂建筑科技有限公司 A kind of blocking method of the deep hole perfusion grouting material of basement bottom board large-scale water leakage
CN110670899A (en) * 2019-10-11 2020-01-10 三门核电有限公司 Construction method suitable for high-pressure leakage stoppage of building
CN112682072A (en) * 2020-12-22 2021-04-20 湖北省大唐安盛建筑工程有限公司 Tunnel reinforcing gap treatment process
CN112878367A (en) * 2021-01-23 2021-06-01 北京隧盾市政建设有限公司 Method for treating water leakage of construction joint and crack of subway main structure
CN112900512A (en) * 2021-01-25 2021-06-04 广州建筑产业开发有限公司 Basement bottom plate crack punching, reinforcing and repairing construction method
CN112900490A (en) * 2021-01-23 2021-06-04 北京隧盾市政建设有限公司 Deformation joint grouting and leaking stoppage subway structure water leakage treatment method
CN115945494A (en) * 2022-12-29 2023-04-11 武汉中科固废资源产业技术研究院有限公司 Leakage repairing method for operating solid waste landfill seepage-proofing system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06248895A (en) * 1993-02-26 1994-09-06 Itsuki Kogyo Kk Grout and grouting method
CN1546842A (en) * 2003-12-11 2004-11-17 广州市泰利斯固结补强工程有限公司 Construction method of leakage waterstop for shield tunnel concrete structure segments
CN101832143A (en) * 2010-04-02 2010-09-15 云南云岭高速公路养护绿化工程有限公司 Method for treating tunnel water leakage
CN101864778A (en) * 2010-06-30 2010-10-20 广东省基础工程公司 Method for leaking stoppage of external wall of underground structure
CN104234090A (en) * 2014-09-04 2014-12-24 江苏南通三建集团有限公司 Method for treating crack water seepage of concrete floor and wall body
RU2559274C1 (en) * 2014-02-10 2015-08-10 Общество С Ограниченной Ответственностью "Горгеострой" Method for elimination of water leaks in underground buildings

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06248895A (en) * 1993-02-26 1994-09-06 Itsuki Kogyo Kk Grout and grouting method
CN1546842A (en) * 2003-12-11 2004-11-17 广州市泰利斯固结补强工程有限公司 Construction method of leakage waterstop for shield tunnel concrete structure segments
CN101832143A (en) * 2010-04-02 2010-09-15 云南云岭高速公路养护绿化工程有限公司 Method for treating tunnel water leakage
CN101864778A (en) * 2010-06-30 2010-10-20 广东省基础工程公司 Method for leaking stoppage of external wall of underground structure
RU2559274C1 (en) * 2014-02-10 2015-08-10 Общество С Ограниченной Ответственностью "Горгеострой" Method for elimination of water leaks in underground buildings
CN104234090A (en) * 2014-09-04 2014-12-24 江苏南通三建集团有限公司 Method for treating crack water seepage of concrete floor and wall body

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《大坝化学灌浆技术经验选编》审编小组: "《大坝化学灌浆技术经验选编》", 31 March 1977, 水利电力出版社 *
冯敬涛: "《城镇道路工程施工工艺手册 面层、人行道、构筑物》", 30 June 2011, 机械工业出版社 *
周书明,龙援青,汪建刚等: "《地下工程承压地下水的控制与防治技术研究》", 31 December 2012, 中国铁道出版社 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118724A (en) * 2016-11-29 2018-06-05 中国二十冶集团有限公司 T-bolt anchor box leak blocking method
CN107882076A (en) * 2017-11-13 2018-04-06 中铁二十四局集团南昌铁路工程有限公司 Underground engineering agent structure and accessory structure interface Seepage water method
CN108316241B (en) * 2018-04-13 2023-08-04 上海公路桥梁(集团)有限公司 Water retaining wall concrete wall structure and severe leakage crack plugging method thereof
CN108316241A (en) * 2018-04-13 2018-07-24 上海公路桥梁(集团)有限公司 Blocking method is stitched in waterwall concrete wall structure and its serious leakage water crack
CN108774040A (en) * 2018-06-20 2018-11-09 河南阳光防水科技有限公司 The inorganic grout material of penetrant crystalline
CN110195444A (en) * 2019-04-23 2019-09-03 浙江绿城房屋服务***有限公司 Basement leakage back side processing method
CN110344448A (en) * 2019-07-14 2019-10-18 广东庆余堂建筑科技有限公司 A kind of blocking method of the deep hole perfusion grouting material of basement bottom board large-scale water leakage
CN110670899A (en) * 2019-10-11 2020-01-10 三门核电有限公司 Construction method suitable for high-pressure leakage stoppage of building
CN112682072A (en) * 2020-12-22 2021-04-20 湖北省大唐安盛建筑工程有限公司 Tunnel reinforcing gap treatment process
CN112878367A (en) * 2021-01-23 2021-06-01 北京隧盾市政建设有限公司 Method for treating water leakage of construction joint and crack of subway main structure
CN112900490A (en) * 2021-01-23 2021-06-04 北京隧盾市政建设有限公司 Deformation joint grouting and leaking stoppage subway structure water leakage treatment method
CN112900512A (en) * 2021-01-25 2021-06-04 广州建筑产业开发有限公司 Basement bottom plate crack punching, reinforcing and repairing construction method
CN115945494A (en) * 2022-12-29 2023-04-11 武汉中科固废资源产业技术研究院有限公司 Leakage repairing method for operating solid waste landfill seepage-proofing system

Similar Documents

Publication Publication Date Title
CN105350556A (en) New material underground structure leakage stoppage construction technology
CN107387123B (en) The construction method of pressure grouting leak stopping is carried out for shield duct piece piece leakage phenomenon
CN102561992B (en) Grouting plugging process adopting deformation water stopper
CN101666234B (en) Fracture rock no-slurry-blocking wall compound grouting construction method
CN108517899A (en) Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall
CN101694096B (en) Treatment method for grouting sand-layer foundation on the condition of flowing water
CN110952953B (en) Pressure-maintaining plugging device for horizontal directional drill hole and water gushing treatment method using same
CN105386435B (en) It is a kind of to be used for the double-liquid grouting system and its construction technology of cement and water glass solution
CN105350953A (en) Measuring method for coal seam gas pressure in complicated geological condition
CN103277120A (en) Post-unfreezing water burst prevention method of non-full-depth freezing vertical shaft
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN109024641A (en) Triple tube double-liquid rotary spray is used for the construction method of deep basal pit leak stopping
CN112095647B (en) Plugging method for quickly plugging leakage point of waterproof curtain
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
CN102536269A (en) Underground grouting and water-plugging process
CN112482415A (en) Consolidation grouting method for underground cavern under high external water pressure and flowing water condition
CN105257309B (en) In a kind of layer of sand in balancing earth-pressure shielding machine storehouse slip casting tool changing construction method
CN204491646U (en) A kind of high water level area fender body device for plugging
CN104314106A (en) Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof
CN114109442B (en) Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method
CN205369234U (en) Freeze high pressure jet grouting pile
CN103174135B (en) Repair method of unqualified post-grouting bored concrete pile
CN101979820B (en) Process for sealing elevation drill hole water-stopping sleeves
CN105781580A (en) Tunnel crack repair method
CN110777860A (en) Method for grouting and plugging back of side wall leakage water of subway station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160224