CN104120686A - High elastic die cushion type composite dam - Google Patents

High elastic die cushion type composite dam Download PDF

Info

Publication number
CN104120686A
CN104120686A CN201410361477.2A CN201410361477A CN104120686A CN 104120686 A CN104120686 A CN 104120686A CN 201410361477 A CN201410361477 A CN 201410361477A CN 104120686 A CN104120686 A CN 104120686A
Authority
CN
China
Prior art keywords
district
area
dam
downstream
upstream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410361477.2A
Other languages
Chinese (zh)
Other versions
CN104120686B (en
Inventor
蔡新合
姚栓喜
雷艳
郝丽莎
张晓将
魏坚政
王君利
吴峻峰
李锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanghe Hydropower Development Co Ltd
PowerChina Northwest Engineering Corp Ltd
Original Assignee
PowerChina Northwest Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Northwest Engineering Corp Ltd filed Critical PowerChina Northwest Engineering Corp Ltd
Priority to CN201410361477.2A priority Critical patent/CN104120686B/en
Publication of CN104120686A publication Critical patent/CN104120686A/en
Application granted granted Critical
Publication of CN104120686B publication Critical patent/CN104120686B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention belongs to the technical field of hydroelectric and hydraulic engineering hydraulic structures, and particularly provides a high elastic die cushion type composite dam. The composite dam comprises a concrete face plate, a cushion layer area, a transition area, an upstream major stone pile area and a downstream minor stone pile area, wherein the concrete face plate, the cushion layer area, the transition area, the upstream major stone pile area and the downstream minor stone pile area are sequentially arranged from an upstream region to a downstream region; a high toe wall area is arranged at the bottom of the concrete face plate, the bottom of the cushion layer area and the bottom of the transition area; a lower compression area is arranged at the bottom of the upstream major stone pile area and the bottom of the downstream minor stone pile area; the lower compression area is arranged at the downstream position of the high toe wall area and below the crest level of the high toe wall area. The high toe wall area and the lower compression area are arranged, so that transformation and stress of a dam body and the concrete face plate are reduced, the standards of stone pile dams with 200 m level face plates are reached, and the technology for stone pile dams with 300 m level face plates is feasible, economical and safe.

Description

The compound dam of a kind of high-elastic die-cushion seat formula
Technical field
The invention belongs to water power hydraulic engineering hydraulic structure technical field, be specifically related to the compound dam of a kind of high-elastic die-cushion seat formula.
Background technology
Along with water power implementation, in the abundant southwest of hydraulic power potentials, the Northwest, large quantities of high dams are built, building or yet to be built.Earth and rockfill dam is modal a kind of dam type during current dam work is built, and is also a kind of dam type with fastest developing speed, accounts for the more than 95% of built dam sum.The earth and rockfill dam that whole world height of dam surpasses 15m has more than 29000, and wherein China has more than 15000, mainly comprises homogeneous earth dam, core wall dam and Concrete Face Rockfill Dam etc.
Reinforced concrete face rockfill dam is a kind of new dam type that the later stage seventies in last century starts to grow up, it embodies the good feature of safety, economy, easy construction and compliance in practice, although start late but develop very fast, the favor of Shen Shouba work circle.According to incompletely statistics, by September, 2011, in the world built, at the rock of building and planning to build, from engineering quantity, height of dam, to project scale, all occupy the forefront.China is built and have more than 270 building rock so far, and sum accounts for global 50%.Along with the accumulation of Dam Construction experience and the raising of design level, the height of rock is also in continuous increase, and Shuibuya Dam is up to 233m, is the highest built rock in the world, also becomes the successful case of the high rock of 250m level.250~300m level superelevation rock that great Shi gorge, Ci Haxia, Gu Shui, Ma Ji, Ru Mei etc. plan to build is at present also in the middle of project study, the safety issue of dam work bound pair superelevation rock, main existence worried below: (1) can not correct Prediction superelevation face dam dam settlement and the sedimentation panel deformation, stress and the requirement to sealing material that cause; (2) whether existing laboratory facilities adopt material for scale model, can correct Prediction superelevation face dam dam permeation stability problem and the physico-mechanical properties of dam material; Existence due to above-mentioned uncertain factor, whether concrete surface plate material and the form of structure of high resistance to extruding, high cracking resistance can be proposed, whether can propose to meet joint seal form of structure and the material of the large deformation of superelevation face dam, become present Ba Gongjie and studied more problem.
But, water cloth a strip of land between hills build up the successful case that becomes the high rock of 250m level, Yi Beiba work circle is accepted.If distortion, panel deflection and the stress of 300m level superelevation rock planned to build are, the distortion magnitude of joint seal reaches the degree of 200m level rock, can also Wei Ba work circle accept, also just solved the technical bottleneck of 300m level superelevation rock.
Summary of the invention
The object of the invention is to overcome the technical feasibility problems such as distortion, panel deflection and stress of 300m level superelevation rock in prior art.
For this reason, the invention provides the compound dam of a kind of high-elastic die-cushion seat formula, comprise concrete slab, bed course district, transition region, main rockfill area, upstream and the downstream time rockfill area setting gradually to downstream from upstream, the bottom of described concrete slab, bed course district, transition region is provided with Gao Zhiqiang district, the bottom of main rockfill area, described upstream and downstream time rockfill area is provided with low compressional zone, and described low compressional zone is placed in below the crest level in Qie Gaozhi wall district, downstream in Gao Zhiqiang district.
Above-mentioned concrete slab He Gaozhiqiang district upstream side is disposed with ballast district and bedding district by upstream to downstream.
The end elevation in above-mentioned ballast district and bedding district is higher than more than low compressional zone bottom 10m.
The thickness that above-mentioned Gao Zhiqiang district head upstream side is put above bedding district is not less than 10m.
Above-mentioned Gao Zhiqiang district upstream side slope is than being 1:t, and the span of t is 0~0.2, and the subregion slope of Yu Di compressional zone, downstream, Gao Zhiqiang district is than being 1:S, and S is not less than 0.5.
The height of He Di compressional zone, above-mentioned Gao Zhiqiang district is consistent, and its height is 0.1~0.4 with the ratio of the height of dam on compound dam.
The bottom in above-mentioned Gao Zhiqiang district is provided with high toe foundation of wall consolidation grouting floor.
Above-mentioned Gao Zhiqiang arranges irrigation gallery in district, and curtain grouting layer is set in irrigation gallery.
The slope of above-mentioned concrete slab, bed course district and transition region, than identical, is 1:m, and the span of m is 1.35~1.7; The downstream side slope ratio of time rockfill area, downstream is 1:n, and the span of n is 1.25~1.8.
The subregion slope ratio of main rockfill area, above-mentioned upstream and downstream time rockfill area is 1:k, and the span of k is 0~1.35.
Beneficial effect of the present invention is as follows:
(1) the low compressional zone that dam body bottom in the compound dam of high-elastic die-cushion seat formula arranges, the high toe foundation of wall consolidation grouting floor of Gao Zhiqiang district and bottom thereof and curtain grouting floor with in dam body, the main rockfill area, upstream that arranges, top, time rockfill area, downstream together with concrete slab, formed the seepage prevention system of sealing.
(2) the compound dam of high-elastic die-cushion seat formula that the present invention proposes, can be so that the stress of 300m level superelevation rock, the distortion of sedimentation and minute crack structure etc. safety indexes, meet existing < < Concrete Face Rockfill Dam design specifications > > (DL/T5016-2011, SL228-98) and < < concrete gravity dam design specifications > > (L5108-1999, SL319-2005) requirement, make 300m level superelevation rock feasible technically.
(3) the compound dam of high-elastic die-cushion seat formula that the present invention proposes makes full use of local building rockfill materials, meets the requirement of economy, has good society, economy and ecological benefits.
Below with reference to accompanying drawing, the present invention is described in further details.
Accompanying drawing explanation
Fig. 1 is the section structure schematic diagram on the compound dam of the high-elastic die-cushion seat formula of the present invention.
Description of reference numerals: 1, concrete slab; 2, bed course district; 3, transition region; 4, main rockfill area, upstream; 5, time rockfill area, downstream; 6, Gao Zhiqiang district; 7, high toe foundation of wall consolidation grouting layer; 8, curtain grouting layer; 9, low compressional zone; 10, bedding district; 11, ballast district.
The specific embodiment
Embodiment 1:
In order to overcome the distortion of 300m level superelevation rock in prior art, the technical feasibility problem such as panel deflection and stress, the present embodiment provides a kind of compound dam of high-elastic die-cushion seat formula as shown in Figure 1, comprise the concrete slab 1 setting gradually to downstream from upstream, bed course district 2, transition region 3, main rockfill area 4, upstream and downstream time rockfill area 5, described concrete slab 1, bed course district 2, the bottom of transition region 3 is provided with Gao Zhiqiang district 6, the bottom of main rockfill area 4, described upstream and downstream time rockfill area 5 is provided with low compressional zone 9, described low compressional zone 9 is placed in below the crest level in Qie Gaozhi wall district, downstream 6 in Gao Zhiqiang district 6.
Wherein, Gao Zhiqiang district 6 is according to design of gravity dam, and design standard is observed the relevant regulations of < < concrete gravity dam design specifications > > (L5108-1999, SL319-2005).The height in Gao Zhiqiang district 6, according to reduce concrete slab 1 stress, be deformed into the magnitude of 200m level rock; The setting in Gao Zhiqiang district 6, can effectively reduce stress and the distortion of concrete slab 1; The structure of concrete slab 1 and water-stopping structure thereof and material are selected according to the requirement of 200m level rock.
And the Gao Zhiqiang district 6 that is arranged so that of low compressional zone 9 meets the requirement of related specifications and stress stable to it, simultaneously, the setting of low compressional zone 9, can reduce distortion and the stress of dam body and concrete slab 1, reach the standard of 200m level rock, make 300m level rock technical feasibility, economic security, 300m level rock can be accepted by people.
In addition, low compressional zone 9 can adopt a kind of low compression material, such as the bedding material in conventional design or its modified materials, Transition Materials, dry lean concrete material, roller-compacting concrete material, modification sand gravel material etc., also can adopt the combination of above-mentioned different materials, low compressional zone 9 is selected the material that in above-mentioned material, construction is simple, cost is low as far as possible, meets economy requirement.
Embodiment 2:
On the basis of embodiment 1, for concrete slab 1 He Gaozhiqiang district 6 is played a protective role, described concrete slab 1 He Gaozhiqiang district 6 upstream sides are disposed with ballast district 11He bedding district 10 by upstream to downstream; The end elevation in described ballast district 11He bedding district 10 is higher than more than low compressional zone 9 bottom 10m; The thickness that described Gao Zhiqiang district 6 head upstream sides are put above bedding district 10 is not less than 10m, and meets the permission gradient requirement in bedding district 10.
And described Gao Zhiqiang district 6 upstream side slopes are than being 1:t, and the span of t is 0~0.2, and the subregion slope of 6 Yu Di compressional zones, downstream 9, Gao Zhiqiang district is than being 1:S, and S is not less than 0.5, and actual definite according to engineering.Described Gao Zhiqiang district 6 is consistent with the height of low compressional zone 9, and its height is 0.1~0.4 with the ratio of the height of dam on compound dam, and its ratio is the smaller the better, and actual definite according to engineering.
The bottom in described Gao Zhiqiang district 6 is provided with high toe foundation of wall consolidation grouting floor 7; The interior irrigation gallery that arranges in described Gao Zhiqiang district 6 arranges curtain grouting layer 8 in irrigation gallery; Concrete slab 1, Gao Zhiqiang district 6, high toe foundation of wall consolidation grouting floor 7 and curtain grouting floor 8 are as the leakage preventing structure of this dam body.
The slope of described concrete slab 1, bed course district 2 and transition region 3, than identical, is 1:m, and the span of m is 1.35~1.7; The downstream side slope ratio of time rockfill area 5, downstream is 1:n, and the span of n is 1.25~1.8; The subregion slope of main rockfill area 4, described upstream and downstream time rockfill area 5 is than being 1:k, and the span of k is 0~1.35, and actual definite according to engineering, generally gets 0.2.
In addition, in the present embodiment, bed course district 2, transition region 3, main rockfill area 4, upstream, time rockfill area 5, downstream, ballast district 11He bedding district 10 all can adopt rockfill materials to fill, and comprise built-up area excavated material, stock ground piece building stones and stock ground sand gravel material etc.The selection of rockfill materials must meet the related request of < < Concrete Face Rockfill Dam design specifications > > (DL/T5016-2011, SL228-98).The present embodiment makes full use of the excavated material of building, reduces the area of rejected material and slag field, reduces the impact of dam construction on environment, reduces construction costs, improves the economic indicator of dam body and hinge, has good economy, society and environmental ecological benefit.
It should be noted that the above-mentioned parameter in the present embodiment must meet the requirement of < < Concrete Face Rockfill Dam design specifications > > (DL/T5016-2011, SL228-98) and < < concrete gravity dam design specifications > > (L5108-1999, SL319-2005).Main rockfill area 4, upstream and downstream time rockfill area 5 dam structures, must check dam body settlement, distortion, stress and panel deflection and stress, all side seams, vertical lap seam displacement etc., meet the regulation of < < Concrete Face Rockfill Dam design specifications > > (DL/T5016-2011, SL228-98); Must check the stress of high toe wall and stablize, meeting the relevant regulations of < < concrete gravity dam design specifications > > (L5108-1999, SL319-2005); Must check the dam body Ge Liao district osmotic stability of (comprising low compressional zone).Gao Zhiqiang district 6, as the leakage preventing structure of low compressional zone 9 and the key components of dam body seepage structure, adopts concreting, and the water-stopping system of sealing is set.The materials such as bedding material, Transition Materials, roller compacted concrete or modification sand gravel material are selected in low compressional zone 9, adopt compaction type construction method.
More than exemplifying is only to illustrate of the present invention, does not form the restriction to protection scope of the present invention, within the every and same or analogous design of the present invention all belongs to protection scope of the present invention.

Claims (10)

1. the compound dam of high-elastic die-cushion seat formula, comprise concrete slab (1), bed course district (2), transition region (3), main rockfill area, upstream (4) and the downstream time rockfill area (5) setting gradually to downstream from upstream, it is characterized in that: the bottom of described concrete slab (1), bed course district (2), transition region (3) is provided with Gao Zhiqiang district (6), the bottom of main rockfill area, described upstream (4) and downstream time rockfill area (5) is provided with low compressional zone (9), and described low compressional zone (9) is placed in below the crest level in Qie Gaozhi wall district, downstream (6) in Gao Zhiqiang district (6).
2. the compound dam of high-elastic die-cushion seat formula as claimed in claim 1, is characterized in that: described concrete slab (1) He Gaozhiqiang district (6) upstream side is disposed with ballast district (11) and bedding district (10) by upstream to downstream.
3. the compound dam of high-elastic die-cushion seat formula as claimed in claim 2, is characterized in that: the end elevation of described ballast district (11) and bedding district (10) is higher than more than low compressional zone (9) bottom 10m.
4. the compound dam of high-elastic die-cushion seat formula as claimed in claim 2, is characterized in that: the thickness that described Gao Zhiqiang district (6) head upstream side is put above bedding district (10) is not less than 10m.
5. the compound dam of high-elastic die-cushion seat formula as claimed in claim 1, it is characterized in that: described Gao Zhiqiang district (6) upstream side slope is than being 1:t, and the span of t is 0~0.2, the subregion slope ratio of Yu Di compressional zone, downstream, Gao Zhiqiang district (6) (9) is 1:S, and S is not less than 0.5.
6. the compound dam of high-elastic die-cushion seat formula as claimed in claim 1, is characterized in that: described Gao Zhiqiang district (6) is consistent with the height of low compressional zone (9), and its height is 0.1~0.4 with the ratio of the height of dam on compound dam.
7. the compound dam of high-elastic die-cushion seat formula as claimed in claim 1, is characterized in that: the bottom in described Gao Zhiqiang district (6) is provided with high toe foundation of wall consolidation grouting floor (7).
8. the compound dam of high-elastic die-cushion seat formula as claimed in claim 1, is characterized in that: in described Gao Zhiqiang district (6), irrigation gallery is set, curtain grouting layer (8) is set in irrigation gallery.
9. the compound dam of high-elastic die-cushion seat formula as claimed in claim 1, is characterized in that: the slope of described concrete slab (1), bed course district (2) and transition region (3), than identical, is 1:m, and the span of m is 1.35~1.7; The downstream side slope ratio of time rockfill area (5), downstream is 1:n, and the span of n is 1.25~1.8.
10. the compound dam of high-elastic die-cushion seat formula as claimed in claim 1, is characterized in that: the subregion slope ratio of main rockfill area, described upstream (4) and downstream time rockfill area (5) is 1:k, and the span of k is 0~1.35.
CN201410361477.2A 2014-07-28 2014-07-28 A kind of high-elastic die-cushion A seating compound dam Active CN104120686B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410361477.2A CN104120686B (en) 2014-07-28 2014-07-28 A kind of high-elastic die-cushion A seating compound dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410361477.2A CN104120686B (en) 2014-07-28 2014-07-28 A kind of high-elastic die-cushion A seating compound dam

Publications (2)

Publication Number Publication Date
CN104120686A true CN104120686A (en) 2014-10-29
CN104120686B CN104120686B (en) 2016-04-13

Family

ID=51766303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410361477.2A Active CN104120686B (en) 2014-07-28 2014-07-28 A kind of high-elastic die-cushion A seating compound dam

Country Status (1)

Country Link
CN (1) CN104120686B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695386A (en) * 2015-04-09 2015-06-10 中国电建集团成都勘测设计研究院有限公司 Blocking and discharge structure and method for ditch water treatment
CN105064289A (en) * 2015-08-04 2015-11-18 中国电建集团华东勘测设计研究院有限公司 Concrete panel structure applied to high-toe wall and construction method
CN105155470A (en) * 2015-06-23 2015-12-16 武汉大学 Self-healing anti-seepage structure for concrete faced rockfill dam
CN105297685A (en) * 2015-11-23 2016-02-03 中国电建集团贵阳勘测设计研究院有限公司 Base concrete panel rock-fill dam and construction method thereof
CN105672191A (en) * 2016-01-15 2016-06-15 河海大学 Mixed dam model test device and use method
CN106120662A (en) * 2016-08-17 2016-11-16 中国电建集团西北勘测设计研究院有限公司 High-modulus rock-faced dam dam, a kind of local
CN106284215A (en) * 2016-08-17 2017-01-04 中国电建集团西北勘测设计研究院有限公司 A kind of mixed dam
CN106638487A (en) * 2017-01-19 2017-05-10 中国电力建设股份有限公司 Combined water retaining dam and construction method of combined water retaining dam
CN106836144A (en) * 2017-01-25 2017-06-13 中国电建集团西北勘测设计研究院有限公司 A kind of method of the maintenanceability of buttress type duplex face dam and raising panel
CN110939108A (en) * 2019-12-27 2020-03-31 中水北方勘测设计研究有限责任公司 Structure for preventing concrete face dam high-toe wall from being damaged
CN112921900A (en) * 2021-01-29 2021-06-08 中国电建集团华东勘测设计研究院有限公司 Seepage-proofing structure for double-channel anchoring of geomembrane and asphalt concrete panel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2258780C1 (en) * 2004-03-03 2005-08-20 Пехтин Владимир Алексеевич Earth-filled dam built on permafrost ground
CN101672026A (en) * 2009-09-18 2010-03-17 中国水电顾问集团华东勘测设计研究院 Face plate rock-fill dam structure of reasonably utilizing sand gravel material and construction method thereof
CN201972137U (en) * 2011-03-16 2011-09-14 华北水利水电学院 Steel-structure combined type interlayer steel plate rock-fill dam
CN103410123A (en) * 2013-08-13 2013-11-27 中国水电顾问集团成都勘测设计研究院 Retaining dam for hydraulic and hydro-power engineering

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2258780C1 (en) * 2004-03-03 2005-08-20 Пехтин Владимир Алексеевич Earth-filled dam built on permafrost ground
CN101672026A (en) * 2009-09-18 2010-03-17 中国水电顾问集团华东勘测设计研究院 Face plate rock-fill dam structure of reasonably utilizing sand gravel material and construction method thereof
CN201972137U (en) * 2011-03-16 2011-09-14 华北水利水电学院 Steel-structure combined type interlayer steel plate rock-fill dam
CN103410123A (en) * 2013-08-13 2013-11-27 中国水电顾问集团成都勘测设计研究院 Retaining dam for hydraulic and hydro-power engineering

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨玺成: ""梨园水电站混凝土面板堆石坝坝体不同介质结合部填筑处理措施"", 《水利水电技术》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695386A (en) * 2015-04-09 2015-06-10 中国电建集团成都勘测设计研究院有限公司 Blocking and discharge structure and method for ditch water treatment
CN105155470A (en) * 2015-06-23 2015-12-16 武汉大学 Self-healing anti-seepage structure for concrete faced rockfill dam
CN105064289A (en) * 2015-08-04 2015-11-18 中国电建集团华东勘测设计研究院有限公司 Concrete panel structure applied to high-toe wall and construction method
CN105297685A (en) * 2015-11-23 2016-02-03 中国电建集团贵阳勘测设计研究院有限公司 Base concrete panel rock-fill dam and construction method thereof
CN105672191B (en) * 2016-01-15 2017-06-16 河海大学 A kind of mixed dam model test apparatus and application method
CN105672191A (en) * 2016-01-15 2016-06-15 河海大学 Mixed dam model test device and use method
CN106120662A (en) * 2016-08-17 2016-11-16 中国电建集团西北勘测设计研究院有限公司 High-modulus rock-faced dam dam, a kind of local
CN106284215A (en) * 2016-08-17 2017-01-04 中国电建集团西北勘测设计研究院有限公司 A kind of mixed dam
CN106638487A (en) * 2017-01-19 2017-05-10 中国电力建设股份有限公司 Combined water retaining dam and construction method of combined water retaining dam
CN106638487B (en) * 2017-01-19 2019-10-25 中国电力建设股份有限公司 A kind of construction method combining checkdam and the combined dam
CN106836144A (en) * 2017-01-25 2017-06-13 中国电建集团西北勘测设计研究院有限公司 A kind of method of the maintenanceability of buttress type duplex face dam and raising panel
CN110939108A (en) * 2019-12-27 2020-03-31 中水北方勘测设计研究有限责任公司 Structure for preventing concrete face dam high-toe wall from being damaged
CN112921900A (en) * 2021-01-29 2021-06-08 中国电建集团华东勘测设计研究院有限公司 Seepage-proofing structure for double-channel anchoring of geomembrane and asphalt concrete panel
CN112921900B (en) * 2021-01-29 2022-06-07 中国电建集团华东勘测设计研究院有限公司 Geomembrane and asphalt concrete panel double-channel anchoring anti-seepage structure

Also Published As

Publication number Publication date
CN104120686B (en) 2016-04-13

Similar Documents

Publication Publication Date Title
CN104120686B (en) A kind of high-elastic die-cushion A seating compound dam
CN106522037B (en) Side broad way based structures based on existing railway roadbed and its construction method
CN106284215B (en) A kind of mixed dam
CN103397617B (en) Extruding wall-geomembrane face dam
CN104099903B (en) High-base asphalt concrete core dam
CN106120662B (en) A kind of part high-modulus rock-faced dam dam
CN105297685B (en) Base concrete panel rock-fill dam and construction method thereof
CN203373705U (en) Ecological slope protection
CN106049379B (en) Temporary power generation method during construction lag of downstream of spillway and rockfill self-breaking dam
CN203462484U (en) Existing retaining wall reinforcement structure
CN206219897U (en) Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN206346075U (en) Side broad way based structures based on existing railway roadbed
CN205934862U (en) Local high -modulus enrockment concrete -faced rockfill dam structure
CN106567365B (en) Earth and rockfill dam longitudinal reinforcement construction method
CN206157496U (en) Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling
CN106283966B (en) Medium-and low-speed maglev single line embankment location independence pier stud type support rail beam transition section structure
CN205934861U (en) Mix dam structure
CN206127736U (en) Moderate -low speed magnetic levitation double -line compound framing formula support rail roof beam transition section structure of location pile foundation that fills
CN206157485U (en) Moderate -low speed magnetic levitation single line excavation location pile foundation combined type support rail roof beam transition section structure
CN205875096U (en) Rockfill self-breaking dam
CN105297679A (en) Seepage-proofing method and structure for upstream surface layer of rock-fill dam
CN104631425B (en) A kind of flyash of accelerating arranges the method oozing consolidation
CN203741782U (en) Multi-section face plate structure of high concrete faced rockfill dam
CN208578002U (en) Composite structure of banketing is changed in a kind of control heightening and thickening dike relative settlement
CN206157482U (en) Moderate -low speed magnetic levitation double -line location pile foundation combined type support rail roof beam transition section structure that fills

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Yao Shuanxi

Inventor after: Wang Junli

Inventor after: Pang Xiulan

Inventor after: Wu Junfeng

Inventor after: Su Xiaojun

Inventor after: Xu Jianjun

Inventor after: Li Feng

Inventor after: Liu Shilong

Inventor after: Zhang Wei

Inventor after: Li Xiaogang

Inventor after: Xie Xiaoping

Inventor after: Cai Xinhe

Inventor after: Yang Cunlong

Inventor after: Lei Yan

Inventor after: Sun Yujun

Inventor after: Hao Lisha

Inventor after: Zhang Xiaojiang

Inventor after: Wei Jianzheng

Inventor before: Cai Xinhe

Inventor before: Yao Shuanxi

Inventor before: Lei Yan

Inventor before: Hao Lisha

Inventor before: Zhang Xiaojiang

Inventor before: Wei Jianzheng

Inventor before: Wang Junli

Inventor before: Wu Junfeng

Inventor before: Li Feng

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160307

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Applicant after: Co., Ltd of northwest survey and design research institute of electricity Jian group of China

Applicant after: Huanghe Hydropower Development Co., Ltd.

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Applicant before: Co., Ltd of northwest survey and design research institute of electricity Jian group of China

C14 Grant of patent or utility model
GR01 Patent grant