CN105019667A - Method for measuring, positioning and installing triangular system inclined steel column - Google Patents
Method for measuring, positioning and installing triangular system inclined steel column Download PDFInfo
- Publication number
- CN105019667A CN105019667A CN201410172499.4A CN201410172499A CN105019667A CN 105019667 A CN105019667 A CN 105019667A CN 201410172499 A CN201410172499 A CN 201410172499A CN 105019667 A CN105019667 A CN 105019667A
- Authority
- CN
- China
- Prior art keywords
- steel
- casting
- column
- box shape
- triangular system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a method for measuring, positioning and installing a triangular system inclined steel column. The triangular system inclined steel column comprises a first steel casting, a second steel casting, a third steel casting, outer frame columns and a box-type steel girder. The installing method comprises the following specific steps: installing the second steel casting and the third steel casting first; then hoisting the box-type steel girder; next, installing the outer frame columns; and finally, hoisting the first steel casting to the top of the outer frame columns, positioning and welding the first steel casting, thus completing the installation. The method realizes quick installation of the triangular system inclined steel column on site, so that the main body shape of a building can be realized.
Description
Technical field
The present invention relates to a kind of mounting method of steel column, specifically a kind of super large triangular system inclination steel column measurement and positioning mounting method.
Background technology
The new Building Project of Hangzhou branch of China Citic Bank is positioned at new city A-08-6 plot, Qianjiang, Hangzhou, Zhejiang province city, and it is designed by world-renowned FOSTER, overall floorage 5.9 ten thousand square metres, building height 99.9 meters.Totally three layers, this engineering underground, be 20 layers on the ground, building main body is the huge support steel structure system of urceolus inside casing, adopts the multiaspect corner cut having imagination, reflects shadow change, exactly like a golden diamond by curtain wall.Building main body changes in multiaspect corner cut in seven layers of place's closing waist, the positive facade in building is isoceles triangle structural system below seven layers, system top node is up to 30 meters, and in 40 ° of inclinations, realize the triangular system of above-mentioned moulding, need the triangular system inclination steel column designing commensurate structure, and complete installation.
Summary of the invention
Goal of the invention: the invention provides a kind of triangular system inclination steel column structure and realize building overall shape, and the measurement and positioning completing this triangular system inclination steel column is installed.
Technical scheme: a kind of triangular system inclination steel column measurement and positioning mounting method, described triangular system inclination steel column comprises: the first steel-casting, the second steel-casting, the 3rd steel-casting, exterior frame column and steel beam with box shape;
Described triangular system inclination steel column is isosceles triangle; Described first steel-casting, the second steel-casting, the 3rd steel-casting are positioned at the summit of isosceles triangle, and described exterior frame column is the waist of isosceles triangle; Described steel beam with box shape is the base of isosceles triangle; Described triangle inclination steel column becomes 40 ° and tilts with vertical direction;
The concrete steps of described triangular system inclination steel column measurement and positioning mounting method are as follows:
(A) by the mode of " lifting+slippage ", the second steel-casting, the 3rd steel-casting are installed;
(B) steel beam with box shape is lifted; In advance arch camber is carried out to steel beam with box shape; This steel beam with box shape is reasonably divided into 6 segmentations, each segmentation weight demands is less than 25 tons, and each girder steel segmentation is all installed it by arranging temporary support;
(C) exterior frame column is installed; In housing column bottom, corresponding steel pipe support position is welded a H type and is assisted bracket in advance, places a jack between auxiliary bracket and steel pipe support, is mainly used in the fine setting of exterior frame column location.After three-legged structure system has unloaded, auxiliary bracket is cut off;
(D) by the top positioning welding of the upper exterior frame column of the first steel-casting lifting.
Beneficial effect: triangular system inclination steel column measurement and positioning mounting method provided by the invention, achieves the Fast Installation at triangular system inclination steel column scene, building overall shape is realized.
