CN105279711A - Construction project planning and site selection system and method - Google Patents

Construction project planning and site selection system and method Download PDF

Info

Publication number
CN105279711A
CN105279711A CN201510297449.3A CN201510297449A CN105279711A CN 105279711 A CN105279711 A CN 105279711A CN 201510297449 A CN201510297449 A CN 201510297449A CN 105279711 A CN105279711 A CN 105279711A
Authority
CN
China
Prior art keywords
factor
construction
plot
land
site selection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510297449.3A
Other languages
Chinese (zh)
Inventor
王芙蓉
徐建刚
崔蓓
祁毅
陈乃栋
王树魁
郑晓华
刘光治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Urban Planning & Research Center
NANJING URBAN PLANNING BUREAU
Nanjing University
Original Assignee
Nanjing Urban Planning & Research Center
NANJING URBAN PLANNING BUREAU
Nanjing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Urban Planning & Research Center, NANJING URBAN PLANNING BUREAU, Nanjing University filed Critical Nanjing Urban Planning & Research Center
Priority to CN201510297449.3A priority Critical patent/CN105279711A/en
Publication of CN105279711A publication Critical patent/CN105279711A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a construction project planning and site selection system and method. The system comprises a basic data preparation module, an intented lot roughing module and a lot estimation, comparison and selection module. Various information such as planning and current situations is compared and analyzed, a construction-available land one-map database and a location model factor database are generated, related limiting factors and limiting conditions are set, satisfactory construction-available lots are rapdily filtered according to planning and construction requirements of a construction project, total points of intented lots are collected and calculated, and a site selection report is thus automatically generated. With adoption of the system and the method, all construction can meet town and country planning and planning layouts, land wastage is reduced, and efficiency of planning, site selection and managing work is promoted.

