CN105297685B - A kind of pedestal CFRD and its construction method - Google Patents

A kind of pedestal CFRD and its construction method Download PDF

Info

Publication number
CN105297685B
CN105297685B CN201510817066.4A CN201510817066A CN105297685B CN 105297685 B CN105297685 B CN 105297685B CN 201510817066 A CN201510817066 A CN 201510817066A CN 105297685 B CN105297685 B CN 105297685B
Authority
CN
China
Prior art keywords
pedestal
rock
area
panel
cfrd
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510817066.4A
Other languages
Chinese (zh)
Other versions
CN105297685A (en
Inventor
杨家修
湛正刚
程瑞林
张合作
慕洪友
蔡大咏
王蒙
邱焕峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201510817066.4A priority Critical patent/CN105297685B/en
Publication of CN105297685A publication Critical patent/CN105297685A/en
Application granted granted Critical
Publication of CN105297685B publication Critical patent/CN105297685B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a kind of pedestal CFRD and its construction method, belong to hydroelectric project technical field, including rock, panel, bed course area and transition region a, the transition region a, bed course area and panel are covered on the upstream face of rock successively, the rock has pedestal, and transition region b is provided between the pedestal and rock.The technical program under rock by setting pedestal, employ hierarchy, fundamentally reduce the height and panel length of rock rockfill, on the premise of crest elevation is not reduced, reduce the deformation of rock and panel, so that design, build and run higher rock and be more prone to reach technical requirements, by Deformation control in controlled range, breach because high CFRD is larger and limited to not above 250m levels by deformation.