Accompanying drawing explanation
Fig. 1 is the structural representation of intermediate cam body system of the present invention inclination steel column.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, illustrate the present invention further, following detailed description of the invention should be understood only be not used in for illustration of the present invention and limit the scope of the invention, after having read the present invention, the amendment of those skilled in the art to various equivalents of the present invention has all fallen within the application's claim limited range.
Embodiment
The triangular system inclination steel column related in the present embodiment comprises: the first steel-casting 1, second steel-casting 2, the 3rd steel-casting 3, exterior frame column 4 and steel beam with box shape 5; Described triangular system inclination steel column is isosceles triangle; Described first steel-casting 1, second steel-casting 2, the 3rd steel-casting 3 are positioned at the summit of isosceles triangle, and described exterior frame column 4 is the waist of isosceles triangle; Described steel beam with box shape 5 is the base of isosceles triangle; Described triangle inclination steel column becomes 40 ° and tilts with vertical direction.
Above-mentioned triangular system inclination steel column measurement and positioning mounting method, concrete steps are as follows:
(A), by the mode of " lifting+slippage ", the second steel-casting 2, the 3rd steel-casting 3 are installed;
(B) steel beam with box shape 5 is lifted; In advance arch camber is carried out to steel beam with box shape; This steel beam with box shape is reasonably divided into 6 segmentations, each segmentation weight demands is less than 25 tons, and each girder steel segmentation is all installed it by arranging temporary support;
(C) exterior frame column 4 is installed; In housing column bottom, corresponding steel pipe support position is welded a H type and is assisted bracket in advance, places a jack between auxiliary bracket and steel pipe support, is mainly used in the fine setting of exterior frame column location.After three-legged structure system has unloaded, auxiliary bracket is cut off;
(D) the first steel-casting 1 is lifted the top positioning welding of upper exterior frame column 4.
Claims (1)
1. a triangular system inclination steel column measurement and positioning mounting method, is characterized in that,
Described triangular system inclination steel column comprises: the first steel-casting (1), the second steel-casting (2), the 3rd steel-casting (3), exterior frame column (4) and steel beam with box shape (5);
Described triangular system inclination steel column is isosceles triangle; Described first steel-casting (1), the second steel-casting (2), the 3rd steel-casting (3) are positioned at the summit of isosceles triangle, the waist that described exterior frame column (4) is isosceles triangle; The base that described steel beam with box shape (5) is isosceles triangle; Described triangle inclination steel column becomes 40 ° and tilts with vertical direction;
The concrete steps of described triangular system inclination steel column measurement and positioning mounting method are as follows:
, by the mode of " lifting+slippage ", the second steel-casting (2), the 3rd steel-casting (3) are installed;
(B) steel beam with box shape (5) is lifted; In advance arch camber is carried out to steel beam with box shape; This steel beam with box shape is reasonably divided into 6 segmentations, each segmentation weight demands is less than 25 tons, and each girder steel segmentation is all installed it by arranging temporary support;
(C) exterior frame column (4) is installed; In housing column bottom, corresponding steel pipe support position is welded a H type and is assisted bracket in advance, places a jack between auxiliary bracket and steel pipe support, is mainly used in the fine setting of exterior frame column location, after three-legged structure system has unloaded, is cut off by auxiliary bracket;
(D) by the top positioning welding of exterior frame column (4) in the first steel-casting (1) lifting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410172499.4A CN105019667B (en) | 2014-04-28 | 2014-04-28 | A kind of triangular system inclines steel column measurement and positioning installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410172499.4A CN105019667B (en) | 2014-04-28 | 2014-04-28 | A kind of triangular system inclines steel column measurement and positioning installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105019667A true CN105019667A (en) | 2015-11-04 |
CN105019667B CN105019667B (en) | 2017-04-05 |
Family
ID=54409933