Description

Construction project Site Selection system and method
Technical field
The present invention relates to construction project Site Selection system and its implementation
Background technology
Informationization technology is utilized to assist construction project Site Selection spininess to be that decision maker's project site selection provides foundation to planning information figure at present.Bei Lun branch office of Ningbo Planning Bureau started the sharing service platform set up in 2009, incorporate image, emulation map, three-dimensional refined model, E-Government figure, and it is trans-departmental, inter-tradely summarize various data message, get through the obstacle between each system of government department, in this platform, the land use situation of whole Beilun District and the area in concrete plot, character, tenure of use etc., various details can clearly present, the basic geological study that planning department provides and regulatory control data, the expropriation of land red line that land departments provides, the environmental protection thematic data etc. that environmental administration provides all concentrates on platform, plan for land condition is transparent, need not multidisciplinary intervention just can supporting item addressing.In October, 2010, frame model and 524 square kilometres of inner city present situation subtle three-dimensional models of 8494 square kilometres, the whole city were built up in Wuhan, it is the megalopolis of national first three-dimensional model main city zone all standing, on three-dimensional model, in conjunction with functions such as Municipal Underground Piping, terrain slope aspect analysis, analysis is compared to different addresses of planning to build, filter out suitable address, auxiliary construction project Site Selection.Beilun District, Ningbo City " figure " decision service platform, provides the figure melting all kinds of planning information to be that decision maker's project site selection provides foundation, is still in the starting stage, also has a segment distance from intelligent with wisdom; " Digital Wuhan " three-dimensional digital city model, can filter out suitable plot; But the several possibilities that must first identify project, internal analysis model and factor of influence are selected comparatively superficial simultaneously.
Generally speaking, utilize informationization technology means to carry out research and the realization of auxiliary construction project Site Selection at present, and in case few in number, the process of its whole addressing also lack organic integration, fully effectively can not be used, need a large amount of artificial participations.Through the examination of Novelty Search Reference center, Jiangsu Province, have no the report of Correlative plan site selection system.
Summary of the invention
1. goal of the invention
Construction project Site Selection is an important job complicated again, in order to overcome traditional cities city planning site selecting method, to there is efficiency low, workload is large, lack objective data and assist the problems such as science decision, the present invention is in conjunction with the actual Consideration of Site Selection and step, have studied a kind of fast finding purpose plot and the technical method for purpose plot marking evaluating selection, the early-stage Study method system of Innovation Construction project planning addressing, fully effectively utilize large data management statistical analysis technique and Information Technology Methods, realize intelligentized auxiliary programming site selection system, for project site selection provides science to support, realize the high-efficient disposition to town and country land resource and reasonable arrangement.
2. technical scheme
To achieve the above object of the invention, the present invention adopts following technical scheme to realize:
Described construction project Site Selection system, comprising: basic data preparation module, is made up of planning and presence information comparative analysis submodule, available land for construction chart database, site selection model factor data storehouse; Module is roughly selected in purpose plot, sets submodule, can build plot and choose submodule and form by restriction factor and restrictive condition; Plot is evaluated than modeling block, comprises factor of influence and evaluation points sets submodule, analyzes mark submodule and addressing report generation module.
Aforesaid construction project Site Selection system, described available land for construction chart database, mainly contain two parts land used data composition, one is inventory land database, main finger has used the part land used of construction, gets final product the database of the construction land of secondary development; Two is increment land used databases, is transferred to the land database of construction land supply by farmland.
Described construction project Site Selection method, comprises the following steps: basic data prepares, and is analyzed planning and presence information, and finding out in city can the plot of development & construction, and according to planned land use qualitative classification, sets up available land for construction chart database; Select the factor that all kinds of Location Selection of Construction Project is relevant, carry out information source and computing method that inducing classification finds out each factor, set up site selection model factor data storehouse; Purpose plot is roughly selected, and the restriction factor that setting is relevant and restrictive condition, choose the plot built satisfied condition; Plot is evaluated than choosing, for the purpose plot of roughly selecting out, according to the good and bad influence factor of construction project planning construction, set each factor of influence and evaluation points, significance level according to each factor of influence and evaluation points arranges weight, gathers the total score in calculating purpose plot, automatically generates addressing report.
Aforesaid construction project Site Selection method, described restriction factor and restrictive condition, refer to that, in the process of screening addressing plot, the restrictive factor that target plot must meet, as long as there is a limiting factor not meet, just gets rid of outside target plot.
Aforesaid construction project Site Selection method, described factor of influence and evaluation points calculate factor according to the height of target plot condition and factor requirements degree of conformity, for analyzing scoring, evaluates the quality in selected plot.
3. beneficial effect
Construction project Site Selection method and the Site Selection system realized based on the method, can be all kinds of facility custom-made by size construction lands, every construction is enable to meet urban and rural planning layout, reduce land wastage, improve the intensivism that land used utilizes, good economic benefit, social benefit and environmental benefit that each construction project is got, colleague can promote the usefulness of Site Selection management work greatly.
Accompanying drawing explanation
Fig. 1 construction project Site Selection system diagram;
Fig. 2 process flow diagram;
Fig. 3 pacing items setting example;
The restricted selecting predictors of Fig. 4 and condition set example;
Fig. 5 affects sex factor and selects example;
Fig. 6 filters out the plot example met the demands;
Fig. 7 target plot score example;
Fig. 8 addressing result evaluates sample report than choosing.
Embodiment
Below in conjunction with accompanying drawing and embodiment, technical scheme of the present invention is described in further detail:
Figure 1 shows that construction project Site Selection system diagram of the present invention.Comprise basic data preparation module, module is roughly selected in purpose plot and plot is evaluated than modeling block.
Figure 2 shows that process flow diagram of the present invention.Basic data preparation module is by planning and presence information comparative analysis submodule, available land for construction chart database, site selection model factor data storehouse forms, input planning information and reading presence information, planning and presence information are analyzed, finding out in city can the plot of development & construction, and according to planned land use qualitative classification, set up available land for construction chart database, available land for construction chart database, mainly contain two parts land used data composition, one is inventory land database, main finger has used the part land used of construction, get final product the database of the construction land of secondary development, two is increment land used databases, is transferred to the land database of construction land supply by farmland, the factor that all kinds of Location Selection of Construction Project is relevant can also be selected, carry out information source and computing method that inducing classification finds out each factor, set up site selection model factor data storehouse.Module is roughly selected in purpose plot, set submodule by restriction factor and restrictive condition, plot can be built choose submodule and form, the restriction factor that setting is relevant and restrictive condition, choose the plot built satisfied condition, restriction factor and restrictive condition, refer in the process of screening addressing plot, the restrictive factor that target plot must meet, as long as there is a limiting factor not meet, just get rid of outside target plot, be illustrated in figure 3 pacing items setting example, Figure 4 shows that restricted selecting predictors and condition set example.Plot is evaluated than modeling block, comprise factor of influence and evaluation points sets submodule, analyze scoring submodule and addressing report generation module, for the purpose plot of roughly selecting out, according to the good and bad influence factor of construction project planning construction, set each factor of influence and evaluation points, significance level according to each factor of influence and evaluation points arranges weight, gather the total score in calculating purpose plot, automatic generation addressing report, Figure 6 shows that the plot example filtering out and meet the demands, Figure 7 shows that target plot score example, Figure 8 shows that addressing result evaluates sample report than choosing.Above-mentioned factor of influence and evaluation points calculate factor according to the height of target plot condition and factor requirements degree of conformity, for analyzing scoring, evaluates the quality in selected plot, Figure 5 shows that affecting sex factor selects example.
In addition to the implementation, the present invention can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of application claims.

Claims (5)

1. construction project Site Selection system, is characterized in that comprising:
Basic data preparation module, is made up of planning and presence information comparative analysis submodule, available land for construction chart database, site selection model factor data storehouse;
Module is roughly selected in purpose plot, sets submodule, can build plot and choose submodule and form by restriction factor and restrictive condition;
Plot is evaluated than modeling block, comprises factor of influence and evaluation points sets submodule, analyzes mark submodule and addressing report generation module.
2. construction project Site Selection system according to claim 1, it is characterized in that described available land for construction chart database, mainly contain two parts land used data composition, one is inventory land database, main finger has used the part land used of construction, gets final product the database of the construction land of secondary development; Two is increment land used databases, is transferred to the land database of construction land supply by farmland.
3. construction project Site Selection method, is characterized in that comprising the following steps:
Basic data prepares, and is analyzed planning and presence information, and finding out in city can the plot of development & construction, and according to planned land use qualitative classification, sets up available land for construction chart database; Select the factor that all kinds of Location Selection of Construction Project is relevant, carry out information source and computing method that inducing classification finds out each factor, set up site selection model factor data storehouse;
Purpose plot is roughly selected, and the restriction factor that setting is relevant and restrictive condition, choose the plot built satisfied condition;
Plot is evaluated than choosing, for the purpose plot of roughly selecting out, according to the good and bad influence factor of construction project planning construction, set each factor of influence and evaluation points, significance level according to each factor of influence and evaluation points arranges weight, gathers the total score in calculating purpose plot, automatically generates addressing report.
4. construction project Site Selection method according to claim 3, it is characterized in that described restriction factor and restrictive condition, refer in the process of screening addressing plot, the restrictive factor that target plot must meet, as long as there is a limiting factor not meet, just get rid of outside target plot.
5. construction project Site Selection method according to claim 3, is characterized in that described factor of influence and evaluation points, is to calculate factor according to the height of target plot condition and factor requirements degree of conformity, for analyzing scoring, evaluates the quality in selected plot.
CN201510297449.3A 2015-05-29 2015-05-29 Construction project planning and site selection system and method Pending CN105279711A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510297449.3A CN105279711A (en) 2015-05-29 2015-05-29 Construction project planning and site selection system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510297449.3A CN105279711A (en) 2015-05-29 2015-05-29 Construction project planning and site selection system and method

Publications (1)

Publication Number Publication Date
CN105279711A true CN105279711A (en) 2016-01-27

Family

ID=55148665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510297449.3A Pending CN105279711A (en) 2015-05-29 2015-05-29 Construction project planning and site selection system and method

Country Status (1)

Country Link
CN (1) CN105279711A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106548290A (en) * 2016-11-08 2017-03-29 北京信余科技有限公司 A kind of urban area development decision-making supports system and method
CN106600134A (en) * 2016-12-08 2017-04-26 中冶京诚工程技术有限公司 Method for analyzing line selection of urban comprehensive pipeline corridor planning system
CN107563624A (en) * 2017-08-22 2018-01-09 广州市城市规划勘测设计研究院 Location Selection of Construction Project method, apparatus and system based on " three rule unifications "
CN107909245A (en) * 2017-10-24 2018-04-13 星际空间(天津)科技发展有限公司 A kind of production method of inventory land
CN108629521A (en) * 2018-05-10 2018-10-09 四川省冶地工程勘察设计有限公司 A kind of mapping Planning preparation system for building system suitable for rustic home
CN109118088A (en) * 2018-08-15 2019-01-01 杨超 A kind of construction management method and system based on wisdom building site
CN110069589A (en) * 2019-03-26 2019-07-30 江苏智途科技股份有限公司 A kind of industrial space planning and distributing method based on more rule unifications
CN110598921A (en) * 2019-08-30 2019-12-20 泰华智慧产业集团股份有限公司 Shortest path algorithm-based building project auxiliary site selection method and system
CN112700045A (en) * 2020-12-31 2021-04-23 武汉市土地利用和城市空间规划研究中心 Intelligent site selection system based on land reserve implementation monitoring model
CN116777168A (en) * 2023-06-29 2023-09-19 浙江万维空间信息技术有限公司 Intelligent land recommendation method for optimally utilizing space

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101561903A (en) * 2009-06-02 2009-10-21 天津大学 Fully automatic substation locating and sizing method considering geographic information
CN101604419A (en) * 2009-07-16 2009-12-16 浙江大学 A kind of construction project is intended the method that addressing is extracted automatically
CN101950386A (en) * 2010-09-13 2011-01-19 天津市星际空间地理信息工程有限公司 Quick site selection method for construction projects
CN102254282A (en) * 2011-07-22 2011-11-23 江苏欧索软件有限公司 System for planning, addressing and optimizing value of entity channel
US20120179498A1 (en) * 2011-01-07 2012-07-12 Cruisewise, Inc. Application of spatial dimension to cruise search and cabin selection
CN103150412A (en) * 2011-12-06 2013-06-12 泰瑞数创科技(北京)有限公司 Method for address selecting of power facilities based on space data mining technique
CN103337035A (en) * 2013-03-19 2013-10-02 东南大学 Method for determining site selection of urban center system based on quantitative evaluation
CN104091215A (en) * 2014-07-22 2014-10-08 上海建科工程咨询有限公司 Project planning management system based on building information model

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101561903A (en) * 2009-06-02 2009-10-21 天津大学 Fully automatic substation locating and sizing method considering geographic information
CN101604419A (en) * 2009-07-16 2009-12-16 浙江大学 A kind of construction project is intended the method that addressing is extracted automatically
CN101950386A (en) * 2010-09-13 2011-01-19 天津市星际空间地理信息工程有限公司 Quick site selection method for construction projects
US20120179498A1 (en) * 2011-01-07 2012-07-12 Cruisewise, Inc. Application of spatial dimension to cruise search and cabin selection
CN102254282A (en) * 2011-07-22 2011-11-23 江苏欧索软件有限公司 System for planning, addressing and optimizing value of entity channel
CN103150412A (en) * 2011-12-06 2013-06-12 泰瑞数创科技(北京)有限公司 Method for address selecting of power facilities based on space data mining technique
CN103337035A (en) * 2013-03-19 2013-10-02 东南大学 Method for determining site selection of urban center system based on quantitative evaluation
CN104091215A (en) * 2014-07-22 2014-10-08 上海建科工程咨询有限公司 Project planning management system based on building information model

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106548290A (en) * 2016-11-08 2017-03-29 北京信余科技有限公司 A kind of urban area development decision-making supports system and method
CN106600134A (en) * 2016-12-08 2017-04-26 中冶京诚工程技术有限公司 Method for analyzing line selection of urban comprehensive pipeline corridor planning system
CN107563624A (en) * 2017-08-22 2018-01-09 广州市城市规划勘测设计研究院 Location Selection of Construction Project method, apparatus and system based on " three rule unifications "
CN107909245A (en) * 2017-10-24 2018-04-13 星际空间(天津)科技发展有限公司 A kind of production method of inventory land
CN107909245B (en) * 2017-10-24 2021-11-26 星际空间(天津)科技发展有限公司 Method for manufacturing land used for storage
CN108629521A (en) * 2018-05-10 2018-10-09 四川省冶地工程勘察设计有限公司 A kind of mapping Planning preparation system for building system suitable for rustic home
CN109118088A (en) * 2018-08-15 2019-01-01 杨超 A kind of construction management method and system based on wisdom building site
CN110069589A (en) * 2019-03-26 2019-07-30 江苏智途科技股份有限公司 A kind of industrial space planning and distributing method based on more rule unifications
CN110598921A (en) * 2019-08-30 2019-12-20 泰华智慧产业集团股份有限公司 Shortest path algorithm-based building project auxiliary site selection method and system
CN112700045A (en) * 2020-12-31 2021-04-23 武汉市土地利用和城市空间规划研究中心 Intelligent site selection system based on land reserve implementation monitoring model
CN112700045B (en) * 2020-12-31 2022-05-13 武汉市土地利用和城市空间规划研究中心 Intelligent site selection system based on land reserve implementation monitoring model
CN116777168A (en) * 2023-06-29 2023-09-19 浙江万维空间信息技术有限公司 Intelligent land recommendation method for optimally utilizing space

Similar Documents

Publication Publication Date Title
CN105279711A (en) Construction project planning and site selection system and method
Wu et al. Economic transition, spatial development and urban land use efficiency in the Yangtze River Delta, China
CN111222661B (en) Urban planning implementation effect analysis and evaluation method
Sánchez-Lozano et al. GIS-based photovoltaic solar farms site selection using ELECTRE-TRI: Evaluating the case for Torre Pacheco, Murcia, Southeast of Spain
Swanwick The assessment of countryside and landscape character in England: an overview
CN110298553A (en) A kind of National land space planing method, system and equipment based on GIS
Zhang et al. Determination of priority nature conservation areas and human disturbances in the Yangtze River Basin, China
CN104200387A (en) Land use zoning method giving consideration to geographic entity semantic similarity
Agugiaro First steps towards an integrated CityGML-based 3D model of Vienna
CN110298520A (en) A kind of farmland construction difficulty determines method
He et al. What is the developmental level of outlying expansion patches? A study of 275 Chinese cities using geographical big data
CN110334168A (en) A kind of cities and towns village ground class refinement technology method
Bai et al. Ecological security pattern construction and zoning along the China-Laos Railway based on the potential-connectedness-resilience framework
CN114219350A (en) Intelligent site selection method and device for natural resource construction project
Giannopoulou et al. Using GIS to record and analyse historical urban areas
CN113536492B (en) Green channel network construction method, device and storage medium
Recanatesi et al. Multi criteria analysis to evaluate the best location of plants for renewable energy by forest biomass: a case study in Central Italy
Wang et al. The impact of LUCC on the spatial pattern of ecological network during urbanization: A case study of Jinan City
Kirnbauer et al. Allocating Urban Agricultural Reuse Strategies to Inventoried Vacant and Underutilized Land.
Droj GIS and remote sensing in environmental management
CN115239281A (en) BIM + GIS-based road migration management system, method and storage medium
Mornya et al. Identification of landfill sites by using GIS and multi-criteria method in Batam, Indonesia
CN106326613A (en) Economic floor area ratio calculation method and system based on land economic mathematical model
Krpan et al. FUNCTIONAL-NODAL METHOD OF THE DEVELOPMENT OF STRATEGIC SPATIAL PLANNING DOCUMENTATION.
Wang Spatial analysis of the Great Wall Ji Town military settlements in the Ming Dynasty: Research and conservation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160127