CN110533389A - The determination method and device of Project Cost - Google Patents

The determination method and device of Project Cost Download PDF

Info

Publication number
CN110533389A
CN110533389A CN201910798483.7A CN201910798483A CN110533389A CN 110533389 A CN110533389 A CN 110533389A CN 201910798483 A CN201910798483 A CN 201910798483A CN 110533389 A CN110533389 A CN 110533389A
Authority
CN
China
Prior art keywords
project
engineering
cost
monovalent
items component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910798483.7A
Other languages
Chinese (zh)
Inventor
杨国平
于水
毕磊
郑天立
商剑平
李薇
王帅
杨林虎
马艳红
陈冠南
崔峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communication Planning and Design Institute for Waterway Transportation Co
Original Assignee
China Communication Planning and Design Institute for Waterway Transportation Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communication Planning and Design Institute for Waterway Transportation Co filed Critical China Communication Planning and Design Institute for Waterway Transportation Co
Priority to CN201910798483.7A priority Critical patent/CN110533389A/en
Publication of CN110533389A publication Critical patent/CN110533389A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of determination method and devices of Project Cost.Wherein, this method comprises: obtaining the engineering parameter of engineering project to be built, and based on engineering parameter determination and the associated multiple cost information models of engineering project, wherein the corresponding items component of each cost information model;Obtain the corresponding multiple property parameters of each cost information model;Based on the corresponding multiple property parameters of each cost information model, the project amount and monovalent information of items component corresponding with each cost information model are determined;Project amount and monovalent information based on each items component, determine the total cost of engineering project.The present invention solves in the related technology that extract result precision not high there are amount of budget due to project cost, leads to engineering metering valuation the technical issues of being easy to appear repeated work.

Description

The determination method and device of Project Cost
Technical field
The present invention relates to Engineering Control technical fields, in particular to a kind of determination method and device of Project Cost.
Background technique
In the related technology, there are many problems in terms of project cost calculating, by taking marine traffic engineering cost as an example, water transport Project cost has following several respects: (1) project amount audit takes a long time, the work that budgetary estimate personnel provide according to designer Journey amount need to carry out secondary verification;(2) Valuation Norm is searched it is time-consuming and laborious, the typing of quota subitem can only according to engineering experience into Row inquiry;(3) expenses statement trellis is at rear, due to inconsistent with table formats of other professions, causes many unnecessary adjustment, Efficiency is very low, it is difficult to the design modification that reply frequently occurs;(4) amount of budget extraction result precision is not high, and quality is difficult to control Often there is the phenomenon that repeating to related works such as calculation and valuations in system.
For above-mentioned problem, currently no effective solution has been proposed.
Summary of the invention
The embodiment of the invention provides a kind of determination method and device of Project Cost, at least solve in the related technology by In project cost, there are amount of budget, to extract result precision not high, and engineering metering valuation is caused to be easy to appear the skill of repeated work Art problem.
According to an aspect of an embodiment of the present invention, a kind of determination method of Project Cost is provided, comprising: obtain yet to be built The engineering parameter for the engineering project made, and based on engineering parameter determination and the associated multiple cost informations of the engineering project Model, wherein each corresponding items component of the cost information model;It is corresponding to obtain each cost information model Multiple property parameters;It is determining to believe with each cost based on the corresponding multiple property parameters of each cost information model Cease the project amount and monovalent information of the corresponding items component of model;Project amount and unit price based on each items component Information determines the total cost of the engineering project.
Optionally, the engineering parameter of engineering project to be built is obtained, and based on engineering parameter determination and the work Multiple cost information models of journey item association include: obtain unit price library corresponding with each engineering parameter and with it is described The corresponding project templet of engineering project, wherein the unit price library is used to provide monovalent information, the project for the engineering project Template is for placing cost information model corresponding with each items component;The project team is determined based on the monovalent library The monovalent information of part, and based on project templet determination and the associated multiple cost information models of the engineering project.
Optionally, the corresponding multiple property parameters of each cost information model, determining and each cost are based on The project amount of the corresponding items component of information model and monovalent information include: to obtain target association table, wherein the target is closed Connection table is used to store the incidence relation between the project amount of each items component and monovalent information;It is determining to believe with each cost Cease the project amount of the corresponding items component of model;Project amount based on target association table inquiry and each items component Corresponding unit price information.
Optionally, in the project amount and unit price information of determining items component corresponding with each cost information model Later, the determining method further include: by preset data exchange standard, export work corresponding with each items component Cheng Liang;Project amount and monovalent information based on each items component, determine that the total cost of the engineering project includes: logical It crosses preset data-interface the project amount is directed into target Cost System, wherein the target Cost System is used for base The total cost is calculated in the project amount and the monovalent information.
Optionally, before the engineering parameter for obtaining engineering project to be built, the determining method further include: obtain more The items component parameter of a engineering project to be trained and each engineering project to be trained;Based on the multiple work to be trained The items component parameter of journey project and each engineering project to be trained, training obtain model database, wherein the model Database is for providing cost information model.
Optionally, the multiple property parameters include at least: items component volume parameter, items component manufacturer, item Mesh component nameplate, items component usage mode.
According to another aspect of an embodiment of the present invention, a kind of determining device of Project Cost is additionally provided, comprising: first obtains Unit is taken, for obtaining the engineering parameter of engineering project to be built, and based on engineering parameter determination and the engineering item The associated multiple cost information models of mesh, wherein each corresponding items component of the cost information model;Second obtains list Member, for obtaining the corresponding multiple property parameters of each cost information model;First determination unit, for being based on each institute State the corresponding multiple property parameters of cost information model, the work of determining items component corresponding with each cost information model Journey amount and monovalent information;Second determination unit, for project amount and monovalent information based on each items component, really The total cost of the fixed engineering project.
Optionally, the first acquisition unit includes: the first acquisition module, for obtaining and each engineering parameter pair The monovalent library answered and project templet corresponding with the engineering project, wherein the unit price library is used to be the engineering project There is provided monovalent information, the project templet is for placing cost information model corresponding with each items component;First really Cover half block is determined for being determined the monovalent information of the items component based on the monovalent library, and based on the project templet With the associated multiple cost information models of the engineering project.
Optionally, first determination unit includes: the second acquisition module, for obtaining target association table, wherein described Target association table is used to store the incidence relation between the project amount of each items component and monovalent information;Second determining module, Project amount for determining items component corresponding with each cost information model;Enquiry module, for being based on the mesh Mark contingency table inquiry monovalent information corresponding with the project amount of each items component.
Optionally, the determining device of the Project Cost further include: export module, in determining and each cost After the project amount of the corresponding items component of information model and monovalent information, by preset data exchange standard, export with The corresponding project amount of each items component;Second determination unit includes: import modul, for passing through preset data The project amount is directed into target Cost System by interface, wherein the target Cost System is used to be based on the project amount The total cost is calculated with the monovalent information.
Optionally, the determining device of the Project Cost further include: third obtains module, for obtaining work to be built Before journey item purpose engineering parameter, the project team of multiple engineering projects to be trained and each engineering project to be trained is obtained Part parameter;Training module, for the project based on the multiple engineering project to be trained and each engineering project to be trained Component parameter, training obtain model database, wherein the model database is for providing cost information model.
Optionally, the multiple property parameters include at least: items component volume parameter, items component manufacturer, item Mesh component nameplate, items component usage mode.
According to another aspect of an embodiment of the present invention, a kind of storage medium is additionally provided, the storage medium is for storing Program, wherein equipment where described program controls the storage medium when being executed by processor executes above-mentioned any one institute The determination method for the Project Cost stated.
According to another aspect of an embodiment of the present invention, a kind of processor is additionally provided, the processor is used to run program, Wherein, the determination method of Project Cost described in above-mentioned any one is executed when described program is run.
In embodiments of the present invention, using the engineering parameter for obtaining engineering project to be built, and it is true based on engineering parameter The fixed and associated multiple cost information models of engineering project, wherein the corresponding items component of each cost information model;It obtains The corresponding multiple property parameters of each cost information model;Based on the corresponding multiple property parameters of each cost information model, really The project amount of fixed items component corresponding with each cost information model and monovalent information;Engineering based on each items component Amount and monovalent information, determine the total cost of engineering project.In this embodiment it is possible to the number assigned by cost information model Real information possessed by each building in word technical modelling engineering project, makes the model reach the integration of design and construction, right Engineering design and construction provides mutually coordinated, internally consistent information model, and then combines the corresponding project of cost information model The project amount of component and monovalent information, can accurately estimate the total cost of each engineering project, the budget to engineering project Amount extraction result precision is higher, and largely reduces the appearance of repeated work during valuation, to solve related skill In art due to project cost there are amount of budget extract result precision it is not high, cause engineering metering valuation be easy to appear repetition work The technical issues of making.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is a kind of flow chart of the determination method of optional Project Cost according to an embodiment of the present invention;
Fig. 2 is a kind of schematic diagram of the determining device of Project Cost according to an embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work It encloses.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way Data be interchangeable under appropriate circumstances, so as to the embodiment of the present invention described herein can in addition to illustrating herein or Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product Or other step or units that equipment is intrinsic.
The embodiment of the present invention, can use BIM technology, (BIM is the abbreviation of Building Information Model, and BIM technology is that one kind is answered Digitization tool for engineering design, construction, management), it is integrated by the digitization to building, informationization model, in project It is shared and is transmitted in the lifecycle process of planning, operation and maintenance, make engineers and technicians to various architecture informations Correct understanding and efficiently reply are made, is provided for design team and each side's construction bodies including building, unit of operation The basis of collaborative work plays a significant role improving production efficiency, save the cost and shortening the construction period aspect.It can greatly improve Project data integration degree, according to the digitization of BIM model, information-based feature, by the project amount data in project each stage Extract real-time is carried out, in conjunction with the analytic function of corresponding marine traffic engineering BIM cost Control module, to solve data sharing collaboration The problems such as difficult, metrical information is inaccurately, project cost data analysis function is weak.
The embodiment of the present invention can be applied to the calculating of Port & Waterway Engineering Projects cost, but be not limited to the Port & Waterway Engineering Projects, also It can be other building intermediate items.The embodiment of the present invention uses scientific method and means, reasonable distribution, using human and material resources and Financial resources, the management activity for reaching reasonable employment construction fund, increasing investment returns.
The present invention utilizes the advantages of BIM technology, utilizes a kind of general BIM data conversion format IFC (data exchange mark It is quasi-), project amount data are converted, are docked with marine traffic engineering BIM Cost System module;Utilize the classification of Cost System module The project amount that BIM model exports is classified by component (or component) type and feature, establishes component liaison by statistical mask And monovalent association is generated, the budget engineering quality of different components and different characteristic is counted, in conjunction with the analysis meter of Cost System module Function is calculated, the metering and valuation of project cost is realized, using the cost data information in model, passes through IFC format and cost mould Block carries out information butt joint, to realize the metering and valuation of project cost.Marine traffic engineering Cost Management can be improved in this mode Intelligence degree provides more effective means and method for marine traffic engineering Cost Management.
The embodiment of the present invention is described in detail below.
According to embodiments of the present invention, a kind of determination embodiment of the method for Project Cost is provided, it should be noted that attached The step of process of figure illustrates can execute in a computer system such as a set of computer executable instructions, though also, So logical order is shown in flow charts, but in some cases, it can be to be different from shown by sequence execution herein Or the step of description.
Fig. 1 is a kind of flow chart of the determination method of optional Project Cost according to an embodiment of the present invention, such as Fig. 1 institute Show, this method comprises the following steps:
Step S102 obtains the engineering parameter of engineering project to be built, and based on engineering parameter determination and engineering project Associated multiple cost information models, wherein the corresponding items component of each cost information model;
Step S104 obtains the corresponding multiple property parameters of each cost information model;
Step S106 is based on the corresponding multiple property parameters of each cost information model, determining and each cost information mould The project amount of the corresponding items component of type and monovalent information;
Step S108, project amount and monovalent information based on each items component, determines the total cost of engineering project.
Through the above steps, can be using the engineering parameter for obtaining engineering project to be built, and it is true to be based on engineering parameter The fixed and associated multiple cost information models of engineering project, wherein the corresponding items component of each cost information model;It obtains The corresponding multiple property parameters of each cost information model;Based on the corresponding multiple property parameters of each cost information model, really The project amount of fixed items component corresponding with each cost information model and monovalent information;Engineering based on each items component Amount and monovalent information, determine the total cost of engineering project.In this embodiment it is possible to the number assigned by cost information model Real information possessed by each building in word technical modelling engineering project, makes the model reach the integration of design and construction, right Engineering design and construction provides mutually coordinated, internally consistent information model, and then combines the corresponding project of cost information model The project amount of component and monovalent information, can accurately estimate the total cost of each engineering project, the budget to engineering project Amount extraction result precision is higher, and largely reduces the appearance of repeated work during valuation, to solve related skill In art due to project cost there are amount of budget extract result precision it is not high, cause engineering metering valuation be easy to appear repetition work The technical issues of making.
The embodiment of the present invention constructs a kind of cost information model (being BIM model) library in advance, stores a variety of cost information moulds Type;Then according to the requirement of each engineering project, progress budget engineering quality extraction in Cost System is imported by data-interface, And corresponding monovalent library and project templet are determined based on each engineering project, choose make corresponding with the various components of engineering project Valence information model, if user can be manually entered component without matched engineering project template, by adding component property Parameter carries out attribute extension, and is entered into the project templet of database.Each project templet, is corresponding with various components Component type and component Name, each component type a quota number is associated with component Name.When all components are completed to match Later, the incidence relation of component and quota number is also established, while the relationship of component, unit price, quota number is stored in database one In contingency table, the user interface on foreground is shown to by extracting the data in contingency table, can allow engineering staff into Row is checked and is modified, so that account valuation process is more flexible, it is as a result more accurate.In the component matching of all engineering projects After the completion, so that it may export corresponding project amount and unit price, and then determine total cost.It is carried out specifically below by each step It is bright.
Method is determined before the engineering parameter for obtaining engineering project to be built as optional embodiment of the present invention Further include: obtain multiple engineering projects to be trained and each the items component parameter of engineering project to be trained;Based on it is multiple to Training engineering project and each the items component parameter of engineering project to be trained, training obtain model database, wherein pattern number According to library for providing cost information model.
It can construct based on the attribute, component parameter of various components in engineering project and meet making for each project cost Valence information model realizes parametric modeling.Each model is corresponding with volume parameter (for example, length and width high parameter), device model, life Produce producer, usage mode etc..The cost information model is a kind of virtualization that can be displayed on display interface or display terminal Model is a kind of Three Dimensional Design Model, parameterized model, and the quantity of cost information model can be one or more.
By determining cost information model, the project amount of the various components in engineering project can be determined, in conjunction with each water Fortune engineering metering Rule Extraction meets the costing engineering amount of each engineering project;In the embodiment of the present invention, BIM technology can be used The project amount in cost information model is extracted, the project amount in model quickly, is accurately extracted, to realize various components not Cost with the construction stage is quickly calculated, and provides foundation for the Project Budget of different processes, and main principle is exactly to utilize The attribute and parameter extraction project amount of cost information model.
Step S102 obtains the engineering parameter of engineering project to be built, and based on engineering parameter determination and engineering project Associated multiple cost information models, wherein the corresponding items component of each cost information model.
In embodiments of the present invention, engineering project to be built includes but is not limited to: container terminal project.
Optionally, the engineering parameter of engineering project to be built is obtained, and is closed based on engineering parameter is determining with engineering project Multiple cost information models of connection include: to obtain and the corresponding monovalent library of each engineering parameter and item corresponding with engineering project Mesh template, wherein monovalent library is used to provide monovalent information for engineering project, and project templet is for placing and each items component pair The cost information model answered;It is identified project the monovalent information of component based on monovalent library, and based on project templet is determining and engineering Multiple cost information models of item association.
Step S104 obtains the corresponding multiple property parameters of each cost information model.
In embodiments of the present invention, multiple property parameters include at least: items component volume parameter, items component factory Family, items component nameplate, items component usage mode.
Step S106 is based on the corresponding multiple property parameters of each cost information model, determining and each cost information mould The project amount of the corresponding items component of type and monovalent information.
As optional embodiment of the present invention, be based on the corresponding multiple property parameters of each cost information model, determine with The project amount of the corresponding items component of each cost information model and monovalent information include: to obtain target association table, wherein mesh Mark contingency table is used to store the incidence relation between the project amount of each items component and monovalent information;It is determining to believe with each cost Cease the project amount of the corresponding items component of model;List corresponding with the project amount of each items component is inquired based on target association table Valence information.
Optionally, the project amount and unit price information for determining corresponding with each cost information model items component it Afterwards, method is determined further include: by preset data exchange standard, export project amount corresponding with each items component;It is based on The project amount of each items component and monovalent information, determine that the total cost of engineering project includes: by preset data-interface Project amount is directed into target Cost System, wherein target Cost System is used to calculate based on project amount and monovalent information total Cost.
The project amount of data exchange standard format, the data exchange standard can be directly exported by cost information model For IFC, the i.e. data exchange standard of construction industry.By exporting project amount, obtains project amount corresponding with engineering project and summarize column Table realizes the automatic calculating of project amount, then can use the project amount that cost information modeling statistics comes out, and it is accurate fixed to realize Valence carries out fast and accurately project cost and counts, realizes the real time monitoring of project total cost and cost accounting.
Step S108, project amount and monovalent information based on each items component, determines the total cost of engineering project.
The embodiment of the present invention can determine that the cost of corresponding various components is believed by project templet corresponding with engineering project Model is ceased, reduces mistake caused by repeating to count, improves quantities calculation accuracy, realize the accurate calculating of project cost, mention High computational accuracy.It will play a positive role, can further mention to marine traffic engineering design and the essential change of management method The integration degree of marine traffic engineering is risen, promote and promotes informationization technology in the industrialization development in water transport engineering project field.
Fig. 2 is a kind of schematic diagram of the determining device of Project Cost according to an embodiment of the present invention, as shown in Fig. 2, this is really Determining device may include: first acquisition unit 21, second acquisition unit 23, the first determination unit 25, the second determination unit 27, In,
First acquisition unit 21 is determined for obtaining the engineering parameter of engineering project to be built, and based on engineering parameter With the associated multiple cost information models of engineering project, wherein the corresponding items component of each cost information model;
Second acquisition unit 23, for obtaining the corresponding multiple property parameters of each cost information model;
First determination unit 25, it is determining and each for being based on the corresponding multiple property parameters of each cost information model The project amount of the corresponding items component of cost information model and monovalent information;
Second determination unit 27 determines engineering project for project amount and monovalent information based on each items component Total cost.
The determining device of above-mentioned Project Cost can obtain the work of engineering project to be built by first acquisition unit 21 Journey parameter, and based on engineering parameter determination and the associated multiple cost information models of engineering project, wherein each cost information mould Type corresponds to an items component;The corresponding multiple property parameters of each cost information model are obtained by second acquisition unit 23; The corresponding multiple property parameters of each cost information model, determining and each cost information mould are based on by the first determination unit 25 The project amount of the corresponding items component of type and monovalent information;Pass through the second engineering of the determination unit 27 based on each items component Amount and monovalent information, determine the total cost of engineering project.In this embodiment it is possible to the number assigned by cost information model Real information possessed by each building in word technical modelling engineering project, makes the model reach the integration of design and construction, right Engineering design and construction provides mutually coordinated, internally consistent information model, and then combines the corresponding project of cost information model The project amount of component and monovalent information, can accurately estimate the total cost of each engineering project, the budget to engineering project Amount extraction result precision is higher, and largely reduces the appearance of repeated work during valuation, to solve related skill In art due to project cost there are amount of budget extract result precision it is not high, cause engineering metering valuation be easy to appear repetition work The technical issues of making.
Optionally, first acquisition unit includes: the first acquisition module, for obtaining unit price corresponding with each engineering parameter Library and project templet corresponding with engineering project, wherein monovalent library is used to provide monovalent information, project templet for engineering project For placing cost information model corresponding with each items component;First determining module, for being identified project based on monovalent library The monovalent information of component, and based on project templet determination and the associated multiple cost information models of engineering project.
Another optional, the first determination unit includes: the second acquisition module, for obtaining target association table, wherein mesh Mark contingency table is used to store the incidence relation between the project amount of each items component and monovalent information;Second determining module is used In the project amount for determining items component corresponding with each cost information model;Enquiry module, for being looked into based on target association table Ask monovalent information corresponding with the project amount of each items component.
In the embodiment of the present invention, the determining device of Project Cost further include: export module, in determining and each cost After the project amount of the corresponding items component of information model and monovalent information, by preset data exchange standard, export with The corresponding project amount of each items component;Second determination unit includes: import modul, for by preset data-interface by work Journey amount is directed into target Cost System, wherein target Cost System is used to calculate total cost based on project amount and monovalent information.
Optionally, the determining device of Project Cost further include: third obtains module, for obtaining engineering item to be built Before purpose engineering parameter, multiple engineering projects to be trained and each the items component parameter of engineering project to be trained are obtained; Training module, for based on multiple engineering projects to be trained and each items component parameter of engineering project to be trained, trained To model database, wherein model database is for providing cost information model.
Another optional, multiple property parameters include at least: items component volume parameter, items component manufacturer, Items component nameplate, items component usage mode.
The determining device of above-mentioned Project Cost can also include processor and memory, above-mentioned first acquisition unit 21, Second acquisition unit 23, the first determination unit 25, the second determination unit 27 is equal to be used as program unit storage in memory, by Processor executes above procedure unit stored in memory to realize corresponding function.
Include kernel in above-mentioned processor, is gone in memory to transfer corresponding program unit by kernel.Kernel can be set One or more determines the total cost of engineering project by adjusting kernel parameter.
Above-mentioned memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM), memory includes extremely A few storage chip.
According to another aspect of an embodiment of the present invention, a kind of storage medium is additionally provided, storage medium is used to store program, Wherein, equipment where program controls storage medium when being executed by processor executes the determination of the Project Cost of above-mentioned any one Method.
According to another aspect of an embodiment of the present invention, a kind of processor is additionally provided, processor is used to run program, In, program executes the determination method of the Project Cost of above-mentioned any one when running.
Present invention also provides a kind of computer program products, when executing on data processing equipment, are adapted for carrying out just The program of beginningization there are as below methods step: obtaining the engineering parameter of engineering project to be built, and based on engineering parameter determine with The associated multiple cost information models of engineering project, wherein the corresponding items component of each cost information model;It obtains each The corresponding multiple property parameters of cost information model;Based on the corresponding multiple property parameters of each cost information model, determine with The project amount of the corresponding items component of each cost information model and monovalent information;Project amount based on each items component with And monovalent information, determine the total cost of engineering project.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
In the above embodiment of the invention, it all emphasizes particularly on different fields to the description of each embodiment, does not have in some embodiment The part of detailed description, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of unit or module It connects, can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple On unit.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code Medium.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (10)

1. a kind of determination method of Project Cost characterized by comprising
The engineering parameter of engineering project to be built is obtained, and associated with the engineering project based on engineering parameter determination Multiple cost information models, wherein each corresponding items component of the cost information model;
Obtain the corresponding multiple property parameters of each cost information model;
Based on the corresponding multiple property parameters of each cost information model, determination is corresponding with each cost information model Items component project amount and monovalent information;
Project amount and monovalent information based on each items component, determine the total cost of the engineering project.
2. determining method according to claim 1, which is characterized in that the engineering parameter of engineering project to be built is obtained, And it is determined based on the engineering parameter with the associated multiple cost information models of the engineering project and includes:
Obtain and the corresponding monovalent library of each engineering parameter and project templet corresponding with the engineering project, wherein The unit price library is used to provide monovalent information for the engineering project, and the project templet is for placing and each project team The corresponding cost information model of part;
The monovalent information of the items component is determined based on the monovalent library, and based on project templet determination and the work Multiple cost information models of journey item association.
3. determining method according to claim 1, which is characterized in that corresponding more based on each cost information model A property parameters, the project amount and unit price information of determining items component corresponding with each cost information model include:
Obtain target association table, wherein the target association table is used to store the project amount and monovalent information of each items component Between incidence relation;
The project amount of determining items component corresponding with each cost information model;
Based on target association table inquiry monovalent information corresponding with the project amount of each items component.
4. determining method according to claim 1, which is characterized in that
It is described true after the project amount and monovalent information of determining items component corresponding with each cost information model Determine method further include: by preset data exchange standard, export project amount corresponding with each items component;
Project amount and monovalent information based on each items component, determine that the total cost of the engineering project includes: logical It crosses preset data-interface the project amount is directed into target Cost System, wherein the target Cost System is used for base The total cost is calculated in the project amount and the monovalent information.
5. determining method according to claim 1, which is characterized in that in the engineering parameter for obtaining engineering project to be built Before, the determining method further include:
Obtain the items component parameter of multiple engineering projects to be trained and each engineering project to be trained;
Items component parameter based on the multiple engineering project to be trained and each engineering project to be trained, training obtain Model database, wherein the model database is for providing cost information model.
6. determining method as claimed in any of claims 1 to 5, which is characterized in that the multiple property parameters are extremely It less include: items component volume parameter, items component manufacturer, items component nameplate, items component usage mode.
7. a kind of determining device of Project Cost characterized by comprising
First acquisition unit, for obtaining the engineering parameter of engineering project to be built, and based on the engineering parameter determine with The associated multiple cost information models of engineering project, wherein each corresponding items component of the cost information model;
Second acquisition unit, for obtaining the corresponding multiple property parameters of each cost information model;
First determination unit, for being based on the corresponding multiple property parameters of each cost information model, determining and each institute State the project amount and monovalent information of the corresponding items component of cost information model;
Second determination unit determines the engineering item for project amount and monovalent information based on each items component Purpose total cost.
8. determining device according to claim 7, which is characterized in that the first acquisition unit includes:
First obtains module, for obtain unit price library corresponding with each engineering parameter and with the engineering project it is corresponding Project templet, wherein the unit price library is used to provide monovalent information for the engineering project, and the project templet is used to place Cost information model corresponding with each items component;
First determining module for determining the monovalent information of the items component based on the monovalent library, and is based on the item The determination of mesh template and the associated multiple cost information models of the engineering project.
9. a kind of storage medium, which is characterized in that the storage medium is for storing program, wherein described program is processed Project Cost described in any one of equipment perform claim requirement 1 to 6 device controls the storage medium when executing where is really Determine method.
10. a kind of processor, which is characterized in that the processor is for running program, wherein right of execution when described program is run Benefit require any one of 1 to 6 described in Project Cost determination method.
CN201910798483.7A 2019-08-27 2019-08-27 The determination method and device of Project Cost Pending CN110533389A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910798483.7A CN110533389A (en) 2019-08-27 2019-08-27 The determination method and device of Project Cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910798483.7A CN110533389A (en) 2019-08-27 2019-08-27 The determination method and device of Project Cost

Publications (1)

Publication Number Publication Date
CN110533389A true CN110533389A (en) 2019-12-03

Family

ID=68664551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910798483.7A Pending CN110533389A (en) 2019-08-27 2019-08-27 The determination method and device of Project Cost

Country Status (1)

Country Link
CN (1) CN110533389A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111680340A (en) * 2020-05-28 2020-09-18 上海上咨工程造价咨询有限公司 Building material price information pushing method, system and device and storage medium thereof
CN111737306A (en) * 2020-06-19 2020-10-02 广联达科技股份有限公司 Engineering index determination method and device, computer equipment and storage medium
CN111985894A (en) * 2020-08-15 2020-11-24 武汉华胜工程建设科技有限公司 Construction engineering project consultation cost management method and system and intelligent terminal
CN112085522A (en) * 2020-08-24 2020-12-15 江苏易达捷信数字科技有限公司 Construction cost data processing method, system, device and medium for engineering project
CN112307018A (en) * 2020-09-29 2021-02-02 山东黄金矿业(莱州)有限公司三山岛金矿 Method for storing unit price data of mine excavation engineering
CN112329178A (en) * 2020-11-26 2021-02-05 国网河北省电力有限公司经济技术研究院 Method and device for establishing three-dimensional construction cost model of angle steel tower and terminal equipment
CN113643064A (en) * 2021-08-13 2021-11-12 大地仁工程咨询有限公司 Integrated pricing system and method for general engineering contract
CN113743893A (en) * 2021-08-27 2021-12-03 国核电力规划设计研究院有限公司 Intelligent cooperative processing system and method for engineering project life cycle
CN113946888A (en) * 2021-12-22 2022-01-18 四川省交通勘察设计研究院有限公司 Tunnel engineering forward design system and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105335905A (en) * 2015-11-24 2016-02-17 广州拓欧信息技术有限公司 Building engineering computation and evaluation system and method
CN107229791A (en) * 2017-05-27 2017-10-03 联合建管(北京)国际工程科技有限责任公司 Cost of construction metering method and device
US20170308934A1 (en) * 2016-04-22 2017-10-26 Economy Research Institute of State Grid Zhejiang Electric Power Management method of power engineering cost
CN108550020A (en) * 2018-03-30 2018-09-18 四川成化工程项目管理有限公司 Building cost control method based on BIM technology
CN109766605A (en) * 2018-12-28 2019-05-17 国网浙江省电力有限公司经济技术研究院 Method for building up in kind with the power distribution network full information mathematical model of value linkage

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105335905A (en) * 2015-11-24 2016-02-17 广州拓欧信息技术有限公司 Building engineering computation and evaluation system and method
US20170308934A1 (en) * 2016-04-22 2017-10-26 Economy Research Institute of State Grid Zhejiang Electric Power Management method of power engineering cost
CN107229791A (en) * 2017-05-27 2017-10-03 联合建管(北京)国际工程科技有限责任公司 Cost of construction metering method and device
CN108550020A (en) * 2018-03-30 2018-09-18 四川成化工程项目管理有限公司 Building cost control method based on BIM technology
CN109766605A (en) * 2018-12-28 2019-05-17 国网浙江省电力有限公司经济技术研究院 Method for building up in kind with the power distribution network full information mathematical model of value linkage

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李春娥等主编: "《工程造价信息管理》", 30 September 2016, 重庆大学出版社 *
王岩等: "《建筑行业的信息化革命—论BIM技术在不同项目中参与方中的应用》", 30 June 2018 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111680340A (en) * 2020-05-28 2020-09-18 上海上咨工程造价咨询有限公司 Building material price information pushing method, system and device and storage medium thereof
CN111680340B (en) * 2020-05-28 2022-08-23 上海上咨工程造价咨询有限公司 Building material price information pushing method, system and device and storage medium thereof
CN111737306A (en) * 2020-06-19 2020-10-02 广联达科技股份有限公司 Engineering index determination method and device, computer equipment and storage medium
CN111985894A (en) * 2020-08-15 2020-11-24 武汉华胜工程建设科技有限公司 Construction engineering project consultation cost management method and system and intelligent terminal
CN112085522A (en) * 2020-08-24 2020-12-15 江苏易达捷信数字科技有限公司 Construction cost data processing method, system, device and medium for engineering project
CN112307018A (en) * 2020-09-29 2021-02-02 山东黄金矿业(莱州)有限公司三山岛金矿 Method for storing unit price data of mine excavation engineering
CN112329178A (en) * 2020-11-26 2021-02-05 国网河北省电力有限公司经济技术研究院 Method and device for establishing three-dimensional construction cost model of angle steel tower and terminal equipment
CN112329178B (en) * 2020-11-26 2022-11-22 国网河北省电力有限公司经济技术研究院 Method and device for establishing three-dimensional construction cost model of angle steel tower and terminal equipment
CN113643064A (en) * 2021-08-13 2021-11-12 大地仁工程咨询有限公司 Integrated pricing system and method for general engineering contract
CN113743893A (en) * 2021-08-27 2021-12-03 国核电力规划设计研究院有限公司 Intelligent cooperative processing system and method for engineering project life cycle
CN113743893B (en) * 2021-08-27 2023-11-17 国核电力规划设计研究院有限公司 Intelligent cooperative processing system and method for whole life cycle of engineering project
CN113946888A (en) * 2021-12-22 2022-01-18 四川省交通勘察设计研究院有限公司 Tunnel engineering forward design system and method

Similar Documents

Publication Publication Date Title
CN110533389A (en) The determination method and device of Project Cost
CN111259535B (en) Method for developing logistics simulation system of ship pipeline production line
CN109754200A (en) Bill of material management method, apparatus and computer readable storage medium
CN106408341A (en) Goods sales volume prediction method and device, and electronic equipment
CN109903064A (en) Method for Sales Forecast method, apparatus and computer readable storage medium
WO2019214455A1 (en) Data sequence prediction method and computing apparatus
CN108694599A (en) Determine method, apparatus, electronic equipment and the storage medium of commodity price
CN110347056A (en) Shop-floor management platform and emulation mode
CN108629632A (en) Predict the method, apparatus and computer readable storage medium of user's income
CN109741177A (en) Appraisal procedure, device and the intelligent terminal of user credit
CN107545038A (en) A kind of file classification method and equipment
CN110264236A (en) Vending machine sales data analysis method, device and storage medium
CN107767152A (en) Product purchase intention analysis method and server
CN108647714A (en) Acquisition methods, terminal device and the medium of negative label weight
CN107633421A (en) A kind of processing method and processing device of market prediction data
CN108898648A (en) A kind of K line chart building method, system and relevant device
CN116630082A (en) Method and device for allocating production resources, electronic equipment and storage medium
Andersen Knowledge productivity and the returns to agricultural research: a review
CN110322297A (en) Medium-and-large-sized stamping die quotation prediction technique based on BP neural network
CN109377092A (en) A kind of modeling method of the project of transmitting and converting electricity valuation model based on BIM
CN109711765A (en) Distribution materials and equipment classification method based on Kraljic buying location model
Clarete et al. CGE models and development policy analysis: problems, pitfalls, and challenges
CN105279320B (en) A kind of method for generating FDTD grids
CN108805603A (en) Marketing activity method for evaluating quality, server and computer readable storage medium
CN113360995A (en) BIM model-based method and system for calling interchange decoration materials

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191203