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410172499.4A Active CN105019667B (en) | 2014-04-28 | 2014-04-28 | A kind of triangular system inclines steel column measurement and positioning installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105019667B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001115563A (en) * | 1999-10-18 | 2001-04-24 | Hajime Onose | Structure of beam and column |
JP2004156339A (en) * | 2002-11-07 | 2004-06-03 | Shimizu Corp | Stiffened structure of rigid frame structure |
US20040139690A1 (en) * | 2001-08-20 | 2004-07-22 | Evelio Pina | Form assembly for forming an eave, a roof slab, and a perimeter beam in a monolithic structure and method of forming the same |
CN101435235A (en) * | 2008-12-19 | 2009-05-20 | 北京工业大学 | Steel tube concrete - steel support - steel plate external wrapping concrete shear force wall and manufacturing method thereof |
CN103015596A (en) * | 2012-12-11 | 2013-04-03 | 山西汾西矿业(集团)有限责任公司 | Detachable steel structure platform and construction method thereof |
CN103556837A (en) * | 2013-11-19 | 2014-02-05 | 中国五冶集团有限公司 | Method for installing steel column on podium building |
-
2014
- 2014-04-28 CN CN201410172499.4A patent/CN105019667B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001115563A (en) * | 1999-10-18 | 2001-04-24 | Hajime Onose | Structure of beam and column |
US20040139690A1 (en) * | 2001-08-20 | 2004-07-22 | Evelio Pina | Form assembly for forming an eave, a roof slab, and a perimeter beam in a monolithic structure and method of forming the same |
JP2004156339A (en) * | 2002-11-07 | 2004-06-03 | Shimizu Corp | Stiffened structure of rigid frame structure |
CN101435235A (en) * | 2008-12-19 | 2009-05-20 | 北京工业大学 | Steel tube concrete - steel support - steel plate external wrapping concrete shear force wall and manufacturing method thereof |
CN103015596A (en) * | 2012-12-11 | 2013-04-03 | 山西汾西矿业(集团)有限责任公司 | Detachable steel structure platform and construction method thereof |
CN103556837A (en) * | 2013-11-19 | 2014-02-05 | 中国五冶集团有限公司 | Method for installing steel column on podium building |
Also Published As
Publication number | Publication date |
---|---|
CN105019667B (en) | 2017-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102912736B (en) | Vertical assembling construction method for trussed arch bridge | |
CN103243654B (en) | Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method | |
CN103485549B (en) | Based on the localization method to large-scale built-in fitting | |
CN102828469B (en) | Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box | |
CN106193117B (en) | A kind of assembling and construction method of the prefabricated pipe gallery in underground | |
CN104110035A (en) | Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device | |
CN106284663A (en) | A kind of construction method of oval suspended-dome structure | |
CN104674665A (en) | Installation method for corridor bridge of large space steel structure | |
CN204715366U (en) | A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode | |
CN205530262U (en) | Adjust timing frame of steel tube column stake position among half reverse construction | |
CN103883128B (en) | Multi-tier large-span steel structure mounting method | |
CN109653515A (en) | Across the steel worm-gearing truss hanging method of 120m | |
CN102953554A (en) | Installation method of large-span honeycomb-shaped double-layer latticed shell structure | |
CN103470036B (en) | A kind of outer construction method of choosing structure | |
CN104818729B (en) | Can be for the mutual foundation of big or small tower crane conversion | |
CN205242437U (en) | A redundant formula vertical braces structure for protection of 220kV cable normal position | |
CN205024719U (en) | Pile foundation and integrated reverse construction vertical braces system of underground continuous wall | |
CN105019667A (en) | Method for measuring, positioning and installing triangular system inclined steel column | |
CN105442868A (en) | Adjustable steel-structure reticulated shell spliced scaffold | |
CN105003081A (en) | Installing and positioning method of bidirectional skew grid of triangular section flexural-torsional members | |
CN206036408U (en) | Span pipeline normal position of foundation ditch and suspend protection architecture in midair | |
CN204199691U (en) | A kind of handrail formwork for placing structure of spiral stairs | |
KR20150030632A (en) | the self-positioning structure of column and the modular pile up construction method using the same | |
CN108792963A (en) | A kind of Steel Space Truss formula tower crane wall-attached supporting seat method for high-rise roof framework | |
CN104088297B (en) | A kind of bellows installing rack for culvert construction and application thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |