CN110533389A - The determination method and device of Project Cost - Google Patents
The determination method and device of Project Cost Download PDFInfo
- Publication number
- CN110533389A CN110533389A CN201910798483.7A CN201910798483A CN110533389A CN 110533389 A CN110533389 A CN 110533389A CN 201910798483 A CN201910798483 A CN 201910798483A CN 110533389 A CN110533389 A CN 110533389A
- Authority
- CN
- China
- Prior art keywords
- project
- engineering
- cost
- monovalent
- items component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 43
- 238000003860 storage Methods 0.000 claims description 14
- 238000012549 training Methods 0.000 claims description 7
- 238000005516 engineering process Methods 0.000 abstract description 10
- 238000010276 construction Methods 0.000 description 12
- 238000013461 design Methods 0.000 description 11
- 238000000605 extraction Methods 0.000 description 7
- 230000008569 process Effects 0.000 description 6
- 230000006870 function Effects 0.000 description 5
- 230000010354 integration Effects 0.000 description 5
- 238000007726 management method Methods 0.000 description 5
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000012550 audit Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000004642 transportation engineering Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0283—Price estimation or determination
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- General Business, Economics & Management (AREA)
- Development Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of determination method and devices of Project Cost.Wherein, this method comprises: obtaining the engineering parameter of engineering project to be built, and based on engineering parameter determination and the associated multiple cost information models of engineering project, wherein the corresponding items component of each cost information model;Obtain the corresponding multiple property parameters of each cost information model;Based on the corresponding multiple property parameters of each cost information model, the project amount and monovalent information of items component corresponding with each cost information model are determined;Project amount and monovalent information based on each items component, determine the total cost of engineering project.The present invention solves in the related technology that extract result precision not high there are amount of budget due to project cost, leads to engineering metering valuation the technical issues of being easy to appear repeated work.
Description
Technical field
The present invention relates to Engineering Control technical fields, in particular to a kind of determination method and device of Project Cost.
Background technique
In the related technology, there are many problems in terms of project cost calculating, by taking marine traffic engineering cost as an example, water transport
Project cost has following several respects: (1) project amount audit takes a long time, the work that budgetary estimate personnel provide according to designer
Journey amount need to carry out secondary verification;(2) Valuation Norm is searched it is time-consuming and laborious, the typing of quota subitem can only according to engineering experience into
Row inquiry;(3) expenses statement trellis is at rear, due to inconsistent with table formats of other professions, causes many unnecessary adjustment,
Efficiency is very low, it is difficult to the design modification that reply frequently occurs;(4) amount of budget extraction result precision is not high, and quality is difficult to control
Often there is the phenomenon that repeating to related works such as calculation and valuations in system.
For above-mentioned problem, currently no effective solution has been proposed.
Summary of the invention
The embodiment of the invention provides a kind of determination method and device of Project Cost, at least solve in the related technology by
In project cost, there are amount of budget, to extract result precision not high, and engineering metering valuation is caused to be easy to appear the skill of repeated work
Art problem.
According to an aspect of an embodiment of the present invention, a kind of determination method of Project Cost is provided, comprising: obtain yet to be built
The engineering parameter for the engineering project made, and based on engineering parameter determination and the associated multiple cost informations of the engineering project
Model, wherein each corresponding items component of the cost information model;It is corresponding to obtain each cost information model
Multiple property parameters;It is determining to believe with each cost based on the corresponding multiple property parameters of each cost information model
Cease the project amount and monovalent information of the corresponding items component of model;Project amount and unit price based on each items component
Information determines the total cost of the engineering project.
Optionally, the engineering parameter of engineering project to be built is obtained, and based on engineering parameter determination and the work
Multiple cost information models of journey item association include: obtain unit price library corresponding with each engineering parameter and with it is described
The corresponding project templet of engineering project, wherein the unit price library is used to provide monovalent information, the project for the engineering project
Template is for placing cost information model corresponding with each items component;The project team is determined based on the monovalent library
The monovalent information of part, and based on project templet determination and the associated multiple cost information models of the engineering project.
Optionally, the corresponding multiple property parameters of each cost information model, determining and each cost are based on
The project amount of the corresponding items component of information model and monovalent information include: to obtain target association table, wherein the target is closed
Connection table is used to store the incidence relation between the project amount of each items component and monovalent information;It is determining to believe with each cost
Cease the project amount of the corresponding items component of model;Project amount based on target association table inquiry and each items component
Corresponding unit price information.
Optionally, in the project amount and unit price information of determining items component corresponding with each cost information model
Later, the determining method further include: by preset data exchange standard, export work corresponding with each items component
Cheng Liang;Project amount and monovalent information based on each items component, determine that the total cost of the engineering project includes: logical
It crosses preset data-interface the project amount is directed into target Cost System, wherein the target Cost System is used for base
The total cost is calculated in the project amount and the monovalent information.
Optionally, before the engineering parameter for obtaining engineering project to be built, the determining method further include: obtain more
The items component parameter of a engineering project to be trained and each engineering project to be trained;Based on the multiple work to be trained
The items component parameter of journey project and each engineering project to be trained, training obtain model database, wherein the model
Database is for providing cost information model.
Optionally, the multiple property parameters include at least: items component volume parameter, items component manufacturer, item
Mesh component nameplate, items component usage mode.
According to another aspect of an embodiment of the present invention, a kind of determining device of Project Cost is additionally provided, comprising: first obtains
Unit is taken, for obtaining the engineering parameter of engineering project to be built, and based on engineering parameter determination and the engineering item
The associated multiple cost information models of mesh, wherein each corresponding items component of the cost information model;Second obtains list
Member, for obtaining the corresponding multiple property parameters of each cost information model;First determination unit, for being based on each institute
State the corresponding multiple property parameters of cost information model, the work of determining items component corresponding with each cost information model
Journey amount and monovalent information;Second determination unit, for project amount and monovalent information based on each items component, really
The total cost of the fixed engineering project.
Optionally, the first acquisition unit includes: the first acquisition module, for obtaining and each engineering parameter pair
The monovalent library answered and project templet corresponding with the engineering project, wherein the unit price library is used to be the engineering project
There is provided monovalent information, the project templet is for placing cost information model corresponding with each items component;First really
Cover half block is determined for being determined the monovalent information of the items component based on the monovalent library, and based on the project templet
With the associated multiple cost information models of the engineering project.
Optionally, first determination unit includes: the second acquisition module, for obtaining target association table, wherein described
Target association table is used to store the incidence relation between the project amount of each items component and monovalent information;Second determining module,
Project amount for determining items component corresponding with each cost information model;Enquiry module, for being based on the mesh
Mark contingency table inquiry monovalent information corresponding with the project amount of each items component.
Optionally, the determining device of the Project Cost further include: export module, in determining and each cost
After the project amount of the corresponding items component of information model and monovalent information, by preset data exchange standard, export with
The corresponding project amount of each items component;Second determination unit includes: import modul, for passing through preset data
The project amount is directed into target Cost System by interface, wherein the target Cost System is used to be based on the project amount
The total cost is calculated with the monovalent information.
Optionally, the determining device of the Project Cost further include: third obtains module, for obtaining work to be built
Before journey item purpose engineering parameter, the project team of multiple engineering projects to be trained and each engineering project to be trained is obtained
Part parameter;Training module, for the project based on the multiple engineering project to be trained and each engineering project to be trained
Component parameter, training obtain model database, wherein the model database is for providing cost information model.
Optionally, the multiple property parameters include at least: items component volume parameter, items component manufacturer, item
Mesh component nameplate, items component usage mode.
According to another aspect of an embodiment of the present invention, a kind of storage medium is additionally provided, the storage medium is for storing
Program, wherein equipment where described program controls the storage medium when being executed by processor executes above-mentioned any one institute
The determination method for the Project Cost stated.
According to another aspect of an embodiment of the present invention, a kind of processor is additionally provided, the processor is used to run program,
Wherein, the determination method of Project Cost described in above-mentioned any one is executed when described program is run.
In embodiments of the present invention, using the engineering parameter for obtaining engineering project to be built, and it is true based on engineering parameter
The fixed and associated multiple cost information models of engineering project, wherein the corresponding items component of each cost information model;It obtains
The corresponding multiple property parameters of each cost information model;Based on the corresponding multiple property parameters of each cost information model, really
The project amount of fixed items component corresponding with each cost information model and monovalent information;Engineering based on each items component
Amount and monovalent information, determine the total cost of engineering project.In this embodiment it is possible to the number assigned by cost information model
Real information possessed by each building in word technical modelling engineering project, makes the model reach the integration of design and construction, right
Engineering design and construction provides mutually coordinated, internally consistent information model, and then combines the corresponding project of cost information model
The project amount of component and monovalent information, can accurately estimate the total cost of each engineering project, the budget to engineering project
Amount extraction result precision is higher, and largely reduces the appearance of repeated work during valuation, to solve related skill
In art due to project cost there are amount of budget extract result precision it is not high, cause engineering metering valuation be easy to appear repetition work
The technical issues of making.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair
Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is a kind of flow chart of the determination method of optional Project Cost according to an embodiment of the present invention;
Fig. 2 is a kind of schematic diagram of the determining device of Project Cost according to an embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention
Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only
The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people
The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work
It encloses.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, "
Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way
Data be interchangeable under appropriate circumstances, so as to the embodiment of the present invention described herein can in addition to illustrating herein or
Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover
Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to
Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product
Or other step or units that equipment is intrinsic.
The embodiment of the present invention, can use BIM technology, (BIM is the abbreviation of Building Information Model, and BIM technology is that one kind is answered
Digitization tool for engineering design, construction, management), it is integrated by the digitization to building, informationization model, in project
It is shared and is transmitted in the lifecycle process of planning, operation and maintenance, make engineers and technicians to various architecture informations
Correct understanding and efficiently reply are made, is provided for design team and each side's construction bodies including building, unit of operation
The basis of collaborative work plays a significant role improving production efficiency, save the cost and shortening the construction period aspect.It can greatly improve
Project data integration degree, according to the digitization of BIM model, information-based feature, by the project amount data in project each stage
Extract real-time is carried out, in conjunction with the analytic function of corresponding marine traffic engineering BIM cost Control module, to solve data sharing collaboration
The problems such as difficult, metrical information is inaccurately, project cost data analysis function is weak.
The embodiment of the present invention can be applied to the calculating of Port & Waterway Engineering Projects cost, but be not limited to the Port & Waterway Engineering Projects, also
It can be other building intermediate items.The embodiment of the present invention uses scientific method and means, reasonable distribution, using human and material resources and
Financial resources, the management activity for reaching reasonable employment construction fund, increasing investment returns.
The present invention utilizes the advantages of BIM technology, utilizes a kind of general BIM data conversion format IFC (data exchange mark
It is quasi-), project amount data are converted, are docked with marine traffic engineering BIM Cost System module;Utilize the classification of Cost System module
The project amount that BIM model exports is classified by component (or component) type and feature, establishes component liaison by statistical mask
And monovalent association is generated, the budget engineering quality of different components and different characteristic is counted, in conjunction with the analysis meter of Cost System module
Function is calculated, the metering and valuation of project cost is realized, using the cost data information in model, passes through IFC format and cost mould
Block carries out information butt joint, to realize the metering and valuation of project cost.Marine traffic engineering Cost Management can be improved in this mode
Intelligence degree provides more effective means and method for marine traffic engineering Cost Management.
The embodiment of the present invention is described in detail below.
According to embodiments of the present invention, a kind of determination embodiment of the method for Project Cost is provided, it should be noted that attached
The step of process of figure illustrates can execute in a computer system such as a set of computer executable instructions, though also,
So logical order is shown in flow charts, but in some cases, it can be to be different from shown by sequence execution herein
Or the step of description.
Fig. 1 is a kind of flow chart of the determination method of optional Project Cost according to an embodiment of the present invention, such as Fig. 1 institute
Show, this method comprises the following steps:
Step S102 obtains the engineering parameter of engineering project to be built, and based on engineering parameter determination and engineering project
Associated multiple cost information models, wherein the corresponding items component of each cost information model;
Step S104 obtains the corresponding multiple property parameters of each cost information model;
Step S106 is based on the corresponding multiple property parameters of each cost information model, determining and each cost information mould
The project amount of the corresponding items component of type and monovalent information;
Step S108, project amount and monovalent information based on each items component, determines the total cost of engineering project.
Through the above steps, can be using the engineering parameter for obtaining engineering project to be built, and it is true to be based on engineering parameter
The fixed and associated multiple cost information models of engineering project, wherein the corresponding items component of each cost information model;It obtains
The corresponding multiple property parameters of each cost information model;Based on the corresponding multiple property parameters of each cost information model, really
The project amount of fixed items component corresponding with each cost information model and monovalent information;Engineering based on each items component
Amount and monovalent information, determine the total cost of engineering project.In this embodiment it is possible to the number assigned by cost information model
Real information possessed by each building in word technical modelling engineering project, makes the model reach the integration of design and construction, right
Engineering design and construction provides mutually coordinated, internally consistent information model, and then combines the corresponding project of cost information model
The project amount of component and monovalent information, can accurately estimate the total cost of each engineering project, the budget to engineering project
Amount extraction result precision is higher, and largely reduces the appearance of repeated work during valuation, to solve related skill
In art due to project cost there are amount of budget extract result precision it is not high, cause engineering metering valuation be easy to appear repetition work
The technical issues of making.
The embodiment of the present invention constructs a kind of cost information model (being BIM model) library in advance, stores a variety of cost information moulds
Type;Then according to the requirement of each engineering project, progress budget engineering quality extraction in Cost System is imported by data-interface,
And corresponding monovalent library and project templet are determined based on each engineering project, choose make corresponding with the various components of engineering project
Valence information model, if user can be manually entered component without matched engineering project template, by adding component property
Parameter carries out attribute extension, and is entered into the project templet of database.Each project templet, is corresponding with various components
Component type and component Name, each component type a quota number is associated with component Name.When all components are completed to match
Later, the incidence relation of component and quota number is also established, while the relationship of component, unit price, quota number is stored in database one
In contingency table, the user interface on foreground is shown to by extracting the data in contingency table, can allow engineering staff into
Row is checked and is modified, so that account valuation process is more flexible, it is as a result more accurate.In the component matching of all engineering projects
After the completion, so that it may export corresponding project amount and unit price, and then determine total cost.It is carried out specifically below by each step
It is bright.
Method is determined before the engineering parameter for obtaining engineering project to be built as optional embodiment of the present invention
Further include: obtain multiple engineering projects to be trained and each the items component parameter of engineering project to be trained;Based on it is multiple to
Training engineering project and each the items component parameter of engineering project to be trained, training obtain model database, wherein pattern number
According to library for providing cost information model.
It can construct based on the attribute, component parameter of various components in engineering project and meet making for each project cost
Valence information model realizes parametric modeling.Each model is corresponding with volume parameter (for example, length and width high parameter), device model, life
Produce producer, usage mode etc..The cost information model is a kind of virtualization that can be displayed on display interface or display terminal
Model is a kind of Three Dimensional Design Model, parameterized model, and the quantity of cost information model can be one or more.
By determining cost information model, the project amount of the various components in engineering project can be determined, in conjunction with each water
Fortune engineering metering Rule Extraction meets the costing engineering amount of each engineering project;In the embodiment of the present invention, BIM technology can be used
The project amount in cost information model is extracted, the project amount in model quickly, is accurately extracted, to realize various components not
Cost with the construction stage is quickly calculated, and provides foundation for the Project Budget of different processes, and main principle is exactly to utilize
The attribute and parameter extraction project amount of cost information model.
Step S102 obtains the engineering parameter of engineering project to be built, and based on engineering parameter determination and engineering project
Associated multiple cost information models, wherein the corresponding items component of each cost information model.
In embodiments of the present invention, engineering project to be built includes but is not limited to: container terminal project.
Optionally, the engineering parameter of engineering project to be built is obtained, and is closed based on engineering parameter is determining with engineering project
Multiple cost information models of connection include: to obtain and the corresponding monovalent library of each engineering parameter and item corresponding with engineering project
Mesh template, wherein monovalent library is used to provide monovalent information for engineering project, and project templet is for placing and each items component pair
The cost information model answered;It is identified project the monovalent information of component based on monovalent library, and based on project templet is determining and engineering
Multiple cost information models of item association.
Step S104 obtains the corresponding multiple property parameters of each cost information model.
In embodiments of the present invention, multiple property parameters include at least: items component volume parameter, items component factory
Family, items component nameplate, items component usage mode.
Step S106 is based on the corresponding multiple property parameters of each cost information model, determining and each cost information mould
The project amount of the corresponding items component of type and monovalent information.
As optional embodiment of the present invention, be based on the corresponding multiple property parameters of each cost information model, determine with
The project amount of the corresponding items component of each cost information model and monovalent information include: to obtain target association table, wherein mesh
Mark contingency table is used to store the incidence relation between the project amount of each items component and monovalent information;It is determining to believe with each cost
Cease the project amount of the corresponding items component of model;List corresponding with the project amount of each items component is inquired based on target association table
Valence information.
Optionally, the project amount and unit price information for determining corresponding with each cost information model items component it
Afterwards, method is determined further include: by preset data exchange standard, export project amount corresponding with each items component;It is based on
The project amount of each items component and monovalent information, determine that the total cost of engineering project includes: by preset data-interface
Project amount is directed into target Cost System, wherein target Cost System is used to calculate based on project amount and monovalent information total
Cost.
The project amount of data exchange standard format, the data exchange standard can be directly exported by cost information model
For IFC, the i.e. data exchange standard of construction industry.By exporting project amount, obtains project amount corresponding with engineering project and summarize column
Table realizes the automatic calculating of project amount, then can use the project amount that cost information modeling statistics comes out, and it is accurate fixed to realize
Valence carries out fast and accurately project cost and counts, realizes the real time monitoring of project total cost and cost accounting.
Step S108, project amount and monovalent information based on each items component, determines the total cost of engineering project.
The embodiment of the present invention can determine that the cost of corresponding various components is believed by project templet corresponding with engineering project
Model is ceased, reduces mistake caused by repeating to count, improves quantities calculation accuracy, realize the accurate calculating of project cost, mention
High computational accuracy.It will play a positive role, can further mention to marine traffic engineering design and the essential change of management method
The integration degree of marine traffic engineering is risen, promote and promotes informationization technology in the industrialization development in water transport engineering project field.
Fig. 2 is a kind of schematic diagram of the determining device of Project Cost according to an embodiment of the present invention, as shown in Fig. 2, this is really
Determining device may include: first acquisition unit 21, second acquisition unit 23, the first determination unit 25, the second determination unit 27,
In,
First acquisition unit 21 is determined for obtaining the engineering parameter of engineering project to be built, and based on engineering parameter
With the associated multiple cost information models of engineering project, wherein the corresponding items component of each cost information model;
Second acquisition unit 23, for obtaining the corresponding multiple property parameters of each cost information model;
First determination unit 25, it is determining and each for being based on the corresponding multiple property parameters of each cost information model
The project amount of the corresponding items component of cost information model and monovalent information;
Second determination unit 27 determines engineering project for project amount and monovalent information based on each items component
Total cost.
The determining device of above-mentioned Project Cost can obtain the work of engineering project to be built by first acquisition unit 21
Journey parameter, and based on engineering parameter determination and the associated multiple cost information models of engineering project, wherein each cost information mould
Type corresponds to an items component;The corresponding multiple property parameters of each cost information model are obtained by second acquisition unit 23;
The corresponding multiple property parameters of each cost information model, determining and each cost information mould are based on by the first determination unit 25
The project amount of the corresponding items component of type and monovalent information;Pass through the second engineering of the determination unit 27 based on each items component
Amount and monovalent information, determine the total cost of engineering project.In this embodiment it is possible to the number assigned by cost information model
Real information possessed by each building in word technical modelling engineering project, makes the model reach the integration of design and construction, right
Engineering design and construction provides mutually coordinated, internally consistent information model, and then combines the corresponding project of cost information model
The project amount of component and monovalent information, can accurately estimate the total cost of each engineering project, the budget to engineering project
Amount extraction result precision is higher, and largely reduces the appearance of repeated work during valuation, to solve related skill
In art due to project cost there are amount of budget extract result precision it is not high, cause engineering metering valuation be easy to appear repetition work
The technical issues of making.
Optionally, first acquisition unit includes: the first acquisition module, for obtaining unit price corresponding with each engineering parameter
Library and project templet corresponding with engineering project, wherein monovalent library is used to provide monovalent information, project templet for engineering project
For placing cost information model corresponding with each items component;First determining module, for being identified project based on monovalent library
The monovalent information of component, and based on project templet determination and the associated multiple cost information models of engineering project.
Another optional, the first determination unit includes: the second acquisition module, for obtaining target association table, wherein mesh
Mark contingency table is used to store the incidence relation between the project amount of each items component and monovalent information;Second determining module is used
In the project amount for determining items component corresponding with each cost information model;Enquiry module, for being looked into based on target association table
Ask monovalent information corresponding with the project amount of each items component.
In the embodiment of the present invention, the determining device of Project Cost further include: export module, in determining and each cost
After the project amount of the corresponding items component of information model and monovalent information, by preset data exchange standard, export with
The corresponding project amount of each items component;Second determination unit includes: import modul, for by preset data-interface by work
Journey amount is directed into target Cost System, wherein target Cost System is used to calculate total cost based on project amount and monovalent information.
Optionally, the determining device of Project Cost further include: third obtains module, for obtaining engineering item to be built
Before purpose engineering parameter, multiple engineering projects to be trained and each the items component parameter of engineering project to be trained are obtained;
Training module, for based on multiple engineering projects to be trained and each items component parameter of engineering project to be trained, trained
To model database, wherein model database is for providing cost information model.
Another optional, multiple property parameters include at least: items component volume parameter, items component manufacturer,
Items component nameplate, items component usage mode.
The determining device of above-mentioned Project Cost can also include processor and memory, above-mentioned first acquisition unit 21,
Second acquisition unit 23, the first determination unit 25, the second determination unit 27 is equal to be used as program unit storage in memory, by
Processor executes above procedure unit stored in memory to realize corresponding function.
Include kernel in above-mentioned processor, is gone in memory to transfer corresponding program unit by kernel.Kernel can be set
One or more determines the total cost of engineering project by adjusting kernel parameter.
Above-mentioned memory may include the non-volatile memory in computer-readable medium, random access memory
(RAM) and/or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM), memory includes extremely
A few storage chip.
According to another aspect of an embodiment of the present invention, a kind of storage medium is additionally provided, storage medium is used to store program,
Wherein, equipment where program controls storage medium when being executed by processor executes the determination of the Project Cost of above-mentioned any one
Method.
According to another aspect of an embodiment of the present invention, a kind of processor is additionally provided, processor is used to run program,
In, program executes the determination method of the Project Cost of above-mentioned any one when running.
Present invention also provides a kind of computer program products, when executing on data processing equipment, are adapted for carrying out just
The program of beginningization there are as below methods step: obtaining the engineering parameter of engineering project to be built, and based on engineering parameter determine with
The associated multiple cost information models of engineering project, wherein the corresponding items component of each cost information model;It obtains each
The corresponding multiple property parameters of cost information model;Based on the corresponding multiple property parameters of each cost information model, determine with
The project amount of the corresponding items component of each cost information model and monovalent information;Project amount based on each items component with
And monovalent information, determine the total cost of engineering project.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
In the above embodiment of the invention, it all emphasizes particularly on different fields to the description of each embodiment, does not have in some embodiment
The part of detailed description, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others
Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei
A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or
Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual
Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of unit or module
It connects, can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
On unit.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially
The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words
It embodies, which is stored in a storage medium, including some instructions are used so that a computer
Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or
Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code
Medium.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (10)
1. a kind of determination method of Project Cost characterized by comprising
The engineering parameter of engineering project to be built is obtained, and associated with the engineering project based on engineering parameter determination
Multiple cost information models, wherein each corresponding items component of the cost information model;
Obtain the corresponding multiple property parameters of each cost information model;
Based on the corresponding multiple property parameters of each cost information model, determination is corresponding with each cost information model
Items component project amount and monovalent information;
Project amount and monovalent information based on each items component, determine the total cost of the engineering project.
2. determining method according to claim 1, which is characterized in that the engineering parameter of engineering project to be built is obtained,
And it is determined based on the engineering parameter with the associated multiple cost information models of the engineering project and includes:
Obtain and the corresponding monovalent library of each engineering parameter and project templet corresponding with the engineering project, wherein
The unit price library is used to provide monovalent information for the engineering project, and the project templet is for placing and each project team
The corresponding cost information model of part;
The monovalent information of the items component is determined based on the monovalent library, and based on project templet determination and the work
Multiple cost information models of journey item association.
3. determining method according to claim 1, which is characterized in that corresponding more based on each cost information model
A property parameters, the project amount and unit price information of determining items component corresponding with each cost information model include:
Obtain target association table, wherein the target association table is used to store the project amount and monovalent information of each items component
Between incidence relation;
The project amount of determining items component corresponding with each cost information model;
Based on target association table inquiry monovalent information corresponding with the project amount of each items component.
4. determining method according to claim 1, which is characterized in that
It is described true after the project amount and monovalent information of determining items component corresponding with each cost information model
Determine method further include: by preset data exchange standard, export project amount corresponding with each items component;
Project amount and monovalent information based on each items component, determine that the total cost of the engineering project includes: logical
It crosses preset data-interface the project amount is directed into target Cost System, wherein the target Cost System is used for base
The total cost is calculated in the project amount and the monovalent information.
5. determining method according to claim 1, which is characterized in that in the engineering parameter for obtaining engineering project to be built
Before, the determining method further include:
Obtain the items component parameter of multiple engineering projects to be trained and each engineering project to be trained;
Items component parameter based on the multiple engineering project to be trained and each engineering project to be trained, training obtain
Model database, wherein the model database is for providing cost information model.
6. determining method as claimed in any of claims 1 to 5, which is characterized in that the multiple property parameters are extremely
It less include: items component volume parameter, items component manufacturer, items component nameplate, items component usage mode.
7. a kind of determining device of Project Cost characterized by comprising
First acquisition unit, for obtaining the engineering parameter of engineering project to be built, and based on the engineering parameter determine with
The associated multiple cost information models of engineering project, wherein each corresponding items component of the cost information model;
Second acquisition unit, for obtaining the corresponding multiple property parameters of each cost information model;
First determination unit, for being based on the corresponding multiple property parameters of each cost information model, determining and each institute
State the project amount and monovalent information of the corresponding items component of cost information model;
Second determination unit determines the engineering item for project amount and monovalent information based on each items component
Purpose total cost.
8. determining device according to claim 7, which is characterized in that the first acquisition unit includes:
First obtains module, for obtain unit price library corresponding with each engineering parameter and with the engineering project it is corresponding
Project templet, wherein the unit price library is used to provide monovalent information for the engineering project, and the project templet is used to place
Cost information model corresponding with each items component;
First determining module for determining the monovalent information of the items component based on the monovalent library, and is based on the item
The determination of mesh template and the associated multiple cost information models of the engineering project.
9. a kind of storage medium, which is characterized in that the storage medium is for storing program, wherein described program is processed
Project Cost described in any one of equipment perform claim requirement 1 to 6 device controls the storage medium when executing where is really
Determine method.
10. a kind of processor, which is characterized in that the processor is for running program, wherein right of execution when described program is run
Benefit require any one of 1 to 6 described in Project Cost determination method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910798483.7A CN110533389A (en) | 2019-08-27 | 2019-08-27 | The determination method and device of Project Cost |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910798483.7A CN110533389A (en) | 2019-08-27 | 2019-08-27 | The determination method and device of Project Cost |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110533389A true CN110533389A (en) | 2019-12-03 |
Family
ID=68664551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910798483.7A Pending CN110533389A (en) | 2019-08-27 | 2019-08-27 | The determination method and device of Project Cost |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110533389A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111680340A (en) * | 2020-05-28 | 2020-09-18 | 上海上咨工程造价咨询有限公司 | Building material price information pushing method, system and device and storage medium thereof |
CN111737306A (en) * | 2020-06-19 | 2020-10-02 | 广联达科技股份有限公司 | Engineering index determination method and device, computer equipment and storage medium |
CN111985894A (en) * | 2020-08-15 | 2020-11-24 | 武汉华胜工程建设科技有限公司 | Construction engineering project consultation cost management method and system and intelligent terminal |
CN112085522A (en) * | 2020-08-24 | 2020-12-15 | 江苏易达捷信数字科技有限公司 | Construction cost data processing method, system, device and medium for engineering project |
CN112307018A (en) * | 2020-09-29 | 2021-02-02 | 山东黄金矿业(莱州)有限公司三山岛金矿 | Method for storing unit price data of mine excavation engineering |
CN112329178A (en) * | 2020-11-26 | 2021-02-05 | 国网河北省电力有限公司经济技术研究院 | Method and device for establishing three-dimensional construction cost model of angle steel tower and terminal equipment |
CN113643064A (en) * | 2021-08-13 | 2021-11-12 | 大地仁工程咨询有限公司 | Integrated pricing system and method for general engineering contract |
CN113743893A (en) * | 2021-08-27 | 2021-12-03 | 国核电力规划设计研究院有限公司 | Intelligent cooperative processing system and method for engineering project life cycle |
CN113946888A (en) * | 2021-12-22 | 2022-01-18 | 四川省交通勘察设计研究院有限公司 | Tunnel engineering forward design system and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105335905A (en) * | 2015-11-24 | 2016-02-17 | 广州拓欧信息技术有限公司 | Building engineering computation and evaluation system and method |
CN107229791A (en) * | 2017-05-27 | 2017-10-03 | 联合建管(北京)国际工程科技有限责任公司 | Cost of construction metering method and device |
US20170308934A1 (en) * | 2016-04-22 | 2017-10-26 | Economy Research Institute of State Grid Zhejiang Electric Power | Management method of power engineering cost |
CN108550020A (en) * | 2018-03-30 | 2018-09-18 | 四川成化工程项目管理有限公司 | Building cost control method based on BIM technology |
CN109766605A (en) * | 2018-12-28 | 2019-05-17 | 国网浙江省电力有限公司经济技术研究院 | Method for building up in kind with the power distribution network full information mathematical model of value linkage |
-
2019
- 2019-08-27 CN CN201910798483.7A patent/CN110533389A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105335905A (en) * | 2015-11-24 | 2016-02-17 | 广州拓欧信息技术有限公司 | Building engineering computation and evaluation system and method |
US20170308934A1 (en) * | 2016-04-22 | 2017-10-26 | Economy Research Institute of State Grid Zhejiang Electric Power | Management method of power engineering cost |
CN107229791A (en) * | 2017-05-27 | 2017-10-03 | 联合建管(北京)国际工程科技有限责任公司 | Cost of construction metering method and device |
CN108550020A (en) * | 2018-03-30 | 2018-09-18 | 四川成化工程项目管理有限公司 | Building cost control method based on BIM technology |
CN109766605A (en) * | 2018-12-28 | 2019-05-17 | 国网浙江省电力有限公司经济技术研究院 | Method for building up in kind with the power distribution network full information mathematical model of value linkage |
Non-Patent Citations (2)
Title |
---|
李春娥等主编: "《工程造价信息管理》", 30 September 2016, 重庆大学出版社 * |
王岩等: "《建筑行业的信息化革命—论BIM技术在不同项目中参与方中的应用》", 30 June 2018 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111680340A (en) * | 2020-05-28 | 2020-09-18 | 上海上咨工程造价咨询有限公司 | Building material price information pushing method, system and device and storage medium thereof |
CN111680340B (en) * | 2020-05-28 | 2022-08-23 | 上海上咨工程造价咨询有限公司 | Building material price information pushing method, system and device and storage medium thereof |
CN111737306A (en) * | 2020-06-19 | 2020-10-02 | 广联达科技股份有限公司 | Engineering index determination method and device, computer equipment and storage medium |
CN111985894A (en) * | 2020-08-15 | 2020-11-24 | 武汉华胜工程建设科技有限公司 | Construction engineering project consultation cost management method and system and intelligent terminal |
CN112085522A (en) * | 2020-08-24 | 2020-12-15 | 江苏易达捷信数字科技有限公司 | Construction cost data processing method, system, device and medium for engineering project |
CN112307018A (en) * | 2020-09-29 | 2021-02-02 | 山东黄金矿业(莱州)有限公司三山岛金矿 | Method for storing unit price data of mine excavation engineering |
CN112329178A (en) * | 2020-11-26 | 2021-02-05 | 国网河北省电力有限公司经济技术研究院 | Method and device for establishing three-dimensional construction cost model of angle steel tower and terminal equipment |
CN112329178B (en) * | 2020-11-26 | 2022-11-22 | 国网河北省电力有限公司经济技术研究院 | Method and device for establishing three-dimensional construction cost model of angle steel tower and terminal equipment |
CN113643064A (en) * | 2021-08-13 | 2021-11-12 | 大地仁工程咨询有限公司 | Integrated pricing system and method for general engineering contract |
CN113743893A (en) * | 2021-08-27 | 2021-12-03 | 国核电力规划设计研究院有限公司 | Intelligent cooperative processing system and method for engineering project life cycle |
CN113743893B (en) * | 2021-08-27 | 2023-11-17 | 国核电力规划设计研究院有限公司 | Intelligent cooperative processing system and method for whole life cycle of engineering project |
CN113946888A (en) * | 2021-12-22 | 2022-01-18 | 四川省交通勘察设计研究院有限公司 | Tunnel engineering forward design system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110533389A (en) | The determination method and device of Project Cost | |
CN111259535B (en) | Method for developing logistics simulation system of ship pipeline production line | |
CN109754200A (en) | Bill of material management method, apparatus and computer readable storage medium | |
CN106408341A (en) | Goods sales volume prediction method and device, and electronic equipment | |
CN109903064A (en) | Method for Sales Forecast method, apparatus and computer readable storage medium | |
WO2019214455A1 (en) | Data sequence prediction method and computing apparatus | |
CN108694599A (en) | Determine method, apparatus, electronic equipment and the storage medium of commodity price | |
CN110347056A (en) | Shop-floor management platform and emulation mode | |
CN108629632A (en) | Predict the method, apparatus and computer readable storage medium of user's income | |
CN109741177A (en) | Appraisal procedure, device and the intelligent terminal of user credit | |
CN107545038A (en) | A kind of file classification method and equipment | |
CN110264236A (en) | Vending machine sales data analysis method, device and storage medium | |
CN107767152A (en) | Product purchase intention analysis method and server | |
CN108647714A (en) | Acquisition methods, terminal device and the medium of negative label weight | |
CN107633421A (en) | A kind of processing method and processing device of market prediction data | |
CN108898648A (en) | A kind of K line chart building method, system and relevant device | |
CN116630082A (en) | Method and device for allocating production resources, electronic equipment and storage medium | |
Andersen | Knowledge productivity and the returns to agricultural research: a review | |
CN110322297A (en) | Medium-and-large-sized stamping die quotation prediction technique based on BP neural network | |
CN109377092A (en) | A kind of modeling method of the project of transmitting and converting electricity valuation model based on BIM | |
CN109711765A (en) | Distribution materials and equipment classification method based on Kraljic buying location model | |
Clarete et al. | CGE models and development policy analysis: problems, pitfalls, and challenges | |
CN105279320B (en) | A kind of method for generating FDTD grids | |
CN108805603A (en) | Marketing activity method for evaluating quality, server and computer readable storage medium | |
CN113360995A (en) | BIM model-based method and system for calling interchange decoration materials |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191203 |