Description

A kind of pedestal CFRD and its construction method
Technical field
The invention belongs to hydroelectric project technical field, it is related to a kind of new dam type for being applicable more than 70m rocks, especially It is to be related to a kind of pedestal CFRD and its construction method.
Background technology
Rock development course is made a general survey of, panel heap is crossed from Tianshengqiao-I rock (height of dam 178m), big vast family The 180m such as masonry dam (height of dam 179.5m) grades is developed into water cloth a strip of land between hills rock (height of dam 233m), and height of dam development maximum span reaches 53m;At present, built highest rock water cloth a strip of land between hills rock operational excellence, illustrate China possessed design, build, The ability of 200m grades of rocks of operation and management.But, several 200m grades of high CFRDs of short-term construction are being obtained While success and invaluable experience, also there is dam deformation bigger than normal than predicted value, panel generation extruding breakage, seepage in part engineering The problems such as measuring larger.If height of dam continues to increase to more than 250m, compared with built highest 233m water cloth a strip of land between hills rock, together Spline span is larger, will bring bigger design and construction difficulty.Therefore, on the basis of current technology, success construction 250m grades or higher of rock, those skilled in the art have no full assurance.
Due to the characteristic of dam material, the deformation during CFRD Embankment with the runtime after retaining is to keep away Exempt from, but deform it is excessive will cause face slab rupture, joint seal destruction so as to increase leakage, or even causes infiltration Stability disruption etc., threatens dam resistance to overturning.In addition, conventional panels rock-fill dams height of dam increase, panel chord length increase, reservoir stores After water level, under effect of water pressure, deck deflection deformation increase, deformation is excessive to cause panel to fracture, and lose panel anti- Ooze function.It was verified that in the case that identical material source, level are matched somebody with somebody and fill index, height of dam is higher, panel chord length is longer, and dam body becomes Shape and deck deflection deformation are bigger.Existing result of study shows that it is exactly face to limit one of key technology of rock height of dam The Deformation control of plate and dam body stockpile.
The content of the invention
In order to solve the above problems, the invention provides a kind of pedestal CFRD and its construction method, from And reduction dam body rockfill height is reached, reduce panel chord length, so as to reduce the effect of dam deformation value, make deformation controllable Within the scope of, upper panel rock-fill dams is highly met design, construction, operation, the administrative skill level of current rock.
The present invention is achieved by following technical solution.
A kind of pedestal CFRD, including rock, panel, bed course area and transition region a, the transition Area a, bed course area and panel are covered on the upstream face of rock successively, and the rock has pedestal, described Transition region b is provided between pedestal and rock.
The pedestal includes the pedestal antiseepage area of upstream side and the pedestal supporting region in downstream.
The pedestal antiseepage area is provided with toe board area at the top of pedestal.
Pedestal irrigation gallery is provided with inside the pedestal antiseepage area.
Seepage proof curtain is provided with below the pedestal antiseepage area.
Pedestal antiseepage area transverse joint is provided with the pedestal antiseepage area.
The panel is provided with panel vertical lap seam.
The rock two ends are provided with toe board.
A kind of construction method of pedestal CFRD, comprises the following steps:
A. pedestal is poured:Dam foundation coating is removed, dam foundation excavation to bearing capacity is met to desired depth, region is being excavated Interior system peace reinforcing bar, presets seepage proof curtain under pedestal antiseepage area, reserves pedestal irrigation gallery, and jump pours pedestal concrete soon, together When take Temperature Control Measures, prevent crack;Pedestal supporting region then determines on-deck size according to material property, and takes temperature Spend control measure;
B. pedestal Anti-seeping technology:Anti-seeping technology is carried out to pedestal antiseepage area and pedestal supporting region interface, in pedestal antiseepage Area sets pedestal antiseepage area transverse joint, and the position of pedestal antiseepage area transverse joint is corresponding with the position of panel vertical lap seam;
C. pedestal joint face is handled:Fill Transition Materials at the top of pedestal, form transition region b, transition region b filling material and Indices are identical with transition region a;
D. CFRD Embankment:Rock, transition region a, bed course area, panel are filled successively, are set on panel Panel vertical lap seam, is corresponded with pedestal antiseepage area transverse joint position, completes construction.
In the step a, when pedestal antiseepage area is poured, upstream 1~5m of thickness is reserved, is together poured with toe board area at the top of pedestal Build, and carry out the concreting of bank slope toe board simultaneously.
The beneficial effects of the invention are as follows:
A kind of pedestal CFRD of the present invention and its construction method, by being divided into rock Pedestal is put, its effect is:1. hierarchy is employed, the height and panel of rock rockfill is fundamentally reduced Length, on the premise of crest elevation is not reduced, reduces the deformation of rock and panel so that design, build and transport The higher rock of row is more prone to reach technical requirements, by Deformation control in controlled range, breaches because high face Sheetpile masonry dam is limited to by deforming larger not above 250m levels;2. first construction is finished before rock construction, is completed Can dash pass the flood period, it is to avoid the destruction that flood season bed course temporary water dash may be caused to dam body temporary section, shorten bed course prevent temporarily The time of shield, the maintenance cost of bed course provisional protection is reduced, while also reducing the investment to construction diversion.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is the partial enlarged drawing at A in the present invention;
Fig. 3 is the elevation of pedestal upstream face in the present invention.
In figure:1- pedestals, 2- rocks, 3- panels, 4- bed courses area, 5- transition regions a, 6- transition region b, 7- pedestal is held Carry toe board area, 10- pedestal antiseepages area transverse joint, 11- pedestal irrigation galleries, 12- antiseepages at the top of area, 8- pedestal antiseepages area, 9- pedestals Curtain, 13- toe boards, 14- panel vertical lap seams.
Embodiment
Technical scheme is further described below in conjunction with the accompanying drawings, but claimed scope is not limited to institute State.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of pedestal CFRD of the present invention, including rock 2nd, panel 3, bed course area 4 and transition region a5, the transition region a5, bed course area 4 and panel 3 are covered in rock 2 successively On upstream face, the rock 2 has pedestal 1, and transition region b6 is provided between the pedestal 1 and rock 2, makees To fill Transition Materials.
The pedestal 1 includes the pedestal antiseepage area 8 of upstream side and the pedestal supporting region 7 in downstream, and the height of pedestal 1 is less than 100m, pedestal supporting region 7 can be in the rigid materials such as normal concrete, grinding coagulation soil, cement sand and gravel, rock-fill concrete One or more of batch mixings are built up, and its rigidity is suitable with the dam foundation after building up;Pedestal antiseepage area 8 is built up by normal concrete;The base Seat antiseepage area 8 is provided with toe board area 9 at the top of pedestal, and inside is provided with pedestal irrigation gallery 11, and lower section is provided with seepage proof curtain 12, to many Individual position carries out antiseepage, reaches good anti-seepage effect.
The panel 3 is provided with panel vertical lap seam 14 so that panel 3 can bear certain deflection;The pedestal antiseepage Some pedestal antiseepage area transverse joints 10 are provided with along river vertical direction in area 8, position and the panel of each pedestal antiseepage area transverse joint 10 hang down Vertical masonry joint 14 is corresponding, and Copper water stop is set in seam.
The rock 2 is conventional rock, and rock 2 and panel 3, bed course 4, transition region a5 are equal Based on pedestal 1, and length of the upper surface along river course direction of pedestal 1 is more than the bottom surface of rock 2 along river course direction Length, the step surface that the upstream side of pedestal 1 extends out, i.e., the top of pedestal antiseepage area 8 is provided with toe board area 9, pedestal top at the top of pedestal Wide 8~the 15m in toe board area of portion 9,1~2m of thickness, using more than C30 concretings;The two ends of pedestal 1 are then provided with toe board 13, toe board knot Structure can avoid rock 2 and the crossover position of pedestal 1 that seepage is occurred by current scour.
The pedestal 1 along the river to length L add 2.9 for 15~100m~3.2 times of H, wherein H is rock 2 Highly;Pedestal 1 respectively upstream with downstream slope, slope ratio determines according to actual conditions.
During construction, following steps are taken:
A. pedestal is poured:Dam foundation coating is removed, dam foundation excavation to bearing capacity is met to desired depth, region is being excavated Interior system peace reinforcing bar, determines the position of pedestal antiseepage area 8, default seepage proof curtain 12, then pours pedestal coagulation under pedestal antiseepage area 8 Soil, reserves pedestal irrigation gallery 11 when pouring.When pouring, pedestal supporting region 7 can be first poured, also can pedestal antiseepage area 8 and pedestal Supporting region 7 pours rising simultaneously, and carries out Anti-seeping technology to pedestal antiseepage area 8 and the interface of pedestal supporting region 7;Pedestal antiseepage area 8 when pouring, and is jumped and poured soon using C20 or more than C20 normal concretes, while taking Temperature Control Measures, prevents crack; Reserved upstream 1~5m of thickness, is together poured with toe board area 9 at the top of pedestal, and the progress bank slope toe board 13 while pedestal 1 is poured Concreting, and corresponding based process;Pouring for pedestal supporting region 7, on-deck size is determined according to material property, it is ensured that The intensity of rock is reached, and takes when pouring suitable Temperature Control Measures.
B. pedestal Anti-seeping technology:Anti-seeping technology is carried out to pedestal antiseepage area 8 and the interface of pedestal supporting region 7, it is anti-in pedestal Ooze area 8 and set pedestal antiseepage area transverse joint 10, the position of pedestal antiseepage area transverse joint 10 is corresponding with the design attitude of panel vertical lap seam 14.
C. pedestal joint face is handled:Transition Materials are filled at the top of pedestal 1, transition region b6 are formed, transition region b6's fills material Material and indices are identical with transition region a5 design objective, and filling-up thickness is then determined according to actual conditions;
D. CFRD Embankment:Rock 2, transition region a5, bed course area 4, panel 3 are filled successively, on panel 3 Panel vertical lap seam 14 is set, corresponded with the position of pedestal antiseepage area transverse joint 10, the construction of panel 3 can by stages be applied according to height of dam Work, realizes that impoundment ahead generates electricity.

Claims (4)

1. a kind of construction method of pedestal CFRD, the pedestal CFRD includes panel enrockment Dam (2), panel (3), bed course area (4) and transition region a (5), the transition region a (5), bed course area (4) and panel (3) are covered successively In on the upstream face of rock (2), the rock (2) has pedestal (1), and the pedestal (1) includes upstream The pedestal antiseepage area (8) of side and the pedestal supporting region (7) in downstream;Pedestal antiseepage area (8) is provided with toe board area at the top of pedestal (9), lower section is provided with seepage proof curtain (12), and inside is provided with pedestal irrigation gallery (11) and pedestal antiseepage area transverse joint (10);Pedestal (1) Transition region b (6) is provided between rock (2);
It is characterized in that:The construction method of the pedestal CFRD comprises the following steps:
A. pedestal is poured:Dam foundation coating is removed, dam foundation excavation to bearing capacity is met to desired depth, is made excavating in region Pacify reinforcing bar, seepage proof curtain (12) is preset under pedestal antiseepage area (8), reserve pedestal irrigation gallery (11), jump pours pedestal and mixed soon Solidifying soil, while taking Temperature Control Measures, prevents crack;Pouring for pedestal supporting region (7), is determined according to material property On-deck size, and take Temperature Control Measures when pouring;
B. pedestal Anti-seeping technology:Anti-seeping technology is carried out to pedestal antiseepage area (8) and pedestal supporting region (7) interface, it is anti-in pedestal Ooze area (8) and set pedestal antiseepage area transverse joint (10), the position of pedestal antiseepage area transverse joint (10) and the position phase of panel vertical lap seam (14) Correspondence;
C. pedestal joint face is handled:Transition Materials are filled at the top of the pedestal (1), form transition region b (6), transition region b (6) are filled Material and indices are identical with transition region a (5);
D. CFRD Embankment:Rock (2), transition region a (5), bed course area (4), panel (3) are filled successively, in face Panel vertical lap seam (14) is set on plate (3), corresponded with pedestal antiseepage area transverse joint (10) position, construction is completed.
2. a kind of construction method of pedestal CFRD according to claim 1, it is characterised in that:The step In rapid a, when pedestal antiseepage area (8) is poured, upstream 1~5m of thickness is reserved, is together poured with toe board area (9) at the top of pedestal, and together The concreting of Shi Jinhang bank slopes toe board (13).
3. a kind of construction method of pedestal CFRD according to claim 1, it is characterised in that:The face Plate (3) is provided with panel vertical lap seam (14).
4. a kind of construction method of pedestal CFRD according to claim 1, it is characterised in that:The face Sheetpile masonry dam (2) two ends are provided with toe board (13).
CN201510817066.4A 2015-11-23 2015-11-23 A kind of pedestal CFRD and its construction method Active CN105297685B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510817066.4A CN105297685B (en) 2015-11-23 2015-11-23 A kind of pedestal CFRD and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510817066.4A CN105297685B (en) 2015-11-23 2015-11-23 A kind of pedestal CFRD and its construction method

Publications (2)

Publication Number Publication Date
CN105297685A CN105297685A (en) 2016-02-03
CN105297685B true CN105297685B (en) 2017-10-24

Family

ID=55195448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510817066.4A Active CN105297685B (en) 2015-11-23 2015-11-23 A kind of pedestal CFRD and its construction method

Country Status (1)

Country Link
CN (1) CN105297685B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672205B (en) * 2016-03-29 2018-02-09 中国电建集团中南勘测设计研究院有限公司 A kind of rock leakage preventing structure
CN106192907B (en) * 2016-07-11 2018-06-22 中国水利水电第十一工程局有限公司 Add the construction method of 150m~300m grade high concrete panel rock-fill dams of cement sand and gravel structure sheaf
CN106087880B (en) * 2016-07-19 2018-10-19 中国水利水电第十一工程局有限公司 A kind of dam that 300 meter level is high and its construction technology
CN106638487B (en) * 2017-01-19 2019-10-25 中国电力建设股份有限公司 A kind of construction method combining checkdam and the combined dam
CN107587484B (en) * 2017-08-31 2023-03-24 贵州省水利投资(集团)有限责任公司 Panel rock-fill dam with toe board under small stress
CN108316250A (en) * 2018-05-02 2018-07-24 中国电建集团华东勘测设计研究院有限公司 Technology and construction method are cleared using the silt that stops for dynamically stopping silt storage capacity separation mud-rock flow
CN108547190A (en) * 2018-06-22 2018-09-18 中国电建集团贵阳勘测设计研究院有限公司 A kind of method of ecological type immerseable embankment processing
CN110042800A (en) * 2019-05-24 2019-07-23 中水北方勘测设计研究有限责任公司 Concrete face rockfill dam leakage preventing structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB715126A (en) * 1950-07-27 1954-09-08 Wilhelm Degen Water-tight seals for dams, etc
CN103132488B (en) * 2011-11-25 2015-04-15 中国电建集团贵阳勘测设计研究院有限公司 Reverse osmosis water processing method and reverse osmosis drainage system in construction period of concrete faced rockfill dam
CN102900092B (en) * 2012-09-24 2015-02-11 长江勘测规划设计研究有限责任公司 Artificial composite foundation of concrete face rockfill dam built on deep and thick coverage layer and construction method of artificial composite foundation
CN204059294U (en) * 2014-07-07 2014-12-31 黄河勘测规划设计有限公司 Deeply covered layer face dam riverbed toe board, junction plate, panel parting arrangement
CN104120686B (en) * 2014-07-28 2016-04-13 中国电建集团西北勘测设计研究院有限公司 A kind of high-elastic die-cushion A seating compound dam
CN104480903B (en) * 2014-12-12 2016-07-06 中国电建集团贵阳勘测设计研究院有限公司 A kind of Face Slab of Concrete-faced Rockfill parting structure and construction method thereof
CN205134283U (en) * 2015-11-20 2016-04-06 中国电建集团贵阳勘测设计研究院有限公司 Base concrete panel rock -fill dam

Also Published As

Publication number Publication date
CN105297685A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN105297685B (en) A kind of pedestal CFRD and its construction method
CN205134283U (en) Base concrete panel rock -fill dam
CN105464056B (en) A kind of leakage preventing structure for adapting to Earth-rockfill Dam Settlements
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
CN101644041B (en) Face rockfill dam toe board structure constructed on completely weathered bed rock and construction method thereof
CN105201001B (en) Composite seepage preventing structure for large karst cave in karst region and construction method thereof
CN207003499U (en) A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN205012288U (en) Embankment dam pitch core -wall base
CN104120686A (en) High elastic die cushion type composite dam
CN106759133A (en) The mixing structure of dam type and construction method of a kind of homogeneous earth and rockfill dam and rock
CN104652371A (en) Overflow cemented rock-fill dam established based on old dam and construction method thereof
CN106498959A (en) Gutter for deep overburden
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN207537975U (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN106087880A (en) Dam that a kind of 300 meter levels are high and construction technology thereof
CN106567365B (en) Earth and rockfill dam longitudinal reinforcement construction method
CN203007961U (en) Gabion cofferdam structure
CN105970882B (en) Solve the structure and its building method of face dam construction time dam body reverse osmosis water problems
CN107761668A (en) A kind of strand Bin Ku makes ground type bank protection structure and its construction process
CN107881987A (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN106522170A (en) Novel dam type adopting concrete anti-seepage wall as dam body anti-seepage body
CN208455573U (en) A kind of full library basin Anti-seeping technology structure of karst area
CN102900092A (en) Artificial composite foundation of concrete face rockfill dam built on deep and thick coverage layer and construction method of artificial composite foundation
CN206189430U (en) A escape canal for deep overburden ground

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant