CN114109442B - Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method - Google Patents

Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method Download PDF

Info

Publication number
CN114109442B
CN114109442B CN202111208907.3A CN202111208907A CN114109442B CN 114109442 B CN114109442 B CN 114109442B CN 202111208907 A CN202111208907 A CN 202111208907A CN 114109442 B CN114109442 B CN 114109442B
Authority
CN
China
Prior art keywords
grouting
drilling
section
face
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111208907.3A
Other languages
Chinese (zh)
Other versions
CN114109442A (en
Inventor
胡芳
李洪亮
张鹏
金宝
周建明
姚德臣
金增禄
赵政法
王宏达
王继山
刘学勇
徐延召
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority to CN202111208907.3A priority Critical patent/CN114109442B/en
Publication of CN114109442A publication Critical patent/CN114109442A/en
Application granted granted Critical
Publication of CN114109442B publication Critical patent/CN114109442B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a forward grouting reinforcement treatment method for a semi-section curtain of a karst broken zone slide collapse of a tunnel. The method comprises the following steps: back-pressure backfilling and plugging emergency treatment are carried out on the tunnel face, and grouting is carried out to strengthen the collapse body; setting a concrete grout stop wall with the thickness of 2-5 m on the face; grouting to reinforce the loose body and surrounding rock within the range of 3m-4.5m outside the contour line of a 3m hole forming section at the rear end of the grout stopping wall to form a circumferential grout stopping curtain layer; grouting reinforcement is carried out on the horizontal section of the collapse body 3m away from the top of the hole in a sectional forward grouting mode, so that a horizontal grouting curtain layer is formed; for a geological weak section, advanced subsection forward grouting reinforcement construction is implemented; after grouting is finished, 3 advanced horizontal exploratory holes are uniformly distributed in a range of 1m near the contour line of the arch part, and grouting effect is analyzed and judged. The invention can better ensure grouting reinforcement effect, improve success rate of successful tunneling through karst broken belt, has higher safety, can accelerate construction treatment progress of bad geological section, and saves construction period and cost.

Description

Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method
Technical Field
The invention relates to a method for reinforcing a karst broken belt collapse body of a tunnel, and belongs to the technical field of tunnel construction.
Background
Along with the development of railway construction at a high speed, the railway gradually develops to remote areas, tunnels are repaired longer, the traversing geology is more complex, and generally poor geology comprises collapse, mud burst, water burst, karst, gas, faults, structural breaking zones, large deformation, rock burst and the like, when the poor geology is encountered, if a processing mode is selected improperly, larger economic loss or safety accidents can be caused, meanwhile, the tunnel of a key line is delayed in construction period, and the whole line construction period is seriously influenced.
At present, the domestic tunnel is still in a fumbling stage in the scheme selection of the construction treatment of poor geological segments such as karst broken bands and the like, and lacks relatively mature construction case guidance. If the construction is directly carried out according to the measures of the traditional curtain grouting scheme, the investment cost is high, the treatment period is long, and the construction method is not suitable from the aspects of economy and construction period assurance; if the construction method of the advanced long pipe shed support, the construction method of the advanced pipe curtain support and the construction method of the CD method are adopted, the success rate of successful tunneling through the karst breaking belt is low, the safety is low, and unnecessary material waste, construction period delay and shack compensation can be increased.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides the forward grouting reinforcement treatment method for the semi-section curtain collapse of the karst breaking belt of the tunnel, which can better ensure grouting reinforcement effect, improve success rate of successful tunneling through the karst breaking belt and has higher safety.
The invention is realized by the following technical scheme: a forward grouting reinforcement treatment method for a karst broken belt sliding collapse half-section curtain of a tunnel is characterized by comprising the following steps: the method comprises the following steps:
(1) The back pressure backfill plugging emergency treatment of the face is carried out to avoid continuous slip and the slip body is consolidated by adopting a grouting reinforcement mode, so that the position of the slurry stopping wall can be excavated as close to the face as possible under the condition of ensuring that the face does not slip;
(2) Setting a concrete grout stop wall with the thickness of 2-5 m on the face;
(3) Constructing and grouting by adopting a YT-28 air drill to reinforce loose bodies and surrounding rocks within the range of 3m-4.5m outside the excavation outline of a 3m hole forming section at the rear end of the grout stopping wall, so as to form a circumferential grout stopping curtain layer;
(4) Drilling advanced horizontal grouting curtain holes on the horizontal section of the sliding and collapsing body 3m away from the top of the hole by adopting a pipe shed drilling machine, wherein the horizontal distance between the drilling holes is 1-1.5 m, grouting reinforcement is carried out by adopting a sectional forward grouting mode, and a horizontal grouting curtain layer is formed;
(5) For a geological weak section, adopting a pipe-shed drilling machine and a high-pressure grouting pump to implement advanced subsection advancing grouting reinforcement construction, realizing reinforcement of surrounding rock within a range of 4.5m beyond an excavation outline, and burying phi 22 threaded steel bars in grouting holes to form a fastening ring within an arch part range so as to overcome the pressure of the surrounding rock in the excavation process;
(6) After grouting is finished, 3 advanced horizontal exploratory holes are uniformly distributed in a range of 1m near the contour line of the arch part by analyzing advanced grouting consolidation drilling and grouting conditions, analyzing and judging grouting effects, providing guidance for excavation in the next step and ensuring construction safety.
According to the invention, the horizontal grouting curtain, the surface layer solidification grouting and the forward grouting solidification process are optimized and added on the traditional curtain grouting process, and a good effect is achieved on saving grouting amount and drilling hole forming rate of a karst crushing belt. The horizontal grouting curtain and the surface layer consolidation grouting curtain can effectively prevent excessive slurry from flowing into a collapse body and a rock-soil body within an excavation outline during advanced reinforcement, form an upper half-section curtain grouting space, and achieve the purposes of accelerating treatment efficiency and shortening treatment period on the premise of ensuring reinforcement treatment effect. Advanced subsection advancing grouting reinforcement construction can effectively ensure the hole forming rate of drilling, simultaneously ensure the grouting consolidation effect, improve the construction efficiency, shorten the construction period and ensure the tunnel construction safety.
Further, in the step 1, when the back pressure backfilling and plugging treatment is carried out on the face, the back pressure face is backfilled by adopting dregs, and then a stacking sand bag is adopted to plug a sliding and collapsing opening so as to prevent continuous sliding and collapsing; when the grouting reinforcement consolidation slide collapse body is adopted, the surface of the face slide collapse body adopts C25 sprayed concrete to fully cover and spray a sealing layer with the thickness of 5cm, meanwhile, the C25 sprayed concrete is adopted to seal the exposed surface of the face, phi 42 grouting flower pipes are arranged on the slide collapse body near the face, the length of each grouting flower pipe is 4.5m, the interval is 1.5mx1.5m, the plum blossom is distributed, and the grouting consolidation is carried out by adopting double liquid slurries.
Further, the construction parameters in the step 3 are drilling depth L=3-5 m, drilling interval 1m×1m and radial drilling.
In the step 4, a hole orifice pipe with the length of 1.5m and the diameter of phi 89 is adopted for the sectional forward grouting, 3-5 m is drilled each time, full Duan Chunya type grouting with a bare hole is carried out, the hole is swept to the original hole depth after the completion, the deep drilling is continued, and the process is repeated, so that the design depth is finally reached; the grouting slurry is poured by adopting C-S double-liquid slurry or cement paste, and the grouting pressure P=1-2 Mpa.
Further, the sectional progressive grouting reinforcement mode in the step 5 is to drill a section of grouting to consolidate a section, and bare hole grouting is adopted; the construction parameters in the step 5 are as follows: drilling depth l=6-24 m, drilling interval 1.5-2 m, drilling angle 9-52 deg, and the drilling is in sector arrangement; the slurry is poured by adopting 0.5:1 pure cement slurry and C-S double slurry, and the grouting pressure P=2-3 Mpa.
Further, when the grout stop wall is poured, a drain pipe is buried in a place where flowing water is concentrated.
The beneficial effects of the invention are as follows: the invention can better ensure grouting reinforcement effect, improve success rate of successful tunneling through karst breaking belt and has higher safety. According to the method, the processes of horizontal grouting curtain, surface layer consolidation grouting, forward grouting consolidation and the like are optimally added on the traditional curtain grouting process, so that good effects can be achieved on the aspects of saving grouting amount and the hole forming rate of a karst crushing belt, unnecessary material waste, construction period delay and shack compensation can be reduced, the one-time reinforcement treatment length can reach 20m, the construction treatment progress of a bad geological section is accelerated, and the method is safer, environment-friendly, construction period and cost are saved. Compared with the existing construction methods of the advanced long pipe shed support, the advanced pipe curtain support, the CD method and the traditional curtain grouting, the method of the invention is more economical, safer and more successful, and has more adaptability, advancement and popularization. The method provides a good practical foundation for selection of a karst breaking belt, a breaking structure and a water-rich rock stratum collapse treatment scheme in future tunnel construction, and simultaneously, the method is further optimized and innovated for the traditional curtain grouting construction method. The method has strong applicability and safety, is applicable to the karst broken belt water-rich section, the mud burst, the sand burst, the water burst, the broken belt of other structures and other unfavorable geological section railway tunnels and highway tunnels, can reduce the construction cost, has obvious social and environmental protection benefits and has wide popularization and application prospects.
Drawings
FIG. 1 is a longitudinal section view of a tunnel karst breaking belt slip half-section curtain grouting progressive grouting construction treatment measure in a concrete embodiment;
fig. 2 is a projection view of dk000+003 (grout stop wall) section advanced grouting reinforcement and advanced horizontal grout stop curtain hole position arrangement in the embodiment;
FIG. 3 is a flow chart of a progressive grouting process;
in the figure, 1, slurry stopping curtain drilling and 2, advanced consolidation drilling are carried out.
Detailed Description
The invention is further illustrated by the following non-limiting examples, in conjunction with the accompanying drawings:
as shown in the drawing, the poor geology of the construction case is a karst crushing belt, mainly comprising dolomites and dolomites limestone and mud rocks, the joint cracks develop very much, and the construction case is in a crushed and loose shape, and surrounding rocks are crushed to very much; the surrounding rock is tiny karst pores, corrosion is developed, and karst fissure water develops; the tunnel is excavated to form a temporary surface, the vault loose body is affected by the fracture water to slide and collapse, the maximum water inflow is about 12000 m/d, and the normal water inflow is about 6000 m/d.
The main construction procedure and the construction steps are as follows:
back-pressure backfilling of the tunnel face, plugging emergency treatment, slip casting consolidation, slurry stopping wall excavation, pouring, surface layer consolidation and water shutoff, horizontal slurry stopping curtain, advanced sectional advancing grouting reinforcement, grouting reinforcement effect evaluation and drainage construction, three-step temporary inverted arch excavation construction.
The concrete construction steps are as follows:
1. back pressure backfill plugging emergency treatment of the tunnel face:
and (3) the construction mechanical equipment is used for transporting the dregs back to the back pressure face (if the face continuously collapses, a dregs retaining wall is arranged behind the face, so that the collapsed objects are naturally accumulated to the top of the face), and then a stacking sand bag is used for blocking the collapse opening to prevent continuous collapse. In order to reduce the flushing of karst fracture water to the collapse body and the sand bag and prevent the water pressure from being large, drainage pipes can be buried according to the water quantity.
2. Grouting and solidifying the face collapse body:
the surface of the face sliding collapse body adopts C25 sprayed concrete to fully cover a sealing layer with the sprayed thickness of 5cm, and simultaneously adopts C25 sprayed concrete to seal the exposed face of the face; and phi 42 grouting flower pipes are arranged near the face of the collapse body, the length is 4.5 m/root, the quincuncial arrangement is 1.5m multiplied by 1.5m, and the grouting consolidation is carried out by adopting double-liquid slurry, so that the purpose of no collapse during the excavation of a slurry stopping wall is achieved.
3. And (3) excavating and pouring construction of the grout stopping wall:
the grouting wall can effectively avoid excessive leakage of slurry in the grouting process, improve grouting efficiency, achieve grouting effect, shorten treatment period and simultaneously play a role in sealing and stopping water for karst water seepage sections.
(1) And (3) excavating: the slip body is excavated to avoid slip through grouting consolidation, and is usually excavated to be close to a grouting wall pouring position as much as possible under the condition that the face is ensured not to slip, and the height of the excavated height double-line tunnel is about 4.5m from the arch crown and 3-5 m from the original face;
(2) The thickness setting requirement of the grout stopping wall is as follows: the thickness is 2-5 m (the thickness of the slurry stopping wall is judged according to the water pressure, the water pressure is increased by 1MPa, the wall thickness is increased by 1m, the minimum thickness is 2m, and the maximum thickness is 5 m);
(3) And (3) drainage treatment: before the grout stop wall is poured, drainage treatment is required to be conducted on the concentrated water outlet part of the current tunnel face. The main method comprises the following steps: the embedded drainage pipe (pipe orifice is provided with a valve), the local caulking, the membrane-mounting bag drainage device and the like enable the dispersion running water of the existing face to be basically controllable after drainage treatment, thereby facilitating the pouring of the grout stopping wall and improving the pouring quality of the grout stopping wall;
(4) And (3) construction of a grout stopping wall:
according to the condition of the on-site tunnel face, adopting a mode of pouring a slurry stopping wall on the whole section of the upper step, wherein the thickness is 2-5 m;
the grout stopping wall is poured for three times, namely, a foundation, a wall body (height is 2 m/cycle), and the wall body is arranged on the top;
the grout stop wall is erected by combining a steel mould and a wood mould, concrete pouring with the mark no lower than C20 is adopted, a drain pipe is buried in a place with more concentrated running water, the drain pipe adopts phi 200mm steel pipes with valves, and the number of the drain pipes is 1 at the bottom and the arch part in general.
4. And (3) surface layer consolidation and water shutoff construction:
the loose body and surrounding rock within the range of 3-4.5 m outside the excavation outline of the 3m hole forming section at the rear end of the slurry stopping wall are reinforced, and meanwhile, a circumferential slurry stopping curtain layer is formed, so that the effects of reducing slurry loss and further sealing water are achieved.
(1) Drilling: drilling depth l=3 to 5m, drilling pitch 1m×1m, radial drilling. The two-wire tunnel is expected to be provided with 50 drill holes; and the drilling adopts YT-28 type hand drill hole forming, the aperture is 50mm, and the hole forming is performed once.
(2) Grouting: after hole forming, a phi 25mm, l=1.5m orifice tube was installed in the orifice. Grouting operation is implemented by adopting a pure pressure grouting method. If no water exists in the holes during grouting, directly grouting 0.5:1 cement thick slurry; if water exists in the hole, the C-S double slurry is directly poured. Grouting pressure P=0.5-1 Mpa, and the slurry mixing ratio and grouting pressure are adjusted according to the actual grouting condition on site.
Grouting end standard: and under the condition of designing grouting pressure, the grouting is finished after the injection rate is smaller than 1L/min and the grouting is continued for 10 min.
5. Horizontal slurry-stopping curtain construction:
a row of horizontal grout stopping curtain holes along the line direction are arranged on the horizontal section of the sliding and collapsing body, which is about 3m away from the top of the hole, so that excessive loss of grout into the collapse body and the rock and soil body (which is excavated in the later stage) within the excavation outline during advanced reinforcement is effectively prevented by the measures, and an upper half section curtain grouting space is formed by consolidation with the grout stopping wall and the surface layer.
(1) Drilling:
1) Drilling arrangement: the drilling depth L=25m, the drilling interval is 1.0-1.5 m, the drilling direction is basically horizontal, the azimuth angles of the holes on two sides are inclined to the directions of the respective side walls, and the fan-shaped section is integrally formed. The two-wire tunnel is expected to be provided with 7 holes, which are adjusted according to the actual situation.
2) Embedding an orifice pipe: and drilling holes with the diameter of phi 127mm, wherein the depth of the holes is 1.5m. After the drilling is completed, a die bag orifice pipe installation method is adopted to install a phi 89mm pressure-resistant steel pipe (L=1.5m) as an orifice pipe. The orifice pipe can be arranged in advance before the grout stop wall is poured, and the orifice pipe is firmly embedded by concrete.
3) Drilling section length: and after the orifice pipe is installed, performing grouting section construction by adopting phi 75mm drilling from the inside of the orifice pipe. The grouting sectional length is 3-5 m. If the broken belt can not form holes or water can not flow out of the holes, the drilling can be immediately started and continued after grouting. Drilling holes by adopting a pipe shed drilling machine.
(2) Grouting:
1) The grouting method comprises the following steps: grouting by adopting a 'forward type' orifice closed pure pressure method, namely drilling 3-5 m each time, carrying out full Duan Chunya type grouting of a bare hole, sweeping the blank to the original hole depth after finishing, continuously drilling to the deep part, and repeating the process, thereby finally reaching the design depth.
2) Construction parameters: the slurry adopts C-S double-slurry quick pouring or cement paste quick pouring. Grouting design pressure P=1-2 Mpa. The slurry mixing ratio and the grouting pressure are adjusted according to the actual grouting condition on site.
3) End standard: and when the injection rate is smaller than 3L/min under the designed grouting pressure, the process can be finished.
6. Advanced subsection advancing grouting reinforcement construction:
in the difficult section of karst broken area drilling pore-forming, adopt forward grouting construction technology, adopt and bore one section slip casting concretion one section, and adopt bare hole slip casting, can guarantee the diffusion effect of thick liquid, place the reinforcing bar in the slip casting downthehole behind the final orifice and play the cantilever beam effect to overcome the pressure of surrounding rock in the excavation process. The method not only can effectively ensure the hole forming rate of the drilling, but also can ensure the grouting consolidation effect, improve the construction efficiency, shorten the construction period and ensure the tunnel construction safety.
(1) The construction range is as follows: according to the pre-construction condition and the current site condition, the grouting range is set to be the 120-degree range of the hole top. If loose body distribution is still found when the side wall hole is constructed, the reinforcement range is widened as much as possible when the conditions allow.
(2) Drilling: the drilling depth L=6-24 m, the drilling interval is 1.5-2 m, the drilling angle is 9-52 degrees, and the drilling holes are arranged in a fan shape. The two-wire tunnel is expected to be arranged with 7 loops, for a total of 51 boreholes. Drilling holes by adopting a pipe shed drilling machine.
And drilling holes with the diameter of phi 127mm, wherein the depth of the holes is 1.5m. After the drilling is completed, a die bag orifice pipe installation method is adopted to install a phi 89mm pressure-resistant steel pipe (L=1.5m) as an orifice pipe.
And after the orifice pipe is installed, performing grouting section construction by adopting phi 75mm drilling from the inside of the orifice pipe. The grouting sectional length is 3-5 m. If the broken belt can not form holes or water can not flow out of the holes, the drilling can be immediately started and continued after grouting.
The position of the drilling hole can be properly adjusted according to the actual situation of the site.
(3) Grouting:
the slurry is poured by adopting 0.5:1 pure cement slurry and C-S double slurry, and the grouting pressure P=2-3 Mpa. The slurry mixing ratio and the grouting pressure are adjusted according to the actual grouting condition on site.
The grouting method is the same as the horizontal grouting curtain grouting method.
Grouting end standard: and under the designed grouting pressure, the grouting is finished after the grouting rate is smaller than 1L/min and the grouting is continued for 10 min.
(4) And after the advanced reinforcement grouting drilling is finished, phi 22mm screw steel is placed in the hole for reinforcement.
7. Grouting reinforcement effect evaluation and drainage hole construction:
analyzing advanced grouting consolidation drilling and grouting conditions, adopting the peripheral condition of the contour of the shallow Kong Tancha collapse section, uniformly and uniformly drilling 3-hole deep hole advanced horizontal exploratory holes (mainly aiming at geological weak sections) in the range of 1m near the contour line of the arch, analyzing and judging grouting effects, providing guidance for the next excavation and tunneling, and ensuring construction safety.
And after the advanced reinforcement grouting drilling is finished, phi 22mm screw steel is placed in the hole for reinforcement.
The shallow hole inspection holes should not have mud and sand burst, not collapse holes, and the water seepage amount should be less than 0.2L/min.m.
Deep hole inspection, wherein 3 advanced horizontal exploratory holes are uniformly distributed in a range of 1m near the contour line of the arch part
(with emphasis on geologically weak sections), the hole depth is 30m.
(4) When the core drilling is not performed, the drilling speed, the drilling pressure, the slag discharging components, the drilling sticking condition and the like are recorded for serious analysis; and after the grouting effect meets the requirement, organizing excavation construction.
8. Excavating and tunneling construction by using a three-step and temporary inverted arch method:
the advanced support adopts double-layer small guide pipes with the length of 4.5 m/root and the circumferential spacing of 20cm, the steel frame adopts I20b steel frame, and the longitudinal spacing is 0.6m; and excavating and tunneling by a mechanical method, so that disturbance to surrounding rock is reduced.
The construction of the three-step temporary inverted arch method is organized according to eighteen-character guidelines of 'pipe advance, tight grouting, short footage, strong support, early sealing and duty measurement', the concrete construction process of excavation and tunneling construction is constructed according to design drawings, specifications and technical guidelines, and the construction is not repeated here.
During the construction process, attention should be paid to:
(1) Performing grouting test in rock stratum under similar geological conditions before grouting, primarily grasping the filling rate of slurry, the grouting amount, the gel time after the slurry is matched, the slurry diffusion radius, the final grouting pressure and other indexes;
(2) The position of the orifice is accurately positioned, the allowable deviation between the orifice position and the design position is that the deviation angle of 5cm of soil accords with the design requirement, and the deviation between the position of the bottom of the orifice is less than 30cm when the orifice is inspected for one section after drilling;
(3) The diameter of the grouting hole is not less than 80mm, and the diameter of the final hole is not less than 73mm;
(4) The drilling and grouting sequence should be from outside to inside, the same circle of hole is constructed at intervals;
(5) The peripheral curtain grouting mode is determined according to the property of surrounding rock and the water inflow, and is mainly forward grouting, and the other modes are auxiliary;
(6) The orifice is 3m, the diameter is phi 73, the grouting pipe is firmly embedded, and a good grouting stopping facility is provided;
(7) The grouting operation of a hole section is generally carried out continuously until the end, the grouting operation is not suitable for interruption, the forced interruption caused by the problems of mechanical failure, power failure, water stopping, equipment and the like is avoided as much as possible, and for the intentional interruption caused by intermittent grouting, slurry burst prevention and the like, the drilling hole is cleaned to the original depth and then re-injection is carried out.
(8) Grouting slurry proportion.
According to the invention, the surface layer consolidation, water shutoff and horizontal slurry stopping curtain construction are carried out, and the two measures effectively prevent excessive slurry loss to the collapse body and the rock-soil body (to be excavated in the later stage) within the excavation outline during advanced reinforcement, so that an upper half-section curtain grouting space is formed, the treatment efficiency is quickened and the treatment period is shortened on the premise of ensuring the reinforcement treatment effect. Advanced sectional forward grouting reinforcement construction is adopted, in a section where hole forming is difficult in karst crushing belt drilling, forward grouting construction technology is adopted, one section of grouting consolidation is adopted, bare hole grouting is adopted, the diffusion effect of slurry can be guaranteed, reinforcing steel bars are placed in grouting holes after final holes to play a role of hanging beams, so that the pressure of surrounding rocks in the excavation process is overcome, the hole forming rate of drilling can be effectively guaranteed, meanwhile, the grouting consolidation effect is guaranteed, the construction efficiency is improved, the construction period is shortened, and the tunnel construction safety is guaranteed.
Other parts in this embodiment are all of the prior art, and are not described herein.

Claims (2)

1. A forward grouting reinforcement treatment method for a karst broken belt sliding collapse half-section curtain of a tunnel is characterized by comprising the following steps: the method comprises the following steps:
(1) The back pressure backfill plugging emergency treatment of the face is carried out to avoid continuous slip and the slip body is consolidated by adopting a grouting reinforcement mode, so that the position of the slurry stopping wall can be excavated as close to the face as possible under the condition of ensuring that the face does not slip;
(2) Setting a concrete grout stop wall with the thickness of 2-5 m on the face;
(3) Constructing and grouting by adopting a YT-28 air drill to reinforce loose bodies and surrounding rocks within the range of 3m-4.5m outside the excavation outline of a 3m hole forming section at the rear end of the grout stopping wall, so as to form a circumferential grout stopping curtain layer;
(4) Drilling advanced horizontal grouting curtain holes on the horizontal section of the sliding and collapsing body 3m away from the top of the hole by adopting a pipe shed drilling machine, wherein the horizontal distance between the drilling holes is 1-1.5 m, grouting reinforcement is carried out by adopting a sectional forward grouting mode, and a horizontal grouting curtain layer is formed;
(5) For a geological weak section, adopting a pipe-shed drilling machine and a high-pressure grouting pump to implement advanced subsection advancing grouting reinforcement construction, realizing reinforcement of surrounding rock within a range of 4.5m beyond an excavation outline, and burying phi 22 threaded steel bars in grouting holes to form a fastening ring within an arch part range so as to overcome the pressure of the surrounding rock in the excavation process;
(6) After grouting is finished, 3 advanced horizontal exploratory holes are uniformly drilled in a range of 1m near the contour line of the arch part by analyzing advanced grouting consolidation drilling and grouting conditions, analyzing and judging grouting effects, providing guidance for excavation in the next step and ensuring construction safety;
in the step 1, when the back pressure backfilling and plugging treatment is carried out on the face, the back pressure face is backfilled by adopting dregs, and then a stacking sand bag is adopted to plug a slip-collapse port so as to prevent continuous slip-collapse; when grouting and reinforcing a concreting collapse body, the surface of the face collapse body is fully covered by C25 sprayed concrete to spray a sealing layer with the thickness of 5cm, meanwhile, the exposed surface of the face is plugged by C25 sprayed concrete, phi 42 grouting flower pipes are arranged on the collapse body near the face, the length of each grouting flower pipe is 4.5m, the interval of 1.5mx1.5m is distributed in a quincuncial shape, and grouting concretion is carried out by adopting double liquid slurries;
the construction parameters in the step 3 are drilling depth L=3-5 m, drilling interval 1m×1m, radial drilling;
in the step 4, a subsection advancing grouting mode adopts an orifice pipe with the length of 1.5m and the diameter of phi 89, 3-5 m is drilled each time, full Duan Chunya type grouting with a bare hole is carried out, after the completion, the hole is swept to the original hole depth, drilling is continued to the deep part, and the process is repeated, so that the design depth is finally reached; grouting slurry is poured by adopting C-S double-liquid slurry or cement paste, and grouting pressure P=1-2 Mpa;
the sectional forward grouting reinforcement mode in the step 5 is to drill a section of grouting to consolidate a section, and bare hole grouting is adopted; the construction parameters in the step 5 are as follows: drilling depth l=6-24 m, drilling interval 1.5-2 m, drilling angle 9-52 deg, and the drilling is in sector arrangement; the slurry is poured by adopting 0.5:1 pure cement slurry and C-S double slurry, and the grouting pressure P=2-3 Mpa.
2. The method for forward grouting reinforcement of the semi-section curtain of the karst breaking zone slide collapse of the tunnel according to claim 1, which is characterized by comprising the following steps: when the grout stop wall is poured, a drain pipe is buried in a place where flowing water is concentrated.
CN202111208907.3A 2021-10-18 2021-10-18 Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method Active CN114109442B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111208907.3A CN114109442B (en) 2021-10-18 2021-10-18 Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111208907.3A CN114109442B (en) 2021-10-18 2021-10-18 Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method

Publications (2)

Publication Number Publication Date
CN114109442A CN114109442A (en) 2022-03-01
CN114109442B true CN114109442B (en) 2024-02-09

Family

ID=80375830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111208907.3A Active CN114109442B (en) 2021-10-18 2021-10-18 Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method

Country Status (1)

Country Link
CN (1) CN114109442B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114687750B (en) * 2022-04-29 2023-12-29 中国矿业大学 Three-way advanced curtain grouting method suitable for mining route in extremely broken rock stratum
CN117365376A (en) * 2023-12-06 2024-01-09 中国电建集团西北勘测设计研究院有限公司 Method for preventing hole collapse and drill sticking in pipe shed drilling construction

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3968655A (en) * 1973-07-13 1976-07-13 Mcglothlin William K Method of reinforcing tunnels before excavation
CN101994513A (en) * 2010-10-30 2011-03-30 中铁十二局集团第二工程有限公司 Method for constructing tunnel by finishing full section curtain grouting from upper-half section
CN105041325A (en) * 2015-07-13 2015-11-11 长沙理工大学 Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN106121661A (en) * 2016-08-08 2016-11-16 中铁二局集团有限公司 A kind of tunnel trunk is by loess separating surface water rich strata construction method
CN106351662A (en) * 2016-08-29 2017-01-25 济南力稳岩土工程有限公司 Partitioned phased grouting reinforcement method, construction method and application
CN107060821A (en) * 2017-03-24 2017-08-18 中铁十六局集团第五工程有限公司 A kind of many lithology method for protecting support of face
CN107642360A (en) * 2017-07-25 2018-01-30 彭峰 Tunneling boring front pre-grouting construction method
WO2019169423A1 (en) * 2018-03-05 2019-09-12 Relborgn Pty Ltd And Triomviri Pty Ltd Method and composition for limiting permeability of a matrix to limit liquid and gas inflow
CN110748350A (en) * 2019-10-28 2020-02-04 中国石油大学(华东) Method for quickly treating collapse of urban subway tunnel passing through water-rich sand layer section
CN111236951A (en) * 2020-02-22 2020-06-05 中铁十九局集团第六工程有限公司 Method for reinforcing secant pile at tunnel portal section of aeolian sand stratum
CN111810199A (en) * 2020-08-31 2020-10-23 中铁十六局集团有限公司 Tunnel water inrush disaster prevention treatment method
CN111810197A (en) * 2019-08-27 2020-10-23 淮南矿业(集团)有限责任公司 Pre-grouting reinforcement method for fault structural zone of working face
CN112412496A (en) * 2020-12-03 2021-02-26 中铁十二局集团有限公司 Full-section advanced curtain grouting construction method for water-rich broken geological zone tunnel
CN112412475A (en) * 2020-11-26 2021-02-26 中铁五局集团第一工程有限责任公司 Method for reinforcing and excavating surrounding rock of ice water accumulation body tunnel under influence of seasonal rainfall and surrounding rock support
CN218934444U (en) * 2022-12-23 2023-04-28 中铁十局集团第三建设有限公司 High-pressure horizontal jet grouting pile tunnel reinforcing structure in frozen soil area

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3968655A (en) * 1973-07-13 1976-07-13 Mcglothlin William K Method of reinforcing tunnels before excavation
CN101994513A (en) * 2010-10-30 2011-03-30 中铁十二局集团第二工程有限公司 Method for constructing tunnel by finishing full section curtain grouting from upper-half section
CN105041325A (en) * 2015-07-13 2015-11-11 长沙理工大学 Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN106121661A (en) * 2016-08-08 2016-11-16 中铁二局集团有限公司 A kind of tunnel trunk is by loess separating surface water rich strata construction method
CN106351662A (en) * 2016-08-29 2017-01-25 济南力稳岩土工程有限公司 Partitioned phased grouting reinforcement method, construction method and application
CN107060821A (en) * 2017-03-24 2017-08-18 中铁十六局集团第五工程有限公司 A kind of many lithology method for protecting support of face
CN107642360A (en) * 2017-07-25 2018-01-30 彭峰 Tunneling boring front pre-grouting construction method
WO2019169423A1 (en) * 2018-03-05 2019-09-12 Relborgn Pty Ltd And Triomviri Pty Ltd Method and composition for limiting permeability of a matrix to limit liquid and gas inflow
CN111810197A (en) * 2019-08-27 2020-10-23 淮南矿业(集团)有限责任公司 Pre-grouting reinforcement method for fault structural zone of working face
CN110748350A (en) * 2019-10-28 2020-02-04 中国石油大学(华东) Method for quickly treating collapse of urban subway tunnel passing through water-rich sand layer section
CN111236951A (en) * 2020-02-22 2020-06-05 中铁十九局集团第六工程有限公司 Method for reinforcing secant pile at tunnel portal section of aeolian sand stratum
CN111810199A (en) * 2020-08-31 2020-10-23 中铁十六局集团有限公司 Tunnel water inrush disaster prevention treatment method
CN112412475A (en) * 2020-11-26 2021-02-26 中铁五局集团第一工程有限责任公司 Method for reinforcing and excavating surrounding rock of ice water accumulation body tunnel under influence of seasonal rainfall and surrounding rock support
CN112412496A (en) * 2020-12-03 2021-02-26 中铁十二局集团有限公司 Full-section advanced curtain grouting construction method for water-rich broken geological zone tunnel
CN218934444U (en) * 2022-12-23 2023-04-28 中铁十局集团第三建设有限公司 High-pressure horizontal jet grouting pile tunnel reinforcing structure in frozen soil area

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
姚志辉 ; 黄艳丽 ; .锦屏二级电站4号隧洞不良地质段塌方处理.人民长江.2009,(第10期),第57-58页. *
帷幕灌浆施工技术在水利工程中的应用分析;李晶;;中国战略新兴产业(第48期);全文 *
引水隧洞涌水粉细砂层洞段施工方案比选;张园园;;水科学与工程技术(第03期);全文 *
细砂层铁路隧道水平旋喷桩超前预支护施工技术;邵永平;;铁道建筑技术(第11期);全文 *
锦屏二级电站4号隧洞不良地质段塌方处理;姚志辉;黄艳丽;;人民长江(第10期);第57-58页 *
隧道穿越富水泥岩断层破碎带超前帷幕注浆技术;彭学军;刘德安;汤宇;林三国;阳军生;;铁道建筑技术(第04期);全文 *
隧道隐伏溶洞超前预报与治理技术研究;杨淑华;;江西建材(第08期);全文 *
高黎贡山隧道进口平导带水作业技术措施;张鹏;;市政技术(第03期);全文 *

Also Published As

Publication number Publication date
CN114109442A (en) 2022-03-01

Similar Documents

Publication Publication Date Title
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN108678776B (en) Sandy clay geological tunnel roof collapse treatment method
CN104453946B (en) Advanced reinforcing construction method for building tunnel in soft surrounding rock
CN110735653A (en) deep-hole retreating type grouting water plugging construction method for igneous rock water-rich fault
CN114109442B (en) Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method
CN111119940B (en) Grouting construction treatment method
CN109026020B (en) Water-rich tunnel karst cave treatment and excavation method
CN106437726A (en) Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN102787846A (en) Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone
WO2022100346A1 (en) Reinforcement structure for entry and exit of large-diameter jacking pipe group in water-rich sand stratum, and construction method
CN112663625A (en) Construction and protection method for shallow-buried bias-pressure weak surrounding rock tunnel portal in alpine region
CN105863648A (en) Underground-excavation shallow-covering large-cross-section tunnel construction method
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN110700841A (en) Double-side-wall guide pit type excavation method for tunnel excavation
CN108265706A (en) A kind of engineering pile and pile-formation process in solution cavity geology
CN103215922A (en) High-pressure high-flow centralized leakage grouting leaking stoppage method
CN206942786U (en) A kind of advanced pre-add fixing structure of high-moisture percentage loess tunnel
CN109853477B (en) Centralized leakage blocking structure and method for changing dynamic water into static water in gallery
CN103572764A (en) Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof
CN113107501B (en) Initial tunneling construction method for tunnel portal extension steel ring
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
Chen et al. Construction technology of large diameter underwater shield tunnel
CN116816389A (en) Tunnel water-rich karst collapse cavity treatment method
CN111764932B (en) Low-risk construction method for muddy water-rich broken shallow tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant